Showing:

Annotations
Attributes
Diagrams
Facets
Main schema OMTD-SHARE-Corpus.xsd
[ top ]
Included schema OMTD-SHARE-GlobalTypes.xsd
[ top ]
Included schema OMTD-SHARE-ISOVocabularies.xsd
[ top ]
Included schema OMTD-SHARE-Actors.xsd
[ top ]
Included schema OMTD-SHARE-Distributions.xsd
[ top ]
Included schema OMTD-SHARE-TextSpecific.xsd
[ top ]
Included schema OMTD-SHARE-ResourceCommon.xsd
[ top ]
Included schema OMTD-SHARE-Projects.xsd
[ top ]
Included schema OMTD-SHARE-ControlledVocabs.xsd
[ top ]
Element ms:corpusInfoType / ms:resourceType
Annotations
Diagram
Diagram
Type xs:string
[ top ]
Element ms:identificationInfo
Annotations
Groups together information needed to identify and describe at a minimal level the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceNames OMTD-SHARE_XMLSchema.tmp#identificationInfoType_descriptions OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceShortName OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#identificationInfoType_public OMTD-SHARE_XMLSchema.tmp#identificationInfoType
Type ms:identificationInfoType
[ top ]
Element ms:identificationInfoType / ms:resourceNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceName
[ top ]
Element ms:resourceName
Annotations
Specifies the name (full title) by which the resource is known
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:identificationInfoType / ms:descriptions
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#identificationInfoType_identificationInfoType_descriptions_description
[ top ]
Element ms:identificationInfoType / ms:descriptions / ms:description
Annotations
A short free-text account that provides information about the resource (e.g. function, contents, technical information etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:identificationInfoType / ms:resourceShortName
Annotations
A short form (e.g. abbreviation, acronym etc.) used to identify the resource.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:identificationInfoType / ms:resourceIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#identificationInfoType_identificationInfoType_resourceIdentifiers_resourceIdentifier
[ top ]
Element ms:identificationInfoType / ms:resourceIdentifiers / ms:resourceIdentifier
Annotations
Associates a resource to an identifier (e.g. PID, DOI, internal to an organization etc.), i.e. a string used to uniquely identify it
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType_resourceIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType
Type ms:resourceIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
resourceIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the resource identifier is assigned by the authority that issues it (e.g. DOI, ISLRN etc.)
[ top ]
Element ms:identificationInfoType / ms:public
Annotations
Declares whether the resource is meant for private use or can be publicly available through the registry
Diagram
Diagram
Type xs:boolean
[ top ]
Element ms:versionInfo
Annotations
Groups information on a specific version or release of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#versionInfoType_version OMTD-SHARE_XMLSchema.tmp#versionInfoType_versionDate OMTD-SHARE_XMLSchema.tmp#versionInfoType_versionType OMTD-SHARE_XMLSchema.tmp#versionInfoType_revision OMTD-SHARE_XMLSchema.tmp#versionInfoType
Type ms:versionInfoType
[ top ]
Element ms:versionInfoType / ms:version
Annotations
Associates a resource with a numeric pattern of the form major_version.minor_version.patch (in accordance to the semantic versioning guidelines, cf. http://semver.org) that identifies its version
Diagram
Diagram
Type xs:string
[ top ]
Element ms:versionInfoType / ms:versionDate
Annotations
Associates a resource with the last modification date (or creation date if it hasn't been modified); the preferred format is YYYYMMDD
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
pattern [0-9]{8}
[ top ]
Element ms:versionInfoType / ms:versionType
Annotations
A type of versioning vocabulary used mainly for works (e.g. scholarly articles, books etc.) that go through a formal review process before final publication, marked with major changes across the versions
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration accepted
For versions that have been accepted for publication but are not yet published
enumeration published
For versions as they have been formally published in print or digital form
enumeration draft
For versions during the writing up process
enumeration submitted
For versions as submitted for publication
enumeration updated
For versions that have been updated vis-a-vis the previous published version
[ top ]
Element ms:versionInfoType / ms:revision
Annotations
A short free-text account of the revisions made to the current version vis-a-vis the previous version or a link to a document reporting these revisions
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:contactInfo
Annotations
Groups information on the possible sources for obtaining further information regarding the resource; at least a general email address or a landing page (website) must be supplied, although the recommended practice is to describe a contact person or group
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactPoint OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactType OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactPersons OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactGroups OMTD-SHARE_XMLSchema.tmp#contactInfoType_mailingLists OMTD-SHARE_XMLSchema.tmp#contactInfoType
Type ms:contactInfoType
[ top ]
Element ms:contactInfoType / ms:contactPoint
Annotations
An email or a URL (landing page) that provides more information on the resource
Diagram
Diagram
Type xs:string
[ top ]
Element ms:contactInfoType / ms:contactType
Annotations
The type of the contact point (email or URL)
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration landingPage
Value for contactType; for URL's used as the landing page of a resource providing general information
enumeration contactEmail
Value for contactType; for general email addresses that can be used as contact point for a resource (e.g. resource@example.com)
[ top ]
Element ms:contactInfoType / ms:contactPersons
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactInfoType_contactPersons_contactPerson
[ top ]
Element ms:contactInfoType / ms:contactPersons / ms:contactPerson
Annotations
Groups information on the person(s) that is/are responsible for providing further information regarding the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_surname OMTD-SHARE_XMLSchema.tmp#personInfoType_givenName OMTD-SHARE_XMLSchema.tmp#personInfoType_personIdentifiers OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#personInfoType_affiliation OMTD-SHARE_XMLSchema.tmp#personInfoType
Type ms:personInfoType
[ top ]
Element ms:personInfoType / ms:surname
Annotations
The surname (family name) of a person
Diagram
Diagram
Type xs:string
[ top ]
Element ms:personInfoType / ms:givenName
Annotations
The given name (first name) of a person; initials can also be used
Diagram
Diagram
Type xs:string
[ top ]
Element ms:personInfoType / ms:personIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personIdentifier
[ top ]
Element ms:personIdentifier
Annotations
Associates a person to an identifier (e.g. ORCID, LinkedIn etc.), i.e. a string used to uniquely identify it
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personIdentifierType_personIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#personIdentifierType
Type ms:personIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
personIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the person identifier is assigned by the authority that issues it (e.g. ORCID, ScopusId, ResearcherID etc.)
[ top ]
Element ms:communicationInfo
Annotations
Groups information on the communication details of a person or an organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_emails OMTD-SHARE_XMLSchema.tmp#communicationInfoType_homepages OMTD-SHARE_XMLSchema.tmp#communicationInfoType_postalAddress OMTD-SHARE_XMLSchema.tmp#communicationInfoType_telephoneNumbers OMTD-SHARE_XMLSchema.tmp#communicationInfoType
Type ms:communicationInfoType
[ top ]
Element ms:communicationInfoType / ms:emails
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_emails_email
[ top ]
Element ms:communicationInfoType / ms:emails / ms:email
Annotations
The email address of a person, group or organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#emailAddress
Type ms:emailAddress
Facets
maxLength 100
pattern [^@]+@[^\.]+\..+|
[ top ]
Element ms:communicationInfoType / ms:homepages
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_homepages_homepage
[ top ]
Element ms:communicationInfoType / ms:homepages / ms:homepage
Annotations
A URL used as homepage of a person, group or organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:communicationInfoType / ms:postalAddress
Annotations
The postal address of a person, group or organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_postalAddress_address OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_postalAddress_zipCode OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_postalAddress_city OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_postalAddress_region OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_postalAddress_country
[ top ]
Element ms:communicationInfoType / ms:postalAddress / ms:address
Annotations
The street and the number of the postal address of a person or organization
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 200
[ top ]
Element ms:communicationInfoType / ms:postalAddress / ms:zipCode
Annotations
The zip code of the postal address of a person or organization
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
[ top ]
Element ms:communicationInfoType / ms:postalAddress / ms:city
Annotations
The name of the city, town or village as mentioned in the postal address of a person or organization
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 50
[ top ]
Element ms:communicationInfoType / ms:postalAddress / ms:region
Annotations
The name of the region, county or department as mentioned in the postal address of a person or organization
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:communicationInfoType / ms:postalAddress / ms:country
Annotations
The country mentioned in the postal address of a person or organization as defined in the list of values of ISO 3166
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#regionIdType
Type ms:regionIdType
Facets
enumeration AA
enumeration AC
enumeration AD
enumeration AE
enumeration AF
enumeration AG
enumeration AI
enumeration AL
enumeration AM
enumeration AO
enumeration AQ
enumeration AR
enumeration AS
enumeration AT
enumeration AU
enumeration AW
enumeration AX
enumeration AZ
enumeration BA
enumeration BB
enumeration BD
enumeration BE
enumeration BF
enumeration BG
enumeration BH
enumeration BI
enumeration BJ
enumeration BL
enumeration BM
enumeration BN
enumeration BO
enumeration BQ
enumeration BR
enumeration BS
enumeration BT
enumeration BV
enumeration BW
enumeration BY
enumeration BZ
enumeration CA
enumeration CC
enumeration CD
enumeration CF
enumeration CG
enumeration CH
enumeration CI
enumeration CK
enumeration CL
enumeration CM
enumeration CN
enumeration CO
enumeration CP
enumeration CR
enumeration CU
enumeration CV
enumeration CW
enumeration CX
enumeration CY
enumeration CZ
enumeration DE
enumeration DG
enumeration DJ
enumeration DK
enumeration DM
enumeration DO
enumeration DZ
enumeration EA
enumeration EC
enumeration EE
enumeration EG
enumeration EH
enumeration ER
enumeration ES
enumeration ET
enumeration EU
enumeration FI
enumeration FJ
enumeration FK
enumeration FM
enumeration FO
enumeration FR
enumeration GA
enumeration GB
enumeration GD
enumeration GE
enumeration GF
enumeration GG
enumeration GH
enumeration GI
enumeration GL
enumeration GM
enumeration GN
enumeration GP
enumeration GQ
enumeration GR
enumeration GS
enumeration GT
enumeration GU
enumeration GW
enumeration GY
enumeration HK
enumeration HM
enumeration HN
enumeration HR
enumeration HT
enumeration HU
enumeration IC
enumeration ID
enumeration IE
enumeration IL
enumeration IM
enumeration IN
enumeration IO
enumeration IQ
enumeration IR
enumeration IS
enumeration IT
enumeration JE
enumeration JM
enumeration JO
enumeration JP
enumeration KE
enumeration KG
enumeration KH
enumeration KI
enumeration KM
enumeration KN
enumeration KP
enumeration KR
enumeration KW
enumeration KY
enumeration KZ
enumeration LA
enumeration LB
enumeration LC
enumeration LI
enumeration LK
enumeration LR
enumeration LS
enumeration LT
enumeration LU
enumeration LV
enumeration LY
enumeration MA
enumeration MC
enumeration MD
enumeration ME
enumeration MF
enumeration MG
enumeration MH
enumeration MK
enumeration ML
enumeration MM
enumeration MN
enumeration MO
enumeration MP
enumeration MQ
enumeration MR
enumeration MS
enumeration MT
enumeration MU
enumeration MV
enumeration MW
enumeration MX
enumeration MY
enumeration MZ
enumeration NA
enumeration NC
enumeration NE
enumeration NF
enumeration NG
enumeration NI
enumeration NL
enumeration NO
enumeration NP
enumeration NR
enumeration NU
enumeration NZ
enumeration OM
enumeration PA
enumeration PE
enumeration PF
enumeration PG
enumeration PH
enumeration PK
enumeration PL
enumeration PM
enumeration PN
enumeration PR
enumeration PS
enumeration PT
enumeration PW
enumeration PY
enumeration QA
enumeration QM..QZ
enumeration RE
enumeration RO
enumeration RS
enumeration RU
enumeration RW
enumeration SA
enumeration SB
enumeration SC
enumeration SD
enumeration SE
enumeration SG
enumeration SH
enumeration SI
enumeration SJ
enumeration SK
enumeration SL
enumeration SM
enumeration SN
enumeration SO
enumeration SR
enumeration SS
enumeration ST
enumeration SV
enumeration SX
enumeration SY
enumeration SZ
enumeration TA
enumeration TC
enumeration TD
enumeration TF
enumeration TG
enumeration TH
enumeration TJ
enumeration TK
enumeration TL
enumeration TM
enumeration TN
enumeration TO
enumeration TR
enumeration TT
enumeration TV
enumeration TW
enumeration TZ
enumeration UA
enumeration UG
enumeration UM
enumeration US
enumeration UY
enumeration UZ
enumeration VA
enumeration VC
enumeration VE
enumeration VG
enumeration VI
enumeration VN
enumeration VU
enumeration WF
enumeration WS
enumeration XA..XZ
enumeration YE
enumeration YT
enumeration ZA
enumeration ZM
enumeration ZW
enumeration ZZ
enumeration 001
enumeration 002
enumeration 003
enumeration 005
enumeration 009
enumeration 011
enumeration 013
enumeration 014
enumeration 015
enumeration 017
enumeration 018
enumeration 019
enumeration 021
enumeration 029
enumeration 030
enumeration 034
enumeration 035
enumeration 039
enumeration 053
enumeration 054
enumeration 057
enumeration 061
enumeration 142
enumeration 143
enumeration 145
enumeration 150
enumeration 151
enumeration 154
enumeration 155
enumeration 419
[ top ]
Element ms:communicationInfoType / ms:telephoneNumbers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_communicationInfoType_telephoneNumbers_telephoneNumber
[ top ]
Element ms:communicationInfoType / ms:telephoneNumbers / ms:telephoneNumber
Annotations
The telephone number of a person or an organization; recommended format: +_international code_city code_number
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
[ top ]
Element ms:personInfoType / ms:affiliation
Annotations
Groups information on the organization to whom a person is affiliated
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_personInfoType_affiliation_position OMTD-SHARE_XMLSchema.tmp#personInfoType_personInfoType_affiliation_affiliatedOrganization
[ top ]
Element ms:personInfoType / ms:affiliation / ms:position
Annotations
The position or the title of a person if affiliated to an organization
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:personInfoType / ms:affiliation / ms:affiliatedOrganization
Annotations
The organization to which a person is affiliated
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:organizationInfoType / ms:organizationNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationInfoType_organizationNames_organizationName
[ top ]
Element ms:organizationInfoType / ms:organizationNames / ms:organizationName
Annotations
The full name of an organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:organizationInfoType / ms:organizationAlternativeNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationInfoType_organizationAlternativeNames_organizationAlternativeName
[ top ]
Element ms:organizationInfoType / ms:organizationAlternativeNames / ms:organizationAlternativeName
Annotations
An alternative name (e.g. abbreviation, acronym, translation etc.) used for an organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString OMTD-SHARE_XMLSchema.tmp#nameType
Type extension of ms:myString
Attributes
QName Type Default Use Annotation
lang xs:language en optional
ms:nameType restriction of xs:string required
Allows to classify the type of the name of an entity
[ top ]
Element ms:organizationInfoType / ms:organizationIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationIdentifier
[ top ]
Element ms:organizationIdentifier
Annotations
Associates an organizationto an identifier, i.e. a string used to uniquely identify it
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationIdentifierType_organizationIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#organizationIdentifierType
Type ms:organizationIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
organizationIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the organization identifier is assigned by the authority that issues it
[ top ]
Element ms:organizationInfoType / ms:departmentNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationInfoType_departmentNames_departmentName
[ top ]
Element ms:organizationInfoType / ms:departmentNames / ms:departmentName
Annotations
The name of the department or unit (e.g. specific university faculty/department, department/unit of a research organization or private company etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString OMTD-SHARE_XMLSchema.tmp#nameType
Type extension of ms:myString
Attributes
QName Type Default Use Annotation
lang xs:language en optional
ms:nameType restriction of xs:string optional
Allows to classify the type of the name of an entity
[ top ]
Element ms:contactInfoType / ms:contactGroups
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactInfoType_contactGroups_contactGroup
[ top ]
Element ms:contactInfoType / ms:contactGroups / ms:contactGroup
Annotations
Groups information on the group(s) that is/are responsible for providing further information regarding the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#groupInfoType_groupNames OMTD-SHARE_XMLSchema.tmp#groupInfoType_affiliatedOrganization OMTD-SHARE_XMLSchema.tmp#groupInfoType
Type ms:groupInfoType
[ top ]
Element ms:groupInfoType / ms:groupNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#groupInfoType_groupInfoType_groupNames_groupName
[ top ]
Element ms:groupInfoType / ms:groupNames / ms:groupName
Annotations
The name(s) of the group
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:groupInfoType / ms:affiliatedOrganization
Annotations
The organization to which the group is affiliated
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:contactInfoType / ms:mailingLists
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactInfoType_mailingLists_mailingListInfo
[ top ]
Element ms:contactInfoType / ms:mailingLists / ms:mailingListInfo
Annotations
Groups information on the mailing list(s) that can be used for further information regarding the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_mailingListName OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_subscribe OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_unsubscribe OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_post OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_archive OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_otherArchives OMTD-SHARE_XMLSchema.tmp#mailingListInfoType
Type ms:mailingListInfoType
[ top ]
Element ms:mailingListInfoType / ms:mailingListName
Annotations
The name of the mailing list
Diagram
Diagram
Type xs:string
[ top ]
Element ms:mailingListInfoType / ms:subscribe
Annotations
The email address to be used for subscribing to the mailing list
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#emailAddress
Type ms:emailAddress
Facets
maxLength 100
pattern [^@]+@[^\.]+\..+|
[ top ]
Element ms:mailingListInfoType / ms:unsubscribe
Annotations
The email address to be used for unsubscribing from the mailing list
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#emailAddress
Type ms:emailAddress
Facets
maxLength 100
pattern [^@]+@[^\.]+\..+|
[ top ]
Element ms:mailingListInfoType / ms:post
Annotations
The email address to be used for posting messages to the mailing list
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#emailAddress
Type ms:emailAddress
Facets
maxLength 100
pattern [^@]+@[^\.]+\..+|
[ top ]
Element ms:mailingListInfoType / ms:archive
Annotations
The URL where the mailing list messages are archived
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:mailingListInfoType / ms:otherArchives
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_mailingListInfoType_otherArchives_otherArchive
[ top ]
Element ms:mailingListInfoType / ms:otherArchives / ms:otherArchive
Annotations
Alternative ULRs where the mailing list messages are archived (for mirrored mailing lists)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:datasetDistributionInfo
Annotations
Groups information on the distribution of a dataset resource (multiple files)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#distributionMedium OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_sizes OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_textFormats OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_characterEncodings OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType
Type ms:datasetDistributionInfoType
[ top ]
Element ms:distributionMedium
Annotations
Specifies the medium (channel) used for delivering or providing access to the resource
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration webExecutable
For resources accessed via a SPARQL query
enumeration downloadable
For resources that can be downloaded
enumeration accessibleThroughInterface
For resources that can accessed only via a dedicated interface
enumeration other
Value for distributionMedium; to be used when the desired value is not included in the listed values
[ top ]
Element ms:distributionLocation
Annotations
Any location (e.g. URL, repository, etc.) where the resource can be accessed from, either in a downloadable form or as a web executable command etc.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:datasetDistributionInfoType / ms:sizes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#sizeInfo
[ top ]
Element ms:sizeInfo
Annotations
Groups information on the size of the resource or of resource parts
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:size
Annotations
Specifies the size of the resource with regard to the SizeUnit measurement in form of a number
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:sizeInfoType / ms:sizeUnit
Annotations
Specifies the unit that is used when providing information on the size of the resource or of resource parts
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration terms
enumeration entries
enumeration articles
enumeration files
enumeration items
enumeration elements
enumeration units
enumeration texts
enumeration sentences
enumeration bytes
enumeration tokens
enumeration words
enumeration keywords
enumeration idiomaticExpressions
enumeration triples
enumeration neologisms
enumeration multiWordUnits
enumeration expressions
enumeration synsets
enumeration classes
enumeration concepts
enumeration lexicalTypes
enumeration phoneticUnits
enumeration morphologicalUnits
enumeration syntacticUnits
enumeration semanticUnits
enumeration predicates
enumeration frames
enumeration kb
enumeration mb
enumeration gb
enumeration tb
enumeration unigrams
enumeration bigrams
enumeration trigrams
enumeration 4-grams
enumeration 5-grams
enumeration rules
enumeration other
[ top ]
Element ms:datasetDistributionInfoType / ms:textFormats
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textFormatInfo
[ top ]
Element ms:textFormatInfo
Annotations
Groups information on the text format(s) of a resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dataFormatInfo OMTD-SHARE_XMLSchema.tmp#textFormatInfoType_sizePerTextFormat OMTD-SHARE_XMLSchema.tmp#textFormatInfoType
Type ms:textFormatInfoType
[ top ]
Element ms:dataFormatInfo
Annotations
Groups the information for the data format; at least mimetype and, if required, a description and documentation url should be provided
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dataFormatInfo_dataFormat OMTD-SHARE_XMLSchema.tmp#dataFormatInfo_dataFormatOther
[ top ]
Element ms:dataFormatInfo / ms:dataFormat
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dataFormatType
Type ms:dataFormatType
Facets
maxLength 100
enumeration text/plain
enumeration application/vnd.xmi+xml
enumeration application/xml
enumeration application/x-xces+xml
enumeration application/tei+xml
enumeration application/rdf+xml
enumeration application/xhtml+xml
enumeration application/emma+xml
enumeration application/pls+xml
enumeration application/postscript
enumeration text/sgml
enumeration text/html
enumeration application/x-tex
enumeration application/rtf
enumeration application/json+ld
enumeration application/x-latex
enumeration text/csv
enumeration text/tab-separated-values
enumeration application/pdf
enumeration application/x-msaccess
enumeration application/msword
enumeration application/vnd.ms-excel
enumeration text/turtle
enumeration aclAnthology
enumeration alvisEnrichedDocument
enumeration bnc
enumeration bioNLP
enumeration bioNLP; format-variant=ST2013a1_a2
enumeration cadixeJSON
enumeration conll2000
enumeration conll2002
enumeration conll2006
enumeration conll2007
enumeration conll2009
enumeration conll2012
enumeration dataSift
enumeration factoredTagLem
enumeration gate
enumeration genia
enumeration graf
enumeration html5Microdata
enumeration i2b2
enumeration imsCwb
enumeration jdbc
enumeration keaCorpus
enumeration lll
enumeration negraExport
enumeration ptb; format-variant=chunked
enumeration ptb; format-variant=combined
enumeration pml
enumeration relp
enumeration aimedCorpus
enumeration tiger
enumeration tupp-dz
enumeration twitter
enumeration xces; format-variant=ilsp
enumeration web1t
enumeration uimaCASDump
enumeration uimaBinaryCas
[ top ]
Element ms:dataFormatInfo / ms:dataFormatOther
Diagram
Diagram
Type xs:string
[ top ]
Element ms:textFormatInfoType / ms:sizePerTextFormat
Annotations
Provides information on the size of the resource parts with different format
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:datasetDistributionInfoType / ms:characterEncodings
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#characterEncodingInfo
[ top ]
Element ms:characterEncodingInfo
Annotations
Groups together information on character encoding of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#characterEncoding OMTD-SHARE_XMLSchema.tmp#characterEncodingInfoType_sizePerCharacterEncoding OMTD-SHARE_XMLSchema.tmp#characterEncodingInfoType
Type ms:characterEncodingInfoType
[ top ]
Element ms:characterEncoding
Annotations
The name of the character encoding used in the resource or supported by the component
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration US-ASCII
enumeration windows-1250
enumeration windows-1251
enumeration windows-1252
enumeration windows-1253
enumeration windows-1254
enumeration windows-1257
enumeration ISO-8859-1
enumeration ISO-8859-2
enumeration ISO-8859-4
enumeration ISO-8859-5
enumeration ISO-8859-7
enumeration ISO-8859-9
enumeration ISO-8859-13
enumeration ISO-8859-15
enumeration KOI8-R
enumeration UTF-8
enumeration UTF-16
enumeration UTF-16BE
enumeration UTF-16LE
enumeration windows-1255
enumeration windows-1256
enumeration windows-1258
enumeration ISO-8859-3
enumeration ISO-8859-6
enumeration ISO-8859-8
enumeration windows-31j
enumeration EUC-JP
enumeration x-EUC-JP-LINUX
enumeration Shift_JIS
enumeration ISO-2022-JP
enumeration x-mswin-936
enumeration GB18030
enumeration x-EUC-CN
enumeration GBK
enumeration ISCII91
enumeration x-windows-949
enumeration EUC-KR
enumeration ISO-2022-KR
enumeration x-windows-950
enumeration x-MS950-HKSCS
enumeration x-EUC-TW
enumeration Big5
enumeration Big5-HKSCS
enumeration TIS-620
enumeration Big5_Solaris
enumeration Cp037
enumeration Cp273
enumeration Cp277
enumeration Cp278
enumeration Cp280
enumeration Cp284
enumeration Cp285
enumeration Cp297
enumeration Cp420
enumeration Cp424
enumeration Cp437
enumeration Cp500
enumeration Cp737
enumeration Cp775
enumeration Cp838
enumeration Cp850
enumeration Cp852
enumeration Cp855
enumeration Cp856
enumeration Cp857
enumeration Cp858
enumeration Cp860
enumeration Cp861
enumeration Cp862
enumeration Cp863
enumeration Cp864
enumeration Cp865
enumeration Cp866
enumeration Cp868
enumeration Cp869
enumeration Cp870
enumeration Cp871
enumeration Cp874
enumeration Cp875
enumeration Cp918
enumeration Cp921
enumeration Cp922
enumeration Cp930
enumeration Cp933
enumeration Cp935
enumeration Cp937
enumeration Cp939
enumeration Cp942
enumeration Cp942C
enumeration Cp943
enumeration Cp943C
enumeration Cp948
enumeration Cp949
enumeration Cp949C
enumeration Cp950
enumeration Cp964
enumeration Cp970
enumeration Cp1006
enumeration Cp1025
enumeration Cp1026
enumeration Cp1046
enumeration Cp1047
enumeration Cp1097
enumeration Cp1098
enumeration Cp1112
enumeration Cp1122
enumeration Cp1123
enumeration Cp1124
enumeration Cp1140
enumeration Cp1141
enumeration Cp1142
enumeration Cp1143
enumeration Cp1144
enumeration Cp1145
enumeration Cp1146
enumeration Cp1147
enumeration Cp1148
enumeration Cp1149
enumeration Cp1381
enumeration Cp1383
enumeration Cp33722
enumeration ISO2022_CN_CNS
enumeration ISO2022_CN_GB
enumeration JISAutoDetect
enumeration MS874
enumeration MacArabic
enumeration MacCentralEurope
enumeration MacCroatian
enumeration MacCyrillic
enumeration MacDingbat
enumeration MacGreek
enumeration MacHebrew
enumeration MacIceland
enumeration MacRoman
enumeration MacRomania
enumeration MacSymbol
enumeration MacThai
enumeration MacTurkish
enumeration MacUkraine
[ top ]
Element ms:characterEncodingInfoType / ms:sizePerCharacterEncoding
Annotations
Provides information on the size of the resource parts with different character encoding
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:rightsInfo
Annotations
Groups information on licensing terms for the distribution of a resource; at least a licence (preferred option) or formal rights statement (e.g. open access) must be declared for the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rightsInfo_licenceInfos OMTD-SHARE_XMLSchema.tmp#rightsStatement OMTD-SHARE_XMLSchema.tmp#attributionText OMTD-SHARE_XMLSchema.tmp#copyrightStatement OMTD-SHARE_XMLSchema.tmp#availabilityStartDate OMTD-SHARE_XMLSchema.tmp#availabilityEndDate OMTD-SHARE_XMLSchema.tmp#rightsInfo_rightsHolders
[ top ]
Element ms:rightsInfo / ms:licenceInfos
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#licenceInfo
[ top ]
Element ms:licenceInfo
Annotations
Groups information on licences for the resource; can be repeated to allow for different modes of access and restrictions of use (e.g. free for academic use, on-a-fee basis for commercial use, download of a sample for free use etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#licenceInfoType_licence OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandardLicenceName OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandardLicenceTermsURL OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandaradLicenceTermsText OMTD-SHARE_XMLSchema.tmp#licenceInfoType_conditionOfUse OMTD-SHARE_XMLSchema.tmp#licenceInfoType
Type ms:licenceInfoType
[ top ]
Element ms:licenceInfoType / ms:licence
Annotations
The licence of use for the resource
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration CC-BY-4.0
Creative Commons Attribution 4.0; cf. https://creativecommons.org/licenses/by/4.0/
enumeration CC-BY-NC-4.0
Creative Commons Attribution Non Commercial 4.0; cf. https://creativecommons.org/licenses/by-nc/4.0/
enumeration CC-BY-NC-ND-4.0
Creative Commons Attribution Non Commercial No Derivatives 4.0; cf. https://creativecommons.org/licenses/by-nc-nd/4.0/
enumeration CC-BY-NC-SA-4.0
Creative Commons Attribution Non Commercial Share Alike 4.0; cf. https://creativecommons.org/licenses/by-nc-sa/4.0/
enumeration CC-BY-ND-4.0
Creative Commons Attribution No Derivatives 4.0; cf. https://creativecommons.org/licenses/by-nd/4.0/
enumeration CC-BY-SA-4.0
Creative Commons Attribution Share Alike 4.0; cf. https://creativecommons.org/licenses/by-sa/4.0/
enumeration CC0-1.0
Creative Commons Zero 1.0 Universal; cf. https://creativecommons.org/publicdomain/zero/1.0/
enumeration CC-BY-3.0
Creative Commons Attribution 3.0 Unported; cf. https://creativecommons.org/licenses/by/3.0/
enumeration CC-BY-NC-3.0
Creative Commons Attribution Non Commercial 3.0 Unported; cf. https://creativecommons.org/licenses/by-nc/3.0/
enumeration CC-BY-NC-ND-3.0
Creative Commons Attribution Non Commercial No Derivatives 3.0 Unported; cf. https://creativecommons.org/licenses/by-nc-nd/3.0/
enumeration CC-BY-NC-SA-3.0
Creative Commons Attribution Non Commercial Share Alike 3.0 Unported; cf. https://creativecommons.org/licenses/by-nc-sa/3.0/
enumeration CC-BY-ND-3.0
Creative Commons Attribution No Derivatives 3.0 Unported; cf. https://creativecommons.org/licenses/by-nd/3.0/
enumeration CC-BY-SA-3.0
Creative Commons Attribution Share Alike 3.0 Unported; cf. https://creativecommons.org/licenses/by-sa/3.0/
enumeration PDDL
Open Data Commons Public Domain Dedication and License; cf. https://opendatacommons.org/licenses/pddl/
enumeration ODC-BY-1.0
Open Data Commons Attribution License v1.0; cf. https://opendatacommons.org/licenses/by/1-0/
enumeration ODbL-1.0
Open Data Commons Open Database License v1.0; cf. https://opendatacommons.org/licenses/odbl/1-0/
enumeration AGPL-1.0
Affero General Public License v1.0; cf. http://www.affero.org/oagpl.html
enumeration Apache-2.0
Apache Lincse 2.0; cf. https://www.apache.org/licenses/LICENSE-2.0
enumeration BSD-4-Clause
BSD 4-Clause (Original or Old) License; cf. http://directory.fsf.org/wiki/License:BSD_4Clause
enumeration BSD-3-Clause
BSD 3-Clause (New or Revised) License; cf. https://opensource.org/licenses/BSD-3-Clause
enumeration BSD-2-Clause
BSD-2-Clause (Simplified) License; cf. https://opensource.org/licenses/BSD-2-Clause
enumeration GFDL-1.3
GNU Free Documentation License v1.3; cf. https://www.gnu.org/licenses/fdl-1.3.en.html
enumeration GPL-3.0
GNU General Public License v3.0; cf. https://www.gnu.org/licenses/gpl-3.0.en.html
enumeration LGPL-3.0
GNU Lesser General Public License v3.0; cf. https://www.gnu.org/licenses/lgpl-3.0.en.html
enumeration MIT
MIT License; cf. https://opensource.org/licenses/MIT
enumeration Princeton-WordNet
WordNet v3.0 (Princeton WordNet) License; cf. https://wordnet.princeton.edu/wordnet/license/
enumeration EPL-1.0
Eclipse Public License v1.0; cf. https://www.eclipse.org/legal/epl-v10.html
enumeration NLM
U.S. National Library of Medicine (NLM) License Agreement for NLM Data; cf. https://www.nlm.nih.gov/databases/license/license.pdf
enumeration f-DPPL-3.0
Free Digital Peer Publishing Licence (v3, en); cf. https://www.hbz-nrw.de/produkte/open-access/lizenzen/dppl/fdppl/f-DPPL_v3_en_11-2008
enumeration M-DPPL-3.0
Modular Digital Peer Publishing Licence (v3, en); cf. https://www.hbz-nrw.de/produkte/open-access/lizenzen/dppl/mdppl/m-DPPL_v3_en_11-2008
enumeration proprietary
Value for "licence"; to be used for licences that have a proprietary status
enumeration underNegotiation
Value for "licence"; to be used for resources whose distribution status is still under negotiation
enumeration openAccessUnspecified
Value for "licence"; to be used for resources that are distributed with open access rights but for which the licence has not been identified or further specified (from trusted sources such as OpenAIRE and CORE)
enumeration restrictedAccessUnspecified
Value for "licence"; to be used for resources that are distributed with restricted and ebargo access rights but for which the licence has not been identified or further specified (from trusted sources such as OpenAIRE and CORE)
enumeration nonStandardLicenceTerms
Value for "licence"; to be used for resources that are licensed with a licence not included in the OMTD list of licences; more information on the licence must be provided in the relevant metadata elements
[ top ]
Element ms:licenceInfoType / ms:nonStandardLicenceName
Annotations
The name with which a licence is known; to be used for licences not included in the pre-defined list of licences
Diagram
Diagram
Type xs:string
[ top ]
Element ms:licenceInfoType / ms:nonStandardLicenceTermsURL
Annotations
Used to provide a hyperlink to a URL containing the text of a licence not included in the predefined list or describing the terms of use for a language resource or terms of service for web services
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:licenceInfoType / ms:nonStandaradLicenceTermsText
Annotations
Used for inputting the text of licences (that are not included in the pre-defined list) and terms of use or terms of service (for web services)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:licenceInfoType / ms:conditionOfUse
Annotations
Specifies the conditions and terms of use imposed by the licence. It is an optional element and only to be taken as providing brief human readable information on the fact that the LR is provided under a specific set of conditions. These correspond to the most frequently used conditions imposed by the licensor of the LR (via the specified licence). The proper exposition of all conditions and possible exceptions is to be found inside the licence text. LR depositors should, hence, carefully choose the values of this field to match the licence chosen and users should carefully read that licence before using the LR.
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration attribution
enumeration nonCommercialUse
enumeration commercialUse
enumeration shareAlike
enumeration noDerivatives
enumeration noRedistribution
enumeration evaluationUse
enumeration research
enumeration languageEngineeringResearch
enumeration education
enumeration informLicensor
enumeration redeposit
enumeration compensate
enumeration personalDataIncluded
enumeration sensitiveDataIncluded
enumeration requestPlan
enumeration spatialConstraint
enumeration userIdentified
enumeration academicUsers
enumeration commercialUsers
enumeration membersOfGroup
enumeration other
[ top ]
Element ms:rightsStatement
Annotations
The name (identifier) of a formal statement indicative of licensing terms for the use of a resource (e.g. open access, free to read etc.); its semantics should be clear, preferrably formally expressed and stored at a URL
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration openAccess
The free and online availability of literature, which allows to read, download, copy, distribute, print, search, or link to the ful text, crawl articles for indexing, pass them as data to software, or use them for any other useful purpose. An availability that is granted without financial, legal, or technical barriers other than those inseparable from gaining access to the internet itself, and those related to giving authors control over the integrity of their work and the right to be properly acknowledged and cited.
enumeration restrictedAccess
Access is subject to restrictions or controls regarding users (e.g. limited to researchers or members of a specific group) or use (e.g. for research only, noncommercial use etc.); subscription or registration may also be required and access may incur financial costs.
[ top ]
Element ms:attributionText
Annotations
The text that must be quoted for attribution purposes when using a resource - for cases where a resource is provided with a restriction on attribution; you can use a standard text such as "Resource A by Resource Creator/Owner B used under licence C as accessed at D"
Diagram
Diagram
Type xs:string
[ top ]
Element ms:copyrightStatement
Annotations
A free text statement that may be included with the resource, usually containing the name(s) of copyright holders and licensing terms (intended for resources that already have such a statement); the element can be repeated for the different language versions using the "lang" attribute to specify the language.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:availabilityStartDate
Annotations
Specifies the start date of availability of a resource - only for cases where a resource is available for a restricted time period.
Diagram
Diagram
Type xs:date
[ top ]
Element ms:availabilityEndDate
Annotations
Specifies the end date of availability of a resource - only for cases where a resource is available for a restricted time period.
Diagram
Diagram
Type xs:date
[ top ]
Element ms:rightsInfo / ms:rightsHolders
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rightsHolder
[ top ]
Element ms:rightsHolder
Annotations
Groups information on a person or an organization who holds the Copyright and SGDB rights that subsist in the resource. The rights holder could be different from the creator that may have assigned the rights to another person or organization (e.g. an author as a creator assigns her rights to the publisher who is the rights holder) and the distributor that holds a specific licence (i.e. a permission) to distribute the work.
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actorInfoType_actorType OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedPerson OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedGroup OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedOrganization OMTD-SHARE_XMLSchema.tmp#actorInfoType
Type ms:actorInfoType
[ top ]
Element ms:actorInfoType / ms:actorType
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration person
enumeration group
enumeration organization
[ top ]
Element ms:actorInfoType / ms:relatedPerson
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_surname OMTD-SHARE_XMLSchema.tmp#personInfoType_givenName OMTD-SHARE_XMLSchema.tmp#personInfoType_personIdentifiers OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#personInfoType_affiliation OMTD-SHARE_XMLSchema.tmp#personInfoType
Type ms:personInfoType
[ top ]
Element ms:actorInfoType / ms:relatedGroup
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#groupInfoType_groupNames OMTD-SHARE_XMLSchema.tmp#groupInfoType_affiliatedOrganization OMTD-SHARE_XMLSchema.tmp#groupInfoType
Type ms:groupInfoType
[ top ]
Element ms:actorInfoType / ms:relatedOrganization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:corpusInfoType / ms:resourceDocumentations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfo
[ top ]
Element ms:resourceDocumentationInfo
Annotations
Groups together information on any document (publication, report, manual etc.) about the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_documentationDescription OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_documentationType OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_publicationIdentifiers OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType
Type ms:resourceDocumentationInfoType
[ top ]
Element ms:resourceDocumentationInfoType / ms:documentationDescription
Annotations
A free text field used for any kind of documentation relating to a resoure; it can be a bibliographic record (preferrably in the form of a bibtex record), a URL for online help, for training material etc.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:resourceDocumentationInfoType / ms:documentationType
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration publicationForCitation
enumeration publication
enumeration manual
enumeration onLineHelpURL
enumeration issueTracker
enumeration samplesLocation
enumeration trainingResource
enumeration demoResource
enumeration other
[ top ]
Element ms:resourceDocumentationInfoType / ms:publicationIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#publicationIdentifier
[ top ]
Element ms:publicationIdentifier
Annotations
Reference to a DOI (recommended) or any kind of identifier used for the publication
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#publicationIdentifierType_publicationIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#publicationIdentifierType_schemeURI OMTD-SHARE_XMLSchema.tmp#publicationIdentifierType
Type ms:publicationIdentifierType
Attributes
QName Type Use Annotation
publicationIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the publication identifier is assigned by the authority that issues it (e.g. DOI, PubMed Central etc.)
schemeURI xs:anyURI optional
[ top ]
Element ms:resourceCreationInfo
Annotations
Groups information on the creation procedure and agents of a resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_resourceCreators OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_fundingProjects OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_creationDate OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType
Type ms:resourceCreationInfoType
[ top ]
Element ms:resourceCreationInfoType / ms:resourceCreators
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_resourceCreationInfoType_resourceCreators_resourceCreator
[ top ]
Element ms:resourceCreationInfoType / ms:resourceCreators / ms:resourceCreator
Annotations
Used to provide information on the person or the organization that has created the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actorInfoType_actorType OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedPerson OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedGroup OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedOrganization OMTD-SHARE_XMLSchema.tmp#actorInfoType
Type ms:actorInfoType
[ top ]
Element ms:resourceCreationInfoType / ms:fundingProjects
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_resourceCreationInfoType_fundingProjects_fundingProject
[ top ]
Element ms:resourceCreationInfoType / ms:fundingProjects / ms:fundingProject
Annotations
Groups information on the project that has funded the resource; choice between the ID of a project or a project title
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectShortNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectIdentifiers OMTD-SHARE_XMLSchema.tmp#projectInfoType_webpages OMTD-SHARE_XMLSchema.tmp#projectInfoType_funders OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingTypes OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingProgramme OMTD-SHARE_XMLSchema.tmp#projectInfoType_jurisdiction OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingCountries OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectDates OMTD-SHARE_XMLSchema.tmp#projectInfoType
Type ms:projectInfoType
[ top ]
Element ms:projectInfoType / ms:projectNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_projectNames_projectName
[ top ]
Element ms:projectInfoType / ms:projectNames / ms:projectName
Annotations
The full name of a project related to the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:projectInfoType / ms:projectShortNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_projectShortNames_projectShortName
[ top ]
Element ms:projectInfoType / ms:projectShortNames / ms:projectShortName
Annotations
A short name, abbreviation or acronym of a project related to the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:projectInfoType / ms:projectIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectIdentifier
[ top ]
Element ms:projectIdentifier
Annotations
A unique identifier for research projects
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectIdentifierType_projectIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#projectIdentifierType
Type ms:projectIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
projectIdentifierSchemeName xs:string required
Specifies the name of the scheme according to which the project identifier is assigned by the authority that issues it
[ top ]
Element ms:projectInfoType / ms:webpages
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_webpages_webpage
[ top ]
Element ms:projectInfoType / ms:webpages / ms:webpage
Annotations
A URL used as webpage of a project
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:projectInfoType / ms:funders
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_funders_funder
[ top ]
Element ms:projectInfoType / ms:funders / ms:funder
Annotations
Funder of the project (e.g. EC for European Commission); preferred format is the registration through fundref
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:projectInfoType / ms:fundingTypes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_fundingTypes_fundingType
[ top ]
Element ms:projectInfoType / ms:fundingTypes / ms:fundingType
Annotations
Specifies the type of funding of the project
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration other
When none of the above is applicable
enumeration ownFunds
Funding from the resource creators’s own sources
enumeration nationalFunds
Funding coming from national sources
enumeration euFunds
Funding coming from EU sources
[ top ]
Element ms:projectInfoType / ms:fundingProgramme
Annotations
A specific programme (e.g. FP7, H2020)
Diagram
Diagram
Type xs:string
[ top ]
Element ms:projectInfoType / ms:jurisdiction
Annotations
Authority granted to a formally consittute legal body (e.g. EU for European Union)
Diagram
Diagram
Type xs:string
[ top ]
Element ms:projectInfoType / ms:fundingCountries
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectInfoType_fundingCountries_fundingCountry
[ top ]
Element ms:projectInfoType / ms:fundingCountries / ms:fundingCountry
Annotations
The name of the funding country, in case of national funding as mentioned in ISO3166
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#regionIdType
Type ms:regionIdType
Facets
enumeration AA
enumeration AC
enumeration AD
enumeration AE
enumeration AF
enumeration AG
enumeration AI
enumeration AL
enumeration AM
enumeration AO
enumeration AQ
enumeration AR
enumeration AS
enumeration AT
enumeration AU
enumeration AW
enumeration AX
enumeration AZ
enumeration BA
enumeration BB
enumeration BD
enumeration BE
enumeration BF
enumeration BG
enumeration BH
enumeration BI
enumeration BJ
enumeration BL
enumeration BM
enumeration BN
enumeration BO
enumeration BQ
enumeration BR
enumeration BS
enumeration BT
enumeration BV
enumeration BW
enumeration BY
enumeration BZ
enumeration CA
enumeration CC
enumeration CD
enumeration CF
enumeration CG
enumeration CH
enumeration CI
enumeration CK
enumeration CL
enumeration CM
enumeration CN
enumeration CO
enumeration CP
enumeration CR
enumeration CU
enumeration CV
enumeration CW
enumeration CX
enumeration CY
enumeration CZ
enumeration DE
enumeration DG
enumeration DJ
enumeration DK
enumeration DM
enumeration DO
enumeration DZ
enumeration EA
enumeration EC
enumeration EE
enumeration EG
enumeration EH
enumeration ER
enumeration ES
enumeration ET
enumeration EU
enumeration FI
enumeration FJ
enumeration FK
enumeration FM
enumeration FO
enumeration FR
enumeration GA
enumeration GB
enumeration GD
enumeration GE
enumeration GF
enumeration GG
enumeration GH
enumeration GI
enumeration GL
enumeration GM
enumeration GN
enumeration GP
enumeration GQ
enumeration GR
enumeration GS
enumeration GT
enumeration GU
enumeration GW
enumeration GY
enumeration HK
enumeration HM
enumeration HN
enumeration HR
enumeration HT
enumeration HU
enumeration IC
enumeration ID
enumeration IE
enumeration IL
enumeration IM
enumeration IN
enumeration IO
enumeration IQ
enumeration IR
enumeration IS
enumeration IT
enumeration JE
enumeration JM
enumeration JO
enumeration JP
enumeration KE
enumeration KG
enumeration KH
enumeration KI
enumeration KM
enumeration KN
enumeration KP
enumeration KR
enumeration KW
enumeration KY
enumeration KZ
enumeration LA
enumeration LB
enumeration LC
enumeration LI
enumeration LK
enumeration LR
enumeration LS
enumeration LT
enumeration LU
enumeration LV
enumeration LY
enumeration MA
enumeration MC
enumeration MD
enumeration ME
enumeration MF
enumeration MG
enumeration MH
enumeration MK
enumeration ML
enumeration MM
enumeration MN
enumeration MO
enumeration MP
enumeration MQ
enumeration MR
enumeration MS
enumeration MT
enumeration MU
enumeration MV
enumeration MW
enumeration MX
enumeration MY
enumeration MZ
enumeration NA
enumeration NC
enumeration NE
enumeration NF
enumeration NG
enumeration NI
enumeration NL
enumeration NO
enumeration NP
enumeration NR
enumeration NU
enumeration NZ
enumeration OM
enumeration PA
enumeration PE
enumeration PF
enumeration PG
enumeration PH
enumeration PK
enumeration PL
enumeration PM
enumeration PN
enumeration PR
enumeration PS
enumeration PT
enumeration PW
enumeration PY
enumeration QA
enumeration QM..QZ
enumeration RE
enumeration RO
enumeration RS
enumeration RU
enumeration RW
enumeration SA
enumeration SB
enumeration SC
enumeration SD
enumeration SE
enumeration SG
enumeration SH
enumeration SI
enumeration SJ
enumeration SK
enumeration SL
enumeration SM
enumeration SN
enumeration SO
enumeration SR
enumeration SS
enumeration ST
enumeration SV
enumeration SX
enumeration SY
enumeration SZ
enumeration TA
enumeration TC
enumeration TD
enumeration TF
enumeration TG
enumeration TH
enumeration TJ
enumeration TK
enumeration TL
enumeration TM
enumeration TN
enumeration TO
enumeration TR
enumeration TT
enumeration TV
enumeration TW
enumeration TZ
enumeration UA
enumeration UG
enumeration UM
enumeration US
enumeration UY
enumeration UZ
enumeration VA
enumeration VC
enumeration VE
enumeration VG
enumeration VI
enumeration VN
enumeration VU
enumeration WF
enumeration WS
enumeration XA..XZ
enumeration YE
enumeration YT
enumeration ZA
enumeration ZM
enumeration ZW
enumeration ZZ
enumeration 001
enumeration 002
enumeration 003
enumeration 005
enumeration 009
enumeration 011
enumeration 013
enumeration 014
enumeration 015
enumeration 017
enumeration 018
enumeration 019
enumeration 021
enumeration 029
enumeration 030
enumeration 034
enumeration 035
enumeration 039
enumeration 053
enumeration 054
enumeration 057
enumeration 061
enumeration 142
enumeration 143
enumeration 145
enumeration 150
enumeration 151
enumeration 154
enumeration 155
enumeration 419
[ top ]
Element ms:projectInfoType / ms:projectDates
Annotations
The duration dates the project
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#date OMTD-SHARE_XMLSchema.tmp#dateRange OMTD-SHARE_XMLSchema.tmp#dateCombinationType
Type ms:dateCombinationType
[ top ]
Element ms:date
Annotations
Basic format for dates, with optional day and month and obligatory year
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dateType_day OMTD-SHARE_XMLSchema.tmp#dateType_month OMTD-SHARE_XMLSchema.tmp#dateType_year OMTD-SHARE_XMLSchema.tmp#dateType
Type ms:dateType
[ top ]
Element ms:dateType / ms:day
Annotations
Optional day, always in two-digit format
Diagram
Diagram
Type restriction of xs:positiveInteger
Facets
maxInclusive 31
minInclusive 1
[ top ]
Element ms:dateType / ms:month
Annotations
Optional month; to be used in two-digit format
Diagram
Diagram
Type restriction of xs:positiveInteger
Facets
maxInclusive 12
minInclusive 1
[ top ]
Element ms:dateType / ms:year
Annotations
for year; to be used with four digits always
Diagram
Diagram
Type restriction of xs:positiveInteger
Facets
totalDigits 4
maxInclusive 2100
minInclusive 1400
[ top ]
Element ms:dateRange
Annotations
Basic format for date ranges, allowing combinations of years and full dates
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#startDate OMTD-SHARE_XMLSchema.tmp#endDate OMTD-SHARE_XMLSchema.tmp#dateRangeType
Type ms:dateRangeType
[ top ]
Element ms:startDate
Annotations
Basic format for start dates, with optional day and month and obligatory year
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dateType_day OMTD-SHARE_XMLSchema.tmp#dateType_month OMTD-SHARE_XMLSchema.tmp#dateType_year OMTD-SHARE_XMLSchema.tmp#dateType
Type ms:dateType
[ top ]
Element ms:endDate
Annotations
Basic format for end dates, with optional day and month and obligatory year
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dateType_day OMTD-SHARE_XMLSchema.tmp#dateType_month OMTD-SHARE_XMLSchema.tmp#dateType_year OMTD-SHARE_XMLSchema.tmp#dateType
Type ms:dateType
[ top ]
Element ms:resourceCreationInfoType / ms:creationDate
Annotations
The date of creation of the resource, expressed as a range between starting and end date or exact date
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#date OMTD-SHARE_XMLSchema.tmp#dateRange OMTD-SHARE_XMLSchema.tmp#dateCombinationType
Type ms:dateCombinationType
[ top ]
Element ms:corpusInfoType / ms:validationInfos
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfo
[ top ]
Element ms:validationInfo
Annotations
Groups information on validation of a resource; it can be repeated to allow for different validations (e.g. formal validation of the whole resource; content validation of one part of the resource etc.).
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfoType_validated OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationType OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationMode OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationModeDetails OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationExtent OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationExtentDetails OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationReports OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationSwComponents OMTD-SHARE_XMLSchema.tmp#validationInfoType_validators OMTD-SHARE_XMLSchema.tmp#validationInfoType
Type ms:validationInfoType
[ top ]
Element ms:validationInfoType / ms:validated
Annotations
Specifies the validation status of the resource
Diagram
Diagram
Type xs:boolean
[ top ]
Element ms:validationInfoType / ms:validationType
Annotations
Specifies the type of the validation that have been performed
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 20
enumeration formal
enumeration content
[ top ]
Element ms:validationInfoType / ms:validationMode
Annotations
Specifies the validation methodology applied
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#processMode
Type ms:processMode
Facets
maxLength 20
enumeration manual
For processes performed only manually, without automatic means or aids
enumeration automatic
For processes performed only with automatic means or aids
enumeration mixed
For processes performed in a mixed way, using manual and automatic means
enumeration interactive
For processes performed interactively
[ top ]
Element ms:validationInfoType / ms:validationModeDetails
Annotations
Textual field for additional information on validation
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:validationInfoType / ms:validationExtent
Annotations
The resource coverage in terms of validated data
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 20
enumeration full
enumeration partial
[ top ]
Element ms:validationInfoType / ms:validationExtentDetails
Annotations
Provides information on size or other details of partially validated data; to be used if only part of the resource has been validated and as an alternative to SizeInfo if the validated part cannot be counted otherwise
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:validationInfoType / ms:validationReports
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationInfoType_validationReports_hasValidationReport
[ top ]
Element ms:validationInfoType / ms:validationReports / ms:hasValidationReport
Annotations
Link to a short account (prose description) of the validation details or the identifier of a document with detailed information on the validation process and results
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_documentUnstructured OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_publicationIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType
Type ms:relatedDocumentInfoType
[ top ]
Element ms:relatedDocumentInfoType / ms:documentUnstructured
Annotations
Used to encode a bibliographic record, preferrably in the form of a bibtex record or as a free text description
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:relatedDocumentInfoType / ms:publicationIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#publicationIdentifier
[ top ]
Element ms:validationInfoType / ms:validationSwComponents
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationInfoType_validationSwComponents_isValidatedBy
[ top ]
Element ms:validationInfoType / ms:validationSwComponents / ms:isValidatedBy
Annotations
Links a resource to the identifier of the software component that has been used for its validation
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:relatedResourceType / ms:resourceNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceName
[ top ]
Element ms:relatedResourceType / ms:resourceIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_relatedResourceType_resourceIdentifiers_resourceIdentifier
[ top ]
Element ms:relatedResourceType / ms:resourceIdentifiers / ms:resourceIdentifier
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType_resourceIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType
Type ms:resourceIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
resourceIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the resource identifier is assigned by the authority that issues it (e.g. DOI, ISLRN etc.)
[ top ]
Element ms:validationInfoType / ms:validators
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationInfoType_validators_validator
[ top ]
Element ms:validationInfoType / ms:validators / ms:validator
Annotations
Groups information on the person(s) or the organization(s) that validated the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actorInfoType_actorType OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedPerson OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedGroup OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedOrganization OMTD-SHARE_XMLSchema.tmp#actorInfoType
Type ms:actorInfoType
[ top ]
Element ms:usageInfo
Annotations
Groups information on usage of the resource (both intended use and cases where it has already been used)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#usageInfoType_intendedApplications OMTD-SHARE_XMLSchema.tmp#usageInfoType_actualUseInfos OMTD-SHARE_XMLSchema.tmp#usageInfoType
Type ms:usageInfoType
[ top ]
Element ms:usageInfoType / ms:intendedApplications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#usageInfoType_usageInfoType_intendedApplications_intendedApplication OMTD-SHARE_XMLSchema.tmp#applicationOther
[ top ]
Element ms:usageInfoType / ms:intendedApplications / ms:intendedApplication
Annotations
Specifies an application where the resource can be used or is recommended to be used
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#applicationType
Type ms:applicationType
Facets
maxLength 100
enumeration annotation
enumeration bilingualLexiconInduction
enumeration contradictionDetection
enumeration dependencyParsing
enumeration derivationalMorphologicalAnalysis
enumeration discourseAnalysis
enumeration documentClassification
enumeration emotionGeneration
enumeration emotionRecognition
enumeration entityMentionRecognition
enumeration eventExtraction
enumeration expressionRecognition
enumeration extractionOfFundingInformation
enumeration intra-documentCoreferenceResolution
enumeration languageIdentification
enumeration languageModelling
enumeration languageModelsTraining
enumeration lemmatization
enumeration lexiconAccess
enumeration lexiconAcquisitionFromCorpora
enumeration lexiconEnhancement
enumeration lexiconExtractionFromLexica
enumeration lexiconFormatConversion
enumeration lexiconMerging
enumeration lexiconVisualization
enumeration machineTranslation
enumeration morphologicalAnalysis
enumeration morphosyntacticAnnotation-bPosTagging
enumeration morphosyntacticAnnotation-posTagging
enumeration naturalLanguageGeneration
enumeration naturalLanguageUnderstanding
enumeration opinionMining
enumeration other
enumeration persuasiveExpressionMining
enumeration qualitativeAnalysis
enumeration questionAnswering
enumeration semanticRoleLabelling
enumeration sentenceSplitting
enumeration shallowParsing
enumeration spellChecking
enumeration temporalExpressionRecognition
enumeration terminologyExtraction
enumeration textGeneration
enumeration textMining
enumeration tokenization
enumeration tokenizationAndSentenceSplitting
enumeration topicDetection
enumeration topicDetectionAndTracking
enumeration topicModelling
enumeration textAndDataMining
The automated processing of unstructured text and/or structured data leading to the extraction of previously hidden knowledge.
enumeration contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text, images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered information (e.g. identification of relationships between entities).
enumeration textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured data that can be further analysed to extract knowledge, support decision making etc.
enumeration knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of a specific domain from external sources so that it can be used in a knowledge-based system.
enumeration informationExtraction
The process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used in a particular context; the selection of the sense is made from a list of the word's senses."
enumeration eventDetection
The process/task of identifying events in data (text, video, images etc.), usually combined with their classification into types of events and recognition of the event attributes (e.g. time, place, participants and duration).
enumeration namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities in text into pre-defined categories such as the names of persons, organizations, locations, expressions of times, quantities, monetary values, percentages, etc.
enumeration knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data.
enumeration knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data. Information extraction is the process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration knowledgeRepresentation
The process/task of representing information about entities in a form that machines are capable of understanding it.
enumeration relationExtraction
The process/task of identifying and classifying relation mentions between entities in text and/or data.
enumeration http://www.meta-share.org/ontologies/OMTD_TDMontology/AccessComponent
A component used for providing access to data resources
enumeration coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same entity in a certain text.
enumeration textCategorisation
The process/task of assigning documents into classes or categories.
enumeration summarisation
The process/task of reducing one or more textual documents with a computer program in order to create a summary that retains the most important points of the original document(s).
enumeration sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed in a piece of text, especially in order to determine whether the writer's attitude towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness, etc.) in the linguistic expression of texts.
enumeration questionAnswering
The process/task of automatically answering questions posed by users in the form of natural language.
enumeration computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems have the ability to use them in tasks, such as automated logical reasoning.
enumeration informationRetrieval
The activity of obtaining information resources relevant to an information need from a collection of information resources. Searches can be based on full-text or other content-based indexing.
enumeration exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's intent and the contextual meaning of terms as they appear in the searchable dataspace, whether on the Web or within a closed system, to generate more relevant results.
enumeration informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from an information stream using (semi)automated or computerized methods prior to presentation to a human user. The selection of the items is based on the correlation between the content of the items and the user’s preferences (content-based filtering) or the correlation between people with similar preferences (collaborative filtering).
enumeration recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning of one text is entailed in that of the other, i.e. whether the truth of one text fragment follows from that of the other fragment.
enumeration paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that conveys the same or similar information.
[ top ]
Element ms:applicationOther
Diagram
Diagram
Type xs:string
[ top ]
Element ms:usageInfoType / ms:actualUseInfos
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfo
[ top ]
Element ms:actualUseInfo
Annotations
Groups information on how the resource has already been used
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_applicationsInvolved OMTD-SHARE_XMLSchema.tmp#applicationOther OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_usageReports OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_derivedResources OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_usageProjects OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseDetails OMTD-SHARE_XMLSchema.tmp#actualUseInfoType
Type ms:actualUseInfoType
[ top ]
Element ms:actualUseInfoType / ms:applicationsInvolved
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseInfoType_applicationsInvolved_applicationInvolved
[ top ]
Element ms:actualUseInfoType / ms:applicationsInvolved / ms:applicationInvolved
Annotations
Specifies an application where the resource has actually been involved and used
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#applicationType
Type ms:applicationType
Facets
maxLength 100
enumeration annotation
enumeration bilingualLexiconInduction
enumeration contradictionDetection
enumeration dependencyParsing
enumeration derivationalMorphologicalAnalysis
enumeration discourseAnalysis
enumeration documentClassification
enumeration emotionGeneration
enumeration emotionRecognition
enumeration entityMentionRecognition
enumeration eventExtraction
enumeration expressionRecognition
enumeration extractionOfFundingInformation
enumeration intra-documentCoreferenceResolution
enumeration languageIdentification
enumeration languageModelling
enumeration languageModelsTraining
enumeration lemmatization
enumeration lexiconAccess
enumeration lexiconAcquisitionFromCorpora
enumeration lexiconEnhancement
enumeration lexiconExtractionFromLexica
enumeration lexiconFormatConversion
enumeration lexiconMerging
enumeration lexiconVisualization
enumeration machineTranslation
enumeration morphologicalAnalysis
enumeration morphosyntacticAnnotation-bPosTagging
enumeration morphosyntacticAnnotation-posTagging
enumeration naturalLanguageGeneration
enumeration naturalLanguageUnderstanding
enumeration opinionMining
enumeration other
enumeration persuasiveExpressionMining
enumeration qualitativeAnalysis
enumeration questionAnswering
enumeration semanticRoleLabelling
enumeration sentenceSplitting
enumeration shallowParsing
enumeration spellChecking
enumeration temporalExpressionRecognition
enumeration terminologyExtraction
enumeration textGeneration
enumeration textMining
enumeration tokenization
enumeration tokenizationAndSentenceSplitting
enumeration topicDetection
enumeration topicDetectionAndTracking
enumeration topicModelling
enumeration textAndDataMining
The automated processing of unstructured text and/or structured data leading to the extraction of previously hidden knowledge.
enumeration contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text, images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered information (e.g. identification of relationships between entities).
enumeration textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured data that can be further analysed to extract knowledge, support decision making etc.
enumeration knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of a specific domain from external sources so that it can be used in a knowledge-based system.
enumeration informationExtraction
The process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used in a particular context; the selection of the sense is made from a list of the word's senses."
enumeration eventDetection
The process/task of identifying events in data (text, video, images etc.), usually combined with their classification into types of events and recognition of the event attributes (e.g. time, place, participants and duration).
enumeration namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities in text into pre-defined categories such as the names of persons, organizations, locations, expressions of times, quantities, monetary values, percentages, etc.
enumeration knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data.
enumeration knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data. Information extraction is the process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration knowledgeRepresentation
The process/task of representing information about entities in a form that machines are capable of understanding it.
enumeration relationExtraction
The process/task of identifying and classifying relation mentions between entities in text and/or data.
enumeration http://www.meta-share.org/ontologies/OMTD_TDMontology/AccessComponent
A component used for providing access to data resources
enumeration coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same entity in a certain text.
enumeration textCategorisation
The process/task of assigning documents into classes or categories.
enumeration summarisation
The process/task of reducing one or more textual documents with a computer program in order to create a summary that retains the most important points of the original document(s).
enumeration sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed in a piece of text, especially in order to determine whether the writer's attitude towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness, etc.) in the linguistic expression of texts.
enumeration questionAnswering
The process/task of automatically answering questions posed by users in the form of natural language.
enumeration computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems have the ability to use them in tasks, such as automated logical reasoning.
enumeration informationRetrieval
The activity of obtaining information resources relevant to an information need from a collection of information resources. Searches can be based on full-text or other content-based indexing.
enumeration exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's intent and the contextual meaning of terms as they appear in the searchable dataspace, whether on the Web or within a closed system, to generate more relevant results.
enumeration informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from an information stream using (semi)automated or computerized methods prior to presentation to a human user. The selection of the items is based on the correlation between the content of the items and the user’s preferences (content-based filtering) or the correlation between people with similar preferences (collaborative filtering).
enumeration recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning of one text is entailed in that of the other, i.e. whether the truth of one text fragment follows from that of the other fragment.
enumeration paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that conveys the same or similar information.
[ top ]
Element ms:actualUseInfoType / ms:usageReports
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseInfoType_usageReports_usageReport
[ top ]
Element ms:actualUseInfoType / ms:usageReports / ms:usageReport
Annotations
Reports on the research papers documenting the usage of a resource, either in a structured form or in free text
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_documentUnstructured OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_publicationIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType
Type ms:relatedDocumentInfoType
[ top ]
Element ms:actualUseInfoType / ms:derivedResources
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseInfoType_derivedResources_derivedResource
[ top ]
Element ms:actualUseInfoType / ms:derivedResources / ms:derivedResource
Annotations
The name, the identifier or the url of the outcome or product of the resource.
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:actualUseInfoType / ms:usageProjects
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseInfoType_usageProjects_usageProject
[ top ]
Element ms:actualUseInfoType / ms:usageProjects / ms:usageProject
Annotations
Groups information on the project in which the resource has been used
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectShortNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectIdentifiers OMTD-SHARE_XMLSchema.tmp#projectInfoType_webpages OMTD-SHARE_XMLSchema.tmp#projectInfoType_funders OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingTypes OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingProgramme OMTD-SHARE_XMLSchema.tmp#projectInfoType_jurisdiction OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingCountries OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectDates OMTD-SHARE_XMLSchema.tmp#projectInfoType
Type ms:projectInfoType
[ top ]
Element ms:actualUseInfoType / ms:actualUseDetails
Annotations
Reports on the usage of the resource in free text
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 250
[ top ]
Element ms:corpusInfoType / ms:relations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relationInfo
[ top ]
Element ms:relationInfo
Annotations
Groups together information on relations between resources
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relationInfoType_relationType OMTD-SHARE_XMLSchema.tmp#relationInfoType_relatedResource OMTD-SHARE_XMLSchema.tmp#relationInfoType
Type ms:relationInfoType
[ top ]
Element ms:relationInfoType / ms:relationType
Annotations
Specifies the type of relation holding between two entities (e.g. two resources that comprise one new resource together, a corpus and the s/w component that has been used for its creation or a corpus and the publication that describes it
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration isPartOf
enumeration isPartWith
enumeration hasPart
enumeration hasOutcome
enumeration isCombinedWith
enumeration requiresLR
enumeration requiresSoftware
enumeration isExactMatch
enumeration isSimilarTo
enumeration isContinuationOf
enumeration isVersionOf
enumeration isSimilarTo
enumeration replaces
enumeration isReplacedWith
enumeration isCreatedBy
enumeration isElicitedBy
enumeration isRecordedBy
enumeration isEditedBy
enumeration isAnalysedBy
enumeration isEvaluatedBy
enumeration isQueriedBy
enumeration isAccessedBy
enumeration isArchivedBy
enumeration isDisplayedBy
enumeration isCompatibleWith
enumeration isAnnotatedVersionOf
enumeration hasAnnotatedVersion
[ top ]
Element ms:relationInfoType / ms:relatedResource
Annotations
Reference to a resource participating in a relation; the preferred form of reference is a unique identifier, otherwise the resource name
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:corpusInfoType / ms:corpusSubtypeSpecificInfo
Annotations
Groups together all information related to raw corpora
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rawCorpusInfo OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfo
[ top ]
Element ms:rawCorpusInfo
Annotations
Groups together information on corpora of all media types
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_corpusSubtype OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_mediaType OMTD-SHARE_XMLSchema.tmp#lingualityInfo OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_languages OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_textClassifications OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_domains OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_timeClassifications OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_geographicClassifications OMTD-SHARE_XMLSchema.tmp#creationInfo OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType
Type ms:rawCorpusInfoType
[ top ]
Element ms:rawCorpusInfoType / ms:corpusSubtype
Diagram
Diagram
Type xs:string
[ top ]
Element ms:rawCorpusInfoType / ms:mediaType
Annotations
Specifies the media type of the resource and basically corresponds to the physical medium of the content representation. Each media type is described through a distinctive set of features. A resource may consist of parts attributed to different types of media. A tool/service may take as input/output more than one different media types.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:lingualityInfo
Annotations
Groups information on the number of languages of the resource part and of the way they are combined to each other
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_lingualityType OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_multilingualityType OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_multilingualityTypeDetails OMTD-SHARE_XMLSchema.tmp#lingualityInfoType
Type ms:lingualityInfoType
[ top ]
Element ms:lingualityInfoType / ms:lingualityType
Annotations
Indicates whether the resource includes one, two or more languages
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 20
enumeration monolingual
For resource with or covering only one language
enumeration bilingual
For resource with or covering two languages
enumeration multilingual
For resource with or covering three or more languages
[ top ]
Element ms:lingualityInfoType / ms:multilingualityType
Annotations
Indicates whether the corpus is parallel, comparable or mixed
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration parallel
enumeration comparable
enumeration multilingualSingleText
For corpora including single texts that contain multiple language excerpts; e.g. european parliament discussions
enumeration originalTranslationsInSameText
enumeration other
[ top ]
Element ms:lingualityInfoType / ms:multilingualityTypeDetails
Annotations
Provides further information on multilinguality of a resource in free text
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 512
[ top ]
Element ms:rawCorpusInfoType / ms:languages
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageInfo
[ top ]
Element ms:languageInfo
Annotations
Groups information on the languages represented in the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#language OMTD-SHARE_XMLSchema.tmp#languageInfoType_sizePerLanguage OMTD-SHARE_XMLSchema.tmp#languageInfoType_languageVarieties OMTD-SHARE_XMLSchema.tmp#languageInfoType
Type ms:languageInfoType
[ top ]
Element ms:language
Annotations
The language that is used in the resource or supported by the component; corresponds to language tag according to ISO 639-1 and for languages not covered by this, the ISO 639-3
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageIdType
Type ms:languageIdType
Facets
enumeration bg
enumeration cs
enumeration hr
enumeration da
enumeration nl
enumeration en
enumeration et
enumeration fi
enumeration fr
enumeration de
enumeration hu
enumeration ga
enumeration it
enumeration lv
enumeration lt
enumeration mt
enumeration el
enumeration pl
enumeration pt
enumeration ro
enumeration sk
enumeration sl
enumeration es
enumeration sv
enumeration aa
enumeration ab
enumeration ae
enumeration af
enumeration ak
enumeration am
enumeration an
enumeration ar
enumeration as
enumeration av
enumeration ay
enumeration az
enumeration ba
enumeration be
enumeration bh
enumeration bi
enumeration bm
enumeration bn
enumeration bo
enumeration br
enumeration bs
enumeration ca
enumeration ce
enumeration ch
enumeration co
enumeration cr
enumeration cu
enumeration cv
enumeration cy
enumeration dv
enumeration dz
enumeration ee
enumeration eo
enumeration eu
enumeration fa
enumeration ff
enumeration fj
enumeration fo
enumeration fy
enumeration gd
enumeration gl
enumeration gn
enumeration gu
enumeration gv
enumeration ha
enumeration he
enumeration hi
enumeration ho
enumeration ht
enumeration hy
enumeration hz
enumeration ia
enumeration id
enumeration ie
enumeration ig
enumeration ii
enumeration ik
enumeration io
enumeration is
enumeration iu
enumeration ja
enumeration jv
enumeration ka
enumeration kg
enumeration ki
enumeration kj
enumeration kk
enumeration kl
enumeration km
enumeration kn
enumeration ko
enumeration kr
enumeration ks
enumeration ku
enumeration kv
enumeration kw
enumeration ky
enumeration la
enumeration lb
enumeration lg
enumeration li
enumeration ln
enumeration lo
enumeration lu
enumeration mg
enumeration mh
enumeration mi
enumeration mk
enumeration ml
enumeration mn
enumeration mr
enumeration ms
enumeration my
enumeration na
enumeration nb
enumeration nd
enumeration ne
enumeration ng
enumeration nn
enumeration no
enumeration nr
enumeration nv
enumeration ny
enumeration oc
enumeration oj
enumeration om
enumeration or
enumeration os
enumeration pa
enumeration pi
enumeration ps
enumeration qu
enumeration rm
enumeration rn
enumeration ru
enumeration rw
enumeration sa
enumeration sc
enumeration sd
enumeration se
enumeration sg
enumeration hbs
enumeration si
enumeration sm
enumeration sn
enumeration so
enumeration sq
enumeration sr
enumeration ss
enumeration st
enumeration su
enumeration sw
enumeration ta
enumeration te
enumeration tg
enumeration th
enumeration ti
enumeration tk
enumeration tl
enumeration tn
enumeration to
enumeration tr
enumeration ts
enumeration tt
enumeration tw
enumeration ty
enumeration ug
enumeration uk
enumeration ur
enumeration uz
enumeration ve
enumeration vi
enumeration vo
enumeration wa
enumeration wo
enumeration xh
enumeration yi
enumeration yo
enumeration za
enumeration zh
enumeration zu
enumeration aaa
enumeration aab
enumeration aac
enumeration aad
enumeration aae
enumeration aaf
enumeration aag
enumeration aah
enumeration aai
enumeration aak
enumeration aal
enumeration aam
enumeration aan
enumeration aao
enumeration aap
enumeration aaq
enumeration aas
enumeration aat
enumeration aau
enumeration aav
enumeration aaw
enumeration aax
enumeration aaz
enumeration aba
enumeration abb
enumeration abc
enumeration abd
enumeration abe
enumeration abf
enumeration abg
enumeration abh
enumeration abi
enumeration abj
enumeration abl
enumeration abm
enumeration abn
enumeration abo
enumeration abp
enumeration abq
enumeration abr
enumeration abs
enumeration abt
enumeration abu
enumeration abv
enumeration abw
enumeration abx
enumeration aby
enumeration abz
enumeration aca
enumeration acb
enumeration acd
enumeration ace
enumeration acf
enumeration ach
enumeration aci
enumeration ack
enumeration acl
enumeration acm
enumeration acn
enumeration acp
enumeration acq
enumeration acr
enumeration acs
enumeration act
enumeration acu
enumeration acv
enumeration acw
enumeration acx
enumeration acy
enumeration acz
enumeration ada
enumeration adb
enumeration add
enumeration ade
enumeration adf
enumeration adg
enumeration adh
enumeration adi
enumeration adj
enumeration adl
enumeration adn
enumeration ado
enumeration adp
enumeration adq
enumeration adr
enumeration ads
enumeration adt
enumeration adu
enumeration adw
enumeration adx
enumeration ady
enumeration adz
enumeration aea
enumeration aeb
enumeration aec
enumeration aed
enumeration aee
enumeration aek
enumeration ael
enumeration aem
enumeration aen
enumeration aeq
enumeration aer
enumeration aes
enumeration aeu
enumeration aew
enumeration aey
enumeration aez
enumeration afa
enumeration afb
enumeration afd
enumeration afe
enumeration afg
enumeration afh
enumeration afi
enumeration afk
enumeration afn
enumeration afo
enumeration afp
enumeration afs
enumeration aft
enumeration afu
enumeration afz
enumeration aga
enumeration agb
enumeration agc
enumeration agd
enumeration age
enumeration agf
enumeration agg
enumeration agh
enumeration agi
enumeration agj
enumeration agk
enumeration agl
enumeration agm
enumeration agn
enumeration ago
enumeration agq
enumeration agr
enumeration ags
enumeration agt
enumeration agu
enumeration agv
enumeration agw
enumeration agx
enumeration agy
enumeration agz
enumeration aha
enumeration ahb
enumeration ahg
enumeration ahh
enumeration ahi
enumeration ahk
enumeration ahl
enumeration ahm
enumeration ahn
enumeration aho
enumeration ahp
enumeration ahr
enumeration ahs
enumeration aht
enumeration aia
enumeration aib
enumeration aic
enumeration aid
enumeration aie
enumeration aif
enumeration aig
enumeration aih
enumeration aii
enumeration aij
enumeration aik
enumeration ail
enumeration aim
enumeration ain
enumeration aio
enumeration aip
enumeration aiq
enumeration air
enumeration ais
enumeration ait
enumeration aiw
enumeration aix
enumeration aiy
enumeration aja
enumeration ajg
enumeration aji
enumeration ajn
enumeration ajp
enumeration ajt
enumeration aju
enumeration ajw
enumeration ajz
enumeration akb
enumeration akc
enumeration akd
enumeration ake
enumeration akf
enumeration akg
enumeration akh
enumeration aki
enumeration akj
enumeration akk
enumeration akl
enumeration akm
enumeration ako
enumeration akp
enumeration akq
enumeration akr
enumeration aks
enumeration akt
enumeration aku
enumeration akv
enumeration akw
enumeration akx
enumeration aky
enumeration akz
enumeration ala
enumeration alc
enumeration ald
enumeration ale
enumeration alf
enumeration alg
enumeration alh
enumeration ali
enumeration alj
enumeration alk
enumeration all
enumeration alm
enumeration aln
enumeration alo
enumeration alp
enumeration alq
enumeration alr
enumeration als
enumeration alt
enumeration alu
enumeration alv
enumeration alw
enumeration alx
enumeration aly
enumeration alz
enumeration ama
enumeration amb
enumeration amc
enumeration ame
enumeration amf
enumeration amg
enumeration ami
enumeration amj
enumeration amk
enumeration aml
enumeration amm
enumeration amn
enumeration amo
enumeration amp
enumeration amq
enumeration amr
enumeration ams
enumeration amt
enumeration amu
enumeration amv
enumeration amw
enumeration amx
enumeration amy
enumeration amz
enumeration ana
enumeration anb
enumeration anc
enumeration and
enumeration ane
enumeration anf
enumeration ang
enumeration anh
enumeration ani
enumeration anj
enumeration ank
enumeration anl
enumeration anm
enumeration ann
enumeration ano
enumeration anp
enumeration anq
enumeration anr
enumeration ans
enumeration ant
enumeration anu
enumeration anv
enumeration anw
enumeration anx
enumeration any
enumeration anz
enumeration aoa
enumeration aob
enumeration aoc
enumeration aod
enumeration aoe
enumeration aof
enumeration aog
enumeration aoh
enumeration aoi
enumeration aoj
enumeration aok
enumeration aol
enumeration aom
enumeration aon
enumeration aor
enumeration aos
enumeration aot
enumeration aou
enumeration aox
enumeration aoz
enumeration apa
enumeration apb
enumeration apc
enumeration apd
enumeration ape
enumeration apf
enumeration apg
enumeration aph
enumeration api
enumeration apj
enumeration apk
enumeration apl
enumeration apm
enumeration apn
enumeration apo
enumeration app
enumeration apq
enumeration apr
enumeration aps
enumeration apt
enumeration apu
enumeration apv
enumeration apw
enumeration apx
enumeration apy
enumeration apz
enumeration aqa
enumeration aqc
enumeration aqd
enumeration aqg
enumeration aql
enumeration aqm
enumeration aqn
enumeration aqp
enumeration aqr
enumeration aqt
enumeration aqz
enumeration arb
enumeration arc
enumeration ard
enumeration are
enumeration arh
enumeration ari
enumeration arj
enumeration ark
enumeration arl
enumeration arn
enumeration aro
enumeration arp
enumeration arq
enumeration arr
enumeration ars
enumeration art
enumeration aru
enumeration arv
enumeration arw
enumeration arx
enumeration ary
enumeration arz
enumeration asa
enumeration asb
enumeration asc
enumeration asd
enumeration ase
enumeration asf
enumeration asg
enumeration ash
enumeration asi
enumeration asj
enumeration ask
enumeration asl
enumeration asn
enumeration aso
enumeration asp
enumeration asq
enumeration asr
enumeration ass
enumeration ast
enumeration asu
enumeration asv
enumeration asw
enumeration asx
enumeration asy
enumeration asz
enumeration ata
enumeration atb
enumeration atc
enumeration atd
enumeration ate
enumeration atg
enumeration ath
enumeration ati
enumeration atj
enumeration atk
enumeration atl
enumeration atm
enumeration atn
enumeration ato
enumeration atp
enumeration atq
enumeration atr
enumeration ats
enumeration att
enumeration atu
enumeration atv
enumeration atw
enumeration atx
enumeration aty
enumeration atz
enumeration aua
enumeration aub
enumeration auc
enumeration aud
enumeration aue
enumeration auf
enumeration aug
enumeration auh
enumeration aui
enumeration auj
enumeration auk
enumeration aul
enumeration aum
enumeration aun
enumeration auo
enumeration aup
enumeration auq
enumeration aur
enumeration aus
enumeration aut
enumeration auu
enumeration auw
enumeration aux
enumeration auy
enumeration auz
enumeration avb
enumeration avd
enumeration avi
enumeration avk
enumeration avl
enumeration avm
enumeration avn
enumeration avo
enumeration avs
enumeration avt
enumeration avu
enumeration avv
enumeration awa
enumeration awb
enumeration awc
enumeration awd
enumeration awe
enumeration awg
enumeration awh
enumeration awi
enumeration awk
enumeration awm
enumeration awn
enumeration awo
enumeration awr
enumeration aws
enumeration awt
enumeration awu
enumeration awv
enumeration aww
enumeration awx
enumeration awy
enumeration axb
enumeration axe
enumeration axg
enumeration axk
enumeration axl
enumeration axm
enumeration axx
enumeration aya
enumeration ayb
enumeration ayc
enumeration ayd
enumeration aye
enumeration ayg
enumeration ayh
enumeration ayi
enumeration ayk
enumeration ayl
enumeration ayn
enumeration ayo
enumeration ayp
enumeration ayq
enumeration ayr
enumeration ays
enumeration ayt
enumeration ayu
enumeration ayy
enumeration ayz
enumeration aza
enumeration azb
enumeration azc
enumeration azd
enumeration azg
enumeration azj
enumeration azm
enumeration azn
enumeration azo
enumeration azt
enumeration azz
enumeration baa
enumeration bab
enumeration bac
enumeration bad
enumeration bae
enumeration baf
enumeration bag
enumeration bah
enumeration bai
enumeration baj
enumeration bal
enumeration ban
enumeration bao
enumeration bap
enumeration bar
enumeration bas
enumeration bat
enumeration bau
enumeration bav
enumeration baw
enumeration bax
enumeration bay
enumeration bba
enumeration bbb
enumeration bbc
enumeration bbd
enumeration bbe
enumeration bbf
enumeration bbg
enumeration bbh
enumeration bbi
enumeration bbj
enumeration bbk
enumeration bbl
enumeration bbm
enumeration bbn
enumeration bbo
enumeration bbp
enumeration bbq
enumeration bbr
enumeration bbs
enumeration bbt
enumeration bbu
enumeration bbv
enumeration bbw
enumeration bbx
enumeration bby
enumeration bbz
enumeration bca
enumeration bcb
enumeration bcc
enumeration bcd
enumeration bce
enumeration bcf
enumeration bcg
enumeration bch
enumeration bci
enumeration bcj
enumeration bck
enumeration bcl
enumeration bcm
enumeration bcn
enumeration bco
enumeration bcp
enumeration bcq
enumeration bcr
enumeration bcs
enumeration bct
enumeration bcu
enumeration bcv
enumeration bcw
enumeration bcy
enumeration bcz
enumeration bda
enumeration bdb
enumeration bdc
enumeration bdd
enumeration bde
enumeration bdf
enumeration bdg
enumeration bdh
enumeration bdi
enumeration bdj
enumeration bdk
enumeration bdl
enumeration bdm
enumeration bdn
enumeration bdo
enumeration bdp
enumeration bdq
enumeration bdr
enumeration bds
enumeration bdt
enumeration bdu
enumeration bdv
enumeration bdw
enumeration bdx
enumeration bdy
enumeration bdz
enumeration bea
enumeration beb
enumeration bec
enumeration bed
enumeration bee
enumeration bef
enumeration beg
enumeration beh
enumeration bei
enumeration bej
enumeration bek
enumeration bem
enumeration beo
enumeration bep
enumeration beq
enumeration ber
enumeration bes
enumeration bet
enumeration beu
enumeration bev
enumeration bew
enumeration bex
enumeration bey
enumeration bez
enumeration bfa
enumeration bfb
enumeration bfc
enumeration bfd
enumeration bfe
enumeration bff
enumeration bfg
enumeration bfh
enumeration bfi
enumeration bfj
enumeration bfk
enumeration bfl
enumeration bfm
enumeration bfn
enumeration bfo
enumeration bfp
enumeration bfq
enumeration bfr
enumeration bfs
enumeration bft
enumeration bfu
enumeration bfw
enumeration bfx
enumeration bfy
enumeration bfz
enumeration bga
enumeration bgb
enumeration bgc
enumeration bgd
enumeration bge
enumeration bgf
enumeration bgg
enumeration bgi
enumeration bgj
enumeration bgk
enumeration bgl
enumeration bgm
enumeration bgn
enumeration bgo
enumeration bgp
enumeration bgq
enumeration bgr
enumeration bgs
enumeration bgt
enumeration bgu
enumeration bgv
enumeration bgw
enumeration bgx
enumeration bgy
enumeration bgz
enumeration bha
enumeration bhb
enumeration bhc
enumeration bhd
enumeration bhe
enumeration bhf
enumeration bhg
enumeration bhh
enumeration bhi
enumeration bhj
enumeration bhl
enumeration bhm
enumeration bhn
enumeration bho
enumeration bhp
enumeration bhq
enumeration bhr
enumeration bhs
enumeration bht
enumeration bhu
enumeration bhv
enumeration bhw
enumeration bhx
enumeration bhy
enumeration bhz
enumeration bia
enumeration bib
enumeration bic
enumeration bid
enumeration bie
enumeration bif
enumeration big
enumeration bij
enumeration bik
enumeration bil
enumeration bim
enumeration bin
enumeration bio
enumeration bip
enumeration biq
enumeration bir
enumeration bit
enumeration biu
enumeration biv
enumeration biw
enumeration bix
enumeration biy
enumeration biz
enumeration bja
enumeration bjb
enumeration bjc
enumeration bje
enumeration bjf
enumeration bjg
enumeration bjh
enumeration bji
enumeration bjj
enumeration bjk
enumeration bjl
enumeration bjm
enumeration bjn
enumeration bjo
enumeration bjp
enumeration bjr
enumeration bjs
enumeration bjt
enumeration bju
enumeration bjv
enumeration bjw
enumeration bjx
enumeration bjy
enumeration bjz
enumeration bka
enumeration bkc
enumeration bkd
enumeration bkf
enumeration bkg
enumeration bkh
enumeration bki
enumeration bkj
enumeration bkk
enumeration bkl
enumeration bkm
enumeration bkn
enumeration bko
enumeration bkp
enumeration bkq
enumeration bkr
enumeration bks
enumeration bkt
enumeration bku
enumeration bkv
enumeration bkw
enumeration bkx
enumeration bky
enumeration bkz
enumeration bla
enumeration blb
enumeration blc
enumeration bld
enumeration ble
enumeration blf
enumeration blg
enumeration blh
enumeration bli
enumeration blj
enumeration blk
enumeration bll
enumeration blm
enumeration bln
enumeration blo
enumeration blp
enumeration blq
enumeration blr
enumeration bls
enumeration blt
enumeration blv
enumeration blw
enumeration blx
enumeration bly
enumeration blz
enumeration bma
enumeration bmb
enumeration bmc
enumeration bmd
enumeration bme
enumeration bmf
enumeration bmg
enumeration bmh
enumeration bmi
enumeration bmj
enumeration bmk
enumeration bml
enumeration bmm
enumeration bmn
enumeration bmo
enumeration bmp
enumeration bmq
enumeration bmr
enumeration bms
enumeration bmt
enumeration bmu
enumeration bmv
enumeration bmw
enumeration bmx
enumeration bmy
enumeration bmz
enumeration bna
enumeration bnb
enumeration bnc
enumeration bnd
enumeration bne
enumeration bnf
enumeration bng
enumeration bni
enumeration bnj
enumeration bnk
enumeration bnl
enumeration bnm
enumeration bnn
enumeration bno
enumeration bnp
enumeration bnq
enumeration bnr
enumeration bns
enumeration bnt
enumeration bnu
enumeration bnv
enumeration bnw
enumeration bnx
enumeration bny
enumeration bnz
enumeration boa
enumeration bob
enumeration boe
enumeration bof
enumeration bog
enumeration boh
enumeration boi
enumeration boj
enumeration bok
enumeration bol
enumeration bom
enumeration bon
enumeration boo
enumeration bop
enumeration boq
enumeration bor
enumeration bot
enumeration bou
enumeration bov
enumeration bow
enumeration box
enumeration boy
enumeration boz
enumeration bpa
enumeration bpb
enumeration bpd
enumeration bpg
enumeration bph
enumeration bpi
enumeration bpj
enumeration bpk
enumeration bpl
enumeration bpm
enumeration bpn
enumeration bpo
enumeration bpp
enumeration bpq
enumeration bpr
enumeration bps
enumeration bpt
enumeration bpu
enumeration bpv
enumeration bpw
enumeration bpx
enumeration bpy
enumeration bpz
enumeration bqa
enumeration bqb
enumeration bqc
enumeration bqd
enumeration bqf
enumeration bqg
enumeration bqh
enumeration bqi
enumeration bqj
enumeration bqk
enumeration bql
enumeration bqm
enumeration bqn
enumeration bqo
enumeration bqp
enumeration bqq
enumeration bqr
enumeration bqs
enumeration bqt
enumeration bqu
enumeration bqv
enumeration bqw
enumeration bqx
enumeration bqy
enumeration bqz
enumeration bra
enumeration brb
enumeration brc
enumeration brd
enumeration brf
enumeration brg
enumeration brh
enumeration bri
enumeration brj
enumeration brk
enumeration brl
enumeration brm
enumeration brn
enumeration bro
enumeration brp
enumeration brq
enumeration brr
enumeration brs
enumeration brt
enumeration bru
enumeration brv
enumeration brw
enumeration brx
enumeration bry
enumeration brz
enumeration bsa
enumeration bsb
enumeration bsc
enumeration bse
enumeration bsf
enumeration bsg
enumeration bsh
enumeration bsi
enumeration bsj
enumeration bsk
enumeration bsl
enumeration bsm
enumeration bsn
enumeration bso
enumeration bsp
enumeration bsq
enumeration bsr
enumeration bss
enumeration bst
enumeration bsu
enumeration bsv
enumeration bsw
enumeration bsx
enumeration bsy
enumeration bta
enumeration btc
enumeration btd
enumeration bte
enumeration btf
enumeration btg
enumeration bth
enumeration bti
enumeration btj
enumeration btk
enumeration btl
enumeration btm
enumeration btn
enumeration bto
enumeration btp
enumeration btq
enumeration btr
enumeration bts
enumeration btt
enumeration btu
enumeration btv
enumeration btw
enumeration btx
enumeration bty
enumeration btz
enumeration bua
enumeration bub
enumeration buc
enumeration bud
enumeration bue
enumeration buf
enumeration bug
enumeration buh
enumeration bui
enumeration buj
enumeration buk
enumeration bum
enumeration bun
enumeration buo
enumeration bup
enumeration buq
enumeration bus
enumeration but
enumeration buu
enumeration buv
enumeration buw
enumeration bux
enumeration buy
enumeration buz
enumeration bva
enumeration bvb
enumeration bvc
enumeration bvd
enumeration bve
enumeration bvf
enumeration bvg
enumeration bvh
enumeration bvi
enumeration bvj
enumeration bvk
enumeration bvl
enumeration bvm
enumeration bvn
enumeration bvo
enumeration bvp
enumeration bvq
enumeration bvr
enumeration bvt
enumeration bvu
enumeration bvv
enumeration bvw
enumeration bvx
enumeration bvy
enumeration bvz
enumeration bwa
enumeration bwb
enumeration bwc
enumeration bwd
enumeration bwe
enumeration bwf
enumeration bwg
enumeration bwh
enumeration bwi
enumeration bwj
enumeration bwk
enumeration bwl
enumeration bwm
enumeration bwn
enumeration bwo
enumeration bwp
enumeration bwq
enumeration bwr
enumeration bws
enumeration bwt
enumeration bwu
enumeration bww
enumeration bwx
enumeration bwy
enumeration bwz
enumeration bxa
enumeration bxb
enumeration bxc
enumeration bxd
enumeration bxe
enumeration bxf
enumeration bxg
enumeration bxh
enumeration bxi
enumeration bxj
enumeration bxk
enumeration bxl
enumeration bxm
enumeration bxn
enumeration bxo
enumeration bxp
enumeration bxq
enumeration bxr
enumeration bxs
enumeration bxu
enumeration bxv
enumeration bxw
enumeration bxx
enumeration bxz
enumeration bya
enumeration byb
enumeration byc
enumeration byd
enumeration bye
enumeration byf
enumeration byg
enumeration byh
enumeration byi
enumeration byj
enumeration byk
enumeration byl
enumeration bym
enumeration byn
enumeration byo
enumeration byp
enumeration byq
enumeration byr
enumeration bys
enumeration byt
enumeration byv
enumeration byw
enumeration byx
enumeration byy
enumeration byz
enumeration bza
enumeration bzb
enumeration bzc
enumeration bzd
enumeration bze
enumeration bzf
enumeration bzg
enumeration bzh
enumeration bzi
enumeration bzj
enumeration bzk
enumeration bzl
enumeration bzm
enumeration bzn
enumeration bzo
enumeration bzp
enumeration bzq
enumeration bzr
enumeration bzs
enumeration bzt
enumeration bzu
enumeration bzv
enumeration bzw
enumeration bzx
enumeration bzy
enumeration bzz
enumeration caa
enumeration cab
enumeration cac
enumeration cad
enumeration cae
enumeration caf
enumeration cag
enumeration cah
enumeration cai
enumeration caj
enumeration cak
enumeration cal
enumeration cam
enumeration can
enumeration cao
enumeration cap
enumeration caq
enumeration car
enumeration cas
enumeration cau
enumeration cav
enumeration caw
enumeration cax
enumeration cay
enumeration caz
enumeration cba
enumeration cbb
enumeration cbc
enumeration cbd
enumeration cbe
enumeration cbg
enumeration cbh
enumeration cbi
enumeration cbj
enumeration cbk
enumeration cbl
enumeration cbn
enumeration cbo
enumeration cbr
enumeration cbs
enumeration cbt
enumeration cbu
enumeration cbv
enumeration cbw
enumeration cby
enumeration cca
enumeration ccc
enumeration ccd
enumeration cce
enumeration ccg
enumeration cch
enumeration ccj
enumeration ccl
enumeration ccm
enumeration ccn
enumeration cco
enumeration ccp
enumeration ccr
enumeration ccs
enumeration cda
enumeration cdc
enumeration cdd
enumeration cde
enumeration cdf
enumeration cdg
enumeration cdh
enumeration cdi
enumeration cdj
enumeration cdm
enumeration cdn
enumeration cdo
enumeration cdr
enumeration cds
enumeration cdy
enumeration cdz
enumeration cea
enumeration ceb
enumeration ceg
enumeration cek
enumeration cel
enumeration cen
enumeration cet
enumeration cfa
enumeration cfd
enumeration cfg
enumeration cfm
enumeration cga
enumeration cgc
enumeration cgg
enumeration cgk
enumeration chb
enumeration chc
enumeration chd
enumeration chf
enumeration chg
enumeration chh
enumeration chj
enumeration chk
enumeration chl
enumeration chm
enumeration chn
enumeration cho
enumeration chp
enumeration chq
enumeration chr
enumeration cht
enumeration chw
enumeration chx
enumeration chy
enumeration chz
enumeration cia
enumeration cib
enumeration cic
enumeration cid
enumeration cie
enumeration cih
enumeration cik
enumeration cim
enumeration cin
enumeration cip
enumeration cir
enumeration ciw
enumeration ciy
enumeration cja
enumeration cje
enumeration cjh
enumeration cji
enumeration cjk
enumeration cjm
enumeration cjn
enumeration cjo
enumeration cjp
enumeration cjs
enumeration cjv
enumeration cjy
enumeration ckb
enumeration ckh
enumeration ckl
enumeration ckn
enumeration cko
enumeration ckq
enumeration ckr
enumeration cks
enumeration ckt
enumeration cku
enumeration ckv
enumeration ckx
enumeration cky
enumeration ckz
enumeration cla
enumeration clc
enumeration cld
enumeration cle
enumeration clh
enumeration cli
enumeration clj
enumeration clk
enumeration cll
enumeration clm
enumeration clo
enumeration clt
enumeration clu
enumeration clw
enumeration cly
enumeration cma
enumeration cmc
enumeration cme
enumeration cmg
enumeration cmi
enumeration cml
enumeration cmm
enumeration cmn
enumeration cmo
enumeration cmr
enumeration cms
enumeration cmt
enumeration cna
enumeration cnb
enumeration cnc
enumeration cng
enumeration cnh
enumeration cni
enumeration cnk
enumeration cnl
enumeration cno
enumeration cns
enumeration cnt
enumeration cnu
enumeration cnw
enumeration cnx
enumeration coa
enumeration cob
enumeration coc
enumeration cod
enumeration coe
enumeration cof
enumeration cog
enumeration coh
enumeration coj
enumeration cok
enumeration col
enumeration com
enumeration con
enumeration coo
enumeration cop
enumeration coq
enumeration cot
enumeration cou
enumeration cov
enumeration cow
enumeration cox
enumeration coy
enumeration coz
enumeration cpa
enumeration cpb
enumeration cpc
enumeration cpe
enumeration cpf
enumeration cpg
enumeration cpi
enumeration cpn
enumeration cpo
enumeration cpp
enumeration cps
enumeration cpu
enumeration cpx
enumeration cpy
enumeration cqd
enumeration cqu
enumeration cra
enumeration crb
enumeration crc
enumeration crd
enumeration crf
enumeration crg
enumeration crh
enumeration cri
enumeration crj
enumeration crk
enumeration crl
enumeration crm
enumeration crn
enumeration cro
enumeration crp
enumeration crq
enumeration crr
enumeration crs
enumeration crt
enumeration crv
enumeration crw
enumeration crx
enumeration cry
enumeration crz
enumeration csa
enumeration csb
enumeration csc
enumeration csd
enumeration cse
enumeration csf
enumeration csg
enumeration csh
enumeration csi
enumeration csj
enumeration csk
enumeration csl
enumeration csm
enumeration csn
enumeration cso
enumeration csq
enumeration csr
enumeration css
enumeration cst
enumeration csu
enumeration csv
enumeration csw
enumeration csy
enumeration csz
enumeration cta
enumeration ctc
enumeration ctd
enumeration cte
enumeration ctg
enumeration cth
enumeration ctl
enumeration ctm
enumeration ctn
enumeration cto
enumeration ctp
enumeration cts
enumeration ctt
enumeration ctu
enumeration ctz
enumeration cua
enumeration cub
enumeration cuc
enumeration cug
enumeration cuh
enumeration cui
enumeration cuj
enumeration cuk
enumeration cul
enumeration cum
enumeration cuo
enumeration cup
enumeration cuq
enumeration cur
enumeration cus
enumeration cut
enumeration cuu
enumeration cuv
enumeration cuw
enumeration cux
enumeration cvg
enumeration cvn
enumeration cwa
enumeration cwb
enumeration cwd
enumeration cwe
enumeration cwg
enumeration cwt
enumeration cya
enumeration cyb
enumeration cyo
enumeration czh
enumeration czk
enumeration czn
enumeration czo
enumeration czt
enumeration daa
enumeration dac
enumeration dad
enumeration dae
enumeration dag
enumeration dah
enumeration dai
enumeration daj
enumeration dak
enumeration dal
enumeration dam
enumeration dao
enumeration daq
enumeration dar
enumeration das
enumeration dau
enumeration dav
enumeration daw
enumeration dax
enumeration day
enumeration daz
enumeration dba
enumeration dbb
enumeration dbd
enumeration dbe
enumeration dbf
enumeration dbg
enumeration dbi
enumeration dbj
enumeration dbl
enumeration dbm
enumeration dbn
enumeration dbo
enumeration dbp
enumeration dbq
enumeration dbr
enumeration dbt
enumeration dbu
enumeration dbv
enumeration dbw
enumeration dby
enumeration dcc
enumeration dcr
enumeration dda
enumeration ddd
enumeration dde
enumeration ddg
enumeration ddi
enumeration ddj
enumeration ddn
enumeration ddo
enumeration ddr
enumeration dds
enumeration ddw
enumeration dec
enumeration ded
enumeration dee
enumeration def
enumeration deg
enumeration deh
enumeration dei
enumeration dek
enumeration del
enumeration dem
enumeration den
enumeration dep
enumeration deq
enumeration der
enumeration des
enumeration dev
enumeration dez
enumeration dga
enumeration dgb
enumeration dgc
enumeration dgd
enumeration dge
enumeration dgg
enumeration dgh
enumeration dgi
enumeration dgk
enumeration dgl
enumeration dgn
enumeration dgo
enumeration dgr
enumeration dgs
enumeration dgt
enumeration dgu
enumeration dgw
enumeration dgx
enumeration dgz
enumeration dhd
enumeration dhg
enumeration dhi
enumeration dhl
enumeration dhm
enumeration dhn
enumeration dho
enumeration dhr
enumeration dhs
enumeration dhu
enumeration dhv
enumeration dhw
enumeration dhx
enumeration dia
enumeration dib
enumeration dic
enumeration did
enumeration dif
enumeration dig
enumeration dih
enumeration dii
enumeration dij
enumeration dik
enumeration dil
enumeration dim
enumeration din
enumeration dio
enumeration dip
enumeration diq
enumeration dir
enumeration dis
enumeration dit
enumeration diu
enumeration diw
enumeration dix
enumeration diy
enumeration diz
enumeration dja
enumeration djb
enumeration djc
enumeration djd
enumeration dje
enumeration djf
enumeration dji
enumeration djj
enumeration djk
enumeration djm
enumeration djn
enumeration djo
enumeration djr
enumeration dju
enumeration djw
enumeration dka
enumeration dkk
enumeration dkr
enumeration dks
enumeration dkx
enumeration dlg
enumeration dlk
enumeration dlm
enumeration dln
enumeration dma
enumeration dmb
enumeration dmc
enumeration dmd
enumeration dme
enumeration dmg
enumeration dmk
enumeration dml
enumeration dmm
enumeration dmn
enumeration dmo
enumeration dmr
enumeration dms
enumeration dmu
enumeration dmv
enumeration dmw
enumeration dmx
enumeration dmy
enumeration dna
enumeration dnd
enumeration dne
enumeration dng
enumeration dni
enumeration dnj
enumeration dnk
enumeration dnn
enumeration dnr
enumeration dnt
enumeration dnu
enumeration dnv
enumeration dnw
enumeration dny
enumeration doa
enumeration dob
enumeration doc
enumeration doe
enumeration dof
enumeration doh
enumeration doi
enumeration dok
enumeration dol
enumeration don
enumeration doo
enumeration dop
enumeration doq
enumeration dor
enumeration dos
enumeration dot
enumeration dov
enumeration dow
enumeration dox
enumeration doy
enumeration doz
enumeration dpp
enumeration dra
enumeration drb
enumeration drc
enumeration drd
enumeration dre
enumeration drg
enumeration dri
enumeration drl
enumeration drn
enumeration dro
enumeration drq
enumeration drr
enumeration drs
enumeration drt
enumeration dru
enumeration dry
enumeration dsb
enumeration dse
enumeration dsh
enumeration dsi
enumeration dsl
enumeration dsn
enumeration dso
enumeration dsq
enumeration dta
enumeration dtb
enumeration dtd
enumeration dth
enumeration dti
enumeration dtk
enumeration dtm
enumeration dto
enumeration dtp
enumeration dtr
enumeration dts
enumeration dtt
enumeration dtu
enumeration dty
enumeration dua
enumeration dub
enumeration duc
enumeration dud
enumeration due
enumeration duf
enumeration dug
enumeration duh
enumeration dui
enumeration duj
enumeration duk
enumeration dul
enumeration dum
enumeration dun
enumeration duo
enumeration dup
enumeration duq
enumeration dur
enumeration dus
enumeration duu
enumeration duv
enumeration duw
enumeration dux
enumeration duy
enumeration duz
enumeration dva
enumeration dwa
enumeration dwr
enumeration dws
enumeration dww
enumeration dya
enumeration dyb
enumeration dyd
enumeration dyg
enumeration dyi
enumeration dym
enumeration dyn
enumeration dyo
enumeration dyu
enumeration dyy
enumeration dza
enumeration dzd
enumeration dze
enumeration dzg
enumeration dzl
enumeration dzn
enumeration eaa
enumeration ebg
enumeration ebk
enumeration ebo
enumeration ebr
enumeration ebu
enumeration ecr
enumeration ecs
enumeration ecy
enumeration eee
enumeration efa
enumeration efe
enumeration efi
enumeration ega
enumeration egl
enumeration ego
enumeration egx
enumeration egy
enumeration ehu
enumeration eip
enumeration eit
enumeration eiv
enumeration eja
enumeration eka
enumeration ekc
enumeration eke
enumeration ekg
enumeration eki
enumeration ekk
enumeration ekl
enumeration ekm
enumeration eko
enumeration ekp
enumeration ekr
enumeration eky
enumeration ele
enumeration elh
enumeration eli
enumeration elk
enumeration elm
enumeration elo
enumeration elu
enumeration elx
enumeration ema
enumeration emb
enumeration eme
enumeration emg
enumeration emi
enumeration emk
enumeration emm
enumeration emn
enumeration emp
enumeration ems
enumeration emu
enumeration emw
enumeration emx
enumeration emy
enumeration ena
enumeration enb
enumeration enc
enumeration end
enumeration enf
enumeration enh
enumeration enl
enumeration enm
enumeration enn
enumeration eno
enumeration enq
enumeration enr
enumeration enu
enumeration env
enumeration enw
enumeration enx
enumeration eot
enumeration epi
enumeration era
enumeration erg
enumeration erh
enumeration eri
enumeration erk
enumeration ero
enumeration err
enumeration ers
enumeration ert
enumeration erw
enumeration ese
enumeration esh
enumeration esi
enumeration esk
enumeration esl
enumeration esm
enumeration esn
enumeration eso
enumeration esq
enumeration ess
enumeration esu
enumeration esx
enumeration esy
enumeration etb
enumeration etc
enumeration eth
enumeration etn
enumeration eto
enumeration etr
enumeration ets
enumeration ett
enumeration etu
enumeration etx
enumeration etz
enumeration euq
enumeration eve
enumeration evh
enumeration evn
enumeration ewo
enumeration ext
enumeration eya
enumeration eyo
enumeration eza
enumeration eze
enumeration faa
enumeration fab
enumeration fad
enumeration faf
enumeration fag
enumeration fah
enumeration fai
enumeration faj
enumeration fak
enumeration fal
enumeration fam
enumeration fan
enumeration fap
enumeration far
enumeration fat
enumeration fau
enumeration fax
enumeration fay
enumeration faz
enumeration fbl
enumeration fcs
enumeration fer
enumeration ffi
enumeration ffm
enumeration fgr
enumeration fia
enumeration fie
enumeration fil
enumeration fip
enumeration fir
enumeration fit
enumeration fiu
enumeration fiw
enumeration fkk
enumeration fkv
enumeration fla
enumeration flh
enumeration fli
enumeration fll
enumeration fln
enumeration flr
enumeration fly
enumeration fmp
enumeration fmu
enumeration fng
enumeration fni
enumeration fod
enumeration foi
enumeration fom
enumeration fon
enumeration for
enumeration fos
enumeration fox
enumeration fpe
enumeration fqs
enumeration frc
enumeration frd
enumeration frk
enumeration frm
enumeration fro
enumeration frp
enumeration frq
enumeration frr
enumeration frs
enumeration frt
enumeration fse
enumeration fsl
enumeration fss
enumeration fub
enumeration fuc
enumeration fud
enumeration fue
enumeration fuf
enumeration fuh
enumeration fui
enumeration fuj
enumeration fum
enumeration fun
enumeration fuq
enumeration fur
enumeration fut
enumeration fuu
enumeration fuv
enumeration fuy
enumeration fvr
enumeration fwa
enumeration fwe
enumeration gaa
enumeration gab
enumeration gac
enumeration gad
enumeration gae
enumeration gaf
enumeration gag
enumeration gah
enumeration gai
enumeration gaj
enumeration gak
enumeration gal
enumeration gam
enumeration gan
enumeration gao
enumeration gap
enumeration gaq
enumeration gar
enumeration gas
enumeration gat
enumeration gau
enumeration gaw
enumeration gax
enumeration gay
enumeration gaz
enumeration gba
enumeration gbb
enumeration gbd
enumeration gbe
enumeration gbf
enumeration gbg
enumeration gbh
enumeration gbi
enumeration gbj
enumeration gbk
enumeration gbl
enumeration gbm
enumeration gbn
enumeration gbo
enumeration gbp
enumeration gbq
enumeration gbr
enumeration gbs
enumeration gbu
enumeration gbv
enumeration gbw
enumeration gbx
enumeration gby
enumeration gbz
enumeration gcc
enumeration gcd
enumeration gce
enumeration gcf
enumeration gcl
enumeration gcn
enumeration gcr
enumeration gct
enumeration gda
enumeration gdb
enumeration gdc
enumeration gdd
enumeration gde
enumeration gdf
enumeration gdg
enumeration gdh
enumeration gdi
enumeration gdj
enumeration gdk
enumeration gdl
enumeration gdm
enumeration gdn
enumeration gdo
enumeration gdq
enumeration gdr
enumeration gds
enumeration gdt
enumeration gdu
enumeration gdx
enumeration gea
enumeration geb
enumeration gec
enumeration ged
enumeration geg
enumeration geh
enumeration gei
enumeration gej
enumeration gek
enumeration gel
enumeration gem
enumeration geq
enumeration ges
enumeration gev
enumeration gew
enumeration gex
enumeration gey
enumeration gez
enumeration gfk
enumeration gft
enumeration gfx
enumeration gga
enumeration ggb
enumeration ggd
enumeration gge
enumeration ggg
enumeration ggk
enumeration ggl
enumeration ggn
enumeration ggo
enumeration ggt
enumeration ggu
enumeration ggw
enumeration gha
enumeration ghc
enumeration ghe
enumeration ghh
enumeration ghk
enumeration ghl
enumeration ghn
enumeration gho
enumeration ghr
enumeration ghs
enumeration ght
enumeration gia
enumeration gib
enumeration gic
enumeration gid
enumeration gig
enumeration gih
enumeration gil
enumeration gim
enumeration gin
enumeration gip
enumeration giq
enumeration gir
enumeration gis
enumeration git
enumeration giu
enumeration giw
enumeration gix
enumeration giy
enumeration giz
enumeration gji
enumeration gjk
enumeration gjm
enumeration gjn
enumeration gju
enumeration gka
enumeration gke
enumeration gkn
enumeration gko
enumeration gkp
enumeration glc
enumeration gld
enumeration glh
enumeration gli
enumeration glj
enumeration glk
enumeration gll
enumeration glo
enumeration glr
enumeration glu
enumeration glw
enumeration gly
enumeration gma
enumeration gmb
enumeration gmd
enumeration gme
enumeration gmg
enumeration gmh
enumeration gml
enumeration gmm
enumeration gmn
enumeration gmq
enumeration gmu
enumeration gmv
enumeration gmw
enumeration gmx
enumeration gmy
enumeration gmz
enumeration gna
enumeration gnb
enumeration gnc
enumeration gnd
enumeration gne
enumeration gng
enumeration gnh
enumeration gni
enumeration gnk
enumeration gnl
enumeration gnm
enumeration gnn
enumeration gno
enumeration gnq
enumeration gnr
enumeration gnt
enumeration gnu
enumeration gnw
enumeration gnz
enumeration goa
enumeration gob
enumeration goc
enumeration god
enumeration goe
enumeration gof
enumeration gog
enumeration goh
enumeration goi
enumeration goj
enumeration gok
enumeration gol
enumeration gom
enumeration gon
enumeration goo
enumeration gop
enumeration goq
enumeration gor
enumeration gos
enumeration got
enumeration gou
enumeration gow
enumeration gox
enumeration goy
enumeration goz
enumeration gpa
enumeration gpe
enumeration gpn
enumeration gqa
enumeration gqi
enumeration gqn
enumeration gqr
enumeration gqu
enumeration gra
enumeration grb
enumeration grc
enumeration grd
enumeration grg
enumeration grh
enumeration gri
enumeration grj
enumeration grk
enumeration grm
enumeration gro
enumeration grq
enumeration grr
enumeration grs
enumeration grt
enumeration gru
enumeration grv
enumeration grw
enumeration grx
enumeration gry
enumeration grz
enumeration gse
enumeration gsg
enumeration gsl
enumeration gsm
enumeration gsn
enumeration gso
enumeration gsp
enumeration gss
enumeration gsw
enumeration gta
enumeration gti
enumeration gtu
enumeration gua
enumeration gub
enumeration guc
enumeration gud
enumeration gue
enumeration guf
enumeration gug
enumeration guh
enumeration gui
enumeration guk
enumeration gul
enumeration gum
enumeration gun
enumeration guo
enumeration gup
enumeration guq
enumeration gur
enumeration gus
enumeration gut
enumeration guu
enumeration guv
enumeration guw
enumeration gux
enumeration guz
enumeration gva
enumeration gvc
enumeration gve
enumeration gvf
enumeration gvj
enumeration gvl
enumeration gvm
enumeration gvn
enumeration gvo
enumeration gvp
enumeration gvr
enumeration gvs
enumeration gvy
enumeration gwa
enumeration gwb
enumeration gwc
enumeration gwd
enumeration gwe
enumeration gwf
enumeration gwg
enumeration gwi
enumeration gwj
enumeration gwm
enumeration gwn
enumeration gwr
enumeration gwt
enumeration gwu
enumeration gww
enumeration gwx
enumeration gxx
enumeration gya
enumeration gyb
enumeration gyd
enumeration gye
enumeration gyf
enumeration gyg
enumeration gyi
enumeration gyl
enumeration gym
enumeration gyn
enumeration gyr
enumeration gyy
enumeration gza
enumeration gzi
enumeration gzn
enumeration haa
enumeration hab
enumeration hac
enumeration had
enumeration hae
enumeration haf
enumeration hag
enumeration hah
enumeration hai
enumeration haj
enumeration hak
enumeration hal
enumeration ham
enumeration han
enumeration hao
enumeration hap
enumeration haq
enumeration har
enumeration has
enumeration hav
enumeration haw
enumeration hax
enumeration hay
enumeration haz
enumeration hba
enumeration hbb
enumeration hbn
enumeration hbo
enumeration hbu
enumeration hca
enumeration hch
enumeration hdn
enumeration hds
enumeration hdy
enumeration hea
enumeration hed
enumeration heg
enumeration heh
enumeration hei
enumeration hem
enumeration hgm
enumeration hgw
enumeration hhi
enumeration hhr
enumeration hhy
enumeration hia
enumeration hib
enumeration hid
enumeration hif
enumeration hig
enumeration hih
enumeration hii
enumeration hij
enumeration hik
enumeration hil
enumeration him
enumeration hio
enumeration hir
enumeration hit
enumeration hiw
enumeration hix
enumeration hji
enumeration hka
enumeration hke
enumeration hkk
enumeration hks
enumeration hla
enumeration hlb
enumeration hld
enumeration hle
enumeration hlt
enumeration hlu
enumeration hma
enumeration hmb
enumeration hmc
enumeration hmd
enumeration hme
enumeration hmf
enumeration hmg
enumeration hmh
enumeration hmi
enumeration hmj
enumeration hmk
enumeration hml
enumeration hmm
enumeration hmn
enumeration hmp
enumeration hmq
enumeration hmr
enumeration hms
enumeration hmt
enumeration hmu
enumeration hmv
enumeration hmw
enumeration hmx
enumeration hmy
enumeration hmz
enumeration hna
enumeration hnd
enumeration hne
enumeration hnh
enumeration hni
enumeration hnj
enumeration hnn
enumeration hno
enumeration hns
enumeration hnu
enumeration hoa
enumeration hob
enumeration hoc
enumeration hod
enumeration hoe
enumeration hoh
enumeration hoi
enumeration hoj
enumeration hok
enumeration hol
enumeration hom
enumeration hoo
enumeration hop
enumeration hor
enumeration hos
enumeration hot
enumeration hov
enumeration how
enumeration hoy
enumeration hoz
enumeration hpo
enumeration hps
enumeration hra
enumeration hrc
enumeration hre
enumeration hrk
enumeration hrm
enumeration hro
enumeration hrp
enumeration hrt
enumeration hru
enumeration hrw
enumeration hrx
enumeration hrz
enumeration hsb
enumeration hsh
enumeration hsl
enumeration hsn
enumeration hss
enumeration hti
enumeration hto
enumeration hts
enumeration htu
enumeration htx
enumeration hub
enumeration huc
enumeration hud
enumeration hue
enumeration huf
enumeration hug
enumeration huh
enumeration hui
enumeration huj
enumeration huk
enumeration hul
enumeration hum
enumeration huo
enumeration hup
enumeration huq
enumeration hur
enumeration hus
enumeration hut
enumeration huu
enumeration huv
enumeration huw
enumeration hux
enumeration huy
enumeration huz
enumeration hvc
enumeration hve
enumeration hvk
enumeration hvn
enumeration hvv
enumeration hwa
enumeration hwc
enumeration hwo
enumeration hya
enumeration hyx
enumeration iai
enumeration ian
enumeration iap
enumeration iar
enumeration iba
enumeration ibb
enumeration ibd
enumeration ibe
enumeration ibg
enumeration ibl
enumeration ibm
enumeration ibn
enumeration ibr
enumeration ibu
enumeration iby
enumeration ica
enumeration ich
enumeration icl
enumeration icr
enumeration ida
enumeration idb
enumeration idc
enumeration idd
enumeration ide
enumeration idi
enumeration idr
enumeration ids
enumeration idt
enumeration idu
enumeration ifa
enumeration ifb
enumeration ife
enumeration iff
enumeration ifk
enumeration ifm
enumeration ifu
enumeration ify
enumeration igb
enumeration ige
enumeration igg
enumeration igl
enumeration igm
enumeration ign
enumeration igo
enumeration igs
enumeration igw
enumeration ihb
enumeration ihi
enumeration ihp
enumeration ihw
enumeration iin
enumeration iir
enumeration ijc
enumeration ije
enumeration ijj
enumeration ijn
enumeration ijo
enumeration ijs
enumeration ike
enumeration iki
enumeration ikk
enumeration ikl
enumeration iko
enumeration ikp
enumeration ikr
enumeration ikt
enumeration ikv
enumeration ikw
enumeration ikx
enumeration ikz
enumeration ila
enumeration ilb
enumeration ilg
enumeration ili
enumeration ilk
enumeration ill
enumeration ilo
enumeration ils
enumeration ilu
enumeration ilv
enumeration ima
enumeration ime
enumeration imi
enumeration iml
enumeration imn
enumeration imo
enumeration imr
enumeration ims
enumeration imy
enumeration inb
enumeration inc
enumeration ine
enumeration ing
enumeration inh
enumeration inj
enumeration inl
enumeration inm
enumeration inn
enumeration ino
enumeration inp
enumeration ins
enumeration int
enumeration inz
enumeration ior
enumeration iou
enumeration iow
enumeration ipi
enumeration ipo
enumeration iqu
enumeration iqw
enumeration ira
enumeration ire
enumeration irh
enumeration iri
enumeration irk
enumeration irn
enumeration iro
enumeration irr
enumeration iru
enumeration irx
enumeration iry
enumeration isa
enumeration isc
enumeration isd
enumeration ise
enumeration isg
enumeration ish
enumeration isi
enumeration isk
enumeration ism
enumeration isn
enumeration iso
enumeration isr
enumeration ist
enumeration isu
enumeration itb
enumeration itc
enumeration ite
enumeration iti
enumeration itk
enumeration itl
enumeration itm
enumeration ito
enumeration itr
enumeration its
enumeration itt
enumeration itv
enumeration itw
enumeration itx
enumeration ity
enumeration itz
enumeration ium
enumeration ivb
enumeration ivv
enumeration iwk
enumeration iwm
enumeration iwo
enumeration iws
enumeration ixc
enumeration ixl
enumeration iya
enumeration iyo
enumeration iyx
enumeration izh
enumeration izr
enumeration izz
enumeration jaa
enumeration jab
enumeration jac
enumeration jad
enumeration jae
enumeration jaf
enumeration jah
enumeration jaj
enumeration jak
enumeration jal
enumeration jam
enumeration jan
enumeration jao
enumeration jaq
enumeration jas
enumeration jat
enumeration jau
enumeration jax
enumeration jay
enumeration jaz
enumeration jbe
enumeration jbi
enumeration jbj
enumeration jbk
enumeration jbn
enumeration jbo
enumeration jbr
enumeration jbt
enumeration jbu
enumeration jbw
enumeration jcs
enumeration jct
enumeration jda
enumeration jdg
enumeration jdt
enumeration jeb
enumeration jee
enumeration jeg
enumeration jeh
enumeration jei
enumeration jek
enumeration jel
enumeration jen
enumeration jer
enumeration jet
enumeration jeu
enumeration jgb
enumeration jge
enumeration jgk
enumeration jgo
enumeration jhi
enumeration jhs
enumeration jia
enumeration jib
enumeration jic
enumeration jid
enumeration jie
enumeration jig
enumeration jih
enumeration jii
enumeration jil
enumeration jim
enumeration jio
enumeration jiq
enumeration jit
enumeration jiu
enumeration jiv
enumeration jiy
enumeration jjr
enumeration jkm
enumeration jko
enumeration jkp
enumeration jkr
enumeration jku
enumeration jle
enumeration jls
enumeration jma
enumeration jmb
enumeration jmc
enumeration jmd
enumeration jmi
enumeration jml
enumeration jmn
enumeration jmr
enumeration jms
enumeration jmw
enumeration jmx
enumeration jna
enumeration jnd
enumeration jng
enumeration jni
enumeration jnj
enumeration jnl
enumeration jns
enumeration job
enumeration jod
enumeration jor
enumeration jos
enumeration jow
enumeration jpa
enumeration jpr
enumeration jpx
enumeration jqr
enumeration jra
enumeration jrb
enumeration jrr
enumeration jrt
enumeration jru
enumeration jsl
enumeration jua
enumeration jub
enumeration juc
enumeration jud
enumeration juh
enumeration jui
enumeration juk
enumeration jul
enumeration jum
enumeration jun
enumeration juo
enumeration jup
enumeration jur
enumeration jus
enumeration jut
enumeration juu
enumeration juw
enumeration juy
enumeration jvd
enumeration jvn
enumeration jwi
enumeration jya
enumeration jye
enumeration jyy
enumeration kaa
enumeration kab
enumeration kac
enumeration kad
enumeration kae
enumeration kaf
enumeration kag
enumeration kah
enumeration kai
enumeration kaj
enumeration kak
enumeration kam
enumeration kao
enumeration kap
enumeration kaq
enumeration kar
enumeration kav
enumeration kaw
enumeration kax
enumeration kay
enumeration kba
enumeration kbb
enumeration kbc
enumeration kbd
enumeration kbe
enumeration kbf
enumeration kbg
enumeration kbh
enumeration kbi
enumeration kbj
enumeration kbk
enumeration kbl
enumeration kbm
enumeration kbn
enumeration kbo
enumeration kbp
enumeration kbq
enumeration kbr
enumeration kbs
enumeration kbt
enumeration kbu
enumeration kbv
enumeration kbw
enumeration kbx
enumeration kby
enumeration kbz
enumeration kca
enumeration kcb
enumeration kcc
enumeration kcd
enumeration kce
enumeration kcf
enumeration kcg
enumeration kch
enumeration kci
enumeration kcj
enumeration kck
enumeration kcl
enumeration kcm
enumeration kcn
enumeration kco
enumeration kcp
enumeration kcq
enumeration kcr
enumeration kcs
enumeration kct
enumeration kcu
enumeration kcv
enumeration kcw
enumeration kcx
enumeration kcy
enumeration kcz
enumeration kda
enumeration kdc
enumeration kdd
enumeration kde
enumeration kdf
enumeration kdg
enumeration kdh
enumeration kdi
enumeration kdj
enumeration kdk
enumeration kdl
enumeration kdm
enumeration kdn
enumeration kdo
enumeration kdp
enumeration kdq
enumeration kdr
enumeration kdt
enumeration kdu
enumeration kdw
enumeration kdx
enumeration kdy
enumeration kdz
enumeration kea
enumeration keb
enumeration kec
enumeration ked
enumeration kee
enumeration kef
enumeration keg
enumeration keh
enumeration kei
enumeration kej
enumeration kek
enumeration kel
enumeration kem
enumeration ken
enumeration keo
enumeration kep
enumeration keq
enumeration ker
enumeration kes
enumeration ket
enumeration keu
enumeration kev
enumeration kew
enumeration kex
enumeration key
enumeration kez
enumeration kfa
enumeration kfb
enumeration kfc
enumeration kfd
enumeration kfe
enumeration kff
enumeration kfg
enumeration kfh
enumeration kfi
enumeration kfj
enumeration kfk
enumeration kfl
enumeration kfm
enumeration kfn
enumeration kfo
enumeration kfp
enumeration kfq
enumeration kfr
enumeration kfs
enumeration kft
enumeration kfu
enumeration kfv
enumeration kfw
enumeration kfx
enumeration kfy
enumeration kfz
enumeration kga
enumeration kgb
enumeration kgc
enumeration kgd
enumeration kge
enumeration kgf
enumeration kgg
enumeration kgi
enumeration kgj
enumeration kgk
enumeration kgl
enumeration kgm
enumeration kgn
enumeration kgo
enumeration kgp
enumeration kgq
enumeration kgr
enumeration kgs
enumeration kgt
enumeration kgu
enumeration kgv
enumeration kgw
enumeration kgx
enumeration kgy
enumeration kha
enumeration khb
enumeration khc
enumeration khd
enumeration khe
enumeration khf
enumeration khg
enumeration khh
enumeration khi
enumeration khj
enumeration khk
enumeration khl
enumeration khn
enumeration kho
enumeration khp
enumeration khq
enumeration khr
enumeration khs
enumeration kht
enumeration khu
enumeration khv
enumeration khw
enumeration khx
enumeration khy
enumeration khz
enumeration kia
enumeration kib
enumeration kic
enumeration kid
enumeration kie
enumeration kif
enumeration kig
enumeration kih
enumeration kii
enumeration kij
enumeration kil
enumeration kim
enumeration kio
enumeration kip
enumeration kiq
enumeration kis
enumeration kit
enumeration kiu
enumeration kiv
enumeration kiw
enumeration kix
enumeration kiy
enumeration kiz
enumeration kja
enumeration kjb
enumeration kjc
enumeration kjd
enumeration kje
enumeration kjf
enumeration kjg
enumeration kjh
enumeration kji
enumeration kjj
enumeration kjk
enumeration kjl
enumeration kjm
enumeration kjn
enumeration kjo
enumeration kjp
enumeration kjq
enumeration kjr
enumeration kjs
enumeration kjt
enumeration kju
enumeration kjx
enumeration kjy
enumeration kjz
enumeration kka
enumeration kkb
enumeration kkc
enumeration kkd
enumeration kke
enumeration kkf
enumeration kkg
enumeration kkh
enumeration kki
enumeration kkj
enumeration kkk
enumeration kkl
enumeration kkm
enumeration kkn
enumeration kko
enumeration kkp
enumeration kkq
enumeration kkr
enumeration kks
enumeration kkt
enumeration kku
enumeration kkv
enumeration kkw
enumeration kkx
enumeration kky
enumeration kkz
enumeration kla
enumeration klb
enumeration klc
enumeration kld
enumeration kle
enumeration klf
enumeration klg
enumeration klh
enumeration kli
enumeration klj
enumeration klk
enumeration kll
enumeration klm
enumeration kln
enumeration klo
enumeration klp
enumeration klq
enumeration klr
enumeration kls
enumeration klt
enumeration klu
enumeration klv
enumeration klw
enumeration klx
enumeration kly
enumeration klz
enumeration kma
enumeration kmb
enumeration kmc
enumeration kmd
enumeration kme
enumeration kmf
enumeration kmg
enumeration kmh
enumeration kmi
enumeration kmj
enumeration kmk
enumeration kml
enumeration kmm
enumeration kmn
enumeration kmo
enumeration kmp
enumeration kmq
enumeration kmr
enumeration kms
enumeration kmt
enumeration kmu
enumeration kmv
enumeration kmw
enumeration kmx
enumeration kmy
enumeration kmz
enumeration kna
enumeration knb
enumeration knc
enumeration knd
enumeration kne
enumeration knf
enumeration kng
enumeration kni
enumeration knj
enumeration knk
enumeration knl
enumeration knm
enumeration knn
enumeration kno
enumeration knp
enumeration knq
enumeration knr
enumeration kns
enumeration knt
enumeration knu
enumeration knv
enumeration knw
enumeration knx
enumeration kny
enumeration knz
enumeration koa
enumeration koc
enumeration kod
enumeration koe
enumeration kof
enumeration kog
enumeration koh
enumeration koi
enumeration koj
enumeration kok
enumeration kol
enumeration koo
enumeration kop
enumeration koq
enumeration kos
enumeration kot
enumeration kou
enumeration kov
enumeration kow
enumeration kox
enumeration koy
enumeration koz
enumeration kpa
enumeration kpb
enumeration kpc
enumeration kpd
enumeration kpe
enumeration kpf
enumeration kpg
enumeration kph
enumeration kpi
enumeration kpj
enumeration kpk
enumeration kpl
enumeration kpm
enumeration kpn
enumeration kpo
enumeration kpq
enumeration kpr
enumeration kps
enumeration kpt
enumeration kpu
enumeration kpv
enumeration kpw
enumeration kpx
enumeration kpy
enumeration kpz
enumeration kqa
enumeration kqb
enumeration kqc
enumeration kqd
enumeration kqe
enumeration kqf
enumeration kqg
enumeration kqh
enumeration kqi
enumeration kqj
enumeration kqk
enumeration kql
enumeration kqm
enumeration kqn
enumeration kqo
enumeration kqp
enumeration kqq
enumeration kqr
enumeration kqs
enumeration kqt
enumeration kqu
enumeration kqv
enumeration kqw
enumeration kqx
enumeration kqy
enumeration kqz
enumeration kra
enumeration krb
enumeration krc
enumeration krd
enumeration kre
enumeration krf
enumeration krh
enumeration kri
enumeration krj
enumeration krk
enumeration krl
enumeration krm
enumeration krn
enumeration kro
enumeration krp
enumeration krr
enumeration krs
enumeration krt
enumeration kru
enumeration krv
enumeration krw
enumeration krx
enumeration kry
enumeration krz
enumeration ksa
enumeration ksb
enumeration ksc
enumeration ksd
enumeration kse
enumeration ksf
enumeration ksg
enumeration ksh
enumeration ksi
enumeration ksj
enumeration ksk
enumeration ksl
enumeration ksm
enumeration ksn
enumeration kso
enumeration ksp
enumeration ksq
enumeration ksr
enumeration kss
enumeration kst
enumeration ksu
enumeration ksv
enumeration ksw
enumeration ksx
enumeration ksy
enumeration ksz
enumeration kta
enumeration ktb
enumeration ktc
enumeration ktd
enumeration kte
enumeration ktf
enumeration ktg
enumeration kth
enumeration kti
enumeration ktj
enumeration ktk
enumeration ktl
enumeration ktm
enumeration ktn
enumeration kto
enumeration ktp
enumeration ktq
enumeration ktr
enumeration kts
enumeration ktt
enumeration ktu
enumeration ktv
enumeration ktw
enumeration ktx
enumeration kty
enumeration ktz
enumeration kub
enumeration kuc
enumeration kud
enumeration kue
enumeration kuf
enumeration kug
enumeration kuh
enumeration kui
enumeration kuj
enumeration kuk
enumeration kul
enumeration kum
enumeration kun
enumeration kuo
enumeration kup
enumeration kuq
enumeration kus
enumeration kut
enumeration kuu
enumeration kuv
enumeration kuw
enumeration kux
enumeration kuy
enumeration kuz
enumeration kva
enumeration kvb
enumeration kvc
enumeration kvd
enumeration kve
enumeration kvf
enumeration kvg
enumeration kvh
enumeration kvi
enumeration kvj
enumeration kvk
enumeration kvl
enumeration kvm
enumeration kvn
enumeration kvo
enumeration kvp
enumeration kvq
enumeration kvr
enumeration kvs
enumeration kvt
enumeration kvu
enumeration kvv
enumeration kvw
enumeration kvx
enumeration kvy
enumeration kvz
enumeration kwa
enumeration kwb
enumeration kwc
enumeration kwd
enumeration kwe
enumeration kwf
enumeration kwg
enumeration kwh
enumeration kwi
enumeration kwj
enumeration kwk
enumeration kwl
enumeration kwm
enumeration kwn
enumeration kwo
enumeration kwp
enumeration kwq
enumeration kwr
enumeration kws
enumeration kwt
enumeration kwu
enumeration kwv
enumeration kww
enumeration kwx
enumeration kwy
enumeration kwz
enumeration kxa
enumeration kxb
enumeration kxc
enumeration kxd
enumeration kxe
enumeration kxf
enumeration kxh
enumeration kxi
enumeration kxj
enumeration kxk
enumeration kxl
enumeration kxm
enumeration kxn
enumeration kxo
enumeration kxp
enumeration kxq
enumeration kxr
enumeration kxs
enumeration kxt
enumeration kxu
enumeration kxv
enumeration kxw
enumeration kxx
enumeration kxy
enumeration kxz
enumeration kya
enumeration kyb
enumeration kyc
enumeration kyd
enumeration kye
enumeration kyf
enumeration kyg
enumeration kyh
enumeration kyi
enumeration kyj
enumeration kyk
enumeration kyl
enumeration kym
enumeration kyn
enumeration kyo
enumeration kyp
enumeration kyq
enumeration kyr
enumeration kys
enumeration kyt
enumeration kyu
enumeration kyv
enumeration kyw
enumeration kyx
enumeration kyy
enumeration kyz
enumeration kza
enumeration kzb
enumeration kzc
enumeration kzd
enumeration kze
enumeration kzf
enumeration kzg
enumeration kzi
enumeration kzj
enumeration kzk
enumeration kzl
enumeration kzm
enumeration kzn
enumeration kzo
enumeration kzp
enumeration kzq
enumeration kzr
enumeration kzs
enumeration kzt
enumeration kzu
enumeration kzv
enumeration kzw
enumeration kzx
enumeration kzy
enumeration kzz
enumeration laa
enumeration lab
enumeration lac
enumeration lad
enumeration lae
enumeration laf
enumeration lag
enumeration lah
enumeration lai
enumeration laj
enumeration lak
enumeration lal
enumeration lam
enumeration lan
enumeration lap
enumeration laq
enumeration lar
enumeration las
enumeration lau
enumeration law
enumeration lax
enumeration lay
enumeration laz
enumeration lba
enumeration lbb
enumeration lbc
enumeration lbe
enumeration lbf
enumeration lbg
enumeration lbi
enumeration lbj
enumeration lbk
enumeration lbl
enumeration lbm
enumeration lbn
enumeration lbo
enumeration lbq
enumeration lbr
enumeration lbs
enumeration lbt
enumeration lbu
enumeration lbv
enumeration lbw
enumeration lbx
enumeration lby
enumeration lbz
enumeration lcc
enumeration lcd
enumeration lce
enumeration lcf
enumeration lch
enumeration lcl
enumeration lcm
enumeration lcp
enumeration lcq
enumeration lcs
enumeration lda
enumeration ldb
enumeration ldd
enumeration ldg
enumeration ldh
enumeration ldi
enumeration ldj
enumeration ldk
enumeration ldl
enumeration ldm
enumeration ldn
enumeration ldo
enumeration ldp
enumeration ldq
enumeration lea
enumeration leb
enumeration lec
enumeration led
enumeration lee
enumeration lef
enumeration leh
enumeration lei
enumeration lej
enumeration lek
enumeration lel
enumeration lem
enumeration len
enumeration leo
enumeration lep
enumeration leq
enumeration ler
enumeration les
enumeration let
enumeration leu
enumeration lev
enumeration lew
enumeration lex
enumeration ley
enumeration lez
enumeration lfa
enumeration lfn
enumeration lga
enumeration lgb
enumeration lgg
enumeration lgh
enumeration lgi
enumeration lgk
enumeration lgl
enumeration lgm
enumeration lgn
enumeration lgq
enumeration lgr
enumeration lgt
enumeration lgu
enumeration lgz
enumeration lha
enumeration lhh
enumeration lhi
enumeration lhl
enumeration lhm
enumeration lhn
enumeration lhp
enumeration lhs
enumeration lht
enumeration lhu
enumeration lia
enumeration lib
enumeration lic
enumeration lid
enumeration lie
enumeration lif
enumeration lig
enumeration lih
enumeration lii
enumeration lij
enumeration lik
enumeration lil
enumeration lio
enumeration lip
enumeration liq
enumeration lir
enumeration lis
enumeration liu
enumeration liv
enumeration liw
enumeration lix
enumeration liy
enumeration liz
enumeration lja
enumeration lje
enumeration lji
enumeration ljl
enumeration ljp
enumeration ljw
enumeration ljx
enumeration lka
enumeration lkb
enumeration lkc
enumeration lkd
enumeration lke
enumeration lkh
enumeration lki
enumeration lkj
enumeration lkl
enumeration lkm
enumeration lkn
enumeration lko
enumeration lkr
enumeration lks
enumeration lkt
enumeration lku
enumeration lky
enumeration lla
enumeration llb
enumeration llc
enumeration lld
enumeration lle
enumeration llf
enumeration llg
enumeration llh
enumeration lli
enumeration llj
enumeration llk
enumeration lll
enumeration llm
enumeration lln
enumeration llo
enumeration llp
enumeration llq
enumeration lls
enumeration llu
enumeration llx
enumeration lma
enumeration lmb
enumeration lmc
enumeration lmd
enumeration lme
enumeration lmf
enumeration lmg
enumeration lmh
enumeration lmi
enumeration lmj
enumeration lmk
enumeration lml
enumeration lmn
enumeration lmo
enumeration lmp
enumeration lmq
enumeration lmr
enumeration lmu
enumeration lmv
enumeration lmw
enumeration lmx
enumeration lmy
enumeration lmz
enumeration lna
enumeration lnb
enumeration lnd
enumeration lng
enumeration lnh
enumeration lni
enumeration lnj
enumeration lnl
enumeration lnm
enumeration lnn
enumeration lno
enumeration lns
enumeration lnu
enumeration lnw
enumeration lnz
enumeration loa
enumeration lob
enumeration loc
enumeration loe
enumeration lof
enumeration log
enumeration loh
enumeration loi
enumeration loj
enumeration lok
enumeration lol
enumeration lom
enumeration lon
enumeration loo
enumeration lop
enumeration loq
enumeration lor
enumeration los
enumeration lot
enumeration lou
enumeration lov
enumeration low
enumeration lox
enumeration loy
enumeration loz
enumeration lpa
enumeration lpe
enumeration lpn
enumeration lpo
enumeration lpx
enumeration lra
enumeration lrc
enumeration lre
enumeration lrg
enumeration lri
enumeration lrk
enumeration lrl
enumeration lrm
enumeration lrn
enumeration lro
enumeration lrr
enumeration lrt
enumeration lrv
enumeration lrz
enumeration lsa
enumeration lsd
enumeration lse
enumeration lsg
enumeration lsh
enumeration lsi
enumeration lsl
enumeration lsm
enumeration lso
enumeration lsp
enumeration lsr
enumeration lss
enumeration lst
enumeration lsy
enumeration ltc
enumeration ltg
enumeration lti
enumeration ltn
enumeration lto
enumeration lts
enumeration ltu
enumeration lua
enumeration luc
enumeration lud
enumeration lue
enumeration luf
enumeration lui
enumeration luj
enumeration luk
enumeration lul
enumeration lum
enumeration lun
enumeration luo
enumeration lup
enumeration luq
enumeration lur
enumeration lus
enumeration lut
enumeration luu
enumeration luv
enumeration luw
enumeration luy
enumeration luz
enumeration lva
enumeration lvk
enumeration lvs
enumeration lvu
enumeration lwa
enumeration lwe
enumeration lwg
enumeration lwh
enumeration lwl
enumeration lwm
enumeration lwo
enumeration lwt
enumeration lwu
enumeration lww
enumeration lya
enumeration lyg
enumeration lyn
enumeration lzh
enumeration lzl
enumeration lzn
enumeration lzz
enumeration maa
enumeration mab
enumeration mad
enumeration mae
enumeration maf
enumeration mag
enumeration mai
enumeration maj
enumeration mak
enumeration mam
enumeration man
enumeration map
enumeration maq
enumeration mas
enumeration mat
enumeration mau
enumeration mav
enumeration maw
enumeration max
enumeration maz
enumeration mba
enumeration mbb
enumeration mbc
enumeration mbd
enumeration mbe
enumeration mbf
enumeration mbh
enumeration mbi
enumeration mbj
enumeration mbk
enumeration mbl
enumeration mbm
enumeration mbn
enumeration mbo
enumeration mbp
enumeration mbq
enumeration mbr
enumeration mbs
enumeration mbt
enumeration mbu
enumeration mbv
enumeration mbw
enumeration mbx
enumeration mby
enumeration mbz
enumeration mca
enumeration mcb
enumeration mcc
enumeration mcd
enumeration mce
enumeration mcf
enumeration mcg
enumeration mch
enumeration mci
enumeration mcj
enumeration mck
enumeration mcl
enumeration mcm
enumeration mcn
enumeration mco
enumeration mcp
enumeration mcq
enumeration mcr
enumeration mcs
enumeration mct
enumeration mcu
enumeration mcv
enumeration mcw
enumeration mcx
enumeration mcy
enumeration mcz
enumeration mda
enumeration mdb
enumeration mdc
enumeration mdd
enumeration mde
enumeration mdf
enumeration mdg
enumeration mdh
enumeration mdi
enumeration mdj
enumeration mdk
enumeration mdl
enumeration mdm
enumeration mdn
enumeration mdp
enumeration mdq
enumeration mdr
enumeration mds
enumeration mdt
enumeration mdu
enumeration mdv
enumeration mdw
enumeration mdx
enumeration mdy
enumeration mdz
enumeration mea
enumeration meb
enumeration mec
enumeration med
enumeration mee
enumeration mef
enumeration meh
enumeration mei
enumeration mej
enumeration mek
enumeration mel
enumeration mem
enumeration men
enumeration meo
enumeration mep
enumeration meq
enumeration mer
enumeration mes
enumeration met
enumeration meu
enumeration mev
enumeration mew
enumeration mey
enumeration mez
enumeration mfa
enumeration mfb
enumeration mfc
enumeration mfd
enumeration mfe
enumeration mff
enumeration mfg
enumeration mfh
enumeration mfi
enumeration mfj
enumeration mfk
enumeration mfl
enumeration mfm
enumeration mfn
enumeration mfo
enumeration mfp
enumeration mfq
enumeration mfr
enumeration mfs
enumeration mft
enumeration mfu
enumeration mfv
enumeration mfw
enumeration mfx
enumeration mfy
enumeration mfz
enumeration mga
enumeration mgb
enumeration mgc
enumeration mgd
enumeration mge
enumeration mgf
enumeration mgg
enumeration mgh
enumeration mgi
enumeration mgj
enumeration mgk
enumeration mgl
enumeration mgm
enumeration mgn
enumeration mgo
enumeration mgp
enumeration mgq
enumeration mgr
enumeration mgs
enumeration mgt
enumeration mgu
enumeration mgv
enumeration mgw
enumeration mgy
enumeration mgz
enumeration mha
enumeration mhb
enumeration mhc
enumeration mhd
enumeration mhe
enumeration mhf
enumeration mhg
enumeration mhi
enumeration mhj
enumeration mhk
enumeration mhl
enumeration mhm
enumeration mhn
enumeration mho
enumeration mhp
enumeration mhq
enumeration mhr
enumeration mhs
enumeration mht
enumeration mhu
enumeration mhw
enumeration mhx
enumeration mhy
enumeration mhz
enumeration mia
enumeration mib
enumeration mic
enumeration mid
enumeration mie
enumeration mif
enumeration mig
enumeration mih
enumeration mii
enumeration mij
enumeration mik
enumeration mil
enumeration mim
enumeration min
enumeration mio
enumeration mip
enumeration miq
enumeration mir
enumeration mis
enumeration mit
enumeration miu
enumeration miw
enumeration mix
enumeration miy
enumeration miz
enumeration mjc
enumeration mjd
enumeration mje
enumeration mjg
enumeration mjh
enumeration mji
enumeration mjj
enumeration mjk
enumeration mjl
enumeration mjm
enumeration mjn
enumeration mjo
enumeration mjp
enumeration mjq
enumeration mjr
enumeration mjs
enumeration mjt
enumeration mju
enumeration mjv
enumeration mjw
enumeration mjx
enumeration mjy
enumeration mjz
enumeration mka
enumeration mkb
enumeration mkc
enumeration mke
enumeration mkf
enumeration mkg
enumeration mkh
enumeration mki
enumeration mkj
enumeration mkk
enumeration mkl
enumeration mkm
enumeration mkn
enumeration mko
enumeration mkp
enumeration mkq
enumeration mkr
enumeration mks
enumeration mkt
enumeration mku
enumeration mkv
enumeration mkw
enumeration mkx
enumeration mky
enumeration mkz
enumeration mla
enumeration mlb
enumeration mlc
enumeration mle
enumeration mlf
enumeration mlh
enumeration mli
enumeration mlj
enumeration mlk
enumeration mll
enumeration mlm
enumeration mln
enumeration mlo
enumeration mlp
enumeration mlq
enumeration mlr
enumeration mls
enumeration mlu
enumeration mlv
enumeration mlw
enumeration mlx
enumeration mlz
enumeration mma
enumeration mmb
enumeration mmc
enumeration mmd
enumeration mme
enumeration mmf
enumeration mmg
enumeration mmh
enumeration mmi
enumeration mmj
enumeration mmk
enumeration mml
enumeration mmm
enumeration mmn
enumeration mmo
enumeration mmp
enumeration mmq
enumeration mmr
enumeration mmt
enumeration mmu
enumeration mmv
enumeration mmw
enumeration mmx
enumeration mmy
enumeration mmz
enumeration mna
enumeration mnb
enumeration mnc
enumeration mnd
enumeration mne
enumeration mnf
enumeration mng
enumeration mnh
enumeration mni
enumeration mnj
enumeration mnk
enumeration mnl
enumeration mnm
enumeration mnn
enumeration mno
enumeration mnp
enumeration mnq
enumeration mnr
enumeration mns
enumeration mnu
enumeration mnv
enumeration mnw
enumeration mnx
enumeration mny
enumeration mnz
enumeration moa
enumeration moc
enumeration mod
enumeration moe
enumeration mog
enumeration moh
enumeration moi
enumeration moj
enumeration mok
enumeration mom
enumeration moo
enumeration mop
enumeration moq
enumeration mor
enumeration mos
enumeration mot
enumeration mou
enumeration mov
enumeration mow
enumeration mox
enumeration moy
enumeration moz
enumeration mpa
enumeration mpb
enumeration mpc
enumeration mpd
enumeration mpe
enumeration mpg
enumeration mph
enumeration mpi
enumeration mpj
enumeration mpk
enumeration mpl
enumeration mpm
enumeration mpn
enumeration mpo
enumeration mpp
enumeration mpq
enumeration mpr
enumeration mps
enumeration mpt
enumeration mpu
enumeration mpv
enumeration mpw
enumeration mpx
enumeration mpy
enumeration mpz
enumeration mqa
enumeration mqb
enumeration mqc
enumeration mqe
enumeration mqf
enumeration mqg
enumeration mqh
enumeration mqi
enumeration mqj
enumeration mqk
enumeration mql
enumeration mqm
enumeration mqn
enumeration mqo
enumeration mqp
enumeration mqq
enumeration mqr
enumeration mqs
enumeration mqt
enumeration mqu
enumeration mqv
enumeration mqw
enumeration mqx
enumeration mqy
enumeration mqz
enumeration mra
enumeration mrb
enumeration mrc
enumeration mrd
enumeration mre
enumeration mrf
enumeration mrg
enumeration mrh
enumeration mrj
enumeration mrk
enumeration mrl
enumeration mrm
enumeration mrn
enumeration mro
enumeration mrp
enumeration mrq
enumeration mrr
enumeration mrs
enumeration mrt
enumeration mru
enumeration mrv
enumeration mrw
enumeration mrx
enumeration mry
enumeration mrz
enumeration msb
enumeration msc
enumeration msd
enumeration mse
enumeration msf
enumeration msg
enumeration msh
enumeration msi
enumeration msj
enumeration msk
enumeration msl
enumeration msm
enumeration msn
enumeration mso
enumeration msp
enumeration msq
enumeration msr
enumeration mss
enumeration msu
enumeration msv
enumeration msw
enumeration msx
enumeration msy
enumeration msz
enumeration mta
enumeration mtb
enumeration mtc
enumeration mtd
enumeration mte
enumeration mtf
enumeration mtg
enumeration mth
enumeration mti
enumeration mtj
enumeration mtk
enumeration mtl
enumeration mtm
enumeration mtn
enumeration mto
enumeration mtp
enumeration mtq
enumeration mtr
enumeration mts
enumeration mtt
enumeration mtu
enumeration mtv
enumeration mtw
enumeration mtx
enumeration mty
enumeration mua
enumeration mub
enumeration muc
enumeration mud
enumeration mue
enumeration mug
enumeration muh
enumeration mui
enumeration muj
enumeration muk
enumeration mul
enumeration mum
enumeration mun
enumeration muo
enumeration mup
enumeration muq
enumeration mur
enumeration mus
enumeration mut
enumeration muu
enumeration muv
enumeration mux
enumeration muy
enumeration muz
enumeration mva
enumeration mvb
enumeration mvd
enumeration mve
enumeration mvf
enumeration mvg
enumeration mvh
enumeration mvi
enumeration mvk
enumeration mvl
enumeration mvm
enumeration mvn
enumeration mvo
enumeration mvp
enumeration mvq
enumeration mvr
enumeration mvs
enumeration mvt
enumeration mvu
enumeration mvv
enumeration mvw
enumeration mvx
enumeration mvy
enumeration mvz
enumeration mwa
enumeration mwb
enumeration mwc
enumeration mwe
enumeration mwf
enumeration mwg
enumeration mwh
enumeration mwi
enumeration mwj
enumeration mwk
enumeration mwl
enumeration mwm
enumeration mwn
enumeration mwo
enumeration mwp
enumeration mwq
enumeration mwr
enumeration mws
enumeration mwt
enumeration mwu
enumeration mwv
enumeration mww
enumeration mwx
enumeration mwy
enumeration mwz
enumeration mxa
enumeration mxb
enumeration mxc
enumeration mxd
enumeration mxe
enumeration mxf
enumeration mxg
enumeration mxh
enumeration mxi
enumeration mxj
enumeration mxk
enumeration mxl
enumeration mxm
enumeration mxn
enumeration mxo
enumeration mxp
enumeration mxq
enumeration mxr
enumeration mxs
enumeration mxt
enumeration mxu
enumeration mxv
enumeration mxw
enumeration mxx
enumeration mxy
enumeration mxz
enumeration myb
enumeration myc
enumeration myd
enumeration mye
enumeration myf
enumeration myg
enumeration myh
enumeration myi
enumeration myj
enumeration myk
enumeration myl
enumeration mym
enumeration myn
enumeration myo
enumeration myp
enumeration myr
enumeration mys
enumeration myu
enumeration myv
enumeration myw
enumeration myx
enumeration myy
enumeration myz
enumeration mza
enumeration mzb
enumeration mzc
enumeration mzd
enumeration mze
enumeration mzg
enumeration mzh
enumeration mzi
enumeration mzj
enumeration mzk
enumeration mzl
enumeration mzm
enumeration mzn
enumeration mzo
enumeration mzp
enumeration mzq
enumeration mzr
enumeration mzs
enumeration mzt
enumeration mzu
enumeration mzv
enumeration mzw
enumeration mzx
enumeration mzy
enumeration mzz
enumeration naa
enumeration nab
enumeration nac
enumeration nad
enumeration nae
enumeration naf
enumeration nag
enumeration nah
enumeration nai
enumeration naj
enumeration nak
enumeration nal
enumeration nam
enumeration nan
enumeration nao
enumeration nap
enumeration naq
enumeration nar
enumeration nas
enumeration nat
enumeration naw
enumeration nax
enumeration nay
enumeration naz
enumeration nba
enumeration nbb
enumeration nbc
enumeration nbd
enumeration nbe
enumeration nbg
enumeration nbh
enumeration nbi
enumeration nbj
enumeration nbk
enumeration nbm
enumeration nbn
enumeration nbo
enumeration nbp
enumeration nbq
enumeration nbr
enumeration nbs
enumeration nbt
enumeration nbu
enumeration nbv
enumeration nbw
enumeration nby
enumeration nca
enumeration ncb
enumeration ncc
enumeration ncd
enumeration nce
enumeration ncf
enumeration ncg
enumeration nch
enumeration nci
enumeration ncj
enumeration nck
enumeration ncl
enumeration ncm
enumeration ncn
enumeration nco
enumeration ncp
enumeration ncr
enumeration ncs
enumeration nct
enumeration ncu
enumeration ncx
enumeration ncz
enumeration nda
enumeration ndb
enumeration ndc
enumeration ndd
enumeration ndf
enumeration ndg
enumeration ndh
enumeration ndi
enumeration ndj
enumeration ndk
enumeration ndl
enumeration ndm
enumeration ndn
enumeration ndp
enumeration ndq
enumeration ndr
enumeration nds
enumeration ndt
enumeration ndu
enumeration ndv
enumeration ndw
enumeration ndx
enumeration ndy
enumeration ndz
enumeration nea
enumeration neb
enumeration nec
enumeration ned
enumeration nee
enumeration nef
enumeration neg
enumeration neh
enumeration nei
enumeration nej
enumeration nek
enumeration nem
enumeration nen
enumeration neo
enumeration neq
enumeration ner
enumeration nes
enumeration net
enumeration neu
enumeration nev
enumeration new
enumeration nex
enumeration ney
enumeration nez
enumeration nfa
enumeration nfd
enumeration nfl
enumeration nfr
enumeration nfu
enumeration nga
enumeration ngb
enumeration ngc
enumeration ngd
enumeration nge
enumeration ngf
enumeration ngg
enumeration ngh
enumeration ngi
enumeration ngj
enumeration ngk
enumeration ngl
enumeration ngm
enumeration ngn
enumeration ngo
enumeration ngp
enumeration ngq
enumeration ngr
enumeration ngs
enumeration ngt
enumeration ngu
enumeration ngv
enumeration ngw
enumeration ngx
enumeration ngy
enumeration ngz
enumeration nha
enumeration nhb
enumeration nhc
enumeration nhd
enumeration nhe
enumeration nhf
enumeration nhg
enumeration nhh
enumeration nhi
enumeration nhk
enumeration nhm
enumeration nhn
enumeration nho
enumeration nhp
enumeration nhq
enumeration nhr
enumeration nht
enumeration nhu
enumeration nhv
enumeration nhw
enumeration nhx
enumeration nhy
enumeration nhz
enumeration nia
enumeration nib
enumeration nic
enumeration nid
enumeration nie
enumeration nif
enumeration nig
enumeration nih
enumeration nii
enumeration nij
enumeration nik
enumeration nil
enumeration nim
enumeration nin
enumeration nio
enumeration niq
enumeration nir
enumeration nis
enumeration nit
enumeration niu
enumeration niv
enumeration niw
enumeration nix
enumeration niy
enumeration niz
enumeration nja
enumeration njb
enumeration njd
enumeration njh
enumeration nji
enumeration njj
enumeration njl
enumeration njm
enumeration njn
enumeration njo
enumeration njr
enumeration njs
enumeration njt
enumeration nju
enumeration njx
enumeration njy
enumeration njz
enumeration nka
enumeration nkb
enumeration nkc
enumeration nkd
enumeration nke
enumeration nkf
enumeration nkg
enumeration nkh
enumeration nki
enumeration nkj
enumeration nkk
enumeration nkm
enumeration nkn
enumeration nko
enumeration nkp
enumeration nkq
enumeration nkr
enumeration nks
enumeration nkt
enumeration nku
enumeration nkv
enumeration nkw
enumeration nkx
enumeration nkz
enumeration nla
enumeration nlc
enumeration nle
enumeration nlg
enumeration nli
enumeration nlj
enumeration nlk
enumeration nll
enumeration nlo
enumeration nlq
enumeration nlu
enumeration nlv
enumeration nlw
enumeration nlx
enumeration nly
enumeration nlz
enumeration nma
enumeration nmb
enumeration nmc
enumeration nmd
enumeration nme
enumeration nmf
enumeration nmg
enumeration nmh
enumeration nmi
enumeration nmj
enumeration nmk
enumeration nml
enumeration nmm
enumeration nmn
enumeration nmo
enumeration nmp
enumeration nmq
enumeration nmr
enumeration nms
enumeration nmt
enumeration nmu
enumeration nmv
enumeration nmw
enumeration nmx
enumeration nmy
enumeration nmz
enumeration nna
enumeration nnb
enumeration nnc
enumeration nnd
enumeration nne
enumeration nnf
enumeration nng
enumeration nnh
enumeration nni
enumeration nnj
enumeration nnk
enumeration nnl
enumeration nnm
enumeration nnn
enumeration nnp
enumeration nnq
enumeration nnr
enumeration nns
enumeration nnt
enumeration nnu
enumeration nnv
enumeration nnw
enumeration nnx
enumeration nny
enumeration nnz
enumeration noa
enumeration noc
enumeration nod
enumeration noe
enumeration nof
enumeration nog
enumeration noh
enumeration noi
enumeration noj
enumeration nok
enumeration nol
enumeration nom
enumeration non
enumeration nop
enumeration noq
enumeration nos
enumeration not
enumeration nou
enumeration nov
enumeration now
enumeration noy
enumeration noz
enumeration npa
enumeration npb
enumeration npg
enumeration nph
enumeration npi
enumeration npl
enumeration npn
enumeration npo
enumeration nps
enumeration npu
enumeration npy
enumeration nqg
enumeration nqk
enumeration nqm
enumeration nqn
enumeration nqo
enumeration nqq
enumeration nqy
enumeration nra
enumeration nrb
enumeration nrc
enumeration nre
enumeration nrg
enumeration nri
enumeration nrk
enumeration nrl
enumeration nrm
enumeration nrn
enumeration nrp
enumeration nrr
enumeration nrt
enumeration nru
enumeration nrx
enumeration nrz
enumeration nsa
enumeration nsc
enumeration nsd
enumeration nse
enumeration nsf
enumeration nsg
enumeration nsh
enumeration nsi
enumeration nsk
enumeration nsl
enumeration nsm
enumeration nsn
enumeration nso
enumeration nsp
enumeration nsq
enumeration nsr
enumeration nss
enumeration nst
enumeration nsu
enumeration nsv
enumeration nsw
enumeration nsx
enumeration nsy
enumeration nsz
enumeration nte
enumeration ntg
enumeration nti
enumeration ntj
enumeration ntk
enumeration ntm
enumeration nto
enumeration ntp
enumeration ntr
enumeration nts
enumeration ntu
enumeration ntw
enumeration ntx
enumeration nty
enumeration ntz
enumeration nua
enumeration nub
enumeration nuc
enumeration nud
enumeration nue
enumeration nuf
enumeration nug
enumeration nuh
enumeration nui
enumeration nuj
enumeration nuk
enumeration nul
enumeration num
enumeration nun
enumeration nuo
enumeration nup
enumeration nuq
enumeration nur
enumeration nus
enumeration nut
enumeration nuu
enumeration nuv
enumeration nuw
enumeration nux
enumeration nuy
enumeration nuz
enumeration nvh
enumeration nvm
enumeration nvo
enumeration nwa
enumeration nwb
enumeration nwc
enumeration nwe
enumeration nwg
enumeration nwi
enumeration nwm
enumeration nwo
enumeration nwr
enumeration nwx
enumeration nwy
enumeration nxa
enumeration nxd
enumeration nxe
enumeration nxg
enumeration nxi
enumeration nxk
enumeration nxl
enumeration nxm
enumeration nxn
enumeration nxq
enumeration nxr
enumeration nxu
enumeration nxx
enumeration nyb
enumeration nyc
enumeration nyd
enumeration nye
enumeration nyf
enumeration nyg
enumeration nyh
enumeration nyi
enumeration nyj
enumeration nyk
enumeration nyl
enumeration nym
enumeration nyn
enumeration nyo
enumeration nyp
enumeration nyq
enumeration nyr
enumeration nys
enumeration nyt
enumeration nyu
enumeration nyv
enumeration nyw
enumeration nyx
enumeration nyy
enumeration nza
enumeration nzb
enumeration nzi
enumeration nzk
enumeration nzm
enumeration nzs
enumeration nzu
enumeration nzy
enumeration nzz
enumeration oaa
enumeration oac
enumeration oar
enumeration oav
enumeration obi
enumeration obk
enumeration obl
enumeration obm
enumeration obo
enumeration obr
enumeration obt
enumeration obu
enumeration oca
enumeration och
enumeration oco
enumeration ocu
enumeration oda
enumeration odk
enumeration odt
enumeration odu
enumeration ofo
enumeration ofs
enumeration ofu
enumeration ogb
enumeration ogc
enumeration oge
enumeration ogg
enumeration ogo
enumeration ogu
enumeration oht
enumeration ohu
enumeration oia
enumeration oin
enumeration ojb
enumeration ojc
enumeration ojg
enumeration ojp
enumeration ojs
enumeration ojv
enumeration ojw
enumeration oka
enumeration okb
enumeration okd
enumeration oke
enumeration okg
enumeration okh
enumeration oki
enumeration okj
enumeration okk
enumeration okl
enumeration okm
enumeration okn
enumeration oko
enumeration okr
enumeration oks
enumeration oku
enumeration okv
enumeration okx
enumeration ola
enumeration old
enumeration ole
enumeration olk
enumeration olm
enumeration olo
enumeration olr
enumeration olt
enumeration oma
enumeration omb
enumeration omc
enumeration ome
enumeration omg
enumeration omi
enumeration omk
enumeration oml
enumeration omn
enumeration omo
enumeration omp
enumeration omq
enumeration omr
enumeration omt
enumeration omu
enumeration omv
enumeration omw
enumeration omx
enumeration ona
enumeration onb
enumeration one
enumeration ong
enumeration oni
enumeration onj
enumeration onk
enumeration onn
enumeration ono
enumeration onp
enumeration onr
enumeration ons
enumeration ont
enumeration onu
enumeration onw
enumeration onx
enumeration ood
enumeration oog
enumeration oon
enumeration oor
enumeration oos
enumeration opa
enumeration opk
enumeration opm
enumeration opo
enumeration opt
enumeration opy
enumeration ora
enumeration orc
enumeration ore
enumeration org
enumeration orh
enumeration orn
enumeration oro
enumeration orr
enumeration ors
enumeration ort
enumeration oru
enumeration orv
enumeration orw
enumeration orx
enumeration ory
enumeration orz
enumeration osa
enumeration osc
enumeration osi
enumeration oso
enumeration osp
enumeration ost
enumeration osu
enumeration osx
enumeration ota
enumeration otb
enumeration otd
enumeration ote
enumeration oti
enumeration otk
enumeration otl
enumeration otm
enumeration otn
enumeration oto
enumeration otq
enumeration otr
enumeration ots
enumeration ott
enumeration otu
enumeration otw
enumeration otx
enumeration oty
enumeration otz
enumeration oua
enumeration oub
enumeration oue
enumeration oui
enumeration oum
enumeration oun
enumeration owi
enumeration owl
enumeration oyb
enumeration oyd
enumeration oym
enumeration oyy
enumeration ozm
enumeration paa
enumeration pab
enumeration pac
enumeration pad
enumeration pae
enumeration paf
enumeration pag
enumeration pah
enumeration pai
enumeration pak
enumeration pal
enumeration pam
enumeration pao
enumeration pap
enumeration paq
enumeration par
enumeration pas
enumeration pat
enumeration pau
enumeration pav
enumeration paw
enumeration pax
enumeration pay
enumeration paz
enumeration pbb
enumeration pbc
enumeration pbe
enumeration pbf
enumeration pbg
enumeration pbh
enumeration pbi
enumeration pbl
enumeration pbn
enumeration pbo
enumeration pbp
enumeration pbr
enumeration pbs
enumeration pbt
enumeration pbu
enumeration pbv
enumeration pby
enumeration pca
enumeration pcb
enumeration pcc
enumeration pcd
enumeration pce
enumeration pcf
enumeration pcg
enumeration pch
enumeration pci
enumeration pcj
enumeration pck
enumeration pcl
enumeration pcm
enumeration pcn
enumeration pcp
enumeration pcw
enumeration pda
enumeration pdc
enumeration pdi
enumeration pdn
enumeration pdo
enumeration pdt
enumeration pdu
enumeration pea
enumeration peb
enumeration ped
enumeration pee
enumeration pef
enumeration peg
enumeration peh
enumeration pei
enumeration pej
enumeration pek
enumeration pel
enumeration pem
enumeration peo
enumeration pep
enumeration peq
enumeration pes
enumeration pev
enumeration pex
enumeration pey
enumeration pez
enumeration pfa
enumeration pfe
enumeration pfl
enumeration pga
enumeration pgg
enumeration pgi
enumeration pgk
enumeration pgl
enumeration pgn
enumeration pgs
enumeration pgu
enumeration pha
enumeration phd
enumeration phg
enumeration phh
enumeration phi
enumeration phk
enumeration phl
enumeration phm
enumeration phn
enumeration pho
enumeration phq
enumeration phr
enumeration pht
enumeration phu
enumeration phv
enumeration phw
enumeration pia
enumeration pib
enumeration pic
enumeration pid
enumeration pie
enumeration pif
enumeration pig
enumeration pih
enumeration pii
enumeration pij
enumeration pil
enumeration pim
enumeration pin
enumeration pio
enumeration pip
enumeration pir
enumeration pis
enumeration pit
enumeration piu
enumeration piv
enumeration piw
enumeration pix
enumeration piy
enumeration piz
enumeration pjt
enumeration pka
enumeration pkb
enumeration pkc
enumeration pkg
enumeration pkh
enumeration pkn
enumeration pko
enumeration pkp
enumeration pkr
enumeration pks
enumeration pkt
enumeration pku
enumeration pla
enumeration plb
enumeration plc
enumeration pld
enumeration ple
enumeration plf
enumeration plg
enumeration plh
enumeration plj
enumeration plk
enumeration pll
enumeration pln
enumeration plo
enumeration plp
enumeration plq
enumeration plr
enumeration pls
enumeration plt
enumeration plu
enumeration plv
enumeration plw
enumeration ply
enumeration plz
enumeration pma
enumeration pmb
enumeration pmc
enumeration pmd
enumeration pme
enumeration pmf
enumeration pmh
enumeration pmi
enumeration pmj
enumeration pmk
enumeration pml
enumeration pmm
enumeration pmn
enumeration pmo
enumeration pmq
enumeration pmr
enumeration pms
enumeration pmt
enumeration pmu
enumeration pmw
enumeration pmx
enumeration pmy
enumeration pmz
enumeration pna
enumeration pnb
enumeration pnc
enumeration pne
enumeration png
enumeration pnh
enumeration pni
enumeration pnj
enumeration pnk
enumeration pnl
enumeration pnm
enumeration pnn
enumeration pno
enumeration pnp
enumeration pnq
enumeration pnr
enumeration pns
enumeration pnt
enumeration pnu
enumeration pnv
enumeration pnw
enumeration pnx
enumeration pny
enumeration pnz
enumeration poc
enumeration pod
enumeration poe
enumeration pof
enumeration pog
enumeration poh
enumeration poi
enumeration pok
enumeration pom
enumeration pon
enumeration poo
enumeration pop
enumeration poq
enumeration pos
enumeration pot
enumeration pov
enumeration pow
enumeration pox
enumeration poy
enumeration poz
enumeration ppa
enumeration ppe
enumeration ppi
enumeration ppk
enumeration ppl
enumeration ppm
enumeration ppn
enumeration ppo
enumeration ppp
enumeration ppq
enumeration pps
enumeration ppt
enumeration ppu
enumeration pqa
enumeration pqe
enumeration pqm
enumeration pqw
enumeration pra
enumeration prb
enumeration prc
enumeration prd
enumeration pre
enumeration prf
enumeration prg
enumeration prh
enumeration pri
enumeration prk
enumeration prl
enumeration prm
enumeration prn
enumeration pro
enumeration prp
enumeration prq
enumeration prr
enumeration prs
enumeration prt
enumeration pru
enumeration prw
enumeration prx
enumeration pry
enumeration prz
enumeration psa
enumeration psc
enumeration psd
enumeration pse
enumeration psg
enumeration psh
enumeration psi
enumeration psl
enumeration psm
enumeration psn
enumeration pso
enumeration psp
enumeration psq
enumeration psr
enumeration pss
enumeration pst
enumeration psu
enumeration psw
enumeration psy
enumeration pta
enumeration pth
enumeration pti
enumeration ptn
enumeration pto
enumeration ptp
enumeration ptq
enumeration ptr
enumeration ptt
enumeration ptu
enumeration ptv
enumeration ptw
enumeration pty
enumeration pua
enumeration pub
enumeration puc
enumeration pud
enumeration pue
enumeration puf
enumeration pug
enumeration pui
enumeration puj
enumeration puk
enumeration pum
enumeration puo
enumeration pup
enumeration puq
enumeration pur
enumeration put
enumeration puu
enumeration puw
enumeration pux
enumeration puy
enumeration pwa
enumeration pwb
enumeration pwg
enumeration pwi
enumeration pwm
enumeration pwn
enumeration pwo
enumeration pwr
enumeration pww
enumeration pxm
enumeration pye
enumeration pym
enumeration pyn
enumeration pys
enumeration pyu
enumeration pyx
enumeration pyy
enumeration pzn
enumeration qaa..qtz
enumeration qua
enumeration qub
enumeration quc
enumeration qud
enumeration quf
enumeration qug
enumeration quh
enumeration qui
enumeration quk
enumeration qul
enumeration qum
enumeration qun
enumeration qup
enumeration quq
enumeration qur
enumeration qus
enumeration quv
enumeration quw
enumeration qux
enumeration quy
enumeration quz
enumeration qva
enumeration qvc
enumeration qve
enumeration qvh
enumeration qvi
enumeration qvj
enumeration qvl
enumeration qvm
enumeration qvn
enumeration qvo
enumeration qvp
enumeration qvs
enumeration qvw
enumeration qvy
enumeration qvz
enumeration qwa
enumeration qwc
enumeration qwe
enumeration qwh
enumeration qwm
enumeration qws
enumeration qwt
enumeration qxa
enumeration qxc
enumeration qxh
enumeration qxl
enumeration qxn
enumeration qxo
enumeration qxp
enumeration qxq
enumeration qxr
enumeration qxs
enumeration qxt
enumeration qxu
enumeration qxw
enumeration qya
enumeration qyp
enumeration raa
enumeration rab
enumeration rac
enumeration rad
enumeration raf
enumeration rag
enumeration rah
enumeration rai
enumeration raj
enumeration rak
enumeration ral
enumeration ram
enumeration ran
enumeration rao
enumeration rap
enumeration raq
enumeration rar
enumeration ras
enumeration rat
enumeration rau
enumeration rav
enumeration raw
enumeration rax
enumeration ray
enumeration raz
enumeration rbb
enumeration rbk
enumeration rbl
enumeration rbp
enumeration rcf
enumeration rdb
enumeration rea
enumeration reb
enumeration ree
enumeration reg
enumeration rei
enumeration rej
enumeration rel
enumeration rem
enumeration ren
enumeration rer
enumeration res
enumeration ret
enumeration rey
enumeration rga
enumeration rge
enumeration rgk
enumeration rgn
enumeration rgr
enumeration rgs
enumeration rgu
enumeration rhg
enumeration rhp
enumeration ria
enumeration rie
enumeration rif
enumeration ril
enumeration rim
enumeration rin
enumeration rir
enumeration rit
enumeration riu
enumeration rjg
enumeration rji
enumeration rjs
enumeration rka
enumeration rkb
enumeration rkh
enumeration rki
enumeration rkm
enumeration rkt
enumeration rkw
enumeration rma
enumeration rmb
enumeration rmc
enumeration rmd
enumeration rme
enumeration rmf
enumeration rmg
enumeration rmh
enumeration rmi
enumeration rmk
enumeration rml
enumeration rmm
enumeration rmn
enumeration rmo
enumeration rmp
enumeration rmq
enumeration rms
enumeration rmt
enumeration rmu
enumeration rmv
enumeration rmw
enumeration rmx
enumeration rmy
enumeration rmz
enumeration rna
enumeration rnd
enumeration rng
enumeration rnl
enumeration rnn
enumeration rnp
enumeration rnr
enumeration rnw
enumeration roa
enumeration rob
enumeration roc
enumeration rod
enumeration roe
enumeration rof
enumeration rog
enumeration rol
enumeration rom
enumeration roo
enumeration rop
enumeration ror
enumeration rou
enumeration row
enumeration rpn
enumeration rpt
enumeration rri
enumeration rro
enumeration rrt
enumeration rsb
enumeration rsi
enumeration rsl
enumeration rtc
enumeration rth
enumeration rtm
enumeration rtw
enumeration rub
enumeration ruc
enumeration rue
enumeration ruf
enumeration rug
enumeration ruh
enumeration rui
enumeration ruk
enumeration ruo
enumeration rup
enumeration ruq
enumeration rut
enumeration ruu
enumeration ruy
enumeration ruz
enumeration rwa
enumeration rwk
enumeration rwm
enumeration rwo
enumeration rwr
enumeration rxd
enumeration rxw
enumeration ryn
enumeration rys
enumeration ryu
enumeration saa
enumeration sab
enumeration sac
enumeration sad
enumeration sae
enumeration saf
enumeration sah
enumeration sai
enumeration saj
enumeration sak
enumeration sal
enumeration sam
enumeration sao
enumeration saq
enumeration sar
enumeration sas
enumeration sat
enumeration sau
enumeration sav
enumeration saw
enumeration sax
enumeration say
enumeration saz
enumeration sba
enumeration sbb
enumeration sbc
enumeration sbd
enumeration sbe
enumeration sbf
enumeration sbg
enumeration sbh
enumeration sbi
enumeration sbj
enumeration sbk
enumeration sbl
enumeration sbm
enumeration sbn
enumeration sbo
enumeration sbp
enumeration sbq
enumeration sbr
enumeration sbs
enumeration sbt
enumeration sbu
enumeration sbv
enumeration sbw
enumeration sbx
enumeration sby
enumeration sbz
enumeration scb
enumeration sce
enumeration scf
enumeration scg
enumeration sch
enumeration sci
enumeration sck
enumeration scl
enumeration scn
enumeration sco
enumeration scp
enumeration scq
enumeration scs
enumeration scu
enumeration scv
enumeration scw
enumeration scx
enumeration sda
enumeration sdb
enumeration sdc
enumeration sde
enumeration sdf
enumeration sdg
enumeration sdh
enumeration sdj
enumeration sdk
enumeration sdl
enumeration sdm
enumeration sdn
enumeration sdo
enumeration sdp
enumeration sdr
enumeration sds
enumeration sdt
enumeration sdu
enumeration sdv
enumeration sdx
enumeration sdz
enumeration sea
enumeration seb
enumeration sec
enumeration sed
enumeration see
enumeration sef
enumeration seg
enumeration seh
enumeration sei
enumeration sej
enumeration sek
enumeration sel
enumeration sem
enumeration sen
enumeration seo
enumeration sep
enumeration seq
enumeration ser
enumeration ses
enumeration set
enumeration seu
enumeration sev
enumeration sew
enumeration sey
enumeration sez
enumeration sfb
enumeration sfe
enumeration sfm
enumeration sfs
enumeration sfw
enumeration sga
enumeration sgb
enumeration sgc
enumeration sgd
enumeration sge
enumeration sgg
enumeration sgh
enumeration sgi
enumeration sgj
enumeration sgk
enumeration sgm
enumeration sgn
enumeration sgo
enumeration sgp
enumeration sgr
enumeration sgs
enumeration sgt
enumeration sgu
enumeration sgw
enumeration sgx
enumeration sgy
enumeration sgz
enumeration sha
enumeration shb
enumeration shc
enumeration shd
enumeration she
enumeration shg
enumeration shh
enumeration shi
enumeration shj
enumeration shk
enumeration shl
enumeration shm
enumeration shn
enumeration sho
enumeration shp
enumeration shq
enumeration shr
enumeration shs
enumeration sht
enumeration shu
enumeration shv
enumeration shw
enumeration shx
enumeration shy
enumeration shz
enumeration sia
enumeration sib
enumeration sid
enumeration sie
enumeration sif
enumeration sig
enumeration sih
enumeration sii
enumeration sij
enumeration sik
enumeration sil
enumeration sim
enumeration sio
enumeration sip
enumeration siq
enumeration sir
enumeration sis
enumeration sit
enumeration siu
enumeration siv
enumeration siw
enumeration six
enumeration siy
enumeration siz
enumeration sja
enumeration sjb
enumeration sjd
enumeration sje
enumeration sjg
enumeration sjk
enumeration sjl
enumeration sjm
enumeration sjn
enumeration sjo
enumeration sjp
enumeration sjr
enumeration sjs
enumeration sjt
enumeration sju
enumeration sjw
enumeration ska
enumeration skb
enumeration skc
enumeration skd
enumeration ske
enumeration skf
enumeration skg
enumeration skh
enumeration ski
enumeration skj
enumeration skk
enumeration skm
enumeration skn
enumeration sko
enumeration skp
enumeration skq
enumeration skr
enumeration sks
enumeration skt
enumeration sku
enumeration skv
enumeration skw
enumeration skx
enumeration sky
enumeration skz
enumeration sla
enumeration slc
enumeration sld
enumeration sle
enumeration slf
enumeration slg
enumeration slh
enumeration sli
enumeration slj
enumeration sll
enumeration slm
enumeration sln
enumeration slp
enumeration slq
enumeration slr
enumeration sls
enumeration slt
enumeration slu
enumeration slw
enumeration slx
enumeration sly
enumeration slz
enumeration sma
enumeration smb
enumeration smc
enumeration smd
enumeration smf
enumeration smg
enumeration smh
enumeration smi
enumeration smj
enumeration smk
enumeration sml
enumeration smm
enumeration smn
enumeration smp
enumeration smq
enumeration smr
enumeration sms
enumeration smt
enumeration smu
enumeration smv
enumeration smw
enumeration smx
enumeration smy
enumeration smz
enumeration snb
enumeration snc
enumeration sne
enumeration snf
enumeration sng
enumeration snh
enumeration sni
enumeration snj
enumeration snk
enumeration snl
enumeration snm
enumeration snn
enumeration sno
enumeration snp
enumeration snq
enumeration snr
enumeration sns
enumeration snu
enumeration snv
enumeration snw
enumeration snx
enumeration sny
enumeration snz
enumeration soa
enumeration sob
enumeration soc
enumeration sod
enumeration soe
enumeration sog
enumeration soh
enumeration soi
enumeration soj
enumeration sok
enumeration sol
enumeration son
enumeration soo
enumeration sop
enumeration soq
enumeration sor
enumeration sos
enumeration sou
enumeration sov
enumeration sow
enumeration sox
enumeration soy
enumeration soz
enumeration spb
enumeration spc
enumeration spd
enumeration spe
enumeration spg
enumeration spi
enumeration spk
enumeration spl
enumeration spm
enumeration spn
enumeration spo
enumeration spp
enumeration spq
enumeration spr
enumeration sps
enumeration spt
enumeration spu
enumeration spv
enumeration spx
enumeration spy
enumeration sqa
enumeration sqh
enumeration sqj
enumeration sqk
enumeration sqm
enumeration sqn
enumeration sqo
enumeration sqq
enumeration sqr
enumeration sqs
enumeration sqt
enumeration squ
enumeration sra
enumeration srb
enumeration src
enumeration sre
enumeration srf
enumeration srg
enumeration srh
enumeration sri
enumeration srk
enumeration srl
enumeration srm
enumeration srn
enumeration sro
enumeration srq
enumeration srr
enumeration srs
enumeration srt
enumeration sru
enumeration srv
enumeration srw
enumeration srx
enumeration sry
enumeration srz
enumeration ssa
enumeration ssb
enumeration ssc
enumeration ssd
enumeration sse
enumeration ssf
enumeration ssg
enumeration ssh
enumeration ssi
enumeration ssj
enumeration ssk
enumeration ssl
enumeration ssm
enumeration ssn
enumeration sso
enumeration ssp
enumeration ssq
enumeration ssr
enumeration sss
enumeration sst
enumeration ssu
enumeration ssv
enumeration ssx
enumeration ssy
enumeration ssz
enumeration sta
enumeration stb
enumeration std
enumeration ste
enumeration stf
enumeration stg
enumeration sth
enumeration sti
enumeration stj
enumeration stk
enumeration stl
enumeration stm
enumeration stn
enumeration sto
enumeration stp
enumeration stq
enumeration str
enumeration sts
enumeration stt
enumeration stu
enumeration stv
enumeration stw
enumeration sty
enumeration sua
enumeration sub
enumeration suc
enumeration sue
enumeration sug
enumeration sui
enumeration suj
enumeration suk
enumeration suq
enumeration sur
enumeration sus
enumeration sut
enumeration suv
enumeration suw
enumeration sux
enumeration suy
enumeration suz
enumeration sva
enumeration svb
enumeration svc
enumeration sve
enumeration svk
enumeration svm
enumeration svr
enumeration svs
enumeration svx
enumeration swb
enumeration swc
enumeration swf
enumeration swg
enumeration swh
enumeration swi
enumeration swj
enumeration swk
enumeration swl
enumeration swm
enumeration swn
enumeration swo
enumeration swp
enumeration swq
enumeration swr
enumeration sws
enumeration swt
enumeration swu
enumeration swv
enumeration sww
enumeration swx
enumeration swy
enumeration sxb
enumeration sxc
enumeration sxe
enumeration sxg
enumeration sxk
enumeration sxl
enumeration sxm
enumeration sxn
enumeration sxo
enumeration sxr
enumeration sxs
enumeration sxu
enumeration sxw
enumeration sya
enumeration syb
enumeration syc
enumeration syd
enumeration syi
enumeration syk
enumeration syl
enumeration sym
enumeration syn
enumeration syo
enumeration syr
enumeration sys
enumeration syw
enumeration syy
enumeration sza
enumeration szb
enumeration szc
enumeration szd
enumeration sze
enumeration szg
enumeration szl
enumeration szn
enumeration szp
enumeration szv
enumeration szw
enumeration taa
enumeration tab
enumeration tac
enumeration tad
enumeration tae
enumeration taf
enumeration tag
enumeration tai
enumeration taj
enumeration tak
enumeration tal
enumeration tan
enumeration tao
enumeration tap
enumeration taq
enumeration tar
enumeration tas
enumeration tau
enumeration tav
enumeration taw
enumeration tax
enumeration tay
enumeration taz
enumeration tba
enumeration tbb
enumeration tbc
enumeration tbd
enumeration tbe
enumeration tbf
enumeration tbg
enumeration tbh
enumeration tbi
enumeration tbj
enumeration tbk
enumeration tbl
enumeration tbm
enumeration tbn
enumeration tbo
enumeration tbp
enumeration tbq
enumeration tbr
enumeration tbs
enumeration tbt
enumeration tbu
enumeration tbv
enumeration tbw
enumeration tbx
enumeration tby
enumeration tbz
enumeration tca
enumeration tcb
enumeration tcc
enumeration tcd
enumeration tce
enumeration tcf
enumeration tcg
enumeration tch
enumeration tci
enumeration tck
enumeration tcl
enumeration tcm
enumeration tcn
enumeration tco
enumeration tcp
enumeration tcq
enumeration tcs
enumeration tct
enumeration tcu
enumeration tcw
enumeration tcx
enumeration tcy
enumeration tcz
enumeration tda
enumeration tdb
enumeration tdc
enumeration tdd
enumeration tde
enumeration tdf
enumeration tdg
enumeration tdh
enumeration tdi
enumeration tdj
enumeration tdk
enumeration tdl
enumeration tdn
enumeration tdo
enumeration tdq
enumeration tdr
enumeration tds
enumeration tdt
enumeration tdu
enumeration tdv
enumeration tdx
enumeration tdy
enumeration tea
enumeration teb
enumeration tec
enumeration ted
enumeration tee
enumeration tef
enumeration teg
enumeration teh
enumeration tei
enumeration tek
enumeration tem
enumeration ten
enumeration teo
enumeration tep
enumeration teq
enumeration ter
enumeration tes
enumeration tet
enumeration teu
enumeration tev
enumeration tew
enumeration tex
enumeration tey
enumeration tfi
enumeration tfn
enumeration tfo
enumeration tfr
enumeration tft
enumeration tga
enumeration tgb
enumeration tgc
enumeration tgd
enumeration tge
enumeration tgf
enumeration tgh
enumeration tgi
enumeration tgj
enumeration tgn
enumeration tgo
enumeration tgp
enumeration tgq
enumeration tgr
enumeration tgs
enumeration tgt
enumeration tgu
enumeration tgv
enumeration tgw
enumeration tgx
enumeration tgy
enumeration tgz
enumeration thc
enumeration thd
enumeration the
enumeration thf
enumeration thh
enumeration thi
enumeration thk
enumeration thl
enumeration thm
enumeration thn
enumeration thp
enumeration thq
enumeration thr
enumeration ths
enumeration tht
enumeration thu
enumeration thv
enumeration thw
enumeration thx
enumeration thy
enumeration thz
enumeration tia
enumeration tic
enumeration tid
enumeration tif
enumeration tig
enumeration tih
enumeration tii
enumeration tij
enumeration tik
enumeration til
enumeration tim
enumeration tin
enumeration tio
enumeration tip
enumeration tiq
enumeration tis
enumeration tit
enumeration tiu
enumeration tiv
enumeration tiw
enumeration tix
enumeration tiy
enumeration tiz
enumeration tja
enumeration tjg
enumeration tji
enumeration tjl
enumeration tjm
enumeration tjn
enumeration tjo
enumeration tjs
enumeration tju
enumeration tjw
enumeration tka
enumeration tkb
enumeration tkd
enumeration tke
enumeration tkf
enumeration tkg
enumeration tkl
enumeration tkm
enumeration tkn
enumeration tkp
enumeration tkq
enumeration tkr
enumeration tks
enumeration tkt
enumeration tku
enumeration tkv
enumeration tkw
enumeration tkx
enumeration tkz
enumeration tla
enumeration tlb
enumeration tlc
enumeration tld
enumeration tlf
enumeration tlg
enumeration tlh
enumeration tli
enumeration tlj
enumeration tlk
enumeration tll
enumeration tlm
enumeration tln
enumeration tlo
enumeration tlp
enumeration tlq
enumeration tlr
enumeration tls
enumeration tlt
enumeration tlu
enumeration tlv
enumeration tlx
enumeration tly
enumeration tma
enumeration tmb
enumeration tmc
enumeration tmd
enumeration tme
enumeration tmf
enumeration tmg
enumeration tmh
enumeration tmi
enumeration tmj
enumeration tmk
enumeration tml
enumeration tmm
enumeration tmn
enumeration tmo
enumeration tmp
enumeration tmq
enumeration tmr
enumeration tms
enumeration tmt
enumeration tmu
enumeration tmv
enumeration tmw
enumeration tmy
enumeration tmz
enumeration tna
enumeration tnb
enumeration tnc
enumeration tnd
enumeration tne
enumeration tng
enumeration tnh
enumeration tni
enumeration tnk
enumeration tnl
enumeration tnm
enumeration tnn
enumeration tno
enumeration tnp
enumeration tnq
enumeration tnr
enumeration tns
enumeration tnt
enumeration tnu
enumeration tnv
enumeration tnw
enumeration tnx
enumeration tny
enumeration tnz
enumeration tob
enumeration toc
enumeration tod
enumeration toe
enumeration tof
enumeration tog
enumeration toh
enumeration toi
enumeration toj
enumeration tol
enumeration tom
enumeration too
enumeration top
enumeration toq
enumeration tor
enumeration tos
enumeration tou
enumeration tov
enumeration tow
enumeration tox
enumeration toy
enumeration toz
enumeration tpa
enumeration tpc
enumeration tpe
enumeration tpf
enumeration tpg
enumeration tpi
enumeration tpj
enumeration tpk
enumeration tpl
enumeration tpm
enumeration tpn
enumeration tpo
enumeration tpp
enumeration tpq
enumeration tpr
enumeration tpt
enumeration tpu
enumeration tpv
enumeration tpw
enumeration tpx
enumeration tpy
enumeration tpz
enumeration tqb
enumeration tql
enumeration tqm
enumeration tqn
enumeration tqo
enumeration tqp
enumeration tqq
enumeration tqr
enumeration tqt
enumeration tqu
enumeration tqw
enumeration tra
enumeration trb
enumeration trc
enumeration trd
enumeration tre
enumeration trf
enumeration trg
enumeration trh
enumeration tri
enumeration trj
enumeration trk
enumeration trl
enumeration trm
enumeration trn
enumeration tro
enumeration trp
enumeration trq
enumeration trr
enumeration trs
enumeration trt
enumeration tru
enumeration trv
enumeration trw
enumeration trx
enumeration try
enumeration trz
enumeration tsa
enumeration tsb
enumeration tsc
enumeration tsd
enumeration tse
enumeration tsf
enumeration tsg
enumeration tsh
enumeration tsi
enumeration tsj
enumeration tsk
enumeration tsl
enumeration tsm
enumeration tsp
enumeration tsq
enumeration tsr
enumeration tss
enumeration tst
enumeration tsu
enumeration tsv
enumeration tsw
enumeration tsx
enumeration tsy
enumeration tsz
enumeration tta
enumeration ttb
enumeration ttc
enumeration ttd
enumeration tte
enumeration ttf
enumeration ttg
enumeration tth
enumeration tti
enumeration ttj
enumeration ttk
enumeration ttl
enumeration ttm
enumeration ttn
enumeration tto
enumeration ttp
enumeration ttq
enumeration ttr
enumeration tts
enumeration ttt
enumeration ttu
enumeration ttv
enumeration ttw
enumeration tty
enumeration ttz
enumeration tua
enumeration tub
enumeration tuc
enumeration tud
enumeration tue
enumeration tuf
enumeration tug
enumeration tuh
enumeration tui
enumeration tuj
enumeration tul
enumeration tum
enumeration tun
enumeration tuo
enumeration tup
enumeration tuq
enumeration tus
enumeration tut
enumeration tuu
enumeration tuv
enumeration tuw
enumeration tux
enumeration tuy
enumeration tuz
enumeration tva
enumeration tvd
enumeration tve
enumeration tvk
enumeration tvl
enumeration tvm
enumeration tvn
enumeration tvo
enumeration tvs
enumeration tvt
enumeration tvu
enumeration tvw
enumeration tvy
enumeration twa
enumeration twb
enumeration twc
enumeration twd
enumeration twe
enumeration twf
enumeration twg
enumeration twh
enumeration twl
enumeration twm
enumeration twn
enumeration two
enumeration twp
enumeration twq
enumeration twr
enumeration twt
enumeration twu
enumeration tww
enumeration twx
enumeration twy
enumeration txa
enumeration txb
enumeration txc
enumeration txe
enumeration txg
enumeration txh
enumeration txi
enumeration txm
enumeration txn
enumeration txo
enumeration txq
enumeration txr
enumeration txs
enumeration txt
enumeration txu
enumeration txx
enumeration txy
enumeration tya
enumeration tye
enumeration tyh
enumeration tyi
enumeration tyj
enumeration tyl
enumeration tyn
enumeration typ
enumeration tyr
enumeration tys
enumeration tyt
enumeration tyu
enumeration tyv
enumeration tyx
enumeration tyz
enumeration tza
enumeration tzh
enumeration tzj
enumeration tzl
enumeration tzm
enumeration tzn
enumeration tzo
enumeration tzx
enumeration uam
enumeration uan
enumeration uar
enumeration uba
enumeration ubi
enumeration ubl
enumeration ubr
enumeration ubu
enumeration uby
enumeration uda
enumeration ude
enumeration udg
enumeration udi
enumeration udj
enumeration udl
enumeration udm
enumeration udu
enumeration ues
enumeration ufi
enumeration uga
enumeration ugb
enumeration uge
enumeration ugn
enumeration ugo
enumeration ugy
enumeration uha
enumeration uhn
enumeration uis
enumeration uiv
enumeration uji
enumeration uka
enumeration ukg
enumeration ukh
enumeration ukl
enumeration ukp
enumeration ukq
enumeration uks
enumeration uku
enumeration ukw
enumeration uky
enumeration ula
enumeration ulb
enumeration ulc
enumeration ule
enumeration ulf
enumeration uli
enumeration ulk
enumeration ull
enumeration ulm
enumeration uln
enumeration ulu
enumeration ulw
enumeration uma
enumeration umb
enumeration umc
enumeration umd
enumeration umg
enumeration umi
enumeration umm
enumeration umn
enumeration umo
enumeration ump
enumeration umr
enumeration ums
enumeration umu
enumeration una
enumeration und
enumeration une
enumeration ung
enumeration unk
enumeration unm
enumeration unn
enumeration unr
enumeration unu
enumeration unx
enumeration unz
enumeration uok
enumeration upi
enumeration upv
enumeration ura
enumeration urb
enumeration urc
enumeration ure
enumeration urf
enumeration urg
enumeration urh
enumeration uri
enumeration urj
enumeration urk
enumeration url
enumeration urm
enumeration urn
enumeration uro
enumeration urp
enumeration urr
enumeration urt
enumeration uru
enumeration urv
enumeration urw
enumeration urx
enumeration ury
enumeration urz
enumeration usa
enumeration ush
enumeration usi
enumeration usk
enumeration usp
enumeration usu
enumeration uta
enumeration ute
enumeration utp
enumeration utr
enumeration utu
enumeration uum
enumeration uun
enumeration uur
enumeration uuu
enumeration uve
enumeration uvh
enumeration uvl
enumeration uwa
enumeration uya
enumeration uzn
enumeration uzs
enumeration vaa
enumeration vae
enumeration vaf
enumeration vag
enumeration vah
enumeration vai
enumeration vaj
enumeration val
enumeration vam
enumeration van
enumeration vao
enumeration vap
enumeration var
enumeration vas
enumeration vau
enumeration vav
enumeration vay
enumeration vbb
enumeration vbk
enumeration vec
enumeration ved
enumeration vel
enumeration vem
enumeration veo
enumeration vep
enumeration ver
enumeration vgr
enumeration vgt
enumeration vic
enumeration vid
enumeration vif
enumeration vig
enumeration vil
enumeration vin
enumeration vis
enumeration vit
enumeration viv
enumeration vka
enumeration vki
enumeration vkj
enumeration vkk
enumeration vkl
enumeration vkm
enumeration vko
enumeration vkp
enumeration vkt
enumeration vku
enumeration vlp
enumeration vls
enumeration vma
enumeration vmb
enumeration vmc
enumeration vmd
enumeration vme
enumeration vmf
enumeration vmg
enumeration vmh
enumeration vmi
enumeration vmj
enumeration vmk
enumeration vml
enumeration vmm
enumeration vmp
enumeration vmq
enumeration vmr
enumeration vms
enumeration vmu
enumeration vmv
enumeration vmw
enumeration vmx
enumeration vmy
enumeration vmz
enumeration vnk
enumeration vnm
enumeration vnp
enumeration vor
enumeration vot
enumeration vra
enumeration vro
enumeration vrs
enumeration vrt
enumeration vsi
enumeration vsl
enumeration vsv
enumeration vto
enumeration vum
enumeration vun
enumeration vut
enumeration vwa
enumeration waa
enumeration wab
enumeration wac
enumeration wad
enumeration wae
enumeration waf
enumeration wag
enumeration wah
enumeration wai
enumeration waj
enumeration wak
enumeration wal
enumeration wam
enumeration wan
enumeration wao
enumeration wap
enumeration waq
enumeration war
enumeration was
enumeration wat
enumeration wau
enumeration wav
enumeration waw
enumeration wax
enumeration way
enumeration waz
enumeration wba
enumeration wbb
enumeration wbe
enumeration wbf
enumeration wbh
enumeration wbi
enumeration wbj
enumeration wbk
enumeration wbl
enumeration wbm
enumeration wbp
enumeration wbq
enumeration wbr
enumeration wbt
enumeration wbv
enumeration wbw
enumeration wca
enumeration wci
enumeration wdd
enumeration wdg
enumeration wdj
enumeration wdk
enumeration wdu
enumeration wdy
enumeration wea
enumeration wec
enumeration wed
enumeration weg
enumeration weh
enumeration wei
enumeration wem
enumeration wen
enumeration weo
enumeration wep
enumeration wer
enumeration wes
enumeration wet
enumeration weu
enumeration wew
enumeration wfg
enumeration wga
enumeration wgb
enumeration wgg
enumeration wgi
enumeration wgo
enumeration wgu
enumeration wgy
enumeration wha
enumeration whg
enumeration whk
enumeration whu
enumeration wib
enumeration wic
enumeration wie
enumeration wif
enumeration wig
enumeration wih
enumeration wii
enumeration wij
enumeration wik
enumeration wil
enumeration wim
enumeration win
enumeration wir
enumeration wiu
enumeration wiv
enumeration wiy
enumeration wja
enumeration wji
enumeration wka
enumeration wkb
enumeration wkd
enumeration wkl
enumeration wku
enumeration wkw
enumeration wky
enumeration wla
enumeration wlc
enumeration wle
enumeration wlg
enumeration wli
enumeration wlk
enumeration wll
enumeration wlm
enumeration wlo
enumeration wlr
enumeration wls
enumeration wlu
enumeration wlv
enumeration wlw
enumeration wlx
enumeration wly
enumeration wma
enumeration wmb
enumeration wmc
enumeration wmd
enumeration wme
enumeration wmh
enumeration wmi
enumeration wmm
enumeration wmn
enumeration wmo
enumeration wms
enumeration wmt
enumeration wmw
enumeration wmx
enumeration wnb
enumeration wnc
enumeration wnd
enumeration wne
enumeration wng
enumeration wni
enumeration wnk
enumeration wnm
enumeration wnn
enumeration wno
enumeration wnp
enumeration wnu
enumeration wnw
enumeration wny
enumeration woa
enumeration wob
enumeration woc
enumeration wod
enumeration woe
enumeration wof
enumeration wog
enumeration woi
enumeration wok
enumeration wom
enumeration won
enumeration woo
enumeration wor
enumeration wos
enumeration wow
enumeration woy
enumeration wpc
enumeration wra
enumeration wrb
enumeration wrd
enumeration wrg
enumeration wrh
enumeration wri
enumeration wrk
enumeration wrl
enumeration wrm
enumeration wrn
enumeration wro
enumeration wrp
enumeration wrr
enumeration wrs
enumeration wru
enumeration wrv
enumeration wrw
enumeration wrx
enumeration wry
enumeration wrz
enumeration wsa
enumeration wsi
enumeration wsk
enumeration wsr
enumeration wss
enumeration wsu
enumeration wsv
enumeration wtf
enumeration wth
enumeration wti
enumeration wtk
enumeration wtm
enumeration wtw
enumeration wua
enumeration wub
enumeration wud
enumeration wuh
enumeration wul
enumeration wum
enumeration wun
enumeration wur
enumeration wut
enumeration wuu
enumeration wuv
enumeration wux
enumeration wuy
enumeration wwa
enumeration wwb
enumeration wwo
enumeration wwr
enumeration www
enumeration wxa
enumeration wxw
enumeration wya
enumeration wyb
enumeration wyi
enumeration wym
enumeration wyr
enumeration wyy
enumeration xaa
enumeration xab
enumeration xac
enumeration xad
enumeration xae
enumeration xag
enumeration xai
enumeration xaj
enumeration xal
enumeration xam
enumeration xan
enumeration xao
enumeration xap
enumeration xaq
enumeration xar
enumeration xas
enumeration xat
enumeration xau
enumeration xav
enumeration xaw
enumeration xay
enumeration xba
enumeration xbb
enumeration xbc
enumeration xbd
enumeration xbe
enumeration xbg
enumeration xbi
enumeration xbj
enumeration xbm
enumeration xbn
enumeration xbo
enumeration xbp
enumeration xbr
enumeration xbw
enumeration xbx
enumeration xby
enumeration xcb
enumeration xcc
enumeration xce
enumeration xcg
enumeration xch
enumeration xcl
enumeration xcm
enumeration xcn
enumeration xco
enumeration xcr
enumeration xct
enumeration xcu
enumeration xcv
enumeration xcw
enumeration xcy
enumeration xda
enumeration xdc
enumeration xdk
enumeration xdm
enumeration xdy
enumeration xeb
enumeration xed
enumeration xeg
enumeration xel
enumeration xem
enumeration xep
enumeration xer
enumeration xes
enumeration xet
enumeration xeu
enumeration xfa
enumeration xga
enumeration xgb
enumeration xgd
enumeration xgf
enumeration xgg
enumeration xgi
enumeration xgl
enumeration xgm
enumeration xgn
enumeration xgr
enumeration xgu
enumeration xgw
enumeration xha
enumeration xhc
enumeration xhd
enumeration xhe
enumeration xhr
enumeration xht
enumeration xhu
enumeration xhv
enumeration xib
enumeration xii
enumeration xil
enumeration xin
enumeration xip
enumeration xir
enumeration xis
enumeration xiv
enumeration xiy
enumeration xjb
enumeration xjt
enumeration xka
enumeration xkb
enumeration xkc
enumeration xkd
enumeration xke
enumeration xkf
enumeration xkg
enumeration xkh
enumeration xki
enumeration xkj
enumeration xkk
enumeration xkl
enumeration xkn
enumeration xko
enumeration xkp
enumeration xkq
enumeration xkr
enumeration xks
enumeration xkt
enumeration xku
enumeration xkv
enumeration xkw
enumeration xkx
enumeration xky
enumeration xkz
enumeration xla
enumeration xlb
enumeration xlc
enumeration xld
enumeration xle
enumeration xlg
enumeration xli
enumeration xln
enumeration xlo
enumeration xlp
enumeration xls
enumeration xlu
enumeration xly
enumeration xma
enumeration xmb
enumeration xmc
enumeration xmd
enumeration xme
enumeration xmf
enumeration xmg
enumeration xmh
enumeration xmj
enumeration xmk
enumeration xml
enumeration xmm
enumeration xmn
enumeration xmo
enumeration xmp
enumeration xmq
enumeration xmr
enumeration xms
enumeration xmt
enumeration xmu
enumeration xmv
enumeration xmw
enumeration xmx
enumeration xmy
enumeration xmz
enumeration xna
enumeration xnb
enumeration xnd
enumeration xng
enumeration xnh
enumeration xni
enumeration xnk
enumeration xnn
enumeration xno
enumeration xnr
enumeration xns
enumeration xnt
enumeration xnu
enumeration xny
enumeration xnz
enumeration xoc
enumeration xod
enumeration xog
enumeration xoi
enumeration xok
enumeration xom
enumeration xon
enumeration xoo
enumeration xop
enumeration xor
enumeration xow
enumeration xpa
enumeration xpc
enumeration xpe
enumeration xpg
enumeration xpi
enumeration xpj
enumeration xpk
enumeration xpm
enumeration xpn
enumeration xpo
enumeration xpp
enumeration xpq
enumeration xpr
enumeration xps
enumeration xpt
enumeration xpu
enumeration xpy
enumeration xqa
enumeration xqt
enumeration xra
enumeration xrb
enumeration xrd
enumeration xre
enumeration xrg
enumeration xri
enumeration xrm
enumeration xrn
enumeration xrq
enumeration xrr
enumeration xrt
enumeration xru
enumeration xrw
enumeration xsa
enumeration xsb
enumeration xsc
enumeration xsd
enumeration xse
enumeration xsh
enumeration xsi
enumeration xsj
enumeration xsl
enumeration xsm
enumeration xsn
enumeration xso
enumeration xsp
enumeration xsq
enumeration xsr
enumeration xss
enumeration xsu
enumeration xsv
enumeration xsy
enumeration xta
enumeration xtb
enumeration xtc
enumeration xtd
enumeration xte
enumeration xtg
enumeration xth
enumeration xti
enumeration xtj
enumeration xtl
enumeration xtm
enumeration xtn
enumeration xto
enumeration xtp
enumeration xtq
enumeration xtr
enumeration xts
enumeration xtt
enumeration xtu
enumeration xtv
enumeration xtw
enumeration xty
enumeration xtz
enumeration xua
enumeration xub
enumeration xud
enumeration xug
enumeration xuj
enumeration xul
enumeration xum
enumeration xun
enumeration xuo
enumeration xup
enumeration xur
enumeration xut
enumeration xuu
enumeration xve
enumeration xvi
enumeration xvn
enumeration xvo
enumeration xvs
enumeration xwa
enumeration xwc
enumeration xwd
enumeration xwe
enumeration xwg
enumeration xwj
enumeration xwk
enumeration xwl
enumeration xwo
enumeration xwr
enumeration xwt
enumeration xww
enumeration xxb
enumeration xxk
enumeration xxm
enumeration xxr
enumeration xxt
enumeration xya
enumeration xyb
enumeration xyj
enumeration xyk
enumeration xyl
enumeration xyt
enumeration xyy
enumeration xzh
enumeration xzm
enumeration xzp
enumeration yaa
enumeration yab
enumeration yac
enumeration yad
enumeration yae
enumeration yaf
enumeration yag
enumeration yah
enumeration yai
enumeration yaj
enumeration yak
enumeration yal
enumeration yam
enumeration yan
enumeration yao
enumeration yap
enumeration yaq
enumeration yar
enumeration yas
enumeration yat
enumeration yau
enumeration yav
enumeration yaw
enumeration yax
enumeration yay
enumeration yaz
enumeration yba
enumeration ybb
enumeration ybe
enumeration ybh
enumeration ybi
enumeration ybj
enumeration ybk
enumeration ybl
enumeration ybm
enumeration ybn
enumeration ybo
enumeration ybx
enumeration yby
enumeration ych
enumeration ycl
enumeration ycn
enumeration ycp
enumeration yda
enumeration ydd
enumeration yde
enumeration ydg
enumeration ydk
enumeration yds
enumeration yea
enumeration yec
enumeration yee
enumeration yei
enumeration yej
enumeration yel
enumeration yer
enumeration yes
enumeration yet
enumeration yeu
enumeration yev
enumeration yey
enumeration yga
enumeration ygi
enumeration ygl
enumeration ygm
enumeration ygp
enumeration ygr
enumeration ygs
enumeration ygu
enumeration ygw
enumeration yha
enumeration yhd
enumeration yhl
enumeration yia
enumeration yif
enumeration yig
enumeration yih
enumeration yii
enumeration yij
enumeration yik
enumeration yil
enumeration yim
enumeration yin
enumeration yip
enumeration yiq
enumeration yir
enumeration yis
enumeration yit
enumeration yiu
enumeration yiv
enumeration yix
enumeration yiz
enumeration yka
enumeration ykg
enumeration yki
enumeration ykk
enumeration ykl
enumeration ykm
enumeration ykn
enumeration yko
enumeration ykr
enumeration ykt
enumeration yku
enumeration yky
enumeration yla
enumeration ylb
enumeration yle
enumeration ylg
enumeration yli
enumeration yll
enumeration ylm
enumeration yln
enumeration ylo
enumeration ylr
enumeration ylu
enumeration yly
enumeration ymb
enumeration ymc
enumeration ymd
enumeration yme
enumeration ymg
enumeration ymh
enumeration ymi
enumeration ymk
enumeration yml
enumeration ymm
enumeration ymn
enumeration ymo
enumeration ymp
enumeration ymq
enumeration ymr
enumeration yms
enumeration ymt
enumeration ymx
enumeration ymz
enumeration yna
enumeration ynd
enumeration yne
enumeration yng
enumeration ynh
enumeration ynk
enumeration ynl
enumeration ynn
enumeration yno
enumeration ynq
enumeration yns
enumeration ynu
enumeration yob
enumeration yog
enumeration yoi
enumeration yok
enumeration yol
enumeration yom
enumeration yon
enumeration yot
enumeration yox
enumeration yoy
enumeration ypa
enumeration ypb
enumeration ypg
enumeration yph
enumeration ypk
enumeration ypm
enumeration ypn
enumeration ypo
enumeration ypp
enumeration ypz
enumeration yra
enumeration yrb
enumeration yre
enumeration yri
enumeration yrk
enumeration yrl
enumeration yrm
enumeration yrn
enumeration yrs
enumeration yrw
enumeration yry
enumeration ysc
enumeration ysd
enumeration ysg
enumeration ysl
enumeration ysn
enumeration yso
enumeration ysp
enumeration ysr
enumeration yss
enumeration ysy
enumeration yta
enumeration ytl
enumeration ytp
enumeration ytw
enumeration yty
enumeration yua
enumeration yub
enumeration yuc
enumeration yud
enumeration yue
enumeration yuf
enumeration yug
enumeration yui
enumeration yuj
enumeration yuk
enumeration yul
enumeration yum
enumeration yun
enumeration yup
enumeration yuq
enumeration yur
enumeration yut
enumeration yuw
enumeration yux
enumeration yuy
enumeration yuz
enumeration yva
enumeration yvt
enumeration ywa
enumeration ywg
enumeration ywl
enumeration ywn
enumeration ywq
enumeration ywr
enumeration ywt
enumeration ywu
enumeration yww
enumeration yxa
enumeration yxg
enumeration yxl
enumeration yxm
enumeration yxu
enumeration yxy
enumeration yyr
enumeration yyu
enumeration yyz
enumeration yzg
enumeration yzk
enumeration zaa
enumeration zab
enumeration zac
enumeration zad
enumeration zae
enumeration zaf
enumeration zag
enumeration zah
enumeration zai
enumeration zaj
enumeration zak
enumeration zal
enumeration zam
enumeration zao
enumeration zap
enumeration zaq
enumeration zar
enumeration zas
enumeration zat
enumeration zau
enumeration zav
enumeration zaw
enumeration zax
enumeration zay
enumeration zaz
enumeration zbc
enumeration zbe
enumeration zbl
enumeration zbt
enumeration zbw
enumeration zca
enumeration zch
enumeration zdj
enumeration zea
enumeration zeg
enumeration zeh
enumeration zen
enumeration zga
enumeration zgb
enumeration zgh
enumeration zgm
enumeration zgn
enumeration zgr
enumeration zhb
enumeration zhd
enumeration zhi
enumeration zhn
enumeration zhw
enumeration zhx
enumeration zia
enumeration zib
enumeration zik
enumeration zil
enumeration zim
enumeration zin
enumeration zir
enumeration ziw
enumeration ziz
enumeration zka
enumeration zkb
enumeration zkd
enumeration zkg
enumeration zkh
enumeration zkk
enumeration zkn
enumeration zko
enumeration zkp
enumeration zkr
enumeration zkt
enumeration zku
enumeration zkv
enumeration zkz
enumeration zle
enumeration zlj
enumeration zlm
enumeration zln
enumeration zlq
enumeration zls
enumeration zlw
enumeration zma
enumeration zmb
enumeration zmc
enumeration zmd
enumeration zme
enumeration zmf
enumeration zmg
enumeration zmh
enumeration zmi
enumeration zmj
enumeration zmk
enumeration zml
enumeration zmm
enumeration zmn
enumeration zmo
enumeration zmp
enumeration zmq
enumeration zmr
enumeration zms
enumeration zmt
enumeration zmu
enumeration zmv
enumeration zmw
enumeration zmx
enumeration zmy
enumeration zmz
enumeration zna
enumeration znd
enumeration zne
enumeration zng
enumeration znk
enumeration zns
enumeration zoc
enumeration zoh
enumeration zom
enumeration zoo
enumeration zoq
enumeration zor
enumeration zos
enumeration zpa
enumeration zpb
enumeration zpc
enumeration zpd
enumeration zpe
enumeration zpf
enumeration zpg
enumeration zph
enumeration zpi
enumeration zpj
enumeration zpk
enumeration zpl
enumeration zpm
enumeration zpn
enumeration zpo
enumeration zpp
enumeration zpq
enumeration zpr
enumeration zps
enumeration zpt
enumeration zpu
enumeration zpv
enumeration zpw
enumeration zpx
enumeration zpy
enumeration zpz
enumeration zqe
enumeration zra
enumeration zrg
enumeration zrn
enumeration zro
enumeration zrp
enumeration zrs
enumeration zsa
enumeration zsk
enumeration zsl
enumeration zsm
enumeration zsr
enumeration zsu
enumeration zte
enumeration ztg
enumeration ztl
enumeration ztm
enumeration ztn
enumeration ztp
enumeration ztq
enumeration zts
enumeration ztt
enumeration ztu
enumeration ztx
enumeration zty
enumeration zua
enumeration zuh
enumeration zum
enumeration zun
enumeration zuy
enumeration zwa
enumeration zxx
enumeration zyb
enumeration zyg
enumeration zyj
enumeration zyn
enumeration zyp
enumeration zza
enumeration zzj
[ top ]
Element ms:languageInfoType / ms:sizePerLanguage
Annotations
Provides information on the size per language component
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:languageInfoType / ms:languageVarieties
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageVarietyInfo
[ top ]
Element ms:languageVarietyInfo
Annotations
Groups information on language varieties occurred in the resource (e.g. dialects)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageVarietyInfoType_languageVarietyType OMTD-SHARE_XMLSchema.tmp#languageVarietyName OMTD-SHARE_XMLSchema.tmp#languageVarietyInfoType_sizePerLanguageVariety OMTD-SHARE_XMLSchema.tmp#languageVarietyInfoType
Type ms:languageVarietyInfoType
[ top ]
Element ms:languageVarietyInfoType / ms:languageVarietyType
Annotations
Specifies the type of the language variety that occurs in the resource or is supported by a tool/service
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 20
enumeration dialect
enumeration jargon
enumeration other
[ top ]
Element ms:languageVarietyName
Annotations
The name of the language variety that occurs in the resource or is supported by a tool/service
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:languageVarietyInfoType / ms:sizePerLanguageVariety
Annotations
Provides information on the size per language variety component
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:rawCorpusInfoType / ms:textClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textClassificationInfo
[ top ]
Element ms:textClassificationInfo
Annotations
Groups together information on text type/genre of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textClassificationInfoType_keywords OMTD-SHARE_XMLSchema.tmp#textGenre OMTD-SHARE_XMLSchema.tmp#textType OMTD-SHARE_XMLSchema.tmp#register OMTD-SHARE_XMLSchema.tmp#subject OMTD-SHARE_XMLSchema.tmp#textClassificationInfoType_sizePerTextClassification OMTD-SHARE_XMLSchema.tmp#textClassificationInfoType
Type ms:textClassificationInfoType
[ top ]
Element ms:textClassificationInfoType / ms:keywords
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#keyword
[ top ]
Element ms:keyword
Annotations
A word or phrase considered important for the classification of a resource and included as tag in its metadata
Diagram
Diagram
Type xs:string
[ top ]
Element ms:textGenre
Annotations
Genre: The conventionalized discourse or text types of the content of the resource, based on extra-linguistic and internal linguistic criteria
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textGenre_classificationSchemeName OMTD-SHARE_XMLSchema.tmp#textGenre_schemeURI
Type extension of xs:string
Attributes
QName Type Use
classificationSchemeName ms:classificationSchemeName required
schemeURI xs:anyURI optional
[ top ]
Element ms:textType
Annotations
Specifies the type of the text according to a text type classification
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textType_classificationSchemeName OMTD-SHARE_XMLSchema.tmp#textType_schemeURI
Type extension of xs:string
Attributes
QName Type Use
classificationSchemeName ms:classificationSchemeName required
schemeURI xs:anyURI optional
[ top ]
Element ms:register
Annotations
For corpora that have already been using register classification
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#register_classificationSchemeName OMTD-SHARE_XMLSchema.tmp#register_schemeURI
Type extension of xs:string
Attributes
QName Type Use
classificationSchemeName ms:classificationSchemeName required
schemeURI xs:anyURI optional
[ top ]
Element ms:subject
Annotations
For resources that are using subject / topic classification
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#subject_classificationSchemeName OMTD-SHARE_XMLSchema.tmp#subject_schemeURI
Type extension of xs:string
Attributes
QName Type Use
classificationSchemeName ms:classificationSchemeName required
schemeURI xs:anyURI optional
[ top ]
Element ms:textClassificationInfoType / ms:sizePerTextClassification
Annotations
Provides information on size of resource parts with different text classification
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:rawCorpusInfoType / ms:domains
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#domainInfo
[ top ]
Element ms:domainInfo
Annotations
Groups together information on domains represented in the resource; can be repeated for parts of the resource with distinct domain
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#domain OMTD-SHARE_XMLSchema.tmp#domainInfoType_sizePerDomain OMTD-SHARE_XMLSchema.tmp#domainInfoType
Type ms:domainInfoType
[ top ]
Element ms:domain
Annotations
Specifies the application domain of the resource or the tool/service
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#domain_classificationSchemeName OMTD-SHARE_XMLSchema.tmp#domain_schemeURI
Type extension of xs:string
Attributes
QName Type Use
classificationSchemeName ms:classificationSchemeName required
schemeURI xs:anyURI optional
[ top ]
Element ms:domainInfoType / ms:sizePerDomain
Annotations
Specifies the size of resource parts per domain
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:rawCorpusInfoType / ms:timeClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#timeCoverageInfo
[ top ]
Element ms:timeCoverageInfo
Annotations
Groups together information on time classification of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#timeCoverageInfoType_timeCoverage OMTD-SHARE_XMLSchema.tmp#timeCoverageInfoType_sizePerTimeCoverage OMTD-SHARE_XMLSchema.tmp#timeCoverageInfoType
Type ms:timeCoverageInfoType
[ top ]
Element ms:timeCoverageInfoType / ms:timeCoverage
Annotations
The time period that the content of a resource is about
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:timeCoverageInfoType / ms:sizePerTimeCoverage
Annotations
Provides information on size per time period represented in the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:rawCorpusInfoType / ms:geographicClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfo
[ top ]
Element ms:geographicCoverageInfo
Annotations
Groups information on geographic classification of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfoType_geographicCoverage OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfoType_sizePerGeographicCoverage OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfoType
Type ms:geographicCoverageInfoType
[ top ]
Element ms:geographicCoverageInfoType / ms:geographicCoverage
Annotations
The geographic region that the content of a resource is about; for countries, recommended use of ISO-3166
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
[ top ]
Element ms:geographicCoverageInfoType / ms:sizePerGeographicCoverage
Annotations
Provides information on size per geographically distinct section of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:creationInfo
Annotations
Groups together information on the resource creation (e.g. for corpora, selection of texts/audio files/ video files etc.; for lexica, construction of lemma list etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#creationInfoType_originalSources OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationMode OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationModeDetails OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationSwComponents OMTD-SHARE_XMLSchema.tmp#creationInfoType
Type ms:creationInfoType
[ top ]
Element ms:creationInfoType / ms:originalSources
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationInfoType_originalSources_hasOriginalSource
[ top ]
Element ms:creationInfoType / ms:originalSources / ms:hasOriginalSource
Annotations
The identifier of the original resources that were at the base of the creation process of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:creationInfoType / ms:creationMode
Annotations
Specifies whether the resource is created automatically or in a manual or interactive mode
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#processMode
Type ms:processMode
Facets
maxLength 20
enumeration manual
For processes performed only manually, without automatic means or aids
enumeration automatic
For processes performed only with automatic means or aids
enumeration mixed
For processes performed in a mixed way, using manual and automatic means
enumeration interactive
For processes performed interactively
[ top ]
Element ms:creationInfoType / ms:creationModeDetails
Annotations
Provides further information on the creation methods and processes
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 200
[ top ]
Element ms:creationInfoType / ms:creationSwComponents
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationInfoType_creationSwComponents_isCreatedBy
[ top ]
Element ms:creationInfoType / ms:creationSwComponents / ms:isCreatedBy
Annotations
The identifier or the s/w component used in the creation process
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:annotatedCorpusInfo
Annotations
Groups together information on annotated corpora of all media types
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_corpusSubtype OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_mediaType OMTD-SHARE_XMLSchema.tmp#lingualityInfo OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_languages OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_annotations OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_textClassifications OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_domains OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_timeClassifications OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_geographicClassifications OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType
Type ms:annotatedCorpusInfoType
[ top ]
Element ms:annotatedCorpusInfoType / ms:corpusSubtype
Diagram
Diagram
Type xs:string
[ top ]
Element ms:annotatedCorpusInfoType / ms:mediaType
Annotations
Specifies the media type of the resource and basically corresponds to the physical medium of the content representation. Each media type is described through a distinctive set of features. A resource may consist of parts attributed to different types of media. A tool/service may take as input/output more than one different media types.
Diagram
Diagram
Type xs:string
[ top ]
Element ms:annotatedCorpusInfoType / ms:languages
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageInfo
[ top ]
Element ms:annotatedCorpusInfoType / ms:annotations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationInfo
[ top ]
Element ms:annotationInfo
Annotations
Groups information on the annotated part(s) of a resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationTypes OMTD-SHARE_XMLSchema.tmp#typesystem OMTD-SHARE_XMLSchema.tmp#annotationSchema OMTD-SHARE_XMLSchema.tmp#annotationResource OMTD-SHARE_XMLSchema.tmp#annotationInfoType_guidelinesDocumentedIn OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationMode OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationModeDetails OMTD-SHARE_XMLSchema.tmp#annotationInfoType_isAnnotatedBy OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationDate OMTD-SHARE_XMLSchema.tmp#annotationInfoType_interannotatorAgreement OMTD-SHARE_XMLSchema.tmp#annotationInfoType_intraannotatorAgreement OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotators OMTD-SHARE_XMLSchema.tmp#annotationInfoType
Type ms:annotationInfoType
[ top ]
Element ms:annotationInfoType / ms:annotationTypes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationTypeInfo
[ top ]
Element ms:annotationTypeInfo
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationTypeInfo_annotationType OMTD-SHARE_XMLSchema.tmp#annotationTypeInfo_annotationTypeOther
[ top ]
Element ms:annotationTypeInfo / ms:annotationType
Annotations
Specifies the annotation type of the resource or what a s/w component consumes or produces as an output
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationTypeType
Type ms:annotationTypeType
Facets
enumeration lemma
enumeration token
[ top ]
Element ms:annotationTypeInfo / ms:annotationTypeOther
Diagram
Diagram
Type xs:string
[ top ]
Element ms:typesystem
Annotations
A name or an identifier (e.g. url reference) to the typesystem used in the annotation of the resource or used by the component
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:annotationSchema
Annotations
A set of elements and values designed to annotate data
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:annotationResource
Annotations
A name or an identifier (e.g. url reference) to the ancillary resource (e.g. tagset, ontology, term list) used in the annotation of the resource or used by the component
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:annotationInfoType / ms:guidelinesDocumentedIn
Annotations
A bibliographic reference or ms:httpURI link to the annotation manual
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_documentUnstructured OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_publicationIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType
Type ms:relatedDocumentInfoType
[ top ]
Element ms:annotationInfoType / ms:annotationMode
Annotations
Indicates whether the resource is annotated manually or by automatic processes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#processMode
Type ms:processMode
Facets
maxLength 20
enumeration manual
For processes performed only manually, without automatic means or aids
enumeration automatic
For processes performed only with automatic means or aids
enumeration mixed
For processes performed in a mixed way, using manual and automatic means
enumeration interactive
For processes performed interactively
[ top ]
Element ms:annotationInfoType / ms:annotationModeDetails
Annotations
Provides further information on annotation process
Diagram
Diagram
Type xs:string
[ top ]
Element ms:annotationInfoType / ms:isAnnotatedBy
Annotations
The name, the identifier or the url of the tool used for the annotation of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:annotationInfoType / ms:annotationDate
Annotations
The dates (either date or range of dates) in which the annotation process has taken place
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#date OMTD-SHARE_XMLSchema.tmp#dateRange OMTD-SHARE_XMLSchema.tmp#dateCombinationType
Type ms:dateCombinationType
[ top ]
Element ms:annotationInfoType / ms:interannotatorAgreement
Annotations
Provides information on the interannotator agreement and the methods/metrics applied
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 1000
[ top ]
Element ms:annotationInfoType / ms:intraannotatorAgreement
Annotations
Provides information on the intra-annotator agreement and the methods/metrics applied
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 1000
[ top ]
Element ms:annotationInfoType / ms:annotators
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationInfoType_annotators_annotator
[ top ]
Element ms:annotationInfoType / ms:annotators / ms:annotator
Annotations
Groups information on the annotators of the specific annotation type
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actorInfoType_actorType OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedPerson OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedGroup OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedOrganization OMTD-SHARE_XMLSchema.tmp#actorInfoType
Type ms:actorInfoType
[ top ]
Element ms:annotatedCorpusInfoType / ms:textClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textClassificationInfo
[ top ]
Element ms:annotatedCorpusInfoType / ms:domains
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#domainInfo
[ top ]
Element ms:annotatedCorpusInfoType / ms:timeClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#timeCoverageInfo
[ top ]
Element ms:annotatedCorpusInfoType / ms:geographicClassifications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfo
[ top ]
Element ms:corpusMetadataRecord
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#baseMetadataRecord_metadataHeaderInfo OMTD-SHARE_XMLSchema.tmp#baseMetadataRecord OMTD-SHARE_XMLSchema.tmp#corpusInfo
Type extension of ms:baseMetadataRecord
[ top ]
Element ms:baseMetadataRecord / ms:metadataHeaderInfo
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataRecordIdentifier OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreationDate OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreators OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_sourceOfMetadataRecord OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_userQuery OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataLastDateUpdated OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_revision OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType
Type ms:metadataHeaderInfoType
[ top ]
Element ms:metadataHeaderInfoType / ms:metadataRecordIdentifier
Annotations
A persistent identifier for the metadata record itself
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataIdentifierType_metadataIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#metadataIdentifierType
Type ms:metadataIdentifierType
Attributes
QName Type Use Annotation
metadataIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the metadata record identifier is assigned by the authority that issues it
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
[ top ]
Element ms:metadataHeaderInfoType / ms:metadataCreationDate
Annotations
The date of creation of this metadata description
Diagram
Diagram
Type xs:date
[ top ]
Element ms:metadataHeaderInfoType / ms:metadataCreators
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_metadataCreators_metadataCreator
[ top ]
Element ms:metadataHeaderInfoType / ms:metadataCreators / ms:metadataCreator
Annotations
Groups information on the person that has created the metadata record (for records manually edited)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_surname OMTD-SHARE_XMLSchema.tmp#personInfoType_givenName OMTD-SHARE_XMLSchema.tmp#personInfoType_personIdentifiers OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#personInfoType_affiliation OMTD-SHARE_XMLSchema.tmp#personInfoType
Type ms:personInfoType
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord
Annotations
Refers to the catalog or repository from which the metadata record has been originated (for harvested records)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_collectedFrom OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_sourceMetadataLink OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_relatedMetadataScheme OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_originalDataProviderInfo
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:collectedFrom
Annotations
Refers to the entity (repository, aggregator etc.) from which the metadata record has been harvested
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryNames OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryIdentifiers OMTD-SHARE_XMLSchema.tmp#repositoryInfoType
Type ms:repositoryInfoType
[ top ]
Element ms:repositoryInfoType / ms:repositoryNames
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryInfoType_repositoryNames_repositoryName
[ top ]
Element ms:repositoryInfoType / ms:repositoryNames / ms:repositoryName
Annotations
The name(s) of the repository
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:repositoryInfoType / ms:repositoryIdentifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryInfoType_repositoryIdentifiers_repositoryIdentifier
[ top ]
Element ms:repositoryInfoType / ms:repositoryIdentifiers / ms:repositoryIdentifier
Annotations
Reference to the identifier used for repositories, archives etc.
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryIdentifierType_repositoryIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#repositoryIdentifierType
Type ms:repositoryIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
repositoryIdentifierSchemeName restriction of xs:string required
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:sourceMetadataLink
Annotations
Diagram
Type ms:httpURI
Facets
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:relatedMetadataScheme
Annotations
Refers to the metadata schema originally used for the description of the resource
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:originalDataProviderInfo
Annotations
Refers to the original data provider, in case the metadata record carries information taken from previous repositories/journals/publishers (e.g. in case the record's last source is an aggregator)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_originalDataProviderInfo_originalDataProviderType OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_originalDataProviderInfo_originalDataProviderRepository OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_originalDataProviderInfo_originalDataProviderJournal OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_metadataHeaderInfoType_metadataHeaderInfoType_sourceOfMetadataRecord_originalDataProviderInfo_originalDataProviderPublisher
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:originalDataProviderInfo / ms:originalDataProviderType
Annotations
Refers to the type of the original data provider (repository/journal/publisher/aggregator etc.)
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration repository
enumeration journal
enumeration publisher
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:originalDataProviderInfo / ms:originalDataProviderRepository
Annotations
Information about the repository that has originally provided the metadata record
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryNames OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryIdentifiers OMTD-SHARE_XMLSchema.tmp#repositoryInfoType
Type ms:repositoryInfoType
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:originalDataProviderInfo / ms:originalDataProviderJournal
Annotations
Information about the journal that has originally provided the metadata record
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalInfoType_journalTitles OMTD-SHARE_XMLSchema.tmp#journalInfoType_identifiers OMTD-SHARE_XMLSchema.tmp#publisher OMTD-SHARE_XMLSchema.tmp#journalInfoType_languages OMTD-SHARE_XMLSchema.tmp#journalInfoType_subjects OMTD-SHARE_XMLSchema.tmp#journalInfoType_rights OMTD-SHARE_XMLSchema.tmp#journalInfoType
Type ms:journalInfoType
[ top ]
Element ms:journalInfoType / ms:journalTitles
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalInfoType_journalInfoType_journalTitles_journalTitle
[ top ]
Element ms:journalInfoType / ms:journalTitles / ms:journalTitle
Annotations
The full name of the journal
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang OMTD-SHARE_XMLSchema.tmp#myString
Type restriction of ms:myString
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Element ms:journalInfoType / ms:identifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalIdentifier
[ top ]
Element ms:journalIdentifier
Annotations
Reference to a DOI (recommended) or any kind of identifier used for the publication
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalIdentifierType_journalIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#journalIdentifierType
Type ms:journalIdentifierType
Attributes
QName Type Use Annotation
journalIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the journal identifier is assigned by the authority that issues it
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
[ top ]
Element ms:publisher
Annotations
Information about the publisher
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:journalInfoType / ms:languages
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalInfoType_journalInfoType_languages_journalLanguage
[ top ]
Element ms:journalInfoType / ms:languages / ms:journalLanguage
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageIdType
Type ms:languageIdType
Facets
enumeration bg
enumeration cs
enumeration hr
enumeration da
enumeration nl
enumeration en
enumeration et
enumeration fi
enumeration fr
enumeration de
enumeration hu
enumeration ga
enumeration it
enumeration lv
enumeration lt
enumeration mt
enumeration el
enumeration pl
enumeration pt
enumeration ro
enumeration sk
enumeration sl
enumeration es
enumeration sv
enumeration aa
enumeration ab
enumeration ae
enumeration af
enumeration ak
enumeration am
enumeration an
enumeration ar
enumeration as
enumeration av
enumeration ay
enumeration az
enumeration ba
enumeration be
enumeration bh
enumeration bi
enumeration bm
enumeration bn
enumeration bo
enumeration br
enumeration bs
enumeration ca
enumeration ce
enumeration ch
enumeration co
enumeration cr
enumeration cu
enumeration cv
enumeration cy
enumeration dv
enumeration dz
enumeration ee
enumeration eo
enumeration eu
enumeration fa
enumeration ff
enumeration fj
enumeration fo
enumeration fy
enumeration gd
enumeration gl
enumeration gn
enumeration gu
enumeration gv
enumeration ha
enumeration he
enumeration hi
enumeration ho
enumeration ht
enumeration hy
enumeration hz
enumeration ia
enumeration id
enumeration ie
enumeration ig
enumeration ii
enumeration ik
enumeration io
enumeration is
enumeration iu
enumeration ja
enumeration jv
enumeration ka
enumeration kg
enumeration ki
enumeration kj
enumeration kk
enumeration kl
enumeration km
enumeration kn
enumeration ko
enumeration kr
enumeration ks
enumeration ku
enumeration kv
enumeration kw
enumeration ky
enumeration la
enumeration lb
enumeration lg
enumeration li
enumeration ln
enumeration lo
enumeration lu
enumeration mg
enumeration mh
enumeration mi
enumeration mk
enumeration ml
enumeration mn
enumeration mr
enumeration ms
enumeration my
enumeration na
enumeration nb
enumeration nd
enumeration ne
enumeration ng
enumeration nn
enumeration no
enumeration nr
enumeration nv
enumeration ny
enumeration oc
enumeration oj
enumeration om
enumeration or
enumeration os
enumeration pa
enumeration pi
enumeration ps
enumeration qu
enumeration rm
enumeration rn
enumeration ru
enumeration rw
enumeration sa
enumeration sc
enumeration sd
enumeration se
enumeration sg
enumeration hbs
enumeration si
enumeration sm
enumeration sn
enumeration so
enumeration sq
enumeration sr
enumeration ss
enumeration st
enumeration su
enumeration sw
enumeration ta
enumeration te
enumeration tg
enumeration th
enumeration ti
enumeration tk
enumeration tl
enumeration tn
enumeration to
enumeration tr
enumeration ts
enumeration tt
enumeration tw
enumeration ty
enumeration ug
enumeration uk
enumeration ur
enumeration uz
enumeration ve
enumeration vi
enumeration vo
enumeration wa
enumeration wo
enumeration xh
enumeration yi
enumeration yo
enumeration za
enumeration zh
enumeration zu
enumeration aaa
enumeration aab
enumeration aac
enumeration aad
enumeration aae
enumeration aaf
enumeration aag
enumeration aah
enumeration aai
enumeration aak
enumeration aal
enumeration aam
enumeration aan
enumeration aao
enumeration aap
enumeration aaq
enumeration aas
enumeration aat
enumeration aau
enumeration aav
enumeration aaw
enumeration aax
enumeration aaz
enumeration aba
enumeration abb
enumeration abc
enumeration abd
enumeration abe
enumeration abf
enumeration abg
enumeration abh
enumeration abi
enumeration abj
enumeration abl
enumeration abm
enumeration abn
enumeration abo
enumeration abp
enumeration abq
enumeration abr
enumeration abs
enumeration abt
enumeration abu
enumeration abv
enumeration abw
enumeration abx
enumeration aby
enumeration abz
enumeration aca
enumeration acb
enumeration acd
enumeration ace
enumeration acf
enumeration ach
enumeration aci
enumeration ack
enumeration acl
enumeration acm
enumeration acn
enumeration acp
enumeration acq
enumeration acr
enumeration acs
enumeration act
enumeration acu
enumeration acv
enumeration acw
enumeration acx
enumeration acy
enumeration acz
enumeration ada
enumeration adb
enumeration add
enumeration ade
enumeration adf
enumeration adg
enumeration adh
enumeration adi
enumeration adj
enumeration adl
enumeration adn
enumeration ado
enumeration adp
enumeration adq
enumeration adr
enumeration ads
enumeration adt
enumeration adu
enumeration adw
enumeration adx
enumeration ady
enumeration adz
enumeration aea
enumeration aeb
enumeration aec
enumeration aed
enumeration aee
enumeration aek
enumeration ael
enumeration aem
enumeration aen
enumeration aeq
enumeration aer
enumeration aes
enumeration aeu
enumeration aew
enumeration aey
enumeration aez
enumeration afa
enumeration afb
enumeration afd
enumeration afe
enumeration afg
enumeration afh
enumeration afi
enumeration afk
enumeration afn
enumeration afo
enumeration afp
enumeration afs
enumeration aft
enumeration afu
enumeration afz
enumeration aga
enumeration agb
enumeration agc
enumeration agd
enumeration age
enumeration agf
enumeration agg
enumeration agh
enumeration agi
enumeration agj
enumeration agk
enumeration agl
enumeration agm
enumeration agn
enumeration ago
enumeration agq
enumeration agr
enumeration ags
enumeration agt
enumeration agu
enumeration agv
enumeration agw
enumeration agx
enumeration agy
enumeration agz
enumeration aha
enumeration ahb
enumeration ahg
enumeration ahh
enumeration ahi
enumeration ahk
enumeration ahl
enumeration ahm
enumeration ahn
enumeration aho
enumeration ahp
enumeration ahr
enumeration ahs
enumeration aht
enumeration aia
enumeration aib
enumeration aic
enumeration aid
enumeration aie
enumeration aif
enumeration aig
enumeration aih
enumeration aii
enumeration aij
enumeration aik
enumeration ail
enumeration aim
enumeration ain
enumeration aio
enumeration aip
enumeration aiq
enumeration air
enumeration ais
enumeration ait
enumeration aiw
enumeration aix
enumeration aiy
enumeration aja
enumeration ajg
enumeration aji
enumeration ajn
enumeration ajp
enumeration ajt
enumeration aju
enumeration ajw
enumeration ajz
enumeration akb
enumeration akc
enumeration akd
enumeration ake
enumeration akf
enumeration akg
enumeration akh
enumeration aki
enumeration akj
enumeration akk
enumeration akl
enumeration akm
enumeration ako
enumeration akp
enumeration akq
enumeration akr
enumeration aks
enumeration akt
enumeration aku
enumeration akv
enumeration akw
enumeration akx
enumeration aky
enumeration akz
enumeration ala
enumeration alc
enumeration ald
enumeration ale
enumeration alf
enumeration alg
enumeration alh
enumeration ali
enumeration alj
enumeration alk
enumeration all
enumeration alm
enumeration aln
enumeration alo
enumeration alp
enumeration alq
enumeration alr
enumeration als
enumeration alt
enumeration alu
enumeration alv
enumeration alw
enumeration alx
enumeration aly
enumeration alz
enumeration ama
enumeration amb
enumeration amc
enumeration ame
enumeration amf
enumeration amg
enumeration ami
enumeration amj
enumeration amk
enumeration aml
enumeration amm
enumeration amn
enumeration amo
enumeration amp
enumeration amq
enumeration amr
enumeration ams
enumeration amt
enumeration amu
enumeration amv
enumeration amw
enumeration amx
enumeration amy
enumeration amz
enumeration ana
enumeration anb
enumeration anc
enumeration and
enumeration ane
enumeration anf
enumeration ang
enumeration anh
enumeration ani
enumeration anj
enumeration ank
enumeration anl
enumeration anm
enumeration ann
enumeration ano
enumeration anp
enumeration anq
enumeration anr
enumeration ans
enumeration ant
enumeration anu
enumeration anv
enumeration anw
enumeration anx
enumeration any
enumeration anz
enumeration aoa
enumeration aob
enumeration aoc
enumeration aod
enumeration aoe
enumeration aof
enumeration aog
enumeration aoh
enumeration aoi
enumeration aoj
enumeration aok
enumeration aol
enumeration aom
enumeration aon
enumeration aor
enumeration aos
enumeration aot
enumeration aou
enumeration aox
enumeration aoz
enumeration apa
enumeration apb
enumeration apc
enumeration apd
enumeration ape
enumeration apf
enumeration apg
enumeration aph
enumeration api
enumeration apj
enumeration apk
enumeration apl
enumeration apm
enumeration apn
enumeration apo
enumeration app
enumeration apq
enumeration apr
enumeration aps
enumeration apt
enumeration apu
enumeration apv
enumeration apw
enumeration apx
enumeration apy
enumeration apz
enumeration aqa
enumeration aqc
enumeration aqd
enumeration aqg
enumeration aql
enumeration aqm
enumeration aqn
enumeration aqp
enumeration aqr
enumeration aqt
enumeration aqz
enumeration arb
enumeration arc
enumeration ard
enumeration are
enumeration arh
enumeration ari
enumeration arj
enumeration ark
enumeration arl
enumeration arn
enumeration aro
enumeration arp
enumeration arq
enumeration arr
enumeration ars
enumeration art
enumeration aru
enumeration arv
enumeration arw
enumeration arx
enumeration ary
enumeration arz
enumeration asa
enumeration asb
enumeration asc
enumeration asd
enumeration ase
enumeration asf
enumeration asg
enumeration ash
enumeration asi
enumeration asj
enumeration ask
enumeration asl
enumeration asn
enumeration aso
enumeration asp
enumeration asq
enumeration asr
enumeration ass
enumeration ast
enumeration asu
enumeration asv
enumeration asw
enumeration asx
enumeration asy
enumeration asz
enumeration ata
enumeration atb
enumeration atc
enumeration atd
enumeration ate
enumeration atg
enumeration ath
enumeration ati
enumeration atj
enumeration atk
enumeration atl
enumeration atm
enumeration atn
enumeration ato
enumeration atp
enumeration atq
enumeration atr
enumeration ats
enumeration att
enumeration atu
enumeration atv
enumeration atw
enumeration atx
enumeration aty
enumeration atz
enumeration aua
enumeration aub
enumeration auc
enumeration aud
enumeration aue
enumeration auf
enumeration aug
enumeration auh
enumeration aui
enumeration auj
enumeration auk
enumeration aul
enumeration aum
enumeration aun
enumeration auo
enumeration aup
enumeration auq
enumeration aur
enumeration aus
enumeration aut
enumeration auu
enumeration auw
enumeration aux
enumeration auy
enumeration auz
enumeration avb
enumeration avd
enumeration avi
enumeration avk
enumeration avl
enumeration avm
enumeration avn
enumeration avo
enumeration avs
enumeration avt
enumeration avu
enumeration avv
enumeration awa
enumeration awb
enumeration awc
enumeration awd
enumeration awe
enumeration awg
enumeration awh
enumeration awi
enumeration awk
enumeration awm
enumeration awn
enumeration awo
enumeration awr
enumeration aws
enumeration awt
enumeration awu
enumeration awv
enumeration aww
enumeration awx
enumeration awy
enumeration axb
enumeration axe
enumeration axg
enumeration axk
enumeration axl
enumeration axm
enumeration axx
enumeration aya
enumeration ayb
enumeration ayc
enumeration ayd
enumeration aye
enumeration ayg
enumeration ayh
enumeration ayi
enumeration ayk
enumeration ayl
enumeration ayn
enumeration ayo
enumeration ayp
enumeration ayq
enumeration ayr
enumeration ays
enumeration ayt
enumeration ayu
enumeration ayy
enumeration ayz
enumeration aza
enumeration azb
enumeration azc
enumeration azd
enumeration azg
enumeration azj
enumeration azm
enumeration azn
enumeration azo
enumeration azt
enumeration azz
enumeration baa
enumeration bab
enumeration bac
enumeration bad
enumeration bae
enumeration baf
enumeration bag
enumeration bah
enumeration bai
enumeration baj
enumeration bal
enumeration ban
enumeration bao
enumeration bap
enumeration bar
enumeration bas
enumeration bat
enumeration bau
enumeration bav
enumeration baw
enumeration bax
enumeration bay
enumeration bba
enumeration bbb
enumeration bbc
enumeration bbd
enumeration bbe
enumeration bbf
enumeration bbg
enumeration bbh
enumeration bbi
enumeration bbj
enumeration bbk
enumeration bbl
enumeration bbm
enumeration bbn
enumeration bbo
enumeration bbp
enumeration bbq
enumeration bbr
enumeration bbs
enumeration bbt
enumeration bbu
enumeration bbv
enumeration bbw
enumeration bbx
enumeration bby
enumeration bbz
enumeration bca
enumeration bcb
enumeration bcc
enumeration bcd
enumeration bce
enumeration bcf
enumeration bcg
enumeration bch
enumeration bci
enumeration bcj
enumeration bck
enumeration bcl
enumeration bcm
enumeration bcn
enumeration bco
enumeration bcp
enumeration bcq
enumeration bcr
enumeration bcs
enumeration bct
enumeration bcu
enumeration bcv
enumeration bcw
enumeration bcy
enumeration bcz
enumeration bda
enumeration bdb
enumeration bdc
enumeration bdd
enumeration bde
enumeration bdf
enumeration bdg
enumeration bdh
enumeration bdi
enumeration bdj
enumeration bdk
enumeration bdl
enumeration bdm
enumeration bdn
enumeration bdo
enumeration bdp
enumeration bdq
enumeration bdr
enumeration bds
enumeration bdt
enumeration bdu
enumeration bdv
enumeration bdw
enumeration bdx
enumeration bdy
enumeration bdz
enumeration bea
enumeration beb
enumeration bec
enumeration bed
enumeration bee
enumeration bef
enumeration beg
enumeration beh
enumeration bei
enumeration bej
enumeration bek
enumeration bem
enumeration beo
enumeration bep
enumeration beq
enumeration ber
enumeration bes
enumeration bet
enumeration beu
enumeration bev
enumeration bew
enumeration bex
enumeration bey
enumeration bez
enumeration bfa
enumeration bfb
enumeration bfc
enumeration bfd
enumeration bfe
enumeration bff
enumeration bfg
enumeration bfh
enumeration bfi
enumeration bfj
enumeration bfk
enumeration bfl
enumeration bfm
enumeration bfn
enumeration bfo
enumeration bfp
enumeration bfq
enumeration bfr
enumeration bfs
enumeration bft
enumeration bfu
enumeration bfw
enumeration bfx
enumeration bfy
enumeration bfz
enumeration bga
enumeration bgb
enumeration bgc
enumeration bgd
enumeration bge
enumeration bgf
enumeration bgg
enumeration bgi
enumeration bgj
enumeration bgk
enumeration bgl
enumeration bgm
enumeration bgn
enumeration bgo
enumeration bgp
enumeration bgq
enumeration bgr
enumeration bgs
enumeration bgt
enumeration bgu
enumeration bgv
enumeration bgw
enumeration bgx
enumeration bgy
enumeration bgz
enumeration bha
enumeration bhb
enumeration bhc
enumeration bhd
enumeration bhe
enumeration bhf
enumeration bhg
enumeration bhh
enumeration bhi
enumeration bhj
enumeration bhl
enumeration bhm
enumeration bhn
enumeration bho
enumeration bhp
enumeration bhq
enumeration bhr
enumeration bhs
enumeration bht
enumeration bhu
enumeration bhv
enumeration bhw
enumeration bhx
enumeration bhy
enumeration bhz
enumeration bia
enumeration bib
enumeration bic
enumeration bid
enumeration bie
enumeration bif
enumeration big
enumeration bij
enumeration bik
enumeration bil
enumeration bim
enumeration bin
enumeration bio
enumeration bip
enumeration biq
enumeration bir
enumeration bit
enumeration biu
enumeration biv
enumeration biw
enumeration bix
enumeration biy
enumeration biz
enumeration bja
enumeration bjb
enumeration bjc
enumeration bje
enumeration bjf
enumeration bjg
enumeration bjh
enumeration bji
enumeration bjj
enumeration bjk
enumeration bjl
enumeration bjm
enumeration bjn
enumeration bjo
enumeration bjp
enumeration bjr
enumeration bjs
enumeration bjt
enumeration bju
enumeration bjv
enumeration bjw
enumeration bjx
enumeration bjy
enumeration bjz
enumeration bka
enumeration bkc
enumeration bkd
enumeration bkf
enumeration bkg
enumeration bkh
enumeration bki
enumeration bkj
enumeration bkk
enumeration bkl
enumeration bkm
enumeration bkn
enumeration bko
enumeration bkp
enumeration bkq
enumeration bkr
enumeration bks
enumeration bkt
enumeration bku
enumeration bkv
enumeration bkw
enumeration bkx
enumeration bky
enumeration bkz
enumeration bla
enumeration blb
enumeration blc
enumeration bld
enumeration ble
enumeration blf
enumeration blg
enumeration blh
enumeration bli
enumeration blj
enumeration blk
enumeration bll
enumeration blm
enumeration bln
enumeration blo
enumeration blp
enumeration blq
enumeration blr
enumeration bls
enumeration blt
enumeration blv
enumeration blw
enumeration blx
enumeration bly
enumeration blz
enumeration bma
enumeration bmb
enumeration bmc
enumeration bmd
enumeration bme
enumeration bmf
enumeration bmg
enumeration bmh
enumeration bmi
enumeration bmj
enumeration bmk
enumeration bml
enumeration bmm
enumeration bmn
enumeration bmo
enumeration bmp
enumeration bmq
enumeration bmr
enumeration bms
enumeration bmt
enumeration bmu
enumeration bmv
enumeration bmw
enumeration bmx
enumeration bmy
enumeration bmz
enumeration bna
enumeration bnb
enumeration bnc
enumeration bnd
enumeration bne
enumeration bnf
enumeration bng
enumeration bni
enumeration bnj
enumeration bnk
enumeration bnl
enumeration bnm
enumeration bnn
enumeration bno
enumeration bnp
enumeration bnq
enumeration bnr
enumeration bns
enumeration bnt
enumeration bnu
enumeration bnv
enumeration bnw
enumeration bnx
enumeration bny
enumeration bnz
enumeration boa
enumeration bob
enumeration boe
enumeration bof
enumeration bog
enumeration boh
enumeration boi
enumeration boj
enumeration bok
enumeration bol
enumeration bom
enumeration bon
enumeration boo
enumeration bop
enumeration boq
enumeration bor
enumeration bot
enumeration bou
enumeration bov
enumeration bow
enumeration box
enumeration boy
enumeration boz
enumeration bpa
enumeration bpb
enumeration bpd
enumeration bpg
enumeration bph
enumeration bpi
enumeration bpj
enumeration bpk
enumeration bpl
enumeration bpm
enumeration bpn
enumeration bpo
enumeration bpp
enumeration bpq
enumeration bpr
enumeration bps
enumeration bpt
enumeration bpu
enumeration bpv
enumeration bpw
enumeration bpx
enumeration bpy
enumeration bpz
enumeration bqa
enumeration bqb
enumeration bqc
enumeration bqd
enumeration bqf
enumeration bqg
enumeration bqh
enumeration bqi
enumeration bqj
enumeration bqk
enumeration bql
enumeration bqm
enumeration bqn
enumeration bqo
enumeration bqp
enumeration bqq
enumeration bqr
enumeration bqs
enumeration bqt
enumeration bqu
enumeration bqv
enumeration bqw
enumeration bqx
enumeration bqy
enumeration bqz
enumeration bra
enumeration brb
enumeration brc
enumeration brd
enumeration brf
enumeration brg
enumeration brh
enumeration bri
enumeration brj
enumeration brk
enumeration brl
enumeration brm
enumeration brn
enumeration bro
enumeration brp
enumeration brq
enumeration brr
enumeration brs
enumeration brt
enumeration bru
enumeration brv
enumeration brw
enumeration brx
enumeration bry
enumeration brz
enumeration bsa
enumeration bsb
enumeration bsc
enumeration bse
enumeration bsf
enumeration bsg
enumeration bsh
enumeration bsi
enumeration bsj
enumeration bsk
enumeration bsl
enumeration bsm
enumeration bsn
enumeration bso
enumeration bsp
enumeration bsq
enumeration bsr
enumeration bss
enumeration bst
enumeration bsu
enumeration bsv
enumeration bsw
enumeration bsx
enumeration bsy
enumeration bta
enumeration btc
enumeration btd
enumeration bte
enumeration btf
enumeration btg
enumeration bth
enumeration bti
enumeration btj
enumeration btk
enumeration btl
enumeration btm
enumeration btn
enumeration bto
enumeration btp
enumeration btq
enumeration btr
enumeration bts
enumeration btt
enumeration btu
enumeration btv
enumeration btw
enumeration btx
enumeration bty
enumeration btz
enumeration bua
enumeration bub
enumeration buc
enumeration bud
enumeration bue
enumeration buf
enumeration bug
enumeration buh
enumeration bui
enumeration buj
enumeration buk
enumeration bum
enumeration bun
enumeration buo
enumeration bup
enumeration buq
enumeration bus
enumeration but
enumeration buu
enumeration buv
enumeration buw
enumeration bux
enumeration buy
enumeration buz
enumeration bva
enumeration bvb
enumeration bvc
enumeration bvd
enumeration bve
enumeration bvf
enumeration bvg
enumeration bvh
enumeration bvi
enumeration bvj
enumeration bvk
enumeration bvl
enumeration bvm
enumeration bvn
enumeration bvo
enumeration bvp
enumeration bvq
enumeration bvr
enumeration bvt
enumeration bvu
enumeration bvv
enumeration bvw
enumeration bvx
enumeration bvy
enumeration bvz
enumeration bwa
enumeration bwb
enumeration bwc
enumeration bwd
enumeration bwe
enumeration bwf
enumeration bwg
enumeration bwh
enumeration bwi
enumeration bwj
enumeration bwk
enumeration bwl
enumeration bwm
enumeration bwn
enumeration bwo
enumeration bwp
enumeration bwq
enumeration bwr
enumeration bws
enumeration bwt
enumeration bwu
enumeration bww
enumeration bwx
enumeration bwy
enumeration bwz
enumeration bxa
enumeration bxb
enumeration bxc
enumeration bxd
enumeration bxe
enumeration bxf
enumeration bxg
enumeration bxh
enumeration bxi
enumeration bxj
enumeration bxk
enumeration bxl
enumeration bxm
enumeration bxn
enumeration bxo
enumeration bxp
enumeration bxq
enumeration bxr
enumeration bxs
enumeration bxu
enumeration bxv
enumeration bxw
enumeration bxx
enumeration bxz
enumeration bya
enumeration byb
enumeration byc
enumeration byd
enumeration bye
enumeration byf
enumeration byg
enumeration byh
enumeration byi
enumeration byj
enumeration byk
enumeration byl
enumeration bym
enumeration byn
enumeration byo
enumeration byp
enumeration byq
enumeration byr
enumeration bys
enumeration byt
enumeration byv
enumeration byw
enumeration byx
enumeration byy
enumeration byz
enumeration bza
enumeration bzb
enumeration bzc
enumeration bzd
enumeration bze
enumeration bzf
enumeration bzg
enumeration bzh
enumeration bzi
enumeration bzj
enumeration bzk
enumeration bzl
enumeration bzm
enumeration bzn
enumeration bzo
enumeration bzp
enumeration bzq
enumeration bzr
enumeration bzs
enumeration bzt
enumeration bzu
enumeration bzv
enumeration bzw
enumeration bzx
enumeration bzy
enumeration bzz
enumeration caa
enumeration cab
enumeration cac
enumeration cad
enumeration cae
enumeration caf
enumeration cag
enumeration cah
enumeration cai
enumeration caj
enumeration cak
enumeration cal
enumeration cam
enumeration can
enumeration cao
enumeration cap
enumeration caq
enumeration car
enumeration cas
enumeration cau
enumeration cav
enumeration caw
enumeration cax
enumeration cay
enumeration caz
enumeration cba
enumeration cbb
enumeration cbc
enumeration cbd
enumeration cbe
enumeration cbg
enumeration cbh
enumeration cbi
enumeration cbj
enumeration cbk
enumeration cbl
enumeration cbn
enumeration cbo
enumeration cbr
enumeration cbs
enumeration cbt
enumeration cbu
enumeration cbv
enumeration cbw
enumeration cby
enumeration cca
enumeration ccc
enumeration ccd
enumeration cce
enumeration ccg
enumeration cch
enumeration ccj
enumeration ccl
enumeration ccm
enumeration ccn
enumeration cco
enumeration ccp
enumeration ccr
enumeration ccs
enumeration cda
enumeration cdc
enumeration cdd
enumeration cde
enumeration cdf
enumeration cdg
enumeration cdh
enumeration cdi
enumeration cdj
enumeration cdm
enumeration cdn
enumeration cdo
enumeration cdr
enumeration cds
enumeration cdy
enumeration cdz
enumeration cea
enumeration ceb
enumeration ceg
enumeration cek
enumeration cel
enumeration cen
enumeration cet
enumeration cfa
enumeration cfd
enumeration cfg
enumeration cfm
enumeration cga
enumeration cgc
enumeration cgg
enumeration cgk
enumeration chb
enumeration chc
enumeration chd
enumeration chf
enumeration chg
enumeration chh
enumeration chj
enumeration chk
enumeration chl
enumeration chm
enumeration chn
enumeration cho
enumeration chp
enumeration chq
enumeration chr
enumeration cht
enumeration chw
enumeration chx
enumeration chy
enumeration chz
enumeration cia
enumeration cib
enumeration cic
enumeration cid
enumeration cie
enumeration cih
enumeration cik
enumeration cim
enumeration cin
enumeration cip
enumeration cir
enumeration ciw
enumeration ciy
enumeration cja
enumeration cje
enumeration cjh
enumeration cji
enumeration cjk
enumeration cjm
enumeration cjn
enumeration cjo
enumeration cjp
enumeration cjs
enumeration cjv
enumeration cjy
enumeration ckb
enumeration ckh
enumeration ckl
enumeration ckn
enumeration cko
enumeration ckq
enumeration ckr
enumeration cks
enumeration ckt
enumeration cku
enumeration ckv
enumeration ckx
enumeration cky
enumeration ckz
enumeration cla
enumeration clc
enumeration cld
enumeration cle
enumeration clh
enumeration cli
enumeration clj
enumeration clk
enumeration cll
enumeration clm
enumeration clo
enumeration clt
enumeration clu
enumeration clw
enumeration cly
enumeration cma
enumeration cmc
enumeration cme
enumeration cmg
enumeration cmi
enumeration cml
enumeration cmm
enumeration cmn
enumeration cmo
enumeration cmr
enumeration cms
enumeration cmt
enumeration cna
enumeration cnb
enumeration cnc
enumeration cng
enumeration cnh
enumeration cni
enumeration cnk
enumeration cnl
enumeration cno
enumeration cns
enumeration cnt
enumeration cnu
enumeration cnw
enumeration cnx
enumeration coa
enumeration cob
enumeration coc
enumeration cod
enumeration coe
enumeration cof
enumeration cog
enumeration coh
enumeration coj
enumeration cok
enumeration col
enumeration com
enumeration con
enumeration coo
enumeration cop
enumeration coq
enumeration cot
enumeration cou
enumeration cov
enumeration cow
enumeration cox
enumeration coy
enumeration coz
enumeration cpa
enumeration cpb
enumeration cpc
enumeration cpe
enumeration cpf
enumeration cpg
enumeration cpi
enumeration cpn
enumeration cpo
enumeration cpp
enumeration cps
enumeration cpu
enumeration cpx
enumeration cpy
enumeration cqd
enumeration cqu
enumeration cra
enumeration crb
enumeration crc
enumeration crd
enumeration crf
enumeration crg
enumeration crh
enumeration cri
enumeration crj
enumeration crk
enumeration crl
enumeration crm
enumeration crn
enumeration cro
enumeration crp
enumeration crq
enumeration crr
enumeration crs
enumeration crt
enumeration crv
enumeration crw
enumeration crx
enumeration cry
enumeration crz
enumeration csa
enumeration csb
enumeration csc
enumeration csd
enumeration cse
enumeration csf
enumeration csg
enumeration csh
enumeration csi
enumeration csj
enumeration csk
enumeration csl
enumeration csm
enumeration csn
enumeration cso
enumeration csq
enumeration csr
enumeration css
enumeration cst
enumeration csu
enumeration csv
enumeration csw
enumeration csy
enumeration csz
enumeration cta
enumeration ctc
enumeration ctd
enumeration cte
enumeration ctg
enumeration cth
enumeration ctl
enumeration ctm
enumeration ctn
enumeration cto
enumeration ctp
enumeration cts
enumeration ctt
enumeration ctu
enumeration ctz
enumeration cua
enumeration cub
enumeration cuc
enumeration cug
enumeration cuh
enumeration cui
enumeration cuj
enumeration cuk
enumeration cul
enumeration cum
enumeration cuo
enumeration cup
enumeration cuq
enumeration cur
enumeration cus
enumeration cut
enumeration cuu
enumeration cuv
enumeration cuw
enumeration cux
enumeration cvg
enumeration cvn
enumeration cwa
enumeration cwb
enumeration cwd
enumeration cwe
enumeration cwg
enumeration cwt
enumeration cya
enumeration cyb
enumeration cyo
enumeration czh
enumeration czk
enumeration czn
enumeration czo
enumeration czt
enumeration daa
enumeration dac
enumeration dad
enumeration dae
enumeration dag
enumeration dah
enumeration dai
enumeration daj
enumeration dak
enumeration dal
enumeration dam
enumeration dao
enumeration daq
enumeration dar
enumeration das
enumeration dau
enumeration dav
enumeration daw
enumeration dax
enumeration day
enumeration daz
enumeration dba
enumeration dbb
enumeration dbd
enumeration dbe
enumeration dbf
enumeration dbg
enumeration dbi
enumeration dbj
enumeration dbl
enumeration dbm
enumeration dbn
enumeration dbo
enumeration dbp
enumeration dbq
enumeration dbr
enumeration dbt
enumeration dbu
enumeration dbv
enumeration dbw
enumeration dby
enumeration dcc
enumeration dcr
enumeration dda
enumeration ddd
enumeration dde
enumeration ddg
enumeration ddi
enumeration ddj
enumeration ddn
enumeration ddo
enumeration ddr
enumeration dds
enumeration ddw
enumeration dec
enumeration ded
enumeration dee
enumeration def
enumeration deg
enumeration deh
enumeration dei
enumeration dek
enumeration del
enumeration dem
enumeration den
enumeration dep
enumeration deq
enumeration der
enumeration des
enumeration dev
enumeration dez
enumeration dga
enumeration dgb
enumeration dgc
enumeration dgd
enumeration dge
enumeration dgg
enumeration dgh
enumeration dgi
enumeration dgk
enumeration dgl
enumeration dgn
enumeration dgo
enumeration dgr
enumeration dgs
enumeration dgt
enumeration dgu
enumeration dgw
enumeration dgx
enumeration dgz
enumeration dhd
enumeration dhg
enumeration dhi
enumeration dhl
enumeration dhm
enumeration dhn
enumeration dho
enumeration dhr
enumeration dhs
enumeration dhu
enumeration dhv
enumeration dhw
enumeration dhx
enumeration dia
enumeration dib
enumeration dic
enumeration did
enumeration dif
enumeration dig
enumeration dih
enumeration dii
enumeration dij
enumeration dik
enumeration dil
enumeration dim
enumeration din
enumeration dio
enumeration dip
enumeration diq
enumeration dir
enumeration dis
enumeration dit
enumeration diu
enumeration diw
enumeration dix
enumeration diy
enumeration diz
enumeration dja
enumeration djb
enumeration djc
enumeration djd
enumeration dje
enumeration djf
enumeration dji
enumeration djj
enumeration djk
enumeration djm
enumeration djn
enumeration djo
enumeration djr
enumeration dju
enumeration djw
enumeration dka
enumeration dkk
enumeration dkr
enumeration dks
enumeration dkx
enumeration dlg
enumeration dlk
enumeration dlm
enumeration dln
enumeration dma
enumeration dmb
enumeration dmc
enumeration dmd
enumeration dme
enumeration dmg
enumeration dmk
enumeration dml
enumeration dmm
enumeration dmn
enumeration dmo
enumeration dmr
enumeration dms
enumeration dmu
enumeration dmv
enumeration dmw
enumeration dmx
enumeration dmy
enumeration dna
enumeration dnd
enumeration dne
enumeration dng
enumeration dni
enumeration dnj
enumeration dnk
enumeration dnn
enumeration dnr
enumeration dnt
enumeration dnu
enumeration dnv
enumeration dnw
enumeration dny
enumeration doa
enumeration dob
enumeration doc
enumeration doe
enumeration dof
enumeration doh
enumeration doi
enumeration dok
enumeration dol
enumeration don
enumeration doo
enumeration dop
enumeration doq
enumeration dor
enumeration dos
enumeration dot
enumeration dov
enumeration dow
enumeration dox
enumeration doy
enumeration doz
enumeration dpp
enumeration dra
enumeration drb
enumeration drc
enumeration drd
enumeration dre
enumeration drg
enumeration dri
enumeration drl
enumeration drn
enumeration dro
enumeration drq
enumeration drr
enumeration drs
enumeration drt
enumeration dru
enumeration dry
enumeration dsb
enumeration dse
enumeration dsh
enumeration dsi
enumeration dsl
enumeration dsn
enumeration dso
enumeration dsq
enumeration dta
enumeration dtb
enumeration dtd
enumeration dth
enumeration dti
enumeration dtk
enumeration dtm
enumeration dto
enumeration dtp
enumeration dtr
enumeration dts
enumeration dtt
enumeration dtu
enumeration dty
enumeration dua
enumeration dub
enumeration duc
enumeration dud
enumeration due
enumeration duf
enumeration dug
enumeration duh
enumeration dui
enumeration duj
enumeration duk
enumeration dul
enumeration dum
enumeration dun
enumeration duo
enumeration dup
enumeration duq
enumeration dur
enumeration dus
enumeration duu
enumeration duv
enumeration duw
enumeration dux
enumeration duy
enumeration duz
enumeration dva
enumeration dwa
enumeration dwr
enumeration dws
enumeration dww
enumeration dya
enumeration dyb
enumeration dyd
enumeration dyg
enumeration dyi
enumeration dym
enumeration dyn
enumeration dyo
enumeration dyu
enumeration dyy
enumeration dza
enumeration dzd
enumeration dze
enumeration dzg
enumeration dzl
enumeration dzn
enumeration eaa
enumeration ebg
enumeration ebk
enumeration ebo
enumeration ebr
enumeration ebu
enumeration ecr
enumeration ecs
enumeration ecy
enumeration eee
enumeration efa
enumeration efe
enumeration efi
enumeration ega
enumeration egl
enumeration ego
enumeration egx
enumeration egy
enumeration ehu
enumeration eip
enumeration eit
enumeration eiv
enumeration eja
enumeration eka
enumeration ekc
enumeration eke
enumeration ekg
enumeration eki
enumeration ekk
enumeration ekl
enumeration ekm
enumeration eko
enumeration ekp
enumeration ekr
enumeration eky
enumeration ele
enumeration elh
enumeration eli
enumeration elk
enumeration elm
enumeration elo
enumeration elu
enumeration elx
enumeration ema
enumeration emb
enumeration eme
enumeration emg
enumeration emi
enumeration emk
enumeration emm
enumeration emn
enumeration emp
enumeration ems
enumeration emu
enumeration emw
enumeration emx
enumeration emy
enumeration ena
enumeration enb
enumeration enc
enumeration end
enumeration enf
enumeration enh
enumeration enl
enumeration enm
enumeration enn
enumeration eno
enumeration enq
enumeration enr
enumeration enu
enumeration env
enumeration enw
enumeration enx
enumeration eot
enumeration epi
enumeration era
enumeration erg
enumeration erh
enumeration eri
enumeration erk
enumeration ero
enumeration err
enumeration ers
enumeration ert
enumeration erw
enumeration ese
enumeration esh
enumeration esi
enumeration esk
enumeration esl
enumeration esm
enumeration esn
enumeration eso
enumeration esq
enumeration ess
enumeration esu
enumeration esx
enumeration esy
enumeration etb
enumeration etc
enumeration eth
enumeration etn
enumeration eto
enumeration etr
enumeration ets
enumeration ett
enumeration etu
enumeration etx
enumeration etz
enumeration euq
enumeration eve
enumeration evh
enumeration evn
enumeration ewo
enumeration ext
enumeration eya
enumeration eyo
enumeration eza
enumeration eze
enumeration faa
enumeration fab
enumeration fad
enumeration faf
enumeration fag
enumeration fah
enumeration fai
enumeration faj
enumeration fak
enumeration fal
enumeration fam
enumeration fan
enumeration fap
enumeration far
enumeration fat
enumeration fau
enumeration fax
enumeration fay
enumeration faz
enumeration fbl
enumeration fcs
enumeration fer
enumeration ffi
enumeration ffm
enumeration fgr
enumeration fia
enumeration fie
enumeration fil
enumeration fip
enumeration fir
enumeration fit
enumeration fiu
enumeration fiw
enumeration fkk
enumeration fkv
enumeration fla
enumeration flh
enumeration fli
enumeration fll
enumeration fln
enumeration flr
enumeration fly
enumeration fmp
enumeration fmu
enumeration fng
enumeration fni
enumeration fod
enumeration foi
enumeration fom
enumeration fon
enumeration for
enumeration fos
enumeration fox
enumeration fpe
enumeration fqs
enumeration frc
enumeration frd
enumeration frk
enumeration frm
enumeration fro
enumeration frp
enumeration frq
enumeration frr
enumeration frs
enumeration frt
enumeration fse
enumeration fsl
enumeration fss
enumeration fub
enumeration fuc
enumeration fud
enumeration fue
enumeration fuf
enumeration fuh
enumeration fui
enumeration fuj
enumeration fum
enumeration fun
enumeration fuq
enumeration fur
enumeration fut
enumeration fuu
enumeration fuv
enumeration fuy
enumeration fvr
enumeration fwa
enumeration fwe
enumeration gaa
enumeration gab
enumeration gac
enumeration gad
enumeration gae
enumeration gaf
enumeration gag
enumeration gah
enumeration gai
enumeration gaj
enumeration gak
enumeration gal
enumeration gam
enumeration gan
enumeration gao
enumeration gap
enumeration gaq
enumeration gar
enumeration gas
enumeration gat
enumeration gau
enumeration gaw
enumeration gax
enumeration gay
enumeration gaz
enumeration gba
enumeration gbb
enumeration gbd
enumeration gbe
enumeration gbf
enumeration gbg
enumeration gbh
enumeration gbi
enumeration gbj
enumeration gbk
enumeration gbl
enumeration gbm
enumeration gbn
enumeration gbo
enumeration gbp
enumeration gbq
enumeration gbr
enumeration gbs
enumeration gbu
enumeration gbv
enumeration gbw
enumeration gbx
enumeration gby
enumeration gbz
enumeration gcc
enumeration gcd
enumeration gce
enumeration gcf
enumeration gcl
enumeration gcn
enumeration gcr
enumeration gct
enumeration gda
enumeration gdb
enumeration gdc
enumeration gdd
enumeration gde
enumeration gdf
enumeration gdg
enumeration gdh
enumeration gdi
enumeration gdj
enumeration gdk
enumeration gdl
enumeration gdm
enumeration gdn
enumeration gdo
enumeration gdq
enumeration gdr
enumeration gds
enumeration gdt
enumeration gdu
enumeration gdx
enumeration gea
enumeration geb
enumeration gec
enumeration ged
enumeration geg
enumeration geh
enumeration gei
enumeration gej
enumeration gek
enumeration gel
enumeration gem
enumeration geq
enumeration ges
enumeration gev
enumeration gew
enumeration gex
enumeration gey
enumeration gez
enumeration gfk
enumeration gft
enumeration gfx
enumeration gga
enumeration ggb
enumeration ggd
enumeration gge
enumeration ggg
enumeration ggk
enumeration ggl
enumeration ggn
enumeration ggo
enumeration ggt
enumeration ggu
enumeration ggw
enumeration gha
enumeration ghc
enumeration ghe
enumeration ghh
enumeration ghk
enumeration ghl
enumeration ghn
enumeration gho
enumeration ghr
enumeration ghs
enumeration ght
enumeration gia
enumeration gib
enumeration gic
enumeration gid
enumeration gig
enumeration gih
enumeration gil
enumeration gim
enumeration gin
enumeration gip
enumeration giq
enumeration gir
enumeration gis
enumeration git
enumeration giu
enumeration giw
enumeration gix
enumeration giy
enumeration giz
enumeration gji
enumeration gjk
enumeration gjm
enumeration gjn
enumeration gju
enumeration gka
enumeration gke
enumeration gkn
enumeration gko
enumeration gkp
enumeration glc
enumeration gld
enumeration glh
enumeration gli
enumeration glj
enumeration glk
enumeration gll
enumeration glo
enumeration glr
enumeration glu
enumeration glw
enumeration gly
enumeration gma
enumeration gmb
enumeration gmd
enumeration gme
enumeration gmg
enumeration gmh
enumeration gml
enumeration gmm
enumeration gmn
enumeration gmq
enumeration gmu
enumeration gmv
enumeration gmw
enumeration gmx
enumeration gmy
enumeration gmz
enumeration gna
enumeration gnb
enumeration gnc
enumeration gnd
enumeration gne
enumeration gng
enumeration gnh
enumeration gni
enumeration gnk
enumeration gnl
enumeration gnm
enumeration gnn
enumeration gno
enumeration gnq
enumeration gnr
enumeration gnt
enumeration gnu
enumeration gnw
enumeration gnz
enumeration goa
enumeration gob
enumeration goc
enumeration god
enumeration goe
enumeration gof
enumeration gog
enumeration goh
enumeration goi
enumeration goj
enumeration gok
enumeration gol
enumeration gom
enumeration gon
enumeration goo
enumeration gop
enumeration goq
enumeration gor
enumeration gos
enumeration got
enumeration gou
enumeration gow
enumeration gox
enumeration goy
enumeration goz
enumeration gpa
enumeration gpe
enumeration gpn
enumeration gqa
enumeration gqi
enumeration gqn
enumeration gqr
enumeration gqu
enumeration gra
enumeration grb
enumeration grc
enumeration grd
enumeration grg
enumeration grh
enumeration gri
enumeration grj
enumeration grk
enumeration grm
enumeration gro
enumeration grq
enumeration grr
enumeration grs
enumeration grt
enumeration gru
enumeration grv
enumeration grw
enumeration grx
enumeration gry
enumeration grz
enumeration gse
enumeration gsg
enumeration gsl
enumeration gsm
enumeration gsn
enumeration gso
enumeration gsp
enumeration gss
enumeration gsw
enumeration gta
enumeration gti
enumeration gtu
enumeration gua
enumeration gub
enumeration guc
enumeration gud
enumeration gue
enumeration guf
enumeration gug
enumeration guh
enumeration gui
enumeration guk
enumeration gul
enumeration gum
enumeration gun
enumeration guo
enumeration gup
enumeration guq
enumeration gur
enumeration gus
enumeration gut
enumeration guu
enumeration guv
enumeration guw
enumeration gux
enumeration guz
enumeration gva
enumeration gvc
enumeration gve
enumeration gvf
enumeration gvj
enumeration gvl
enumeration gvm
enumeration gvn
enumeration gvo
enumeration gvp
enumeration gvr
enumeration gvs
enumeration gvy
enumeration gwa
enumeration gwb
enumeration gwc
enumeration gwd
enumeration gwe
enumeration gwf
enumeration gwg
enumeration gwi
enumeration gwj
enumeration gwm
enumeration gwn
enumeration gwr
enumeration gwt
enumeration gwu
enumeration gww
enumeration gwx
enumeration gxx
enumeration gya
enumeration gyb
enumeration gyd
enumeration gye
enumeration gyf
enumeration gyg
enumeration gyi
enumeration gyl
enumeration gym
enumeration gyn
enumeration gyr
enumeration gyy
enumeration gza
enumeration gzi
enumeration gzn
enumeration haa
enumeration hab
enumeration hac
enumeration had
enumeration hae
enumeration haf
enumeration hag
enumeration hah
enumeration hai
enumeration haj
enumeration hak
enumeration hal
enumeration ham
enumeration han
enumeration hao
enumeration hap
enumeration haq
enumeration har
enumeration has
enumeration hav
enumeration haw
enumeration hax
enumeration hay
enumeration haz
enumeration hba
enumeration hbb
enumeration hbn
enumeration hbo
enumeration hbu
enumeration hca
enumeration hch
enumeration hdn
enumeration hds
enumeration hdy
enumeration hea
enumeration hed
enumeration heg
enumeration heh
enumeration hei
enumeration hem
enumeration hgm
enumeration hgw
enumeration hhi
enumeration hhr
enumeration hhy
enumeration hia
enumeration hib
enumeration hid
enumeration hif
enumeration hig
enumeration hih
enumeration hii
enumeration hij
enumeration hik
enumeration hil
enumeration him
enumeration hio
enumeration hir
enumeration hit
enumeration hiw
enumeration hix
enumeration hji
enumeration hka
enumeration hke
enumeration hkk
enumeration hks
enumeration hla
enumeration hlb
enumeration hld
enumeration hle
enumeration hlt
enumeration hlu
enumeration hma
enumeration hmb
enumeration hmc
enumeration hmd
enumeration hme
enumeration hmf
enumeration hmg
enumeration hmh
enumeration hmi
enumeration hmj
enumeration hmk
enumeration hml
enumeration hmm
enumeration hmn
enumeration hmp
enumeration hmq
enumeration hmr
enumeration hms
enumeration hmt
enumeration hmu
enumeration hmv
enumeration hmw
enumeration hmx
enumeration hmy
enumeration hmz
enumeration hna
enumeration hnd
enumeration hne
enumeration hnh
enumeration hni
enumeration hnj
enumeration hnn
enumeration hno
enumeration hns
enumeration hnu
enumeration hoa
enumeration hob
enumeration hoc
enumeration hod
enumeration hoe
enumeration hoh
enumeration hoi
enumeration hoj
enumeration hok
enumeration hol
enumeration hom
enumeration hoo
enumeration hop
enumeration hor
enumeration hos
enumeration hot
enumeration hov
enumeration how
enumeration hoy
enumeration hoz
enumeration hpo
enumeration hps
enumeration hra
enumeration hrc
enumeration hre
enumeration hrk
enumeration hrm
enumeration hro
enumeration hrp
enumeration hrt
enumeration hru
enumeration hrw
enumeration hrx
enumeration hrz
enumeration hsb
enumeration hsh
enumeration hsl
enumeration hsn
enumeration hss
enumeration hti
enumeration hto
enumeration hts
enumeration htu
enumeration htx
enumeration hub
enumeration huc
enumeration hud
enumeration hue
enumeration huf
enumeration hug
enumeration huh
enumeration hui
enumeration huj
enumeration huk
enumeration hul
enumeration hum
enumeration huo
enumeration hup
enumeration huq
enumeration hur
enumeration hus
enumeration hut
enumeration huu
enumeration huv
enumeration huw
enumeration hux
enumeration huy
enumeration huz
enumeration hvc
enumeration hve
enumeration hvk
enumeration hvn
enumeration hvv
enumeration hwa
enumeration hwc
enumeration hwo
enumeration hya
enumeration hyx
enumeration iai
enumeration ian
enumeration iap
enumeration iar
enumeration iba
enumeration ibb
enumeration ibd
enumeration ibe
enumeration ibg
enumeration ibl
enumeration ibm
enumeration ibn
enumeration ibr
enumeration ibu
enumeration iby
enumeration ica
enumeration ich
enumeration icl
enumeration icr
enumeration ida
enumeration idb
enumeration idc
enumeration idd
enumeration ide
enumeration idi
enumeration idr
enumeration ids
enumeration idt
enumeration idu
enumeration ifa
enumeration ifb
enumeration ife
enumeration iff
enumeration ifk
enumeration ifm
enumeration ifu
enumeration ify
enumeration igb
enumeration ige
enumeration igg
enumeration igl
enumeration igm
enumeration ign
enumeration igo
enumeration igs
enumeration igw
enumeration ihb
enumeration ihi
enumeration ihp
enumeration ihw
enumeration iin
enumeration iir
enumeration ijc
enumeration ije
enumeration ijj
enumeration ijn
enumeration ijo
enumeration ijs
enumeration ike
enumeration iki
enumeration ikk
enumeration ikl
enumeration iko
enumeration ikp
enumeration ikr
enumeration ikt
enumeration ikv
enumeration ikw
enumeration ikx
enumeration ikz
enumeration ila
enumeration ilb
enumeration ilg
enumeration ili
enumeration ilk
enumeration ill
enumeration ilo
enumeration ils
enumeration ilu
enumeration ilv
enumeration ima
enumeration ime
enumeration imi
enumeration iml
enumeration imn
enumeration imo
enumeration imr
enumeration ims
enumeration imy
enumeration inb
enumeration inc
enumeration ine
enumeration ing
enumeration inh
enumeration inj
enumeration inl
enumeration inm
enumeration inn
enumeration ino
enumeration inp
enumeration ins
enumeration int
enumeration inz
enumeration ior
enumeration iou
enumeration iow
enumeration ipi
enumeration ipo
enumeration iqu
enumeration iqw
enumeration ira
enumeration ire
enumeration irh
enumeration iri
enumeration irk
enumeration irn
enumeration iro
enumeration irr
enumeration iru
enumeration irx
enumeration iry
enumeration isa
enumeration isc
enumeration isd
enumeration ise
enumeration isg
enumeration ish
enumeration isi
enumeration isk
enumeration ism
enumeration isn
enumeration iso
enumeration isr
enumeration ist
enumeration isu
enumeration itb
enumeration itc
enumeration ite
enumeration iti
enumeration itk
enumeration itl
enumeration itm
enumeration ito
enumeration itr
enumeration its
enumeration itt
enumeration itv
enumeration itw
enumeration itx
enumeration ity
enumeration itz
enumeration ium
enumeration ivb
enumeration ivv
enumeration iwk
enumeration iwm
enumeration iwo
enumeration iws
enumeration ixc
enumeration ixl
enumeration iya
enumeration iyo
enumeration iyx
enumeration izh
enumeration izr
enumeration izz
enumeration jaa
enumeration jab
enumeration jac
enumeration jad
enumeration jae
enumeration jaf
enumeration jah
enumeration jaj
enumeration jak
enumeration jal
enumeration jam
enumeration jan
enumeration jao
enumeration jaq
enumeration jas
enumeration jat
enumeration jau
enumeration jax
enumeration jay
enumeration jaz
enumeration jbe
enumeration jbi
enumeration jbj
enumeration jbk
enumeration jbn
enumeration jbo
enumeration jbr
enumeration jbt
enumeration jbu
enumeration jbw
enumeration jcs
enumeration jct
enumeration jda
enumeration jdg
enumeration jdt
enumeration jeb
enumeration jee
enumeration jeg
enumeration jeh
enumeration jei
enumeration jek
enumeration jel
enumeration jen
enumeration jer
enumeration jet
enumeration jeu
enumeration jgb
enumeration jge
enumeration jgk
enumeration jgo
enumeration jhi
enumeration jhs
enumeration jia
enumeration jib
enumeration jic
enumeration jid
enumeration jie
enumeration jig
enumeration jih
enumeration jii
enumeration jil
enumeration jim
enumeration jio
enumeration jiq
enumeration jit
enumeration jiu
enumeration jiv
enumeration jiy
enumeration jjr
enumeration jkm
enumeration jko
enumeration jkp
enumeration jkr
enumeration jku
enumeration jle
enumeration jls
enumeration jma
enumeration jmb
enumeration jmc
enumeration jmd
enumeration jmi
enumeration jml
enumeration jmn
enumeration jmr
enumeration jms
enumeration jmw
enumeration jmx
enumeration jna
enumeration jnd
enumeration jng
enumeration jni
enumeration jnj
enumeration jnl
enumeration jns
enumeration job
enumeration jod
enumeration jor
enumeration jos
enumeration jow
enumeration jpa
enumeration jpr
enumeration jpx
enumeration jqr
enumeration jra
enumeration jrb
enumeration jrr
enumeration jrt
enumeration jru
enumeration jsl
enumeration jua
enumeration jub
enumeration juc
enumeration jud
enumeration juh
enumeration jui
enumeration juk
enumeration jul
enumeration jum
enumeration jun
enumeration juo
enumeration jup
enumeration jur
enumeration jus
enumeration jut
enumeration juu
enumeration juw
enumeration juy
enumeration jvd
enumeration jvn
enumeration jwi
enumeration jya
enumeration jye
enumeration jyy
enumeration kaa
enumeration kab
enumeration kac
enumeration kad
enumeration kae
enumeration kaf
enumeration kag
enumeration kah
enumeration kai
enumeration kaj
enumeration kak
enumeration kam
enumeration kao
enumeration kap
enumeration kaq
enumeration kar
enumeration kav
enumeration kaw
enumeration kax
enumeration kay
enumeration kba
enumeration kbb
enumeration kbc
enumeration kbd
enumeration kbe
enumeration kbf
enumeration kbg
enumeration kbh
enumeration kbi
enumeration kbj
enumeration kbk
enumeration kbl
enumeration kbm
enumeration kbn
enumeration kbo
enumeration kbp
enumeration kbq
enumeration kbr
enumeration kbs
enumeration kbt
enumeration kbu
enumeration kbv
enumeration kbw
enumeration kbx
enumeration kby
enumeration kbz
enumeration kca
enumeration kcb
enumeration kcc
enumeration kcd
enumeration kce
enumeration kcf
enumeration kcg
enumeration kch
enumeration kci
enumeration kcj
enumeration kck
enumeration kcl
enumeration kcm
enumeration kcn
enumeration kco
enumeration kcp
enumeration kcq
enumeration kcr
enumeration kcs
enumeration kct
enumeration kcu
enumeration kcv
enumeration kcw
enumeration kcx
enumeration kcy
enumeration kcz
enumeration kda
enumeration kdc
enumeration kdd
enumeration kde
enumeration kdf
enumeration kdg
enumeration kdh
enumeration kdi
enumeration kdj
enumeration kdk
enumeration kdl
enumeration kdm
enumeration kdn
enumeration kdo
enumeration kdp
enumeration kdq
enumeration kdr
enumeration kdt
enumeration kdu
enumeration kdw
enumeration kdx
enumeration kdy
enumeration kdz
enumeration kea
enumeration keb
enumeration kec
enumeration ked
enumeration kee
enumeration kef
enumeration keg
enumeration keh
enumeration kei
enumeration kej
enumeration kek
enumeration kel
enumeration kem
enumeration ken
enumeration keo
enumeration kep
enumeration keq
enumeration ker
enumeration kes
enumeration ket
enumeration keu
enumeration kev
enumeration kew
enumeration kex
enumeration key
enumeration kez
enumeration kfa
enumeration kfb
enumeration kfc
enumeration kfd
enumeration kfe
enumeration kff
enumeration kfg
enumeration kfh
enumeration kfi
enumeration kfj
enumeration kfk
enumeration kfl
enumeration kfm
enumeration kfn
enumeration kfo
enumeration kfp
enumeration kfq
enumeration kfr
enumeration kfs
enumeration kft
enumeration kfu
enumeration kfv
enumeration kfw
enumeration kfx
enumeration kfy
enumeration kfz
enumeration kga
enumeration kgb
enumeration kgc
enumeration kgd
enumeration kge
enumeration kgf
enumeration kgg
enumeration kgi
enumeration kgj
enumeration kgk
enumeration kgl
enumeration kgm
enumeration kgn
enumeration kgo
enumeration kgp
enumeration kgq
enumeration kgr
enumeration kgs
enumeration kgt
enumeration kgu
enumeration kgv
enumeration kgw
enumeration kgx
enumeration kgy
enumeration kha
enumeration khb
enumeration khc
enumeration khd
enumeration khe
enumeration khf
enumeration khg
enumeration khh
enumeration khi
enumeration khj
enumeration khk
enumeration khl
enumeration khn
enumeration kho
enumeration khp
enumeration khq
enumeration khr
enumeration khs
enumeration kht
enumeration khu
enumeration khv
enumeration khw
enumeration khx
enumeration khy
enumeration khz
enumeration kia
enumeration kib
enumeration kic
enumeration kid
enumeration kie
enumeration kif
enumeration kig
enumeration kih
enumeration kii
enumeration kij
enumeration kil
enumeration kim
enumeration kio
enumeration kip
enumeration kiq
enumeration kis
enumeration kit
enumeration kiu
enumeration kiv
enumeration kiw
enumeration kix
enumeration kiy
enumeration kiz
enumeration kja
enumeration kjb
enumeration kjc
enumeration kjd
enumeration kje
enumeration kjf
enumeration kjg
enumeration kjh
enumeration kji
enumeration kjj
enumeration kjk
enumeration kjl
enumeration kjm
enumeration kjn
enumeration kjo
enumeration kjp
enumeration kjq
enumeration kjr
enumeration kjs
enumeration kjt
enumeration kju
enumeration kjx
enumeration kjy
enumeration kjz
enumeration kka
enumeration kkb
enumeration kkc
enumeration kkd
enumeration kke
enumeration kkf
enumeration kkg
enumeration kkh
enumeration kki
enumeration kkj
enumeration kkk
enumeration kkl
enumeration kkm
enumeration kkn
enumeration kko
enumeration kkp
enumeration kkq
enumeration kkr
enumeration kks
enumeration kkt
enumeration kku
enumeration kkv
enumeration kkw
enumeration kkx
enumeration kky
enumeration kkz
enumeration kla
enumeration klb
enumeration klc
enumeration kld
enumeration kle
enumeration klf
enumeration klg
enumeration klh
enumeration kli
enumeration klj
enumeration klk
enumeration kll
enumeration klm
enumeration kln
enumeration klo
enumeration klp
enumeration klq
enumeration klr
enumeration kls
enumeration klt
enumeration klu
enumeration klv
enumeration klw
enumeration klx
enumeration kly
enumeration klz
enumeration kma
enumeration kmb
enumeration kmc
enumeration kmd
enumeration kme
enumeration kmf
enumeration kmg
enumeration kmh
enumeration kmi
enumeration kmj
enumeration kmk
enumeration kml
enumeration kmm
enumeration kmn
enumeration kmo
enumeration kmp
enumeration kmq
enumeration kmr
enumeration kms
enumeration kmt
enumeration kmu
enumeration kmv
enumeration kmw
enumeration kmx
enumeration kmy
enumeration kmz
enumeration kna
enumeration knb
enumeration knc
enumeration knd
enumeration kne
enumeration knf
enumeration kng
enumeration kni
enumeration knj
enumeration knk
enumeration knl
enumeration knm
enumeration knn
enumeration kno
enumeration knp
enumeration knq
enumeration knr
enumeration kns
enumeration knt
enumeration knu
enumeration knv
enumeration knw
enumeration knx
enumeration kny
enumeration knz
enumeration koa
enumeration koc
enumeration kod
enumeration koe
enumeration kof
enumeration kog
enumeration koh
enumeration koi
enumeration koj
enumeration kok
enumeration kol
enumeration koo
enumeration kop
enumeration koq
enumeration kos
enumeration kot
enumeration kou
enumeration kov
enumeration kow
enumeration kox
enumeration koy
enumeration koz
enumeration kpa
enumeration kpb
enumeration kpc
enumeration kpd
enumeration kpe
enumeration kpf
enumeration kpg
enumeration kph
enumeration kpi
enumeration kpj
enumeration kpk
enumeration kpl
enumeration kpm
enumeration kpn
enumeration kpo
enumeration kpq
enumeration kpr
enumeration kps
enumeration kpt
enumeration kpu
enumeration kpv
enumeration kpw
enumeration kpx
enumeration kpy
enumeration kpz
enumeration kqa
enumeration kqb
enumeration kqc
enumeration kqd
enumeration kqe
enumeration kqf
enumeration kqg
enumeration kqh
enumeration kqi
enumeration kqj
enumeration kqk
enumeration kql
enumeration kqm
enumeration kqn
enumeration kqo
enumeration kqp
enumeration kqq
enumeration kqr
enumeration kqs
enumeration kqt
enumeration kqu
enumeration kqv
enumeration kqw
enumeration kqx
enumeration kqy
enumeration kqz
enumeration kra
enumeration krb
enumeration krc
enumeration krd
enumeration kre
enumeration krf
enumeration krh
enumeration kri
enumeration krj
enumeration krk
enumeration krl
enumeration krm
enumeration krn
enumeration kro
enumeration krp
enumeration krr
enumeration krs
enumeration krt
enumeration kru
enumeration krv
enumeration krw
enumeration krx
enumeration kry
enumeration krz
enumeration ksa
enumeration ksb
enumeration ksc
enumeration ksd
enumeration kse
enumeration ksf
enumeration ksg
enumeration ksh
enumeration ksi
enumeration ksj
enumeration ksk
enumeration ksl
enumeration ksm
enumeration ksn
enumeration kso
enumeration ksp
enumeration ksq
enumeration ksr
enumeration kss
enumeration kst
enumeration ksu
enumeration ksv
enumeration ksw
enumeration ksx
enumeration ksy
enumeration ksz
enumeration kta
enumeration ktb
enumeration ktc
enumeration ktd
enumeration kte
enumeration ktf
enumeration ktg
enumeration kth
enumeration kti
enumeration ktj
enumeration ktk
enumeration ktl
enumeration ktm
enumeration ktn
enumeration kto
enumeration ktp
enumeration ktq
enumeration ktr
enumeration kts
enumeration ktt
enumeration ktu
enumeration ktv
enumeration ktw
enumeration ktx
enumeration kty
enumeration ktz
enumeration kub
enumeration kuc
enumeration kud
enumeration kue
enumeration kuf
enumeration kug
enumeration kuh
enumeration kui
enumeration kuj
enumeration kuk
enumeration kul
enumeration kum
enumeration kun
enumeration kuo
enumeration kup
enumeration kuq
enumeration kus
enumeration kut
enumeration kuu
enumeration kuv
enumeration kuw
enumeration kux
enumeration kuy
enumeration kuz
enumeration kva
enumeration kvb
enumeration kvc
enumeration kvd
enumeration kve
enumeration kvf
enumeration kvg
enumeration kvh
enumeration kvi
enumeration kvj
enumeration kvk
enumeration kvl
enumeration kvm
enumeration kvn
enumeration kvo
enumeration kvp
enumeration kvq
enumeration kvr
enumeration kvs
enumeration kvt
enumeration kvu
enumeration kvv
enumeration kvw
enumeration kvx
enumeration kvy
enumeration kvz
enumeration kwa
enumeration kwb
enumeration kwc
enumeration kwd
enumeration kwe
enumeration kwf
enumeration kwg
enumeration kwh
enumeration kwi
enumeration kwj
enumeration kwk
enumeration kwl
enumeration kwm
enumeration kwn
enumeration kwo
enumeration kwp
enumeration kwq
enumeration kwr
enumeration kws
enumeration kwt
enumeration kwu
enumeration kwv
enumeration kww
enumeration kwx
enumeration kwy
enumeration kwz
enumeration kxa
enumeration kxb
enumeration kxc
enumeration kxd
enumeration kxe
enumeration kxf
enumeration kxh
enumeration kxi
enumeration kxj
enumeration kxk
enumeration kxl
enumeration kxm
enumeration kxn
enumeration kxo
enumeration kxp
enumeration kxq
enumeration kxr
enumeration kxs
enumeration kxt
enumeration kxu
enumeration kxv
enumeration kxw
enumeration kxx
enumeration kxy
enumeration kxz
enumeration kya
enumeration kyb
enumeration kyc
enumeration kyd
enumeration kye
enumeration kyf
enumeration kyg
enumeration kyh
enumeration kyi
enumeration kyj
enumeration kyk
enumeration kyl
enumeration kym
enumeration kyn
enumeration kyo
enumeration kyp
enumeration kyq
enumeration kyr
enumeration kys
enumeration kyt
enumeration kyu
enumeration kyv
enumeration kyw
enumeration kyx
enumeration kyy
enumeration kyz
enumeration kza
enumeration kzb
enumeration kzc
enumeration kzd
enumeration kze
enumeration kzf
enumeration kzg
enumeration kzi
enumeration kzj
enumeration kzk
enumeration kzl
enumeration kzm
enumeration kzn
enumeration kzo
enumeration kzp
enumeration kzq
enumeration kzr
enumeration kzs
enumeration kzt
enumeration kzu
enumeration kzv
enumeration kzw
enumeration kzx
enumeration kzy
enumeration kzz
enumeration laa
enumeration lab
enumeration lac
enumeration lad
enumeration lae
enumeration laf
enumeration lag
enumeration lah
enumeration lai
enumeration laj
enumeration lak
enumeration lal
enumeration lam
enumeration lan
enumeration lap
enumeration laq
enumeration lar
enumeration las
enumeration lau
enumeration law
enumeration lax
enumeration lay
enumeration laz
enumeration lba
enumeration lbb
enumeration lbc
enumeration lbe
enumeration lbf
enumeration lbg
enumeration lbi
enumeration lbj
enumeration lbk
enumeration lbl
enumeration lbm
enumeration lbn
enumeration lbo
enumeration lbq
enumeration lbr
enumeration lbs
enumeration lbt
enumeration lbu
enumeration lbv
enumeration lbw
enumeration lbx
enumeration lby
enumeration lbz
enumeration lcc
enumeration lcd
enumeration lce
enumeration lcf
enumeration lch
enumeration lcl
enumeration lcm
enumeration lcp
enumeration lcq
enumeration lcs
enumeration lda
enumeration ldb
enumeration ldd
enumeration ldg
enumeration ldh
enumeration ldi
enumeration ldj
enumeration ldk
enumeration ldl
enumeration ldm
enumeration ldn
enumeration ldo
enumeration ldp
enumeration ldq
enumeration lea
enumeration leb
enumeration lec
enumeration led
enumeration lee
enumeration lef
enumeration leh
enumeration lei
enumeration lej
enumeration lek
enumeration lel
enumeration lem
enumeration len
enumeration leo
enumeration lep
enumeration leq
enumeration ler
enumeration les
enumeration let
enumeration leu
enumeration lev
enumeration lew
enumeration lex
enumeration ley
enumeration lez
enumeration lfa
enumeration lfn
enumeration lga
enumeration lgb
enumeration lgg
enumeration lgh
enumeration lgi
enumeration lgk
enumeration lgl
enumeration lgm
enumeration lgn
enumeration lgq
enumeration lgr
enumeration lgt
enumeration lgu
enumeration lgz
enumeration lha
enumeration lhh
enumeration lhi
enumeration lhl
enumeration lhm
enumeration lhn
enumeration lhp
enumeration lhs
enumeration lht
enumeration lhu
enumeration lia
enumeration lib
enumeration lic
enumeration lid
enumeration lie
enumeration lif
enumeration lig
enumeration lih
enumeration lii
enumeration lij
enumeration lik
enumeration lil
enumeration lio
enumeration lip
enumeration liq
enumeration lir
enumeration lis
enumeration liu
enumeration liv
enumeration liw
enumeration lix
enumeration liy
enumeration liz
enumeration lja
enumeration lje
enumeration lji
enumeration ljl
enumeration ljp
enumeration ljw
enumeration ljx
enumeration lka
enumeration lkb
enumeration lkc
enumeration lkd
enumeration lke
enumeration lkh
enumeration lki
enumeration lkj
enumeration lkl
enumeration lkm
enumeration lkn
enumeration lko
enumeration lkr
enumeration lks
enumeration lkt
enumeration lku
enumeration lky
enumeration lla
enumeration llb
enumeration llc
enumeration lld
enumeration lle
enumeration llf
enumeration llg
enumeration llh
enumeration lli
enumeration llj
enumeration llk
enumeration lll
enumeration llm
enumeration lln
enumeration llo
enumeration llp
enumeration llq
enumeration lls
enumeration llu
enumeration llx
enumeration lma
enumeration lmb
enumeration lmc
enumeration lmd
enumeration lme
enumeration lmf
enumeration lmg
enumeration lmh
enumeration lmi
enumeration lmj
enumeration lmk
enumeration lml
enumeration lmn
enumeration lmo
enumeration lmp
enumeration lmq
enumeration lmr
enumeration lmu
enumeration lmv
enumeration lmw
enumeration lmx
enumeration lmy
enumeration lmz
enumeration lna
enumeration lnb
enumeration lnd
enumeration lng
enumeration lnh
enumeration lni
enumeration lnj
enumeration lnl
enumeration lnm
enumeration lnn
enumeration lno
enumeration lns
enumeration lnu
enumeration lnw
enumeration lnz
enumeration loa
enumeration lob
enumeration loc
enumeration loe
enumeration lof
enumeration log
enumeration loh
enumeration loi
enumeration loj
enumeration lok
enumeration lol
enumeration lom
enumeration lon
enumeration loo
enumeration lop
enumeration loq
enumeration lor
enumeration los
enumeration lot
enumeration lou
enumeration lov
enumeration low
enumeration lox
enumeration loy
enumeration loz
enumeration lpa
enumeration lpe
enumeration lpn
enumeration lpo
enumeration lpx
enumeration lra
enumeration lrc
enumeration lre
enumeration lrg
enumeration lri
enumeration lrk
enumeration lrl
enumeration lrm
enumeration lrn
enumeration lro
enumeration lrr
enumeration lrt
enumeration lrv
enumeration lrz
enumeration lsa
enumeration lsd
enumeration lse
enumeration lsg
enumeration lsh
enumeration lsi
enumeration lsl
enumeration lsm
enumeration lso
enumeration lsp
enumeration lsr
enumeration lss
enumeration lst
enumeration lsy
enumeration ltc
enumeration ltg
enumeration lti
enumeration ltn
enumeration lto
enumeration lts
enumeration ltu
enumeration lua
enumeration luc
enumeration lud
enumeration lue
enumeration luf
enumeration lui
enumeration luj
enumeration luk
enumeration lul
enumeration lum
enumeration lun
enumeration luo
enumeration lup
enumeration luq
enumeration lur
enumeration lus
enumeration lut
enumeration luu
enumeration luv
enumeration luw
enumeration luy
enumeration luz
enumeration lva
enumeration lvk
enumeration lvs
enumeration lvu
enumeration lwa
enumeration lwe
enumeration lwg
enumeration lwh
enumeration lwl
enumeration lwm
enumeration lwo
enumeration lwt
enumeration lwu
enumeration lww
enumeration lya
enumeration lyg
enumeration lyn
enumeration lzh
enumeration lzl
enumeration lzn
enumeration lzz
enumeration maa
enumeration mab
enumeration mad
enumeration mae
enumeration maf
enumeration mag
enumeration mai
enumeration maj
enumeration mak
enumeration mam
enumeration man
enumeration map
enumeration maq
enumeration mas
enumeration mat
enumeration mau
enumeration mav
enumeration maw
enumeration max
enumeration maz
enumeration mba
enumeration mbb
enumeration mbc
enumeration mbd
enumeration mbe
enumeration mbf
enumeration mbh
enumeration mbi
enumeration mbj
enumeration mbk
enumeration mbl
enumeration mbm
enumeration mbn
enumeration mbo
enumeration mbp
enumeration mbq
enumeration mbr
enumeration mbs
enumeration mbt
enumeration mbu
enumeration mbv
enumeration mbw
enumeration mbx
enumeration mby
enumeration mbz
enumeration mca
enumeration mcb
enumeration mcc
enumeration mcd
enumeration mce
enumeration mcf
enumeration mcg
enumeration mch
enumeration mci
enumeration mcj
enumeration mck
enumeration mcl
enumeration mcm
enumeration mcn
enumeration mco
enumeration mcp
enumeration mcq
enumeration mcr
enumeration mcs
enumeration mct
enumeration mcu
enumeration mcv
enumeration mcw
enumeration mcx
enumeration mcy
enumeration mcz
enumeration mda
enumeration mdb
enumeration mdc
enumeration mdd
enumeration mde
enumeration mdf
enumeration mdg
enumeration mdh
enumeration mdi
enumeration mdj
enumeration mdk
enumeration mdl
enumeration mdm
enumeration mdn
enumeration mdp
enumeration mdq
enumeration mdr
enumeration mds
enumeration mdt
enumeration mdu
enumeration mdv
enumeration mdw
enumeration mdx
enumeration mdy
enumeration mdz
enumeration mea
enumeration meb
enumeration mec
enumeration med
enumeration mee
enumeration mef
enumeration meh
enumeration mei
enumeration mej
enumeration mek
enumeration mel
enumeration mem
enumeration men
enumeration meo
enumeration mep
enumeration meq
enumeration mer
enumeration mes
enumeration met
enumeration meu
enumeration mev
enumeration mew
enumeration mey
enumeration mez
enumeration mfa
enumeration mfb
enumeration mfc
enumeration mfd
enumeration mfe
enumeration mff
enumeration mfg
enumeration mfh
enumeration mfi
enumeration mfj
enumeration mfk
enumeration mfl
enumeration mfm
enumeration mfn
enumeration mfo
enumeration mfp
enumeration mfq
enumeration mfr
enumeration mfs
enumeration mft
enumeration mfu
enumeration mfv
enumeration mfw
enumeration mfx
enumeration mfy
enumeration mfz
enumeration mga
enumeration mgb
enumeration mgc
enumeration mgd
enumeration mge
enumeration mgf
enumeration mgg
enumeration mgh
enumeration mgi
enumeration mgj
enumeration mgk
enumeration mgl
enumeration mgm
enumeration mgn
enumeration mgo
enumeration mgp
enumeration mgq
enumeration mgr
enumeration mgs
enumeration mgt
enumeration mgu
enumeration mgv
enumeration mgw
enumeration mgy
enumeration mgz
enumeration mha
enumeration mhb
enumeration mhc
enumeration mhd
enumeration mhe
enumeration mhf
enumeration mhg
enumeration mhi
enumeration mhj
enumeration mhk
enumeration mhl
enumeration mhm
enumeration mhn
enumeration mho
enumeration mhp
enumeration mhq
enumeration mhr
enumeration mhs
enumeration mht
enumeration mhu
enumeration mhw
enumeration mhx
enumeration mhy
enumeration mhz
enumeration mia
enumeration mib
enumeration mic
enumeration mid
enumeration mie
enumeration mif
enumeration mig
enumeration mih
enumeration mii
enumeration mij
enumeration mik
enumeration mil
enumeration mim
enumeration min
enumeration mio
enumeration mip
enumeration miq
enumeration mir
enumeration mis
enumeration mit
enumeration miu
enumeration miw
enumeration mix
enumeration miy
enumeration miz
enumeration mjc
enumeration mjd
enumeration mje
enumeration mjg
enumeration mjh
enumeration mji
enumeration mjj
enumeration mjk
enumeration mjl
enumeration mjm
enumeration mjn
enumeration mjo
enumeration mjp
enumeration mjq
enumeration mjr
enumeration mjs
enumeration mjt
enumeration mju
enumeration mjv
enumeration mjw
enumeration mjx
enumeration mjy
enumeration mjz
enumeration mka
enumeration mkb
enumeration mkc
enumeration mke
enumeration mkf
enumeration mkg
enumeration mkh
enumeration mki
enumeration mkj
enumeration mkk
enumeration mkl
enumeration mkm
enumeration mkn
enumeration mko
enumeration mkp
enumeration mkq
enumeration mkr
enumeration mks
enumeration mkt
enumeration mku
enumeration mkv
enumeration mkw
enumeration mkx
enumeration mky
enumeration mkz
enumeration mla
enumeration mlb
enumeration mlc
enumeration mle
enumeration mlf
enumeration mlh
enumeration mli
enumeration mlj
enumeration mlk
enumeration mll
enumeration mlm
enumeration mln
enumeration mlo
enumeration mlp
enumeration mlq
enumeration mlr
enumeration mls
enumeration mlu
enumeration mlv
enumeration mlw
enumeration mlx
enumeration mlz
enumeration mma
enumeration mmb
enumeration mmc
enumeration mmd
enumeration mme
enumeration mmf
enumeration mmg
enumeration mmh
enumeration mmi
enumeration mmj
enumeration mmk
enumeration mml
enumeration mmm
enumeration mmn
enumeration mmo
enumeration mmp
enumeration mmq
enumeration mmr
enumeration mmt
enumeration mmu
enumeration mmv
enumeration mmw
enumeration mmx
enumeration mmy
enumeration mmz
enumeration mna
enumeration mnb
enumeration mnc
enumeration mnd
enumeration mne
enumeration mnf
enumeration mng
enumeration mnh
enumeration mni
enumeration mnj
enumeration mnk
enumeration mnl
enumeration mnm
enumeration mnn
enumeration mno
enumeration mnp
enumeration mnq
enumeration mnr
enumeration mns
enumeration mnu
enumeration mnv
enumeration mnw
enumeration mnx
enumeration mny
enumeration mnz
enumeration moa
enumeration moc
enumeration mod
enumeration moe
enumeration mog
enumeration moh
enumeration moi
enumeration moj
enumeration mok
enumeration mom
enumeration moo
enumeration mop
enumeration moq
enumeration mor
enumeration mos
enumeration mot
enumeration mou
enumeration mov
enumeration mow
enumeration mox
enumeration moy
enumeration moz
enumeration mpa
enumeration mpb
enumeration mpc
enumeration mpd
enumeration mpe
enumeration mpg
enumeration mph
enumeration mpi
enumeration mpj
enumeration mpk
enumeration mpl
enumeration mpm
enumeration mpn
enumeration mpo
enumeration mpp
enumeration mpq
enumeration mpr
enumeration mps
enumeration mpt
enumeration mpu
enumeration mpv
enumeration mpw
enumeration mpx
enumeration mpy
enumeration mpz
enumeration mqa
enumeration mqb
enumeration mqc
enumeration mqe
enumeration mqf
enumeration mqg
enumeration mqh
enumeration mqi
enumeration mqj
enumeration mqk
enumeration mql
enumeration mqm
enumeration mqn
enumeration mqo
enumeration mqp
enumeration mqq
enumeration mqr
enumeration mqs
enumeration mqt
enumeration mqu
enumeration mqv
enumeration mqw
enumeration mqx
enumeration mqy
enumeration mqz
enumeration mra
enumeration mrb
enumeration mrc
enumeration mrd
enumeration mre
enumeration mrf
enumeration mrg
enumeration mrh
enumeration mrj
enumeration mrk
enumeration mrl
enumeration mrm
enumeration mrn
enumeration mro
enumeration mrp
enumeration mrq
enumeration mrr
enumeration mrs
enumeration mrt
enumeration mru
enumeration mrv
enumeration mrw
enumeration mrx
enumeration mry
enumeration mrz
enumeration msb
enumeration msc
enumeration msd
enumeration mse
enumeration msf
enumeration msg
enumeration msh
enumeration msi
enumeration msj
enumeration msk
enumeration msl
enumeration msm
enumeration msn
enumeration mso
enumeration msp
enumeration msq
enumeration msr
enumeration mss
enumeration msu
enumeration msv
enumeration msw
enumeration msx
enumeration msy
enumeration msz
enumeration mta
enumeration mtb
enumeration mtc
enumeration mtd
enumeration mte
enumeration mtf
enumeration mtg
enumeration mth
enumeration mti
enumeration mtj
enumeration mtk
enumeration mtl
enumeration mtm
enumeration mtn
enumeration mto
enumeration mtp
enumeration mtq
enumeration mtr
enumeration mts
enumeration mtt
enumeration mtu
enumeration mtv
enumeration mtw
enumeration mtx
enumeration mty
enumeration mua
enumeration mub
enumeration muc
enumeration mud
enumeration mue
enumeration mug
enumeration muh
enumeration mui
enumeration muj
enumeration muk
enumeration mul
enumeration mum
enumeration mun
enumeration muo
enumeration mup
enumeration muq
enumeration mur
enumeration mus
enumeration mut
enumeration muu
enumeration muv
enumeration mux
enumeration muy
enumeration muz
enumeration mva
enumeration mvb
enumeration mvd
enumeration mve
enumeration mvf
enumeration mvg
enumeration mvh
enumeration mvi
enumeration mvk
enumeration mvl
enumeration mvm
enumeration mvn
enumeration mvo
enumeration mvp
enumeration mvq
enumeration mvr
enumeration mvs
enumeration mvt
enumeration mvu
enumeration mvv
enumeration mvw
enumeration mvx
enumeration mvy
enumeration mvz
enumeration mwa
enumeration mwb
enumeration mwc
enumeration mwe
enumeration mwf
enumeration mwg
enumeration mwh
enumeration mwi
enumeration mwj
enumeration mwk
enumeration mwl
enumeration mwm
enumeration mwn
enumeration mwo
enumeration mwp
enumeration mwq
enumeration mwr
enumeration mws
enumeration mwt
enumeration mwu
enumeration mwv
enumeration mww
enumeration mwx
enumeration mwy
enumeration mwz
enumeration mxa
enumeration mxb
enumeration mxc
enumeration mxd
enumeration mxe
enumeration mxf
enumeration mxg
enumeration mxh
enumeration mxi
enumeration mxj
enumeration mxk
enumeration mxl
enumeration mxm
enumeration mxn
enumeration mxo
enumeration mxp
enumeration mxq
enumeration mxr
enumeration mxs
enumeration mxt
enumeration mxu
enumeration mxv
enumeration mxw
enumeration mxx
enumeration mxy
enumeration mxz
enumeration myb
enumeration myc
enumeration myd
enumeration mye
enumeration myf
enumeration myg
enumeration myh
enumeration myi
enumeration myj
enumeration myk
enumeration myl
enumeration mym
enumeration myn
enumeration myo
enumeration myp
enumeration myr
enumeration mys
enumeration myu
enumeration myv
enumeration myw
enumeration myx
enumeration myy
enumeration myz
enumeration mza
enumeration mzb
enumeration mzc
enumeration mzd
enumeration mze
enumeration mzg
enumeration mzh
enumeration mzi
enumeration mzj
enumeration mzk
enumeration mzl
enumeration mzm
enumeration mzn
enumeration mzo
enumeration mzp
enumeration mzq
enumeration mzr
enumeration mzs
enumeration mzt
enumeration mzu
enumeration mzv
enumeration mzw
enumeration mzx
enumeration mzy
enumeration mzz
enumeration naa
enumeration nab
enumeration nac
enumeration nad
enumeration nae
enumeration naf
enumeration nag
enumeration nah
enumeration nai
enumeration naj
enumeration nak
enumeration nal
enumeration nam
enumeration nan
enumeration nao
enumeration nap
enumeration naq
enumeration nar
enumeration nas
enumeration nat
enumeration naw
enumeration nax
enumeration nay
enumeration naz
enumeration nba
enumeration nbb
enumeration nbc
enumeration nbd
enumeration nbe
enumeration nbg
enumeration nbh
enumeration nbi
enumeration nbj
enumeration nbk
enumeration nbm
enumeration nbn
enumeration nbo
enumeration nbp
enumeration nbq
enumeration nbr
enumeration nbs
enumeration nbt
enumeration nbu
enumeration nbv
enumeration nbw
enumeration nby
enumeration nca
enumeration ncb
enumeration ncc
enumeration ncd
enumeration nce
enumeration ncf
enumeration ncg
enumeration nch
enumeration nci
enumeration ncj
enumeration nck
enumeration ncl
enumeration ncm
enumeration ncn
enumeration nco
enumeration ncp
enumeration ncr
enumeration ncs
enumeration nct
enumeration ncu
enumeration ncx
enumeration ncz
enumeration nda
enumeration ndb
enumeration ndc
enumeration ndd
enumeration ndf
enumeration ndg
enumeration ndh
enumeration ndi
enumeration ndj
enumeration ndk
enumeration ndl
enumeration ndm
enumeration ndn
enumeration ndp
enumeration ndq
enumeration ndr
enumeration nds
enumeration ndt
enumeration ndu
enumeration ndv
enumeration ndw
enumeration ndx
enumeration ndy
enumeration ndz
enumeration nea
enumeration neb
enumeration nec
enumeration ned
enumeration nee
enumeration nef
enumeration neg
enumeration neh
enumeration nei
enumeration nej
enumeration nek
enumeration nem
enumeration nen
enumeration neo
enumeration neq
enumeration ner
enumeration nes
enumeration net
enumeration neu
enumeration nev
enumeration new
enumeration nex
enumeration ney
enumeration nez
enumeration nfa
enumeration nfd
enumeration nfl
enumeration nfr
enumeration nfu
enumeration nga
enumeration ngb
enumeration ngc
enumeration ngd
enumeration nge
enumeration ngf
enumeration ngg
enumeration ngh
enumeration ngi
enumeration ngj
enumeration ngk
enumeration ngl
enumeration ngm
enumeration ngn
enumeration ngo
enumeration ngp
enumeration ngq
enumeration ngr
enumeration ngs
enumeration ngt
enumeration ngu
enumeration ngv
enumeration ngw
enumeration ngx
enumeration ngy
enumeration ngz
enumeration nha
enumeration nhb
enumeration nhc
enumeration nhd
enumeration nhe
enumeration nhf
enumeration nhg
enumeration nhh
enumeration nhi
enumeration nhk
enumeration nhm
enumeration nhn
enumeration nho
enumeration nhp
enumeration nhq
enumeration nhr
enumeration nht
enumeration nhu
enumeration nhv
enumeration nhw
enumeration nhx
enumeration nhy
enumeration nhz
enumeration nia
enumeration nib
enumeration nic
enumeration nid
enumeration nie
enumeration nif
enumeration nig
enumeration nih
enumeration nii
enumeration nij
enumeration nik
enumeration nil
enumeration nim
enumeration nin
enumeration nio
enumeration niq
enumeration nir
enumeration nis
enumeration nit
enumeration niu
enumeration niv
enumeration niw
enumeration nix
enumeration niy
enumeration niz
enumeration nja
enumeration njb
enumeration njd
enumeration njh
enumeration nji
enumeration njj
enumeration njl
enumeration njm
enumeration njn
enumeration njo
enumeration njr
enumeration njs
enumeration njt
enumeration nju
enumeration njx
enumeration njy
enumeration njz
enumeration nka
enumeration nkb
enumeration nkc
enumeration nkd
enumeration nke
enumeration nkf
enumeration nkg
enumeration nkh
enumeration nki
enumeration nkj
enumeration nkk
enumeration nkm
enumeration nkn
enumeration nko
enumeration nkp
enumeration nkq
enumeration nkr
enumeration nks
enumeration nkt
enumeration nku
enumeration nkv
enumeration nkw
enumeration nkx
enumeration nkz
enumeration nla
enumeration nlc
enumeration nle
enumeration nlg
enumeration nli
enumeration nlj
enumeration nlk
enumeration nll
enumeration nlo
enumeration nlq
enumeration nlu
enumeration nlv
enumeration nlw
enumeration nlx
enumeration nly
enumeration nlz
enumeration nma
enumeration nmb
enumeration nmc
enumeration nmd
enumeration nme
enumeration nmf
enumeration nmg
enumeration nmh
enumeration nmi
enumeration nmj
enumeration nmk
enumeration nml
enumeration nmm
enumeration nmn
enumeration nmo
enumeration nmp
enumeration nmq
enumeration nmr
enumeration nms
enumeration nmt
enumeration nmu
enumeration nmv
enumeration nmw
enumeration nmx
enumeration nmy
enumeration nmz
enumeration nna
enumeration nnb
enumeration nnc
enumeration nnd
enumeration nne
enumeration nnf
enumeration nng
enumeration nnh
enumeration nni
enumeration nnj
enumeration nnk
enumeration nnl
enumeration nnm
enumeration nnn
enumeration nnp
enumeration nnq
enumeration nnr
enumeration nns
enumeration nnt
enumeration nnu
enumeration nnv
enumeration nnw
enumeration nnx
enumeration nny
enumeration nnz
enumeration noa
enumeration noc
enumeration nod
enumeration noe
enumeration nof
enumeration nog
enumeration noh
enumeration noi
enumeration noj
enumeration nok
enumeration nol
enumeration nom
enumeration non
enumeration nop
enumeration noq
enumeration nos
enumeration not
enumeration nou
enumeration nov
enumeration now
enumeration noy
enumeration noz
enumeration npa
enumeration npb
enumeration npg
enumeration nph
enumeration npi
enumeration npl
enumeration npn
enumeration npo
enumeration nps
enumeration npu
enumeration npy
enumeration nqg
enumeration nqk
enumeration nqm
enumeration nqn
enumeration nqo
enumeration nqq
enumeration nqy
enumeration nra
enumeration nrb
enumeration nrc
enumeration nre
enumeration nrg
enumeration nri
enumeration nrk
enumeration nrl
enumeration nrm
enumeration nrn
enumeration nrp
enumeration nrr
enumeration nrt
enumeration nru
enumeration nrx
enumeration nrz
enumeration nsa
enumeration nsc
enumeration nsd
enumeration nse
enumeration nsf
enumeration nsg
enumeration nsh
enumeration nsi
enumeration nsk
enumeration nsl
enumeration nsm
enumeration nsn
enumeration nso
enumeration nsp
enumeration nsq
enumeration nsr
enumeration nss
enumeration nst
enumeration nsu
enumeration nsv
enumeration nsw
enumeration nsx
enumeration nsy
enumeration nsz
enumeration nte
enumeration ntg
enumeration nti
enumeration ntj
enumeration ntk
enumeration ntm
enumeration nto
enumeration ntp
enumeration ntr
enumeration nts
enumeration ntu
enumeration ntw
enumeration ntx
enumeration nty
enumeration ntz
enumeration nua
enumeration nub
enumeration nuc
enumeration nud
enumeration nue
enumeration nuf
enumeration nug
enumeration nuh
enumeration nui
enumeration nuj
enumeration nuk
enumeration nul
enumeration num
enumeration nun
enumeration nuo
enumeration nup
enumeration nuq
enumeration nur
enumeration nus
enumeration nut
enumeration nuu
enumeration nuv
enumeration nuw
enumeration nux
enumeration nuy
enumeration nuz
enumeration nvh
enumeration nvm
enumeration nvo
enumeration nwa
enumeration nwb
enumeration nwc
enumeration nwe
enumeration nwg
enumeration nwi
enumeration nwm
enumeration nwo
enumeration nwr
enumeration nwx
enumeration nwy
enumeration nxa
enumeration nxd
enumeration nxe
enumeration nxg
enumeration nxi
enumeration nxk
enumeration nxl
enumeration nxm
enumeration nxn
enumeration nxq
enumeration nxr
enumeration nxu
enumeration nxx
enumeration nyb
enumeration nyc
enumeration nyd
enumeration nye
enumeration nyf
enumeration nyg
enumeration nyh
enumeration nyi
enumeration nyj
enumeration nyk
enumeration nyl
enumeration nym
enumeration nyn
enumeration nyo
enumeration nyp
enumeration nyq
enumeration nyr
enumeration nys
enumeration nyt
enumeration nyu
enumeration nyv
enumeration nyw
enumeration nyx
enumeration nyy
enumeration nza
enumeration nzb
enumeration nzi
enumeration nzk
enumeration nzm
enumeration nzs
enumeration nzu
enumeration nzy
enumeration nzz
enumeration oaa
enumeration oac
enumeration oar
enumeration oav
enumeration obi
enumeration obk
enumeration obl
enumeration obm
enumeration obo
enumeration obr
enumeration obt
enumeration obu
enumeration oca
enumeration och
enumeration oco
enumeration ocu
enumeration oda
enumeration odk
enumeration odt
enumeration odu
enumeration ofo
enumeration ofs
enumeration ofu
enumeration ogb
enumeration ogc
enumeration oge
enumeration ogg
enumeration ogo
enumeration ogu
enumeration oht
enumeration ohu
enumeration oia
enumeration oin
enumeration ojb
enumeration ojc
enumeration ojg
enumeration ojp
enumeration ojs
enumeration ojv
enumeration ojw
enumeration oka
enumeration okb
enumeration okd
enumeration oke
enumeration okg
enumeration okh
enumeration oki
enumeration okj
enumeration okk
enumeration okl
enumeration okm
enumeration okn
enumeration oko
enumeration okr
enumeration oks
enumeration oku
enumeration okv
enumeration okx
enumeration ola
enumeration old
enumeration ole
enumeration olk
enumeration olm
enumeration olo
enumeration olr
enumeration olt
enumeration oma
enumeration omb
enumeration omc
enumeration ome
enumeration omg
enumeration omi
enumeration omk
enumeration oml
enumeration omn
enumeration omo
enumeration omp
enumeration omq
enumeration omr
enumeration omt
enumeration omu
enumeration omv
enumeration omw
enumeration omx
enumeration ona
enumeration onb
enumeration one
enumeration ong
enumeration oni
enumeration onj
enumeration onk
enumeration onn
enumeration ono
enumeration onp
enumeration onr
enumeration ons
enumeration ont
enumeration onu
enumeration onw
enumeration onx
enumeration ood
enumeration oog
enumeration oon
enumeration oor
enumeration oos
enumeration opa
enumeration opk
enumeration opm
enumeration opo
enumeration opt
enumeration opy
enumeration ora
enumeration orc
enumeration ore
enumeration org
enumeration orh
enumeration orn
enumeration oro
enumeration orr
enumeration ors
enumeration ort
enumeration oru
enumeration orv
enumeration orw
enumeration orx
enumeration ory
enumeration orz
enumeration osa
enumeration osc
enumeration osi
enumeration oso
enumeration osp
enumeration ost
enumeration osu
enumeration osx
enumeration ota
enumeration otb
enumeration otd
enumeration ote
enumeration oti
enumeration otk
enumeration otl
enumeration otm
enumeration otn
enumeration oto
enumeration otq
enumeration otr
enumeration ots
enumeration ott
enumeration otu
enumeration otw
enumeration otx
enumeration oty
enumeration otz
enumeration oua
enumeration oub
enumeration oue
enumeration oui
enumeration oum
enumeration oun
enumeration owi
enumeration owl
enumeration oyb
enumeration oyd
enumeration oym
enumeration oyy
enumeration ozm
enumeration paa
enumeration pab
enumeration pac
enumeration pad
enumeration pae
enumeration paf
enumeration pag
enumeration pah
enumeration pai
enumeration pak
enumeration pal
enumeration pam
enumeration pao
enumeration pap
enumeration paq
enumeration par
enumeration pas
enumeration pat
enumeration pau
enumeration pav
enumeration paw
enumeration pax
enumeration pay
enumeration paz
enumeration pbb
enumeration pbc
enumeration pbe
enumeration pbf
enumeration pbg
enumeration pbh
enumeration pbi
enumeration pbl
enumeration pbn
enumeration pbo
enumeration pbp
enumeration pbr
enumeration pbs
enumeration pbt
enumeration pbu
enumeration pbv
enumeration pby
enumeration pca
enumeration pcb
enumeration pcc
enumeration pcd
enumeration pce
enumeration pcf
enumeration pcg
enumeration pch
enumeration pci
enumeration pcj
enumeration pck
enumeration pcl
enumeration pcm
enumeration pcn
enumeration pcp
enumeration pcw
enumeration pda
enumeration pdc
enumeration pdi
enumeration pdn
enumeration pdo
enumeration pdt
enumeration pdu
enumeration pea
enumeration peb
enumeration ped
enumeration pee
enumeration pef
enumeration peg
enumeration peh
enumeration pei
enumeration pej
enumeration pek
enumeration pel
enumeration pem
enumeration peo
enumeration pep
enumeration peq
enumeration pes
enumeration pev
enumeration pex
enumeration pey
enumeration pez
enumeration pfa
enumeration pfe
enumeration pfl
enumeration pga
enumeration pgg
enumeration pgi
enumeration pgk
enumeration pgl
enumeration pgn
enumeration pgs
enumeration pgu
enumeration pha
enumeration phd
enumeration phg
enumeration phh
enumeration phi
enumeration phk
enumeration phl
enumeration phm
enumeration phn
enumeration pho
enumeration phq
enumeration phr
enumeration pht
enumeration phu
enumeration phv
enumeration phw
enumeration pia
enumeration pib
enumeration pic
enumeration pid
enumeration pie
enumeration pif
enumeration pig
enumeration pih
enumeration pii
enumeration pij
enumeration pil
enumeration pim
enumeration pin
enumeration pio
enumeration pip
enumeration pir
enumeration pis
enumeration pit
enumeration piu
enumeration piv
enumeration piw
enumeration pix
enumeration piy
enumeration piz
enumeration pjt
enumeration pka
enumeration pkb
enumeration pkc
enumeration pkg
enumeration pkh
enumeration pkn
enumeration pko
enumeration pkp
enumeration pkr
enumeration pks
enumeration pkt
enumeration pku
enumeration pla
enumeration plb
enumeration plc
enumeration pld
enumeration ple
enumeration plf
enumeration plg
enumeration plh
enumeration plj
enumeration plk
enumeration pll
enumeration pln
enumeration plo
enumeration plp
enumeration plq
enumeration plr
enumeration pls
enumeration plt
enumeration plu
enumeration plv
enumeration plw
enumeration ply
enumeration plz
enumeration pma
enumeration pmb
enumeration pmc
enumeration pmd
enumeration pme
enumeration pmf
enumeration pmh
enumeration pmi
enumeration pmj
enumeration pmk
enumeration pml
enumeration pmm
enumeration pmn
enumeration pmo
enumeration pmq
enumeration pmr
enumeration pms
enumeration pmt
enumeration pmu
enumeration pmw
enumeration pmx
enumeration pmy
enumeration pmz
enumeration pna
enumeration pnb
enumeration pnc
enumeration pne
enumeration png
enumeration pnh
enumeration pni
enumeration pnj
enumeration pnk
enumeration pnl
enumeration pnm
enumeration pnn
enumeration pno
enumeration pnp
enumeration pnq
enumeration pnr
enumeration pns
enumeration pnt
enumeration pnu
enumeration pnv
enumeration pnw
enumeration pnx
enumeration pny
enumeration pnz
enumeration poc
enumeration pod
enumeration poe
enumeration pof
enumeration pog
enumeration poh
enumeration poi
enumeration pok
enumeration pom
enumeration pon
enumeration poo
enumeration pop
enumeration poq
enumeration pos
enumeration pot
enumeration pov
enumeration pow
enumeration pox
enumeration poy
enumeration poz
enumeration ppa
enumeration ppe
enumeration ppi
enumeration ppk
enumeration ppl
enumeration ppm
enumeration ppn
enumeration ppo
enumeration ppp
enumeration ppq
enumeration pps
enumeration ppt
enumeration ppu
enumeration pqa
enumeration pqe
enumeration pqm
enumeration pqw
enumeration pra
enumeration prb
enumeration prc
enumeration prd
enumeration pre
enumeration prf
enumeration prg
enumeration prh
enumeration pri
enumeration prk
enumeration prl
enumeration prm
enumeration prn
enumeration pro
enumeration prp
enumeration prq
enumeration prr
enumeration prs
enumeration prt
enumeration pru
enumeration prw
enumeration prx
enumeration pry
enumeration prz
enumeration psa
enumeration psc
enumeration psd
enumeration pse
enumeration psg
enumeration psh
enumeration psi
enumeration psl
enumeration psm
enumeration psn
enumeration pso
enumeration psp
enumeration psq
enumeration psr
enumeration pss
enumeration pst
enumeration psu
enumeration psw
enumeration psy
enumeration pta
enumeration pth
enumeration pti
enumeration ptn
enumeration pto
enumeration ptp
enumeration ptq
enumeration ptr
enumeration ptt
enumeration ptu
enumeration ptv
enumeration ptw
enumeration pty
enumeration pua
enumeration pub
enumeration puc
enumeration pud
enumeration pue
enumeration puf
enumeration pug
enumeration pui
enumeration puj
enumeration puk
enumeration pum
enumeration puo
enumeration pup
enumeration puq
enumeration pur
enumeration put
enumeration puu
enumeration puw
enumeration pux
enumeration puy
enumeration pwa
enumeration pwb
enumeration pwg
enumeration pwi
enumeration pwm
enumeration pwn
enumeration pwo
enumeration pwr
enumeration pww
enumeration pxm
enumeration pye
enumeration pym
enumeration pyn
enumeration pys
enumeration pyu
enumeration pyx
enumeration pyy
enumeration pzn
enumeration qaa..qtz
enumeration qua
enumeration qub
enumeration quc
enumeration qud
enumeration quf
enumeration qug
enumeration quh
enumeration qui
enumeration quk
enumeration qul
enumeration qum
enumeration qun
enumeration qup
enumeration quq
enumeration qur
enumeration qus
enumeration quv
enumeration quw
enumeration qux
enumeration quy
enumeration quz
enumeration qva
enumeration qvc
enumeration qve
enumeration qvh
enumeration qvi
enumeration qvj
enumeration qvl
enumeration qvm
enumeration qvn
enumeration qvo
enumeration qvp
enumeration qvs
enumeration qvw
enumeration qvy
enumeration qvz
enumeration qwa
enumeration qwc
enumeration qwe
enumeration qwh
enumeration qwm
enumeration qws
enumeration qwt
enumeration qxa
enumeration qxc
enumeration qxh
enumeration qxl
enumeration qxn
enumeration qxo
enumeration qxp
enumeration qxq
enumeration qxr
enumeration qxs
enumeration qxt
enumeration qxu
enumeration qxw
enumeration qya
enumeration qyp
enumeration raa
enumeration rab
enumeration rac
enumeration rad
enumeration raf
enumeration rag
enumeration rah
enumeration rai
enumeration raj
enumeration rak
enumeration ral
enumeration ram
enumeration ran
enumeration rao
enumeration rap
enumeration raq
enumeration rar
enumeration ras
enumeration rat
enumeration rau
enumeration rav
enumeration raw
enumeration rax
enumeration ray
enumeration raz
enumeration rbb
enumeration rbk
enumeration rbl
enumeration rbp
enumeration rcf
enumeration rdb
enumeration rea
enumeration reb
enumeration ree
enumeration reg
enumeration rei
enumeration rej
enumeration rel
enumeration rem
enumeration ren
enumeration rer
enumeration res
enumeration ret
enumeration rey
enumeration rga
enumeration rge
enumeration rgk
enumeration rgn
enumeration rgr
enumeration rgs
enumeration rgu
enumeration rhg
enumeration rhp
enumeration ria
enumeration rie
enumeration rif
enumeration ril
enumeration rim
enumeration rin
enumeration rir
enumeration rit
enumeration riu
enumeration rjg
enumeration rji
enumeration rjs
enumeration rka
enumeration rkb
enumeration rkh
enumeration rki
enumeration rkm
enumeration rkt
enumeration rkw
enumeration rma
enumeration rmb
enumeration rmc
enumeration rmd
enumeration rme
enumeration rmf
enumeration rmg
enumeration rmh
enumeration rmi
enumeration rmk
enumeration rml
enumeration rmm
enumeration rmn
enumeration rmo
enumeration rmp
enumeration rmq
enumeration rms
enumeration rmt
enumeration rmu
enumeration rmv
enumeration rmw
enumeration rmx
enumeration rmy
enumeration rmz
enumeration rna
enumeration rnd
enumeration rng
enumeration rnl
enumeration rnn
enumeration rnp
enumeration rnr
enumeration rnw
enumeration roa
enumeration rob
enumeration roc
enumeration rod
enumeration roe
enumeration rof
enumeration rog
enumeration rol
enumeration rom
enumeration roo
enumeration rop
enumeration ror
enumeration rou
enumeration row
enumeration rpn
enumeration rpt
enumeration rri
enumeration rro
enumeration rrt
enumeration rsb
enumeration rsi
enumeration rsl
enumeration rtc
enumeration rth
enumeration rtm
enumeration rtw
enumeration rub
enumeration ruc
enumeration rue
enumeration ruf
enumeration rug
enumeration ruh
enumeration rui
enumeration ruk
enumeration ruo
enumeration rup
enumeration ruq
enumeration rut
enumeration ruu
enumeration ruy
enumeration ruz
enumeration rwa
enumeration rwk
enumeration rwm
enumeration rwo
enumeration rwr
enumeration rxd
enumeration rxw
enumeration ryn
enumeration rys
enumeration ryu
enumeration saa
enumeration sab
enumeration sac
enumeration sad
enumeration sae
enumeration saf
enumeration sah
enumeration sai
enumeration saj
enumeration sak
enumeration sal
enumeration sam
enumeration sao
enumeration saq
enumeration sar
enumeration sas
enumeration sat
enumeration sau
enumeration sav
enumeration saw
enumeration sax
enumeration say
enumeration saz
enumeration sba
enumeration sbb
enumeration sbc
enumeration sbd
enumeration sbe
enumeration sbf
enumeration sbg
enumeration sbh
enumeration sbi
enumeration sbj
enumeration sbk
enumeration sbl
enumeration sbm
enumeration sbn
enumeration sbo
enumeration sbp
enumeration sbq
enumeration sbr
enumeration sbs
enumeration sbt
enumeration sbu
enumeration sbv
enumeration sbw
enumeration sbx
enumeration sby
enumeration sbz
enumeration scb
enumeration sce
enumeration scf
enumeration scg
enumeration sch
enumeration sci
enumeration sck
enumeration scl
enumeration scn
enumeration sco
enumeration scp
enumeration scq
enumeration scs
enumeration scu
enumeration scv
enumeration scw
enumeration scx
enumeration sda
enumeration sdb
enumeration sdc
enumeration sde
enumeration sdf
enumeration sdg
enumeration sdh
enumeration sdj
enumeration sdk
enumeration sdl
enumeration sdm
enumeration sdn
enumeration sdo
enumeration sdp
enumeration sdr
enumeration sds
enumeration sdt
enumeration sdu
enumeration sdv
enumeration sdx
enumeration sdz
enumeration sea
enumeration seb
enumeration sec
enumeration sed
enumeration see
enumeration sef
enumeration seg
enumeration seh
enumeration sei
enumeration sej
enumeration sek
enumeration sel
enumeration sem
enumeration sen
enumeration seo
enumeration sep
enumeration seq
enumeration ser
enumeration ses
enumeration set
enumeration seu
enumeration sev
enumeration sew
enumeration sey
enumeration sez
enumeration sfb
enumeration sfe
enumeration sfm
enumeration sfs
enumeration sfw
enumeration sga
enumeration sgb
enumeration sgc
enumeration sgd
enumeration sge
enumeration sgg
enumeration sgh
enumeration sgi
enumeration sgj
enumeration sgk
enumeration sgm
enumeration sgn
enumeration sgo
enumeration sgp
enumeration sgr
enumeration sgs
enumeration sgt
enumeration sgu
enumeration sgw
enumeration sgx
enumeration sgy
enumeration sgz
enumeration sha
enumeration shb
enumeration shc
enumeration shd
enumeration she
enumeration shg
enumeration shh
enumeration shi
enumeration shj
enumeration shk
enumeration shl
enumeration shm
enumeration shn
enumeration sho
enumeration shp
enumeration shq
enumeration shr
enumeration shs
enumeration sht
enumeration shu
enumeration shv
enumeration shw
enumeration shx
enumeration shy
enumeration shz
enumeration sia
enumeration sib
enumeration sid
enumeration sie
enumeration sif
enumeration sig
enumeration sih
enumeration sii
enumeration sij
enumeration sik
enumeration sil
enumeration sim
enumeration sio
enumeration sip
enumeration siq
enumeration sir
enumeration sis
enumeration sit
enumeration siu
enumeration siv
enumeration siw
enumeration six
enumeration siy
enumeration siz
enumeration sja
enumeration sjb
enumeration sjd
enumeration sje
enumeration sjg
enumeration sjk
enumeration sjl
enumeration sjm
enumeration sjn
enumeration sjo
enumeration sjp
enumeration sjr
enumeration sjs
enumeration sjt
enumeration sju
enumeration sjw
enumeration ska
enumeration skb
enumeration skc
enumeration skd
enumeration ske
enumeration skf
enumeration skg
enumeration skh
enumeration ski
enumeration skj
enumeration skk
enumeration skm
enumeration skn
enumeration sko
enumeration skp
enumeration skq
enumeration skr
enumeration sks
enumeration skt
enumeration sku
enumeration skv
enumeration skw
enumeration skx
enumeration sky
enumeration skz
enumeration sla
enumeration slc
enumeration sld
enumeration sle
enumeration slf
enumeration slg
enumeration slh
enumeration sli
enumeration slj
enumeration sll
enumeration slm
enumeration sln
enumeration slp
enumeration slq
enumeration slr
enumeration sls
enumeration slt
enumeration slu
enumeration slw
enumeration slx
enumeration sly
enumeration slz
enumeration sma
enumeration smb
enumeration smc
enumeration smd
enumeration smf
enumeration smg
enumeration smh
enumeration smi
enumeration smj
enumeration smk
enumeration sml
enumeration smm
enumeration smn
enumeration smp
enumeration smq
enumeration smr
enumeration sms
enumeration smt
enumeration smu
enumeration smv
enumeration smw
enumeration smx
enumeration smy
enumeration smz
enumeration snb
enumeration snc
enumeration sne
enumeration snf
enumeration sng
enumeration snh
enumeration sni
enumeration snj
enumeration snk
enumeration snl
enumeration snm
enumeration snn
enumeration sno
enumeration snp
enumeration snq
enumeration snr
enumeration sns
enumeration snu
enumeration snv
enumeration snw
enumeration snx
enumeration sny
enumeration snz
enumeration soa
enumeration sob
enumeration soc
enumeration sod
enumeration soe
enumeration sog
enumeration soh
enumeration soi
enumeration soj
enumeration sok
enumeration sol
enumeration son
enumeration soo
enumeration sop
enumeration soq
enumeration sor
enumeration sos
enumeration sou
enumeration sov
enumeration sow
enumeration sox
enumeration soy
enumeration soz
enumeration spb
enumeration spc
enumeration spd
enumeration spe
enumeration spg
enumeration spi
enumeration spk
enumeration spl
enumeration spm
enumeration spn
enumeration spo
enumeration spp
enumeration spq
enumeration spr
enumeration sps
enumeration spt
enumeration spu
enumeration spv
enumeration spx
enumeration spy
enumeration sqa
enumeration sqh
enumeration sqj
enumeration sqk
enumeration sqm
enumeration sqn
enumeration sqo
enumeration sqq
enumeration sqr
enumeration sqs
enumeration sqt
enumeration squ
enumeration sra
enumeration srb
enumeration src
enumeration sre
enumeration srf
enumeration srg
enumeration srh
enumeration sri
enumeration srk
enumeration srl
enumeration srm
enumeration srn
enumeration sro
enumeration srq
enumeration srr
enumeration srs
enumeration srt
enumeration sru
enumeration srv
enumeration srw
enumeration srx
enumeration sry
enumeration srz
enumeration ssa
enumeration ssb
enumeration ssc
enumeration ssd
enumeration sse
enumeration ssf
enumeration ssg
enumeration ssh
enumeration ssi
enumeration ssj
enumeration ssk
enumeration ssl
enumeration ssm
enumeration ssn
enumeration sso
enumeration ssp
enumeration ssq
enumeration ssr
enumeration sss
enumeration sst
enumeration ssu
enumeration ssv
enumeration ssx
enumeration ssy
enumeration ssz
enumeration sta
enumeration stb
enumeration std
enumeration ste
enumeration stf
enumeration stg
enumeration sth
enumeration sti
enumeration stj
enumeration stk
enumeration stl
enumeration stm
enumeration stn
enumeration sto
enumeration stp
enumeration stq
enumeration str
enumeration sts
enumeration stt
enumeration stu
enumeration stv
enumeration stw
enumeration sty
enumeration sua
enumeration sub
enumeration suc
enumeration sue
enumeration sug
enumeration sui
enumeration suj
enumeration suk
enumeration suq
enumeration sur
enumeration sus
enumeration sut
enumeration suv
enumeration suw
enumeration sux
enumeration suy
enumeration suz
enumeration sva
enumeration svb
enumeration svc
enumeration sve
enumeration svk
enumeration svm
enumeration svr
enumeration svs
enumeration svx
enumeration swb
enumeration swc
enumeration swf
enumeration swg
enumeration swh
enumeration swi
enumeration swj
enumeration swk
enumeration swl
enumeration swm
enumeration swn
enumeration swo
enumeration swp
enumeration swq
enumeration swr
enumeration sws
enumeration swt
enumeration swu
enumeration swv
enumeration sww
enumeration swx
enumeration swy
enumeration sxb
enumeration sxc
enumeration sxe
enumeration sxg
enumeration sxk
enumeration sxl
enumeration sxm
enumeration sxn
enumeration sxo
enumeration sxr
enumeration sxs
enumeration sxu
enumeration sxw
enumeration sya
enumeration syb
enumeration syc
enumeration syd
enumeration syi
enumeration syk
enumeration syl
enumeration sym
enumeration syn
enumeration syo
enumeration syr
enumeration sys
enumeration syw
enumeration syy
enumeration sza
enumeration szb
enumeration szc
enumeration szd
enumeration sze
enumeration szg
enumeration szl
enumeration szn
enumeration szp
enumeration szv
enumeration szw
enumeration taa
enumeration tab
enumeration tac
enumeration tad
enumeration tae
enumeration taf
enumeration tag
enumeration tai
enumeration taj
enumeration tak
enumeration tal
enumeration tan
enumeration tao
enumeration tap
enumeration taq
enumeration tar
enumeration tas
enumeration tau
enumeration tav
enumeration taw
enumeration tax
enumeration tay
enumeration taz
enumeration tba
enumeration tbb
enumeration tbc
enumeration tbd
enumeration tbe
enumeration tbf
enumeration tbg
enumeration tbh
enumeration tbi
enumeration tbj
enumeration tbk
enumeration tbl
enumeration tbm
enumeration tbn
enumeration tbo
enumeration tbp
enumeration tbq
enumeration tbr
enumeration tbs
enumeration tbt
enumeration tbu
enumeration tbv
enumeration tbw
enumeration tbx
enumeration tby
enumeration tbz
enumeration tca
enumeration tcb
enumeration tcc
enumeration tcd
enumeration tce
enumeration tcf
enumeration tcg
enumeration tch
enumeration tci
enumeration tck
enumeration tcl
enumeration tcm
enumeration tcn
enumeration tco
enumeration tcp
enumeration tcq
enumeration tcs
enumeration tct
enumeration tcu
enumeration tcw
enumeration tcx
enumeration tcy
enumeration tcz
enumeration tda
enumeration tdb
enumeration tdc
enumeration tdd
enumeration tde
enumeration tdf
enumeration tdg
enumeration tdh
enumeration tdi
enumeration tdj
enumeration tdk
enumeration tdl
enumeration tdn
enumeration tdo
enumeration tdq
enumeration tdr
enumeration tds
enumeration tdt
enumeration tdu
enumeration tdv
enumeration tdx
enumeration tdy
enumeration tea
enumeration teb
enumeration tec
enumeration ted
enumeration tee
enumeration tef
enumeration teg
enumeration teh
enumeration tei
enumeration tek
enumeration tem
enumeration ten
enumeration teo
enumeration tep
enumeration teq
enumeration ter
enumeration tes
enumeration tet
enumeration teu
enumeration tev
enumeration tew
enumeration tex
enumeration tey
enumeration tfi
enumeration tfn
enumeration tfo
enumeration tfr
enumeration tft
enumeration tga
enumeration tgb
enumeration tgc
enumeration tgd
enumeration tge
enumeration tgf
enumeration tgh
enumeration tgi
enumeration tgj
enumeration tgn
enumeration tgo
enumeration tgp
enumeration tgq
enumeration tgr
enumeration tgs
enumeration tgt
enumeration tgu
enumeration tgv
enumeration tgw
enumeration tgx
enumeration tgy
enumeration tgz
enumeration thc
enumeration thd
enumeration the
enumeration thf
enumeration thh
enumeration thi
enumeration thk
enumeration thl
enumeration thm
enumeration thn
enumeration thp
enumeration thq
enumeration thr
enumeration ths
enumeration tht
enumeration thu
enumeration thv
enumeration thw
enumeration thx
enumeration thy
enumeration thz
enumeration tia
enumeration tic
enumeration tid
enumeration tif
enumeration tig
enumeration tih
enumeration tii
enumeration tij
enumeration tik
enumeration til
enumeration tim
enumeration tin
enumeration tio
enumeration tip
enumeration tiq
enumeration tis
enumeration tit
enumeration tiu
enumeration tiv
enumeration tiw
enumeration tix
enumeration tiy
enumeration tiz
enumeration tja
enumeration tjg
enumeration tji
enumeration tjl
enumeration tjm
enumeration tjn
enumeration tjo
enumeration tjs
enumeration tju
enumeration tjw
enumeration tka
enumeration tkb
enumeration tkd
enumeration tke
enumeration tkf
enumeration tkg
enumeration tkl
enumeration tkm
enumeration tkn
enumeration tkp
enumeration tkq
enumeration tkr
enumeration tks
enumeration tkt
enumeration tku
enumeration tkv
enumeration tkw
enumeration tkx
enumeration tkz
enumeration tla
enumeration tlb
enumeration tlc
enumeration tld
enumeration tlf
enumeration tlg
enumeration tlh
enumeration tli
enumeration tlj
enumeration tlk
enumeration tll
enumeration tlm
enumeration tln
enumeration tlo
enumeration tlp
enumeration tlq
enumeration tlr
enumeration tls
enumeration tlt
enumeration tlu
enumeration tlv
enumeration tlx
enumeration tly
enumeration tma
enumeration tmb
enumeration tmc
enumeration tmd
enumeration tme
enumeration tmf
enumeration tmg
enumeration tmh
enumeration tmi
enumeration tmj
enumeration tmk
enumeration tml
enumeration tmm
enumeration tmn
enumeration tmo
enumeration tmp
enumeration tmq
enumeration tmr
enumeration tms
enumeration tmt
enumeration tmu
enumeration tmv
enumeration tmw
enumeration tmy
enumeration tmz
enumeration tna
enumeration tnb
enumeration tnc
enumeration tnd
enumeration tne
enumeration tng
enumeration tnh
enumeration tni
enumeration tnk
enumeration tnl
enumeration tnm
enumeration tnn
enumeration tno
enumeration tnp
enumeration tnq
enumeration tnr
enumeration tns
enumeration tnt
enumeration tnu
enumeration tnv
enumeration tnw
enumeration tnx
enumeration tny
enumeration tnz
enumeration tob
enumeration toc
enumeration tod
enumeration toe
enumeration tof
enumeration tog
enumeration toh
enumeration toi
enumeration toj
enumeration tol
enumeration tom
enumeration too
enumeration top
enumeration toq
enumeration tor
enumeration tos
enumeration tou
enumeration tov
enumeration tow
enumeration tox
enumeration toy
enumeration toz
enumeration tpa
enumeration tpc
enumeration tpe
enumeration tpf
enumeration tpg
enumeration tpi
enumeration tpj
enumeration tpk
enumeration tpl
enumeration tpm
enumeration tpn
enumeration tpo
enumeration tpp
enumeration tpq
enumeration tpr
enumeration tpt
enumeration tpu
enumeration tpv
enumeration tpw
enumeration tpx
enumeration tpy
enumeration tpz
enumeration tqb
enumeration tql
enumeration tqm
enumeration tqn
enumeration tqo
enumeration tqp
enumeration tqq
enumeration tqr
enumeration tqt
enumeration tqu
enumeration tqw
enumeration tra
enumeration trb
enumeration trc
enumeration trd
enumeration tre
enumeration trf
enumeration trg
enumeration trh
enumeration tri
enumeration trj
enumeration trk
enumeration trl
enumeration trm
enumeration trn
enumeration tro
enumeration trp
enumeration trq
enumeration trr
enumeration trs
enumeration trt
enumeration tru
enumeration trv
enumeration trw
enumeration trx
enumeration try
enumeration trz
enumeration tsa
enumeration tsb
enumeration tsc
enumeration tsd
enumeration tse
enumeration tsf
enumeration tsg
enumeration tsh
enumeration tsi
enumeration tsj
enumeration tsk
enumeration tsl
enumeration tsm
enumeration tsp
enumeration tsq
enumeration tsr
enumeration tss
enumeration tst
enumeration tsu
enumeration tsv
enumeration tsw
enumeration tsx
enumeration tsy
enumeration tsz
enumeration tta
enumeration ttb
enumeration ttc
enumeration ttd
enumeration tte
enumeration ttf
enumeration ttg
enumeration tth
enumeration tti
enumeration ttj
enumeration ttk
enumeration ttl
enumeration ttm
enumeration ttn
enumeration tto
enumeration ttp
enumeration ttq
enumeration ttr
enumeration tts
enumeration ttt
enumeration ttu
enumeration ttv
enumeration ttw
enumeration tty
enumeration ttz
enumeration tua
enumeration tub
enumeration tuc
enumeration tud
enumeration tue
enumeration tuf
enumeration tug
enumeration tuh
enumeration tui
enumeration tuj
enumeration tul
enumeration tum
enumeration tun
enumeration tuo
enumeration tup
enumeration tuq
enumeration tus
enumeration tut
enumeration tuu
enumeration tuv
enumeration tuw
enumeration tux
enumeration tuy
enumeration tuz
enumeration tva
enumeration tvd
enumeration tve
enumeration tvk
enumeration tvl
enumeration tvm
enumeration tvn
enumeration tvo
enumeration tvs
enumeration tvt
enumeration tvu
enumeration tvw
enumeration tvy
enumeration twa
enumeration twb
enumeration twc
enumeration twd
enumeration twe
enumeration twf
enumeration twg
enumeration twh
enumeration twl
enumeration twm
enumeration twn
enumeration two
enumeration twp
enumeration twq
enumeration twr
enumeration twt
enumeration twu
enumeration tww
enumeration twx
enumeration twy
enumeration txa
enumeration txb
enumeration txc
enumeration txe
enumeration txg
enumeration txh
enumeration txi
enumeration txm
enumeration txn
enumeration txo
enumeration txq
enumeration txr
enumeration txs
enumeration txt
enumeration txu
enumeration txx
enumeration txy
enumeration tya
enumeration tye
enumeration tyh
enumeration tyi
enumeration tyj
enumeration tyl
enumeration tyn
enumeration typ
enumeration tyr
enumeration tys
enumeration tyt
enumeration tyu
enumeration tyv
enumeration tyx
enumeration tyz
enumeration tza
enumeration tzh
enumeration tzj
enumeration tzl
enumeration tzm
enumeration tzn
enumeration tzo
enumeration tzx
enumeration uam
enumeration uan
enumeration uar
enumeration uba
enumeration ubi
enumeration ubl
enumeration ubr
enumeration ubu
enumeration uby
enumeration uda
enumeration ude
enumeration udg
enumeration udi
enumeration udj
enumeration udl
enumeration udm
enumeration udu
enumeration ues
enumeration ufi
enumeration uga
enumeration ugb
enumeration uge
enumeration ugn
enumeration ugo
enumeration ugy
enumeration uha
enumeration uhn
enumeration uis
enumeration uiv
enumeration uji
enumeration uka
enumeration ukg
enumeration ukh
enumeration ukl
enumeration ukp
enumeration ukq
enumeration uks
enumeration uku
enumeration ukw
enumeration uky
enumeration ula
enumeration ulb
enumeration ulc
enumeration ule
enumeration ulf
enumeration uli
enumeration ulk
enumeration ull
enumeration ulm
enumeration uln
enumeration ulu
enumeration ulw
enumeration uma
enumeration umb
enumeration umc
enumeration umd
enumeration umg
enumeration umi
enumeration umm
enumeration umn
enumeration umo
enumeration ump
enumeration umr
enumeration ums
enumeration umu
enumeration una
enumeration und
enumeration une
enumeration ung
enumeration unk
enumeration unm
enumeration unn
enumeration unr
enumeration unu
enumeration unx
enumeration unz
enumeration uok
enumeration upi
enumeration upv
enumeration ura
enumeration urb
enumeration urc
enumeration ure
enumeration urf
enumeration urg
enumeration urh
enumeration uri
enumeration urj
enumeration urk
enumeration url
enumeration urm
enumeration urn
enumeration uro
enumeration urp
enumeration urr
enumeration urt
enumeration uru
enumeration urv
enumeration urw
enumeration urx
enumeration ury
enumeration urz
enumeration usa
enumeration ush
enumeration usi
enumeration usk
enumeration usp
enumeration usu
enumeration uta
enumeration ute
enumeration utp
enumeration utr
enumeration utu
enumeration uum
enumeration uun
enumeration uur
enumeration uuu
enumeration uve
enumeration uvh
enumeration uvl
enumeration uwa
enumeration uya
enumeration uzn
enumeration uzs
enumeration vaa
enumeration vae
enumeration vaf
enumeration vag
enumeration vah
enumeration vai
enumeration vaj
enumeration val
enumeration vam
enumeration van
enumeration vao
enumeration vap
enumeration var
enumeration vas
enumeration vau
enumeration vav
enumeration vay
enumeration vbb
enumeration vbk
enumeration vec
enumeration ved
enumeration vel
enumeration vem
enumeration veo
enumeration vep
enumeration ver
enumeration vgr
enumeration vgt
enumeration vic
enumeration vid
enumeration vif
enumeration vig
enumeration vil
enumeration vin
enumeration vis
enumeration vit
enumeration viv
enumeration vka
enumeration vki
enumeration vkj
enumeration vkk
enumeration vkl
enumeration vkm
enumeration vko
enumeration vkp
enumeration vkt
enumeration vku
enumeration vlp
enumeration vls
enumeration vma
enumeration vmb
enumeration vmc
enumeration vmd
enumeration vme
enumeration vmf
enumeration vmg
enumeration vmh
enumeration vmi
enumeration vmj
enumeration vmk
enumeration vml
enumeration vmm
enumeration vmp
enumeration vmq
enumeration vmr
enumeration vms
enumeration vmu
enumeration vmv
enumeration vmw
enumeration vmx
enumeration vmy
enumeration vmz
enumeration vnk
enumeration vnm
enumeration vnp
enumeration vor
enumeration vot
enumeration vra
enumeration vro
enumeration vrs
enumeration vrt
enumeration vsi
enumeration vsl
enumeration vsv
enumeration vto
enumeration vum
enumeration vun
enumeration vut
enumeration vwa
enumeration waa
enumeration wab
enumeration wac
enumeration wad
enumeration wae
enumeration waf
enumeration wag
enumeration wah
enumeration wai
enumeration waj
enumeration wak
enumeration wal
enumeration wam
enumeration wan
enumeration wao
enumeration wap
enumeration waq
enumeration war
enumeration was
enumeration wat
enumeration wau
enumeration wav
enumeration waw
enumeration wax
enumeration way
enumeration waz
enumeration wba
enumeration wbb
enumeration wbe
enumeration wbf
enumeration wbh
enumeration wbi
enumeration wbj
enumeration wbk
enumeration wbl
enumeration wbm
enumeration wbp
enumeration wbq
enumeration wbr
enumeration wbt
enumeration wbv
enumeration wbw
enumeration wca
enumeration wci
enumeration wdd
enumeration wdg
enumeration wdj
enumeration wdk
enumeration wdu
enumeration wdy
enumeration wea
enumeration wec
enumeration wed
enumeration weg
enumeration weh
enumeration wei
enumeration wem
enumeration wen
enumeration weo
enumeration wep
enumeration wer
enumeration wes
enumeration wet
enumeration weu
enumeration wew
enumeration wfg
enumeration wga
enumeration wgb
enumeration wgg
enumeration wgi
enumeration wgo
enumeration wgu
enumeration wgy
enumeration wha
enumeration whg
enumeration whk
enumeration whu
enumeration wib
enumeration wic
enumeration wie
enumeration wif
enumeration wig
enumeration wih
enumeration wii
enumeration wij
enumeration wik
enumeration wil
enumeration wim
enumeration win
enumeration wir
enumeration wiu
enumeration wiv
enumeration wiy
enumeration wja
enumeration wji
enumeration wka
enumeration wkb
enumeration wkd
enumeration wkl
enumeration wku
enumeration wkw
enumeration wky
enumeration wla
enumeration wlc
enumeration wle
enumeration wlg
enumeration wli
enumeration wlk
enumeration wll
enumeration wlm
enumeration wlo
enumeration wlr
enumeration wls
enumeration wlu
enumeration wlv
enumeration wlw
enumeration wlx
enumeration wly
enumeration wma
enumeration wmb
enumeration wmc
enumeration wmd
enumeration wme
enumeration wmh
enumeration wmi
enumeration wmm
enumeration wmn
enumeration wmo
enumeration wms
enumeration wmt
enumeration wmw
enumeration wmx
enumeration wnb
enumeration wnc
enumeration wnd
enumeration wne
enumeration wng
enumeration wni
enumeration wnk
enumeration wnm
enumeration wnn
enumeration wno
enumeration wnp
enumeration wnu
enumeration wnw
enumeration wny
enumeration woa
enumeration wob
enumeration woc
enumeration wod
enumeration woe
enumeration wof
enumeration wog
enumeration woi
enumeration wok
enumeration wom
enumeration won
enumeration woo
enumeration wor
enumeration wos
enumeration wow
enumeration woy
enumeration wpc
enumeration wra
enumeration wrb
enumeration wrd
enumeration wrg
enumeration wrh
enumeration wri
enumeration wrk
enumeration wrl
enumeration wrm
enumeration wrn
enumeration wro
enumeration wrp
enumeration wrr
enumeration wrs
enumeration wru
enumeration wrv
enumeration wrw
enumeration wrx
enumeration wry
enumeration wrz
enumeration wsa
enumeration wsi
enumeration wsk
enumeration wsr
enumeration wss
enumeration wsu
enumeration wsv
enumeration wtf
enumeration wth
enumeration wti
enumeration wtk
enumeration wtm
enumeration wtw
enumeration wua
enumeration wub
enumeration wud
enumeration wuh
enumeration wul
enumeration wum
enumeration wun
enumeration wur
enumeration wut
enumeration wuu
enumeration wuv
enumeration wux
enumeration wuy
enumeration wwa
enumeration wwb
enumeration wwo
enumeration wwr
enumeration www
enumeration wxa
enumeration wxw
enumeration wya
enumeration wyb
enumeration wyi
enumeration wym
enumeration wyr
enumeration wyy
enumeration xaa
enumeration xab
enumeration xac
enumeration xad
enumeration xae
enumeration xag
enumeration xai
enumeration xaj
enumeration xal
enumeration xam
enumeration xan
enumeration xao
enumeration xap
enumeration xaq
enumeration xar
enumeration xas
enumeration xat
enumeration xau
enumeration xav
enumeration xaw
enumeration xay
enumeration xba
enumeration xbb
enumeration xbc
enumeration xbd
enumeration xbe
enumeration xbg
enumeration xbi
enumeration xbj
enumeration xbm
enumeration xbn
enumeration xbo
enumeration xbp
enumeration xbr
enumeration xbw
enumeration xbx
enumeration xby
enumeration xcb
enumeration xcc
enumeration xce
enumeration xcg
enumeration xch
enumeration xcl
enumeration xcm
enumeration xcn
enumeration xco
enumeration xcr
enumeration xct
enumeration xcu
enumeration xcv
enumeration xcw
enumeration xcy
enumeration xda
enumeration xdc
enumeration xdk
enumeration xdm
enumeration xdy
enumeration xeb
enumeration xed
enumeration xeg
enumeration xel
enumeration xem
enumeration xep
enumeration xer
enumeration xes
enumeration xet
enumeration xeu
enumeration xfa
enumeration xga
enumeration xgb
enumeration xgd
enumeration xgf
enumeration xgg
enumeration xgi
enumeration xgl
enumeration xgm
enumeration xgn
enumeration xgr
enumeration xgu
enumeration xgw
enumeration xha
enumeration xhc
enumeration xhd
enumeration xhe
enumeration xhr
enumeration xht
enumeration xhu
enumeration xhv
enumeration xib
enumeration xii
enumeration xil
enumeration xin
enumeration xip
enumeration xir
enumeration xis
enumeration xiv
enumeration xiy
enumeration xjb
enumeration xjt
enumeration xka
enumeration xkb
enumeration xkc
enumeration xkd
enumeration xke
enumeration xkf
enumeration xkg
enumeration xkh
enumeration xki
enumeration xkj
enumeration xkk
enumeration xkl
enumeration xkn
enumeration xko
enumeration xkp
enumeration xkq
enumeration xkr
enumeration xks
enumeration xkt
enumeration xku
enumeration xkv
enumeration xkw
enumeration xkx
enumeration xky
enumeration xkz
enumeration xla
enumeration xlb
enumeration xlc
enumeration xld
enumeration xle
enumeration xlg
enumeration xli
enumeration xln
enumeration xlo
enumeration xlp
enumeration xls
enumeration xlu
enumeration xly
enumeration xma
enumeration xmb
enumeration xmc
enumeration xmd
enumeration xme
enumeration xmf
enumeration xmg
enumeration xmh
enumeration xmj
enumeration xmk
enumeration xml
enumeration xmm
enumeration xmn
enumeration xmo
enumeration xmp
enumeration xmq
enumeration xmr
enumeration xms
enumeration xmt
enumeration xmu
enumeration xmv
enumeration xmw
enumeration xmx
enumeration xmy
enumeration xmz
enumeration xna
enumeration xnb
enumeration xnd
enumeration xng
enumeration xnh
enumeration xni
enumeration xnk
enumeration xnn
enumeration xno
enumeration xnr
enumeration xns
enumeration xnt
enumeration xnu
enumeration xny
enumeration xnz
enumeration xoc
enumeration xod
enumeration xog
enumeration xoi
enumeration xok
enumeration xom
enumeration xon
enumeration xoo
enumeration xop
enumeration xor
enumeration xow
enumeration xpa
enumeration xpc
enumeration xpe
enumeration xpg
enumeration xpi
enumeration xpj
enumeration xpk
enumeration xpm
enumeration xpn
enumeration xpo
enumeration xpp
enumeration xpq
enumeration xpr
enumeration xps
enumeration xpt
enumeration xpu
enumeration xpy
enumeration xqa
enumeration xqt
enumeration xra
enumeration xrb
enumeration xrd
enumeration xre
enumeration xrg
enumeration xri
enumeration xrm
enumeration xrn
enumeration xrq
enumeration xrr
enumeration xrt
enumeration xru
enumeration xrw
enumeration xsa
enumeration xsb
enumeration xsc
enumeration xsd
enumeration xse
enumeration xsh
enumeration xsi
enumeration xsj
enumeration xsl
enumeration xsm
enumeration xsn
enumeration xso
enumeration xsp
enumeration xsq
enumeration xsr
enumeration xss
enumeration xsu
enumeration xsv
enumeration xsy
enumeration xta
enumeration xtb
enumeration xtc
enumeration xtd
enumeration xte
enumeration xtg
enumeration xth
enumeration xti
enumeration xtj
enumeration xtl
enumeration xtm
enumeration xtn
enumeration xto
enumeration xtp
enumeration xtq
enumeration xtr
enumeration xts
enumeration xtt
enumeration xtu
enumeration xtv
enumeration xtw
enumeration xty
enumeration xtz
enumeration xua
enumeration xub
enumeration xud
enumeration xug
enumeration xuj
enumeration xul
enumeration xum
enumeration xun
enumeration xuo
enumeration xup
enumeration xur
enumeration xut
enumeration xuu
enumeration xve
enumeration xvi
enumeration xvn
enumeration xvo
enumeration xvs
enumeration xwa
enumeration xwc
enumeration xwd
enumeration xwe
enumeration xwg
enumeration xwj
enumeration xwk
enumeration xwl
enumeration xwo
enumeration xwr
enumeration xwt
enumeration xww
enumeration xxb
enumeration xxk
enumeration xxm
enumeration xxr
enumeration xxt
enumeration xya
enumeration xyb
enumeration xyj
enumeration xyk
enumeration xyl
enumeration xyt
enumeration xyy
enumeration xzh
enumeration xzm
enumeration xzp
enumeration yaa
enumeration yab
enumeration yac
enumeration yad
enumeration yae
enumeration yaf
enumeration yag
enumeration yah
enumeration yai
enumeration yaj
enumeration yak
enumeration yal
enumeration yam
enumeration yan
enumeration yao
enumeration yap
enumeration yaq
enumeration yar
enumeration yas
enumeration yat
enumeration yau
enumeration yav
enumeration yaw
enumeration yax
enumeration yay
enumeration yaz
enumeration yba
enumeration ybb
enumeration ybe
enumeration ybh
enumeration ybi
enumeration ybj
enumeration ybk
enumeration ybl
enumeration ybm
enumeration ybn
enumeration ybo
enumeration ybx
enumeration yby
enumeration ych
enumeration ycl
enumeration ycn
enumeration ycp
enumeration yda
enumeration ydd
enumeration yde
enumeration ydg
enumeration ydk
enumeration yds
enumeration yea
enumeration yec
enumeration yee
enumeration yei
enumeration yej
enumeration yel
enumeration yer
enumeration yes
enumeration yet
enumeration yeu
enumeration yev
enumeration yey
enumeration yga
enumeration ygi
enumeration ygl
enumeration ygm
enumeration ygp
enumeration ygr
enumeration ygs
enumeration ygu
enumeration ygw
enumeration yha
enumeration yhd
enumeration yhl
enumeration yia
enumeration yif
enumeration yig
enumeration yih
enumeration yii
enumeration yij
enumeration yik
enumeration yil
enumeration yim
enumeration yin
enumeration yip
enumeration yiq
enumeration yir
enumeration yis
enumeration yit
enumeration yiu
enumeration yiv
enumeration yix
enumeration yiz
enumeration yka
enumeration ykg
enumeration yki
enumeration ykk
enumeration ykl
enumeration ykm
enumeration ykn
enumeration yko
enumeration ykr
enumeration ykt
enumeration yku
enumeration yky
enumeration yla
enumeration ylb
enumeration yle
enumeration ylg
enumeration yli
enumeration yll
enumeration ylm
enumeration yln
enumeration ylo
enumeration ylr
enumeration ylu
enumeration yly
enumeration ymb
enumeration ymc
enumeration ymd
enumeration yme
enumeration ymg
enumeration ymh
enumeration ymi
enumeration ymk
enumeration yml
enumeration ymm
enumeration ymn
enumeration ymo
enumeration ymp
enumeration ymq
enumeration ymr
enumeration yms
enumeration ymt
enumeration ymx
enumeration ymz
enumeration yna
enumeration ynd
enumeration yne
enumeration yng
enumeration ynh
enumeration ynk
enumeration ynl
enumeration ynn
enumeration yno
enumeration ynq
enumeration yns
enumeration ynu
enumeration yob
enumeration yog
enumeration yoi
enumeration yok
enumeration yol
enumeration yom
enumeration yon
enumeration yot
enumeration yox
enumeration yoy
enumeration ypa
enumeration ypb
enumeration ypg
enumeration yph
enumeration ypk
enumeration ypm
enumeration ypn
enumeration ypo
enumeration ypp
enumeration ypz
enumeration yra
enumeration yrb
enumeration yre
enumeration yri
enumeration yrk
enumeration yrl
enumeration yrm
enumeration yrn
enumeration yrs
enumeration yrw
enumeration yry
enumeration ysc
enumeration ysd
enumeration ysg
enumeration ysl
enumeration ysn
enumeration yso
enumeration ysp
enumeration ysr
enumeration yss
enumeration ysy
enumeration yta
enumeration ytl
enumeration ytp
enumeration ytw
enumeration yty
enumeration yua
enumeration yub
enumeration yuc
enumeration yud
enumeration yue
enumeration yuf
enumeration yug
enumeration yui
enumeration yuj
enumeration yuk
enumeration yul
enumeration yum
enumeration yun
enumeration yup
enumeration yuq
enumeration yur
enumeration yut
enumeration yuw
enumeration yux
enumeration yuy
enumeration yuz
enumeration yva
enumeration yvt
enumeration ywa
enumeration ywg
enumeration ywl
enumeration ywn
enumeration ywq
enumeration ywr
enumeration ywt
enumeration ywu
enumeration yww
enumeration yxa
enumeration yxg
enumeration yxl
enumeration yxm
enumeration yxu
enumeration yxy
enumeration yyr
enumeration yyu
enumeration yyz
enumeration yzg
enumeration yzk
enumeration zaa
enumeration zab
enumeration zac
enumeration zad
enumeration zae
enumeration zaf
enumeration zag
enumeration zah
enumeration zai
enumeration zaj
enumeration zak
enumeration zal
enumeration zam
enumeration zao
enumeration zap
enumeration zaq
enumeration zar
enumeration zas
enumeration zat
enumeration zau
enumeration zav
enumeration zaw
enumeration zax
enumeration zay
enumeration zaz
enumeration zbc
enumeration zbe
enumeration zbl
enumeration zbt
enumeration zbw
enumeration zca
enumeration zch
enumeration zdj
enumeration zea
enumeration zeg
enumeration zeh
enumeration zen
enumeration zga
enumeration zgb
enumeration zgh
enumeration zgm
enumeration zgn
enumeration zgr
enumeration zhb
enumeration zhd
enumeration zhi
enumeration zhn
enumeration zhw
enumeration zhx
enumeration zia
enumeration zib
enumeration zik
enumeration zil
enumeration zim
enumeration zin
enumeration zir
enumeration ziw
enumeration ziz
enumeration zka
enumeration zkb
enumeration zkd
enumeration zkg
enumeration zkh
enumeration zkk
enumeration zkn
enumeration zko
enumeration zkp
enumeration zkr
enumeration zkt
enumeration zku
enumeration zkv
enumeration zkz
enumeration zle
enumeration zlj
enumeration zlm
enumeration zln
enumeration zlq
enumeration zls
enumeration zlw
enumeration zma
enumeration zmb
enumeration zmc
enumeration zmd
enumeration zme
enumeration zmf
enumeration zmg
enumeration zmh
enumeration zmi
enumeration zmj
enumeration zmk
enumeration zml
enumeration zmm
enumeration zmn
enumeration zmo
enumeration zmp
enumeration zmq
enumeration zmr
enumeration zms
enumeration zmt
enumeration zmu
enumeration zmv
enumeration zmw
enumeration zmx
enumeration zmy
enumeration zmz
enumeration zna
enumeration znd
enumeration zne
enumeration zng
enumeration znk
enumeration zns
enumeration zoc
enumeration zoh
enumeration zom
enumeration zoo
enumeration zoq
enumeration zor
enumeration zos
enumeration zpa
enumeration zpb
enumeration zpc
enumeration zpd
enumeration zpe
enumeration zpf
enumeration zpg
enumeration zph
enumeration zpi
enumeration zpj
enumeration zpk
enumeration zpl
enumeration zpm
enumeration zpn
enumeration zpo
enumeration zpp
enumeration zpq
enumeration zpr
enumeration zps
enumeration zpt
enumeration zpu
enumeration zpv
enumeration zpw
enumeration zpx
enumeration zpy
enumeration zpz
enumeration zqe
enumeration zra
enumeration zrg
enumeration zrn
enumeration zro
enumeration zrp
enumeration zrs
enumeration zsa
enumeration zsk
enumeration zsl
enumeration zsm
enumeration zsr
enumeration zsu
enumeration zte
enumeration ztg
enumeration ztl
enumeration ztm
enumeration ztn
enumeration ztp
enumeration ztq
enumeration zts
enumeration ztt
enumeration ztu
enumeration ztx
enumeration zty
enumeration zua
enumeration zuh
enumeration zum
enumeration zun
enumeration zuy
enumeration zwa
enumeration zxx
enumeration zyb
enumeration zyg
enumeration zyj
enumeration zyn
enumeration zyp
enumeration zza
enumeration zzj
[ top ]
Element ms:journalInfoType / ms:subjects
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#subject
[ top ]
Element ms:journalInfoType / ms:rights
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rightsInfo
[ top ]
Element ms:metadataHeaderInfoType / ms:sourceOfMetadataRecord / ms:originalDataProviderInfo / ms:originalDataProviderPublisher
Annotations
Information about the publisher (organization) that has originally provided the metadata record
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:metadataHeaderInfoType / ms:userQuery
Annotations
The query text that has created the corpus of scholarly publications
Diagram
Diagram
Type xs:string
[ top ]
Element ms:metadataHeaderInfoType / ms:metadataLastDateUpdated
Annotations
The date of the last updating of the metadata record
Diagram
Diagram
Type xs:date
[ top ]
Element ms:metadataHeaderInfoType / ms:revision
Annotations
Provides an account of the revisions in free text or a link to a document with revisions
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:corpusInfo
Annotations
Groups together all information related to corpora
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#corpusInfoType_resourceType OMTD-SHARE_XMLSchema.tmp#identificationInfo OMTD-SHARE_XMLSchema.tmp#versionInfo OMTD-SHARE_XMLSchema.tmp#contactInfo OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfo OMTD-SHARE_XMLSchema.tmp#rightsInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_resourceDocumentations OMTD-SHARE_XMLSchema.tmp#resourceCreationInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_validationInfos OMTD-SHARE_XMLSchema.tmp#usageInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_relations OMTD-SHARE_XMLSchema.tmp#corpusInfoType_corpusSubtypeSpecificInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType
Type ms:corpusInfoType
[ top ]
Element ms:corpusTextPartInfo
Annotations
Groups together information on the text component of a resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#corpusTextPartInfoType
Type ms:corpusTextPartInfoType
[ top ]
Element ms:languageId
Annotations
The identifier of the language subelement according to the IETF BCP47 guidelines (i.e. ISO 639-3 codes when existing supplemented with ISO 639-3 codes for new entries)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageIdType
Type ms:languageIdType
Facets
enumeration bg
enumeration cs
enumeration hr
enumeration da
enumeration nl
enumeration en
enumeration et
enumeration fi
enumeration fr
enumeration de
enumeration hu
enumeration ga
enumeration it
enumeration lv
enumeration lt
enumeration mt
enumeration el
enumeration pl
enumeration pt
enumeration ro
enumeration sk
enumeration sl
enumeration es
enumeration sv
enumeration aa
enumeration ab
enumeration ae
enumeration af
enumeration ak
enumeration am
enumeration an
enumeration ar
enumeration as
enumeration av
enumeration ay
enumeration az
enumeration ba
enumeration be
enumeration bh
enumeration bi
enumeration bm
enumeration bn
enumeration bo
enumeration br
enumeration bs
enumeration ca
enumeration ce
enumeration ch
enumeration co
enumeration cr
enumeration cu
enumeration cv
enumeration cy
enumeration dv
enumeration dz
enumeration ee
enumeration eo
enumeration eu
enumeration fa
enumeration ff
enumeration fj
enumeration fo
enumeration fy
enumeration gd
enumeration gl
enumeration gn
enumeration gu
enumeration gv
enumeration ha
enumeration he
enumeration hi
enumeration ho
enumeration ht
enumeration hy
enumeration hz
enumeration ia
enumeration id
enumeration ie
enumeration ig
enumeration ii
enumeration ik
enumeration io
enumeration is
enumeration iu
enumeration ja
enumeration jv
enumeration ka
enumeration kg
enumeration ki
enumeration kj
enumeration kk
enumeration kl
enumeration km
enumeration kn
enumeration ko
enumeration kr
enumeration ks
enumeration ku
enumeration kv
enumeration kw
enumeration ky
enumeration la
enumeration lb
enumeration lg
enumeration li
enumeration ln
enumeration lo
enumeration lu
enumeration mg
enumeration mh
enumeration mi
enumeration mk
enumeration ml
enumeration mn
enumeration mr
enumeration ms
enumeration my
enumeration na
enumeration nb
enumeration nd
enumeration ne
enumeration ng
enumeration nn
enumeration no
enumeration nr
enumeration nv
enumeration ny
enumeration oc
enumeration oj
enumeration om
enumeration or
enumeration os
enumeration pa
enumeration pi
enumeration ps
enumeration qu
enumeration rm
enumeration rn
enumeration ru
enumeration rw
enumeration sa
enumeration sc
enumeration sd
enumeration se
enumeration sg
enumeration hbs
enumeration si
enumeration sm
enumeration sn
enumeration so
enumeration sq
enumeration sr
enumeration ss
enumeration st
enumeration su
enumeration sw
enumeration ta
enumeration te
enumeration tg
enumeration th
enumeration ti
enumeration tk
enumeration tl
enumeration tn
enumeration to
enumeration tr
enumeration ts
enumeration tt
enumeration tw
enumeration ty
enumeration ug
enumeration uk
enumeration ur
enumeration uz
enumeration ve
enumeration vi
enumeration vo
enumeration wa
enumeration wo
enumeration xh
enumeration yi
enumeration yo
enumeration za
enumeration zh
enumeration zu
enumeration aaa
enumeration aab
enumeration aac
enumeration aad
enumeration aae
enumeration aaf
enumeration aag
enumeration aah
enumeration aai
enumeration aak
enumeration aal
enumeration aam
enumeration aan
enumeration aao
enumeration aap
enumeration aaq
enumeration aas
enumeration aat
enumeration aau
enumeration aav
enumeration aaw
enumeration aax
enumeration aaz
enumeration aba
enumeration abb
enumeration abc
enumeration abd
enumeration abe
enumeration abf
enumeration abg
enumeration abh
enumeration abi
enumeration abj
enumeration abl
enumeration abm
enumeration abn
enumeration abo
enumeration abp
enumeration abq
enumeration abr
enumeration abs
enumeration abt
enumeration abu
enumeration abv
enumeration abw
enumeration abx
enumeration aby
enumeration abz
enumeration aca
enumeration acb
enumeration acd
enumeration ace
enumeration acf
enumeration ach
enumeration aci
enumeration ack
enumeration acl
enumeration acm
enumeration acn
enumeration acp
enumeration acq
enumeration acr
enumeration acs
enumeration act
enumeration acu
enumeration acv
enumeration acw
enumeration acx
enumeration acy
enumeration acz
enumeration ada
enumeration adb
enumeration add
enumeration ade
enumeration adf
enumeration adg
enumeration adh
enumeration adi
enumeration adj
enumeration adl
enumeration adn
enumeration ado
enumeration adp
enumeration adq
enumeration adr
enumeration ads
enumeration adt
enumeration adu
enumeration adw
enumeration adx
enumeration ady
enumeration adz
enumeration aea
enumeration aeb
enumeration aec
enumeration aed
enumeration aee
enumeration aek
enumeration ael
enumeration aem
enumeration aen
enumeration aeq
enumeration aer
enumeration aes
enumeration aeu
enumeration aew
enumeration aey
enumeration aez
enumeration afa
enumeration afb
enumeration afd
enumeration afe
enumeration afg
enumeration afh
enumeration afi
enumeration afk
enumeration afn
enumeration afo
enumeration afp
enumeration afs
enumeration aft
enumeration afu
enumeration afz
enumeration aga
enumeration agb
enumeration agc
enumeration agd
enumeration age
enumeration agf
enumeration agg
enumeration agh
enumeration agi
enumeration agj
enumeration agk
enumeration agl
enumeration agm
enumeration agn
enumeration ago
enumeration agq
enumeration agr
enumeration ags
enumeration agt
enumeration agu
enumeration agv
enumeration agw
enumeration agx
enumeration agy
enumeration agz
enumeration aha
enumeration ahb
enumeration ahg
enumeration ahh
enumeration ahi
enumeration ahk
enumeration ahl
enumeration ahm
enumeration ahn
enumeration aho
enumeration ahp
enumeration ahr
enumeration ahs
enumeration aht
enumeration aia
enumeration aib
enumeration aic
enumeration aid
enumeration aie
enumeration aif
enumeration aig
enumeration aih
enumeration aii
enumeration aij
enumeration aik
enumeration ail
enumeration aim
enumeration ain
enumeration aio
enumeration aip
enumeration aiq
enumeration air
enumeration ais
enumeration ait
enumeration aiw
enumeration aix
enumeration aiy
enumeration aja
enumeration ajg
enumeration aji
enumeration ajn
enumeration ajp
enumeration ajt
enumeration aju
enumeration ajw
enumeration ajz
enumeration akb
enumeration akc
enumeration akd
enumeration ake
enumeration akf
enumeration akg
enumeration akh
enumeration aki
enumeration akj
enumeration akk
enumeration akl
enumeration akm
enumeration ako
enumeration akp
enumeration akq
enumeration akr
enumeration aks
enumeration akt
enumeration aku
enumeration akv
enumeration akw
enumeration akx
enumeration aky
enumeration akz
enumeration ala
enumeration alc
enumeration ald
enumeration ale
enumeration alf
enumeration alg
enumeration alh
enumeration ali
enumeration alj
enumeration alk
enumeration all
enumeration alm
enumeration aln
enumeration alo
enumeration alp
enumeration alq
enumeration alr
enumeration als
enumeration alt
enumeration alu
enumeration alv
enumeration alw
enumeration alx
enumeration aly
enumeration alz
enumeration ama
enumeration amb
enumeration amc
enumeration ame
enumeration amf
enumeration amg
enumeration ami
enumeration amj
enumeration amk
enumeration aml
enumeration amm
enumeration amn
enumeration amo
enumeration amp
enumeration amq
enumeration amr
enumeration ams
enumeration amt
enumeration amu
enumeration amv
enumeration amw
enumeration amx
enumeration amy
enumeration amz
enumeration ana
enumeration anb
enumeration anc
enumeration and
enumeration ane
enumeration anf
enumeration ang
enumeration anh
enumeration ani
enumeration anj
enumeration ank
enumeration anl
enumeration anm
enumeration ann
enumeration ano
enumeration anp
enumeration anq
enumeration anr
enumeration ans
enumeration ant
enumeration anu
enumeration anv
enumeration anw
enumeration anx
enumeration any
enumeration anz
enumeration aoa
enumeration aob
enumeration aoc
enumeration aod
enumeration aoe
enumeration aof
enumeration aog
enumeration aoh
enumeration aoi
enumeration aoj
enumeration aok
enumeration aol
enumeration aom
enumeration aon
enumeration aor
enumeration aos
enumeration aot
enumeration aou
enumeration aox
enumeration aoz
enumeration apa
enumeration apb
enumeration apc
enumeration apd
enumeration ape
enumeration apf
enumeration apg
enumeration aph
enumeration api
enumeration apj
enumeration apk
enumeration apl
enumeration apm
enumeration apn
enumeration apo
enumeration app
enumeration apq
enumeration apr
enumeration aps
enumeration apt
enumeration apu
enumeration apv
enumeration apw
enumeration apx
enumeration apy
enumeration apz
enumeration aqa
enumeration aqc
enumeration aqd
enumeration aqg
enumeration aql
enumeration aqm
enumeration aqn
enumeration aqp
enumeration aqr
enumeration aqt
enumeration aqz
enumeration arb
enumeration arc
enumeration ard
enumeration are
enumeration arh
enumeration ari
enumeration arj
enumeration ark
enumeration arl
enumeration arn
enumeration aro
enumeration arp
enumeration arq
enumeration arr
enumeration ars
enumeration art
enumeration aru
enumeration arv
enumeration arw
enumeration arx
enumeration ary
enumeration arz
enumeration asa
enumeration asb
enumeration asc
enumeration asd
enumeration ase
enumeration asf
enumeration asg
enumeration ash
enumeration asi
enumeration asj
enumeration ask
enumeration asl
enumeration asn
enumeration aso
enumeration asp
enumeration asq
enumeration asr
enumeration ass
enumeration ast
enumeration asu
enumeration asv
enumeration asw
enumeration asx
enumeration asy
enumeration asz
enumeration ata
enumeration atb
enumeration atc
enumeration atd
enumeration ate
enumeration atg
enumeration ath
enumeration ati
enumeration atj
enumeration atk
enumeration atl
enumeration atm
enumeration atn
enumeration ato
enumeration atp
enumeration atq
enumeration atr
enumeration ats
enumeration att
enumeration atu
enumeration atv
enumeration atw
enumeration atx
enumeration aty
enumeration atz
enumeration aua
enumeration aub
enumeration auc
enumeration aud
enumeration aue
enumeration auf
enumeration aug
enumeration auh
enumeration aui
enumeration auj
enumeration auk
enumeration aul
enumeration aum
enumeration aun
enumeration auo
enumeration aup
enumeration auq
enumeration aur
enumeration aus
enumeration aut
enumeration auu
enumeration auw
enumeration aux
enumeration auy
enumeration auz
enumeration avb
enumeration avd
enumeration avi
enumeration avk
enumeration avl
enumeration avm
enumeration avn
enumeration avo
enumeration avs
enumeration avt
enumeration avu
enumeration avv
enumeration awa
enumeration awb
enumeration awc
enumeration awd
enumeration awe
enumeration awg
enumeration awh
enumeration awi
enumeration awk
enumeration awm
enumeration awn
enumeration awo
enumeration awr
enumeration aws
enumeration awt
enumeration awu
enumeration awv
enumeration aww
enumeration awx
enumeration awy
enumeration axb
enumeration axe
enumeration axg
enumeration axk
enumeration axl
enumeration axm
enumeration axx
enumeration aya
enumeration ayb
enumeration ayc
enumeration ayd
enumeration aye
enumeration ayg
enumeration ayh
enumeration ayi
enumeration ayk
enumeration ayl
enumeration ayn
enumeration ayo
enumeration ayp
enumeration ayq
enumeration ayr
enumeration ays
enumeration ayt
enumeration ayu
enumeration ayy
enumeration ayz
enumeration aza
enumeration azb
enumeration azc
enumeration azd
enumeration azg
enumeration azj
enumeration azm
enumeration azn
enumeration azo
enumeration azt
enumeration azz
enumeration baa
enumeration bab
enumeration bac
enumeration bad
enumeration bae
enumeration baf
enumeration bag
enumeration bah
enumeration bai
enumeration baj
enumeration bal
enumeration ban
enumeration bao
enumeration bap
enumeration bar
enumeration bas
enumeration bat
enumeration bau
enumeration bav
enumeration baw
enumeration bax
enumeration bay
enumeration bba
enumeration bbb
enumeration bbc
enumeration bbd
enumeration bbe
enumeration bbf
enumeration bbg
enumeration bbh
enumeration bbi
enumeration bbj
enumeration bbk
enumeration bbl
enumeration bbm
enumeration bbn
enumeration bbo
enumeration bbp
enumeration bbq
enumeration bbr
enumeration bbs
enumeration bbt
enumeration bbu
enumeration bbv
enumeration bbw
enumeration bbx
enumeration bby
enumeration bbz
enumeration bca
enumeration bcb
enumeration bcc
enumeration bcd
enumeration bce
enumeration bcf
enumeration bcg
enumeration bch
enumeration bci
enumeration bcj
enumeration bck
enumeration bcl
enumeration bcm
enumeration bcn
enumeration bco
enumeration bcp
enumeration bcq
enumeration bcr
enumeration bcs
enumeration bct
enumeration bcu
enumeration bcv
enumeration bcw
enumeration bcy
enumeration bcz
enumeration bda
enumeration bdb
enumeration bdc
enumeration bdd
enumeration bde
enumeration bdf
enumeration bdg
enumeration bdh
enumeration bdi
enumeration bdj
enumeration bdk
enumeration bdl
enumeration bdm
enumeration bdn
enumeration bdo
enumeration bdp
enumeration bdq
enumeration bdr
enumeration bds
enumeration bdt
enumeration bdu
enumeration bdv
enumeration bdw
enumeration bdx
enumeration bdy
enumeration bdz
enumeration bea
enumeration beb
enumeration bec
enumeration bed
enumeration bee
enumeration bef
enumeration beg
enumeration beh
enumeration bei
enumeration bej
enumeration bek
enumeration bem
enumeration beo
enumeration bep
enumeration beq
enumeration ber
enumeration bes
enumeration bet
enumeration beu
enumeration bev
enumeration bew
enumeration bex
enumeration bey
enumeration bez
enumeration bfa
enumeration bfb
enumeration bfc
enumeration bfd
enumeration bfe
enumeration bff
enumeration bfg
enumeration bfh
enumeration bfi
enumeration bfj
enumeration bfk
enumeration bfl
enumeration bfm
enumeration bfn
enumeration bfo
enumeration bfp
enumeration bfq
enumeration bfr
enumeration bfs
enumeration bft
enumeration bfu
enumeration bfw
enumeration bfx
enumeration bfy
enumeration bfz
enumeration bga
enumeration bgb
enumeration bgc
enumeration bgd
enumeration bge
enumeration bgf
enumeration bgg
enumeration bgi
enumeration bgj
enumeration bgk
enumeration bgl
enumeration bgm
enumeration bgn
enumeration bgo
enumeration bgp
enumeration bgq
enumeration bgr
enumeration bgs
enumeration bgt
enumeration bgu
enumeration bgv
enumeration bgw
enumeration bgx
enumeration bgy
enumeration bgz
enumeration bha
enumeration bhb
enumeration bhc
enumeration bhd
enumeration bhe
enumeration bhf
enumeration bhg
enumeration bhh
enumeration bhi
enumeration bhj
enumeration bhl
enumeration bhm
enumeration bhn
enumeration bho
enumeration bhp
enumeration bhq
enumeration bhr
enumeration bhs
enumeration bht
enumeration bhu
enumeration bhv
enumeration bhw
enumeration bhx
enumeration bhy
enumeration bhz
enumeration bia
enumeration bib
enumeration bic
enumeration bid
enumeration bie
enumeration bif
enumeration big
enumeration bij
enumeration bik
enumeration bil
enumeration bim
enumeration bin
enumeration bio
enumeration bip
enumeration biq
enumeration bir
enumeration bit
enumeration biu
enumeration biv
enumeration biw
enumeration bix
enumeration biy
enumeration biz
enumeration bja
enumeration bjb
enumeration bjc
enumeration bje
enumeration bjf
enumeration bjg
enumeration bjh
enumeration bji
enumeration bjj
enumeration bjk
enumeration bjl
enumeration bjm
enumeration bjn
enumeration bjo
enumeration bjp
enumeration bjr
enumeration bjs
enumeration bjt
enumeration bju
enumeration bjv
enumeration bjw
enumeration bjx
enumeration bjy
enumeration bjz
enumeration bka
enumeration bkc
enumeration bkd
enumeration bkf
enumeration bkg
enumeration bkh
enumeration bki
enumeration bkj
enumeration bkk
enumeration bkl
enumeration bkm
enumeration bkn
enumeration bko
enumeration bkp
enumeration bkq
enumeration bkr
enumeration bks
enumeration bkt
enumeration bku
enumeration bkv
enumeration bkw
enumeration bkx
enumeration bky
enumeration bkz
enumeration bla
enumeration blb
enumeration blc
enumeration bld
enumeration ble
enumeration blf
enumeration blg
enumeration blh
enumeration bli
enumeration blj
enumeration blk
enumeration bll
enumeration blm
enumeration bln
enumeration blo
enumeration blp
enumeration blq
enumeration blr
enumeration bls
enumeration blt
enumeration blv
enumeration blw
enumeration blx
enumeration bly
enumeration blz
enumeration bma
enumeration bmb
enumeration bmc
enumeration bmd
enumeration bme
enumeration bmf
enumeration bmg
enumeration bmh
enumeration bmi
enumeration bmj
enumeration bmk
enumeration bml
enumeration bmm
enumeration bmn
enumeration bmo
enumeration bmp
enumeration bmq
enumeration bmr
enumeration bms
enumeration bmt
enumeration bmu
enumeration bmv
enumeration bmw
enumeration bmx
enumeration bmy
enumeration bmz
enumeration bna
enumeration bnb
enumeration bnc
enumeration bnd
enumeration bne
enumeration bnf
enumeration bng
enumeration bni
enumeration bnj
enumeration bnk
enumeration bnl
enumeration bnm
enumeration bnn
enumeration bno
enumeration bnp
enumeration bnq
enumeration bnr
enumeration bns
enumeration bnt
enumeration bnu
enumeration bnv
enumeration bnw
enumeration bnx
enumeration bny
enumeration bnz
enumeration boa
enumeration bob
enumeration boe
enumeration bof
enumeration bog
enumeration boh
enumeration boi
enumeration boj
enumeration bok
enumeration bol
enumeration bom
enumeration bon
enumeration boo
enumeration bop
enumeration boq
enumeration bor
enumeration bot
enumeration bou
enumeration bov
enumeration bow
enumeration box
enumeration boy
enumeration boz
enumeration bpa
enumeration bpb
enumeration bpd
enumeration bpg
enumeration bph
enumeration bpi
enumeration bpj
enumeration bpk
enumeration bpl
enumeration bpm
enumeration bpn
enumeration bpo
enumeration bpp
enumeration bpq
enumeration bpr
enumeration bps
enumeration bpt
enumeration bpu
enumeration bpv
enumeration bpw
enumeration bpx
enumeration bpy
enumeration bpz
enumeration bqa
enumeration bqb
enumeration bqc
enumeration bqd
enumeration bqf
enumeration bqg
enumeration bqh
enumeration bqi
enumeration bqj
enumeration bqk
enumeration bql
enumeration bqm
enumeration bqn
enumeration bqo
enumeration bqp
enumeration bqq
enumeration bqr
enumeration bqs
enumeration bqt
enumeration bqu
enumeration bqv
enumeration bqw
enumeration bqx
enumeration bqy
enumeration bqz
enumeration bra
enumeration brb
enumeration brc
enumeration brd
enumeration brf
enumeration brg
enumeration brh
enumeration bri
enumeration brj
enumeration brk
enumeration brl
enumeration brm
enumeration brn
enumeration bro
enumeration brp
enumeration brq
enumeration brr
enumeration brs
enumeration brt
enumeration bru
enumeration brv
enumeration brw
enumeration brx
enumeration bry
enumeration brz
enumeration bsa
enumeration bsb
enumeration bsc
enumeration bse
enumeration bsf
enumeration bsg
enumeration bsh
enumeration bsi
enumeration bsj
enumeration bsk
enumeration bsl
enumeration bsm
enumeration bsn
enumeration bso
enumeration bsp
enumeration bsq
enumeration bsr
enumeration bss
enumeration bst
enumeration bsu
enumeration bsv
enumeration bsw
enumeration bsx
enumeration bsy
enumeration bta
enumeration btc
enumeration btd
enumeration bte
enumeration btf
enumeration btg
enumeration bth
enumeration bti
enumeration btj
enumeration btk
enumeration btl
enumeration btm
enumeration btn
enumeration bto
enumeration btp
enumeration btq
enumeration btr
enumeration bts
enumeration btt
enumeration btu
enumeration btv
enumeration btw
enumeration btx
enumeration bty
enumeration btz
enumeration bua
enumeration bub
enumeration buc
enumeration bud
enumeration bue
enumeration buf
enumeration bug
enumeration buh
enumeration bui
enumeration buj
enumeration buk
enumeration bum
enumeration bun
enumeration buo
enumeration bup
enumeration buq
enumeration bus
enumeration but
enumeration buu
enumeration buv
enumeration buw
enumeration bux
enumeration buy
enumeration buz
enumeration bva
enumeration bvb
enumeration bvc
enumeration bvd
enumeration bve
enumeration bvf
enumeration bvg
enumeration bvh
enumeration bvi
enumeration bvj
enumeration bvk
enumeration bvl
enumeration bvm
enumeration bvn
enumeration bvo
enumeration bvp
enumeration bvq
enumeration bvr
enumeration bvt
enumeration bvu
enumeration bvv
enumeration bvw
enumeration bvx
enumeration bvy
enumeration bvz
enumeration bwa
enumeration bwb
enumeration bwc
enumeration bwd
enumeration bwe
enumeration bwf
enumeration bwg
enumeration bwh
enumeration bwi
enumeration bwj
enumeration bwk
enumeration bwl
enumeration bwm
enumeration bwn
enumeration bwo
enumeration bwp
enumeration bwq
enumeration bwr
enumeration bws
enumeration bwt
enumeration bwu
enumeration bww
enumeration bwx
enumeration bwy
enumeration bwz
enumeration bxa
enumeration bxb
enumeration bxc
enumeration bxd
enumeration bxe
enumeration bxf
enumeration bxg
enumeration bxh
enumeration bxi
enumeration bxj
enumeration bxk
enumeration bxl
enumeration bxm
enumeration bxn
enumeration bxo
enumeration bxp
enumeration bxq
enumeration bxr
enumeration bxs
enumeration bxu
enumeration bxv
enumeration bxw
enumeration bxx
enumeration bxz
enumeration bya
enumeration byb
enumeration byc
enumeration byd
enumeration bye
enumeration byf
enumeration byg
enumeration byh
enumeration byi
enumeration byj
enumeration byk
enumeration byl
enumeration bym
enumeration byn
enumeration byo
enumeration byp
enumeration byq
enumeration byr
enumeration bys
enumeration byt
enumeration byv
enumeration byw
enumeration byx
enumeration byy
enumeration byz
enumeration bza
enumeration bzb
enumeration bzc
enumeration bzd
enumeration bze
enumeration bzf
enumeration bzg
enumeration bzh
enumeration bzi
enumeration bzj
enumeration bzk
enumeration bzl
enumeration bzm
enumeration bzn
enumeration bzo
enumeration bzp
enumeration bzq
enumeration bzr
enumeration bzs
enumeration bzt
enumeration bzu
enumeration bzv
enumeration bzw
enumeration bzx
enumeration bzy
enumeration bzz
enumeration caa
enumeration cab
enumeration cac
enumeration cad
enumeration cae
enumeration caf
enumeration cag
enumeration cah
enumeration cai
enumeration caj
enumeration cak
enumeration cal
enumeration cam
enumeration can
enumeration cao
enumeration cap
enumeration caq
enumeration car
enumeration cas
enumeration cau
enumeration cav
enumeration caw
enumeration cax
enumeration cay
enumeration caz
enumeration cba
enumeration cbb
enumeration cbc
enumeration cbd
enumeration cbe
enumeration cbg
enumeration cbh
enumeration cbi
enumeration cbj
enumeration cbk
enumeration cbl
enumeration cbn
enumeration cbo
enumeration cbr
enumeration cbs
enumeration cbt
enumeration cbu
enumeration cbv
enumeration cbw
enumeration cby
enumeration cca
enumeration ccc
enumeration ccd
enumeration cce
enumeration ccg
enumeration cch
enumeration ccj
enumeration ccl
enumeration ccm
enumeration ccn
enumeration cco
enumeration ccp
enumeration ccr
enumeration ccs
enumeration cda
enumeration cdc
enumeration cdd
enumeration cde
enumeration cdf
enumeration cdg
enumeration cdh
enumeration cdi
enumeration cdj
enumeration cdm
enumeration cdn
enumeration cdo
enumeration cdr
enumeration cds
enumeration cdy
enumeration cdz
enumeration cea
enumeration ceb
enumeration ceg
enumeration cek
enumeration cel
enumeration cen
enumeration cet
enumeration cfa
enumeration cfd
enumeration cfg
enumeration cfm
enumeration cga
enumeration cgc
enumeration cgg
enumeration cgk
enumeration chb
enumeration chc
enumeration chd
enumeration chf
enumeration chg
enumeration chh
enumeration chj
enumeration chk
enumeration chl
enumeration chm
enumeration chn
enumeration cho
enumeration chp
enumeration chq
enumeration chr
enumeration cht
enumeration chw
enumeration chx
enumeration chy
enumeration chz
enumeration cia
enumeration cib
enumeration cic
enumeration cid
enumeration cie
enumeration cih
enumeration cik
enumeration cim
enumeration cin
enumeration cip
enumeration cir
enumeration ciw
enumeration ciy
enumeration cja
enumeration cje
enumeration cjh
enumeration cji
enumeration cjk
enumeration cjm
enumeration cjn
enumeration cjo
enumeration cjp
enumeration cjs
enumeration cjv
enumeration cjy
enumeration ckb
enumeration ckh
enumeration ckl
enumeration ckn
enumeration cko
enumeration ckq
enumeration ckr
enumeration cks
enumeration ckt
enumeration cku
enumeration ckv
enumeration ckx
enumeration cky
enumeration ckz
enumeration cla
enumeration clc
enumeration cld
enumeration cle
enumeration clh
enumeration cli
enumeration clj
enumeration clk
enumeration cll
enumeration clm
enumeration clo
enumeration clt
enumeration clu
enumeration clw
enumeration cly
enumeration cma
enumeration cmc
enumeration cme
enumeration cmg
enumeration cmi
enumeration cml
enumeration cmm
enumeration cmn
enumeration cmo
enumeration cmr
enumeration cms
enumeration cmt
enumeration cna
enumeration cnb
enumeration cnc
enumeration cng
enumeration cnh
enumeration cni
enumeration cnk
enumeration cnl
enumeration cno
enumeration cns
enumeration cnt
enumeration cnu
enumeration cnw
enumeration cnx
enumeration coa
enumeration cob
enumeration coc
enumeration cod
enumeration coe
enumeration cof
enumeration cog
enumeration coh
enumeration coj
enumeration cok
enumeration col
enumeration com
enumeration con
enumeration coo
enumeration cop
enumeration coq
enumeration cot
enumeration cou
enumeration cov
enumeration cow
enumeration cox
enumeration coy
enumeration coz
enumeration cpa
enumeration cpb
enumeration cpc
enumeration cpe
enumeration cpf
enumeration cpg
enumeration cpi
enumeration cpn
enumeration cpo
enumeration cpp
enumeration cps
enumeration cpu
enumeration cpx
enumeration cpy
enumeration cqd
enumeration cqu
enumeration cra
enumeration crb
enumeration crc
enumeration crd
enumeration crf
enumeration crg
enumeration crh
enumeration cri
enumeration crj
enumeration crk
enumeration crl
enumeration crm
enumeration crn
enumeration cro
enumeration crp
enumeration crq
enumeration crr
enumeration crs
enumeration crt
enumeration crv
enumeration crw
enumeration crx
enumeration cry
enumeration crz
enumeration csa
enumeration csb
enumeration csc
enumeration csd
enumeration cse
enumeration csf
enumeration csg
enumeration csh
enumeration csi
enumeration csj
enumeration csk
enumeration csl
enumeration csm
enumeration csn
enumeration cso
enumeration csq
enumeration csr
enumeration css
enumeration cst
enumeration csu
enumeration csv
enumeration csw
enumeration csy
enumeration csz
enumeration cta
enumeration ctc
enumeration ctd
enumeration cte
enumeration ctg
enumeration cth
enumeration ctl
enumeration ctm
enumeration ctn
enumeration cto
enumeration ctp
enumeration cts
enumeration ctt
enumeration ctu
enumeration ctz
enumeration cua
enumeration cub
enumeration cuc
enumeration cug
enumeration cuh
enumeration cui
enumeration cuj
enumeration cuk
enumeration cul
enumeration cum
enumeration cuo
enumeration cup
enumeration cuq
enumeration cur
enumeration cus
enumeration cut
enumeration cuu
enumeration cuv
enumeration cuw
enumeration cux
enumeration cvg
enumeration cvn
enumeration cwa
enumeration cwb
enumeration cwd
enumeration cwe
enumeration cwg
enumeration cwt
enumeration cya
enumeration cyb
enumeration cyo
enumeration czh
enumeration czk
enumeration czn
enumeration czo
enumeration czt
enumeration daa
enumeration dac
enumeration dad
enumeration dae
enumeration dag
enumeration dah
enumeration dai
enumeration daj
enumeration dak
enumeration dal
enumeration dam
enumeration dao
enumeration daq
enumeration dar
enumeration das
enumeration dau
enumeration dav
enumeration daw
enumeration dax
enumeration day
enumeration daz
enumeration dba
enumeration dbb
enumeration dbd
enumeration dbe
enumeration dbf
enumeration dbg
enumeration dbi
enumeration dbj
enumeration dbl
enumeration dbm
enumeration dbn
enumeration dbo
enumeration dbp
enumeration dbq
enumeration dbr
enumeration dbt
enumeration dbu
enumeration dbv
enumeration dbw
enumeration dby
enumeration dcc
enumeration dcr
enumeration dda
enumeration ddd
enumeration dde
enumeration ddg
enumeration ddi
enumeration ddj
enumeration ddn
enumeration ddo
enumeration ddr
enumeration dds
enumeration ddw
enumeration dec
enumeration ded
enumeration dee
enumeration def
enumeration deg
enumeration deh
enumeration dei
enumeration dek
enumeration del
enumeration dem
enumeration den
enumeration dep
enumeration deq
enumeration der
enumeration des
enumeration dev
enumeration dez
enumeration dga
enumeration dgb
enumeration dgc
enumeration dgd
enumeration dge
enumeration dgg
enumeration dgh
enumeration dgi
enumeration dgk
enumeration dgl
enumeration dgn
enumeration dgo
enumeration dgr
enumeration dgs
enumeration dgt
enumeration dgu
enumeration dgw
enumeration dgx
enumeration dgz
enumeration dhd
enumeration dhg
enumeration dhi
enumeration dhl
enumeration dhm
enumeration dhn
enumeration dho
enumeration dhr
enumeration dhs
enumeration dhu
enumeration dhv
enumeration dhw
enumeration dhx
enumeration dia
enumeration dib
enumeration dic
enumeration did
enumeration dif
enumeration dig
enumeration dih
enumeration dii
enumeration dij
enumeration dik
enumeration dil
enumeration dim
enumeration din
enumeration dio
enumeration dip
enumeration diq
enumeration dir
enumeration dis
enumeration dit
enumeration diu
enumeration diw
enumeration dix
enumeration diy
enumeration diz
enumeration dja
enumeration djb
enumeration djc
enumeration djd
enumeration dje
enumeration djf
enumeration dji
enumeration djj
enumeration djk
enumeration djm
enumeration djn
enumeration djo
enumeration djr
enumeration dju
enumeration djw
enumeration dka
enumeration dkk
enumeration dkr
enumeration dks
enumeration dkx
enumeration dlg
enumeration dlk
enumeration dlm
enumeration dln
enumeration dma
enumeration dmb
enumeration dmc
enumeration dmd
enumeration dme
enumeration dmg
enumeration dmk
enumeration dml
enumeration dmm
enumeration dmn
enumeration dmo
enumeration dmr
enumeration dms
enumeration dmu
enumeration dmv
enumeration dmw
enumeration dmx
enumeration dmy
enumeration dna
enumeration dnd
enumeration dne
enumeration dng
enumeration dni
enumeration dnj
enumeration dnk
enumeration dnn
enumeration dnr
enumeration dnt
enumeration dnu
enumeration dnv
enumeration dnw
enumeration dny
enumeration doa
enumeration dob
enumeration doc
enumeration doe
enumeration dof
enumeration doh
enumeration doi
enumeration dok
enumeration dol
enumeration don
enumeration doo
enumeration dop
enumeration doq
enumeration dor
enumeration dos
enumeration dot
enumeration dov
enumeration dow
enumeration dox
enumeration doy
enumeration doz
enumeration dpp
enumeration dra
enumeration drb
enumeration drc
enumeration drd
enumeration dre
enumeration drg
enumeration dri
enumeration drl
enumeration drn
enumeration dro
enumeration drq
enumeration drr
enumeration drs
enumeration drt
enumeration dru
enumeration dry
enumeration dsb
enumeration dse
enumeration dsh
enumeration dsi
enumeration dsl
enumeration dsn
enumeration dso
enumeration dsq
enumeration dta
enumeration dtb
enumeration dtd
enumeration dth
enumeration dti
enumeration dtk
enumeration dtm
enumeration dto
enumeration dtp
enumeration dtr
enumeration dts
enumeration dtt
enumeration dtu
enumeration dty
enumeration dua
enumeration dub
enumeration duc
enumeration dud
enumeration due
enumeration duf
enumeration dug
enumeration duh
enumeration dui
enumeration duj
enumeration duk
enumeration dul
enumeration dum
enumeration dun
enumeration duo
enumeration dup
enumeration duq
enumeration dur
enumeration dus
enumeration duu
enumeration duv
enumeration duw
enumeration dux
enumeration duy
enumeration duz
enumeration dva
enumeration dwa
enumeration dwr
enumeration dws
enumeration dww
enumeration dya
enumeration dyb
enumeration dyd
enumeration dyg
enumeration dyi
enumeration dym
enumeration dyn
enumeration dyo
enumeration dyu
enumeration dyy
enumeration dza
enumeration dzd
enumeration dze
enumeration dzg
enumeration dzl
enumeration dzn
enumeration eaa
enumeration ebg
enumeration ebk
enumeration ebo
enumeration ebr
enumeration ebu
enumeration ecr
enumeration ecs
enumeration ecy
enumeration eee
enumeration efa
enumeration efe
enumeration efi
enumeration ega
enumeration egl
enumeration ego
enumeration egx
enumeration egy
enumeration ehu
enumeration eip
enumeration eit
enumeration eiv
enumeration eja
enumeration eka
enumeration ekc
enumeration eke
enumeration ekg
enumeration eki
enumeration ekk
enumeration ekl
enumeration ekm
enumeration eko
enumeration ekp
enumeration ekr
enumeration eky
enumeration ele
enumeration elh
enumeration eli
enumeration elk
enumeration elm
enumeration elo
enumeration elu
enumeration elx
enumeration ema
enumeration emb
enumeration eme
enumeration emg
enumeration emi
enumeration emk
enumeration emm
enumeration emn
enumeration emp
enumeration ems
enumeration emu
enumeration emw
enumeration emx
enumeration emy
enumeration ena
enumeration enb
enumeration enc
enumeration end
enumeration enf
enumeration enh
enumeration enl
enumeration enm
enumeration enn
enumeration eno
enumeration enq
enumeration enr
enumeration enu
enumeration env
enumeration enw
enumeration enx
enumeration eot
enumeration epi
enumeration era
enumeration erg
enumeration erh
enumeration eri
enumeration erk
enumeration ero
enumeration err
enumeration ers
enumeration ert
enumeration erw
enumeration ese
enumeration esh
enumeration esi
enumeration esk
enumeration esl
enumeration esm
enumeration esn
enumeration eso
enumeration esq
enumeration ess
enumeration esu
enumeration esx
enumeration esy
enumeration etb
enumeration etc
enumeration eth
enumeration etn
enumeration eto
enumeration etr
enumeration ets
enumeration ett
enumeration etu
enumeration etx
enumeration etz
enumeration euq
enumeration eve
enumeration evh
enumeration evn
enumeration ewo
enumeration ext
enumeration eya
enumeration eyo
enumeration eza
enumeration eze
enumeration faa
enumeration fab
enumeration fad
enumeration faf
enumeration fag
enumeration fah
enumeration fai
enumeration faj
enumeration fak
enumeration fal
enumeration fam
enumeration fan
enumeration fap
enumeration far
enumeration fat
enumeration fau
enumeration fax
enumeration fay
enumeration faz
enumeration fbl
enumeration fcs
enumeration fer
enumeration ffi
enumeration ffm
enumeration fgr
enumeration fia
enumeration fie
enumeration fil
enumeration fip
enumeration fir
enumeration fit
enumeration fiu
enumeration fiw
enumeration fkk
enumeration fkv
enumeration fla
enumeration flh
enumeration fli
enumeration fll
enumeration fln
enumeration flr
enumeration fly
enumeration fmp
enumeration fmu
enumeration fng
enumeration fni
enumeration fod
enumeration foi
enumeration fom
enumeration fon
enumeration for
enumeration fos
enumeration fox
enumeration fpe
enumeration fqs
enumeration frc
enumeration frd
enumeration frk
enumeration frm
enumeration fro
enumeration frp
enumeration frq
enumeration frr
enumeration frs
enumeration frt
enumeration fse
enumeration fsl
enumeration fss
enumeration fub
enumeration fuc
enumeration fud
enumeration fue
enumeration fuf
enumeration fuh
enumeration fui
enumeration fuj
enumeration fum
enumeration fun
enumeration fuq
enumeration fur
enumeration fut
enumeration fuu
enumeration fuv
enumeration fuy
enumeration fvr
enumeration fwa
enumeration fwe
enumeration gaa
enumeration gab
enumeration gac
enumeration gad
enumeration gae
enumeration gaf
enumeration gag
enumeration gah
enumeration gai
enumeration gaj
enumeration gak
enumeration gal
enumeration gam
enumeration gan
enumeration gao
enumeration gap
enumeration gaq
enumeration gar
enumeration gas
enumeration gat
enumeration gau
enumeration gaw
enumeration gax
enumeration gay
enumeration gaz
enumeration gba
enumeration gbb
enumeration gbd
enumeration gbe
enumeration gbf
enumeration gbg
enumeration gbh
enumeration gbi
enumeration gbj
enumeration gbk
enumeration gbl
enumeration gbm
enumeration gbn
enumeration gbo
enumeration gbp
enumeration gbq
enumeration gbr
enumeration gbs
enumeration gbu
enumeration gbv
enumeration gbw
enumeration gbx
enumeration gby
enumeration gbz
enumeration gcc
enumeration gcd
enumeration gce
enumeration gcf
enumeration gcl
enumeration gcn
enumeration gcr
enumeration gct
enumeration gda
enumeration gdb
enumeration gdc
enumeration gdd
enumeration gde
enumeration gdf
enumeration gdg
enumeration gdh
enumeration gdi
enumeration gdj
enumeration gdk
enumeration gdl
enumeration gdm
enumeration gdn
enumeration gdo
enumeration gdq
enumeration gdr
enumeration gds
enumeration gdt
enumeration gdu
enumeration gdx
enumeration gea
enumeration geb
enumeration gec
enumeration ged
enumeration geg
enumeration geh
enumeration gei
enumeration gej
enumeration gek
enumeration gel
enumeration gem
enumeration geq
enumeration ges
enumeration gev
enumeration gew
enumeration gex
enumeration gey
enumeration gez
enumeration gfk
enumeration gft
enumeration gfx
enumeration gga
enumeration ggb
enumeration ggd
enumeration gge
enumeration ggg
enumeration ggk
enumeration ggl
enumeration ggn
enumeration ggo
enumeration ggt
enumeration ggu
enumeration ggw
enumeration gha
enumeration ghc
enumeration ghe
enumeration ghh
enumeration ghk
enumeration ghl
enumeration ghn
enumeration gho
enumeration ghr
enumeration ghs
enumeration ght
enumeration gia
enumeration gib
enumeration gic
enumeration gid
enumeration gig
enumeration gih
enumeration gil
enumeration gim
enumeration gin
enumeration gip
enumeration giq
enumeration gir
enumeration gis
enumeration git
enumeration giu
enumeration giw
enumeration gix
enumeration giy
enumeration giz
enumeration gji
enumeration gjk
enumeration gjm
enumeration gjn
enumeration gju
enumeration gka
enumeration gke
enumeration gkn
enumeration gko
enumeration gkp
enumeration glc
enumeration gld
enumeration glh
enumeration gli
enumeration glj
enumeration glk
enumeration gll
enumeration glo
enumeration glr
enumeration glu
enumeration glw
enumeration gly
enumeration gma
enumeration gmb
enumeration gmd
enumeration gme
enumeration gmg
enumeration gmh
enumeration gml
enumeration gmm
enumeration gmn
enumeration gmq
enumeration gmu
enumeration gmv
enumeration gmw
enumeration gmx
enumeration gmy
enumeration gmz
enumeration gna
enumeration gnb
enumeration gnc
enumeration gnd
enumeration gne
enumeration gng
enumeration gnh
enumeration gni
enumeration gnk
enumeration gnl
enumeration gnm
enumeration gnn
enumeration gno
enumeration gnq
enumeration gnr
enumeration gnt
enumeration gnu
enumeration gnw
enumeration gnz
enumeration goa
enumeration gob
enumeration goc
enumeration god
enumeration goe
enumeration gof
enumeration gog
enumeration goh
enumeration goi
enumeration goj
enumeration gok
enumeration gol
enumeration gom
enumeration gon
enumeration goo
enumeration gop
enumeration goq
enumeration gor
enumeration gos
enumeration got
enumeration gou
enumeration gow
enumeration gox
enumeration goy
enumeration goz
enumeration gpa
enumeration gpe
enumeration gpn
enumeration gqa
enumeration gqi
enumeration gqn
enumeration gqr
enumeration gqu
enumeration gra
enumeration grb
enumeration grc
enumeration grd
enumeration grg
enumeration grh
enumeration gri
enumeration grj
enumeration grk
enumeration grm
enumeration gro
enumeration grq
enumeration grr
enumeration grs
enumeration grt
enumeration gru
enumeration grv
enumeration grw
enumeration grx
enumeration gry
enumeration grz
enumeration gse
enumeration gsg
enumeration gsl
enumeration gsm
enumeration gsn
enumeration gso
enumeration gsp
enumeration gss
enumeration gsw
enumeration gta
enumeration gti
enumeration gtu
enumeration gua
enumeration gub
enumeration guc
enumeration gud
enumeration gue
enumeration guf
enumeration gug
enumeration guh
enumeration gui
enumeration guk
enumeration gul
enumeration gum
enumeration gun
enumeration guo
enumeration gup
enumeration guq
enumeration gur
enumeration gus
enumeration gut
enumeration guu
enumeration guv
enumeration guw
enumeration gux
enumeration guz
enumeration gva
enumeration gvc
enumeration gve
enumeration gvf
enumeration gvj
enumeration gvl
enumeration gvm
enumeration gvn
enumeration gvo
enumeration gvp
enumeration gvr
enumeration gvs
enumeration gvy
enumeration gwa
enumeration gwb
enumeration gwc
enumeration gwd
enumeration gwe
enumeration gwf
enumeration gwg
enumeration gwi
enumeration gwj
enumeration gwm
enumeration gwn
enumeration gwr
enumeration gwt
enumeration gwu
enumeration gww
enumeration gwx
enumeration gxx
enumeration gya
enumeration gyb
enumeration gyd
enumeration gye
enumeration gyf
enumeration gyg
enumeration gyi
enumeration gyl
enumeration gym
enumeration gyn
enumeration gyr
enumeration gyy
enumeration gza
enumeration gzi
enumeration gzn
enumeration haa
enumeration hab
enumeration hac
enumeration had
enumeration hae
enumeration haf
enumeration hag
enumeration hah
enumeration hai
enumeration haj
enumeration hak
enumeration hal
enumeration ham
enumeration han
enumeration hao
enumeration hap
enumeration haq
enumeration har
enumeration has
enumeration hav
enumeration haw
enumeration hax
enumeration hay
enumeration haz
enumeration hba
enumeration hbb
enumeration hbn
enumeration hbo
enumeration hbu
enumeration hca
enumeration hch
enumeration hdn
enumeration hds
enumeration hdy
enumeration hea
enumeration hed
enumeration heg
enumeration heh
enumeration hei
enumeration hem
enumeration hgm
enumeration hgw
enumeration hhi
enumeration hhr
enumeration hhy
enumeration hia
enumeration hib
enumeration hid
enumeration hif
enumeration hig
enumeration hih
enumeration hii
enumeration hij
enumeration hik
enumeration hil
enumeration him
enumeration hio
enumeration hir
enumeration hit
enumeration hiw
enumeration hix
enumeration hji
enumeration hka
enumeration hke
enumeration hkk
enumeration hks
enumeration hla
enumeration hlb
enumeration hld
enumeration hle
enumeration hlt
enumeration hlu
enumeration hma
enumeration hmb
enumeration hmc
enumeration hmd
enumeration hme
enumeration hmf
enumeration hmg
enumeration hmh
enumeration hmi
enumeration hmj
enumeration hmk
enumeration hml
enumeration hmm
enumeration hmn
enumeration hmp
enumeration hmq
enumeration hmr
enumeration hms
enumeration hmt
enumeration hmu
enumeration hmv
enumeration hmw
enumeration hmx
enumeration hmy
enumeration hmz
enumeration hna
enumeration hnd
enumeration hne
enumeration hnh
enumeration hni
enumeration hnj
enumeration hnn
enumeration hno
enumeration hns
enumeration hnu
enumeration hoa
enumeration hob
enumeration hoc
enumeration hod
enumeration hoe
enumeration hoh
enumeration hoi
enumeration hoj
enumeration hok
enumeration hol
enumeration hom
enumeration hoo
enumeration hop
enumeration hor
enumeration hos
enumeration hot
enumeration hov
enumeration how
enumeration hoy
enumeration hoz
enumeration hpo
enumeration hps
enumeration hra
enumeration hrc
enumeration hre
enumeration hrk
enumeration hrm
enumeration hro
enumeration hrp
enumeration hrt
enumeration hru
enumeration hrw
enumeration hrx
enumeration hrz
enumeration hsb
enumeration hsh
enumeration hsl
enumeration hsn
enumeration hss
enumeration hti
enumeration hto
enumeration hts
enumeration htu
enumeration htx
enumeration hub
enumeration huc
enumeration hud
enumeration hue
enumeration huf
enumeration hug
enumeration huh
enumeration hui
enumeration huj
enumeration huk
enumeration hul
enumeration hum
enumeration huo
enumeration hup
enumeration huq
enumeration hur
enumeration hus
enumeration hut
enumeration huu
enumeration huv
enumeration huw
enumeration hux
enumeration huy
enumeration huz
enumeration hvc
enumeration hve
enumeration hvk
enumeration hvn
enumeration hvv
enumeration hwa
enumeration hwc
enumeration hwo
enumeration hya
enumeration hyx
enumeration iai
enumeration ian
enumeration iap
enumeration iar
enumeration iba
enumeration ibb
enumeration ibd
enumeration ibe
enumeration ibg
enumeration ibl
enumeration ibm
enumeration ibn
enumeration ibr
enumeration ibu
enumeration iby
enumeration ica
enumeration ich
enumeration icl
enumeration icr
enumeration ida
enumeration idb
enumeration idc
enumeration idd
enumeration ide
enumeration idi
enumeration idr
enumeration ids
enumeration idt
enumeration idu
enumeration ifa
enumeration ifb
enumeration ife
enumeration iff
enumeration ifk
enumeration ifm
enumeration ifu
enumeration ify
enumeration igb
enumeration ige
enumeration igg
enumeration igl
enumeration igm
enumeration ign
enumeration igo
enumeration igs
enumeration igw
enumeration ihb
enumeration ihi
enumeration ihp
enumeration ihw
enumeration iin
enumeration iir
enumeration ijc
enumeration ije
enumeration ijj
enumeration ijn
enumeration ijo
enumeration ijs
enumeration ike
enumeration iki
enumeration ikk
enumeration ikl
enumeration iko
enumeration ikp
enumeration ikr
enumeration ikt
enumeration ikv
enumeration ikw
enumeration ikx
enumeration ikz
enumeration ila
enumeration ilb
enumeration ilg
enumeration ili
enumeration ilk
enumeration ill
enumeration ilo
enumeration ils
enumeration ilu
enumeration ilv
enumeration ima
enumeration ime
enumeration imi
enumeration iml
enumeration imn
enumeration imo
enumeration imr
enumeration ims
enumeration imy
enumeration inb
enumeration inc
enumeration ine
enumeration ing
enumeration inh
enumeration inj
enumeration inl
enumeration inm
enumeration inn
enumeration ino
enumeration inp
enumeration ins
enumeration int
enumeration inz
enumeration ior
enumeration iou
enumeration iow
enumeration ipi
enumeration ipo
enumeration iqu
enumeration iqw
enumeration ira
enumeration ire
enumeration irh
enumeration iri
enumeration irk
enumeration irn
enumeration iro
enumeration irr
enumeration iru
enumeration irx
enumeration iry
enumeration isa
enumeration isc
enumeration isd
enumeration ise
enumeration isg
enumeration ish
enumeration isi
enumeration isk
enumeration ism
enumeration isn
enumeration iso
enumeration isr
enumeration ist
enumeration isu
enumeration itb
enumeration itc
enumeration ite
enumeration iti
enumeration itk
enumeration itl
enumeration itm
enumeration ito
enumeration itr
enumeration its
enumeration itt
enumeration itv
enumeration itw
enumeration itx
enumeration ity
enumeration itz
enumeration ium
enumeration ivb
enumeration ivv
enumeration iwk
enumeration iwm
enumeration iwo
enumeration iws
enumeration ixc
enumeration ixl
enumeration iya
enumeration iyo
enumeration iyx
enumeration izh
enumeration izr
enumeration izz
enumeration jaa
enumeration jab
enumeration jac
enumeration jad
enumeration jae
enumeration jaf
enumeration jah
enumeration jaj
enumeration jak
enumeration jal
enumeration jam
enumeration jan
enumeration jao
enumeration jaq
enumeration jas
enumeration jat
enumeration jau
enumeration jax
enumeration jay
enumeration jaz
enumeration jbe
enumeration jbi
enumeration jbj
enumeration jbk
enumeration jbn
enumeration jbo
enumeration jbr
enumeration jbt
enumeration jbu
enumeration jbw
enumeration jcs
enumeration jct
enumeration jda
enumeration jdg
enumeration jdt
enumeration jeb
enumeration jee
enumeration jeg
enumeration jeh
enumeration jei
enumeration jek
enumeration jel
enumeration jen
enumeration jer
enumeration jet
enumeration jeu
enumeration jgb
enumeration jge
enumeration jgk
enumeration jgo
enumeration jhi
enumeration jhs
enumeration jia
enumeration jib
enumeration jic
enumeration jid
enumeration jie
enumeration jig
enumeration jih
enumeration jii
enumeration jil
enumeration jim
enumeration jio
enumeration jiq
enumeration jit
enumeration jiu
enumeration jiv
enumeration jiy
enumeration jjr
enumeration jkm
enumeration jko
enumeration jkp
enumeration jkr
enumeration jku
enumeration jle
enumeration jls
enumeration jma
enumeration jmb
enumeration jmc
enumeration jmd
enumeration jmi
enumeration jml
enumeration jmn
enumeration jmr
enumeration jms
enumeration jmw
enumeration jmx
enumeration jna
enumeration jnd
enumeration jng
enumeration jni
enumeration jnj
enumeration jnl
enumeration jns
enumeration job
enumeration jod
enumeration jor
enumeration jos
enumeration jow
enumeration jpa
enumeration jpr
enumeration jpx
enumeration jqr
enumeration jra
enumeration jrb
enumeration jrr
enumeration jrt
enumeration jru
enumeration jsl
enumeration jua
enumeration jub
enumeration juc
enumeration jud
enumeration juh
enumeration jui
enumeration juk
enumeration jul
enumeration jum
enumeration jun
enumeration juo
enumeration jup
enumeration jur
enumeration jus
enumeration jut
enumeration juu
enumeration juw
enumeration juy
enumeration jvd
enumeration jvn
enumeration jwi
enumeration jya
enumeration jye
enumeration jyy
enumeration kaa
enumeration kab
enumeration kac
enumeration kad
enumeration kae
enumeration kaf
enumeration kag
enumeration kah
enumeration kai
enumeration kaj
enumeration kak
enumeration kam
enumeration kao
enumeration kap
enumeration kaq
enumeration kar
enumeration kav
enumeration kaw
enumeration kax
enumeration kay
enumeration kba
enumeration kbb
enumeration kbc
enumeration kbd
enumeration kbe
enumeration kbf
enumeration kbg
enumeration kbh
enumeration kbi
enumeration kbj
enumeration kbk
enumeration kbl
enumeration kbm
enumeration kbn
enumeration kbo
enumeration kbp
enumeration kbq
enumeration kbr
enumeration kbs
enumeration kbt
enumeration kbu
enumeration kbv
enumeration kbw
enumeration kbx
enumeration kby
enumeration kbz
enumeration kca
enumeration kcb
enumeration kcc
enumeration kcd
enumeration kce
enumeration kcf
enumeration kcg
enumeration kch
enumeration kci
enumeration kcj
enumeration kck
enumeration kcl
enumeration kcm
enumeration kcn
enumeration kco
enumeration kcp
enumeration kcq
enumeration kcr
enumeration kcs
enumeration kct
enumeration kcu
enumeration kcv
enumeration kcw
enumeration kcx
enumeration kcy
enumeration kcz
enumeration kda
enumeration kdc
enumeration kdd
enumeration kde
enumeration kdf
enumeration kdg
enumeration kdh
enumeration kdi
enumeration kdj
enumeration kdk
enumeration kdl
enumeration kdm
enumeration kdn
enumeration kdo
enumeration kdp
enumeration kdq
enumeration kdr
enumeration kdt
enumeration kdu
enumeration kdw
enumeration kdx
enumeration kdy
enumeration kdz
enumeration kea
enumeration keb
enumeration kec
enumeration ked
enumeration kee
enumeration kef
enumeration keg
enumeration keh
enumeration kei
enumeration kej
enumeration kek
enumeration kel
enumeration kem
enumeration ken
enumeration keo
enumeration kep
enumeration keq
enumeration ker
enumeration kes
enumeration ket
enumeration keu
enumeration kev
enumeration kew
enumeration kex
enumeration key
enumeration kez
enumeration kfa
enumeration kfb
enumeration kfc
enumeration kfd
enumeration kfe
enumeration kff
enumeration kfg
enumeration kfh
enumeration kfi
enumeration kfj
enumeration kfk
enumeration kfl
enumeration kfm
enumeration kfn
enumeration kfo
enumeration kfp
enumeration kfq
enumeration kfr
enumeration kfs
enumeration kft
enumeration kfu
enumeration kfv
enumeration kfw
enumeration kfx
enumeration kfy
enumeration kfz
enumeration kga
enumeration kgb
enumeration kgc
enumeration kgd
enumeration kge
enumeration kgf
enumeration kgg
enumeration kgi
enumeration kgj
enumeration kgk
enumeration kgl
enumeration kgm
enumeration kgn
enumeration kgo
enumeration kgp
enumeration kgq
enumeration kgr
enumeration kgs
enumeration kgt
enumeration kgu
enumeration kgv
enumeration kgw
enumeration kgx
enumeration kgy
enumeration kha
enumeration khb
enumeration khc
enumeration khd
enumeration khe
enumeration khf
enumeration khg
enumeration khh
enumeration khi
enumeration khj
enumeration khk
enumeration khl
enumeration khn
enumeration kho
enumeration khp
enumeration khq
enumeration khr
enumeration khs
enumeration kht
enumeration khu
enumeration khv
enumeration khw
enumeration khx
enumeration khy
enumeration khz
enumeration kia
enumeration kib
enumeration kic
enumeration kid
enumeration kie
enumeration kif
enumeration kig
enumeration kih
enumeration kii
enumeration kij
enumeration kil
enumeration kim
enumeration kio
enumeration kip
enumeration kiq
enumeration kis
enumeration kit
enumeration kiu
enumeration kiv
enumeration kiw
enumeration kix
enumeration kiy
enumeration kiz
enumeration kja
enumeration kjb
enumeration kjc
enumeration kjd
enumeration kje
enumeration kjf
enumeration kjg
enumeration kjh
enumeration kji
enumeration kjj
enumeration kjk
enumeration kjl
enumeration kjm
enumeration kjn
enumeration kjo
enumeration kjp
enumeration kjq
enumeration kjr
enumeration kjs
enumeration kjt
enumeration kju
enumeration kjx
enumeration kjy
enumeration kjz
enumeration kka
enumeration kkb
enumeration kkc
enumeration kkd
enumeration kke
enumeration kkf
enumeration kkg
enumeration kkh
enumeration kki
enumeration kkj
enumeration kkk
enumeration kkl
enumeration kkm
enumeration kkn
enumeration kko
enumeration kkp
enumeration kkq
enumeration kkr
enumeration kks
enumeration kkt
enumeration kku
enumeration kkv
enumeration kkw
enumeration kkx
enumeration kky
enumeration kkz
enumeration kla
enumeration klb
enumeration klc
enumeration kld
enumeration kle
enumeration klf
enumeration klg
enumeration klh
enumeration kli
enumeration klj
enumeration klk
enumeration kll
enumeration klm
enumeration kln
enumeration klo
enumeration klp
enumeration klq
enumeration klr
enumeration kls
enumeration klt
enumeration klu
enumeration klv
enumeration klw
enumeration klx
enumeration kly
enumeration klz
enumeration kma
enumeration kmb
enumeration kmc
enumeration kmd
enumeration kme
enumeration kmf
enumeration kmg
enumeration kmh
enumeration kmi
enumeration kmj
enumeration kmk
enumeration kml
enumeration kmm
enumeration kmn
enumeration kmo
enumeration kmp
enumeration kmq
enumeration kmr
enumeration kms
enumeration kmt
enumeration kmu
enumeration kmv
enumeration kmw
enumeration kmx
enumeration kmy
enumeration kmz
enumeration kna
enumeration knb
enumeration knc
enumeration knd
enumeration kne
enumeration knf
enumeration kng
enumeration kni
enumeration knj
enumeration knk
enumeration knl
enumeration knm
enumeration knn
enumeration kno
enumeration knp
enumeration knq
enumeration knr
enumeration kns
enumeration knt
enumeration knu
enumeration knv
enumeration knw
enumeration knx
enumeration kny
enumeration knz
enumeration koa
enumeration koc
enumeration kod
enumeration koe
enumeration kof
enumeration kog
enumeration koh
enumeration koi
enumeration koj
enumeration kok
enumeration kol
enumeration koo
enumeration kop
enumeration koq
enumeration kos
enumeration kot
enumeration kou
enumeration kov
enumeration kow
enumeration kox
enumeration koy
enumeration koz
enumeration kpa
enumeration kpb
enumeration kpc
enumeration kpd
enumeration kpe
enumeration kpf
enumeration kpg
enumeration kph
enumeration kpi
enumeration kpj
enumeration kpk
enumeration kpl
enumeration kpm
enumeration kpn
enumeration kpo
enumeration kpq
enumeration kpr
enumeration kps
enumeration kpt
enumeration kpu
enumeration kpv
enumeration kpw
enumeration kpx
enumeration kpy
enumeration kpz
enumeration kqa
enumeration kqb
enumeration kqc
enumeration kqd
enumeration kqe
enumeration kqf
enumeration kqg
enumeration kqh
enumeration kqi
enumeration kqj
enumeration kqk
enumeration kql
enumeration kqm
enumeration kqn
enumeration kqo
enumeration kqp
enumeration kqq
enumeration kqr
enumeration kqs
enumeration kqt
enumeration kqu
enumeration kqv
enumeration kqw
enumeration kqx
enumeration kqy
enumeration kqz
enumeration kra
enumeration krb
enumeration krc
enumeration krd
enumeration kre
enumeration krf
enumeration krh
enumeration kri
enumeration krj
enumeration krk
enumeration krl
enumeration krm
enumeration krn
enumeration kro
enumeration krp
enumeration krr
enumeration krs
enumeration krt
enumeration kru
enumeration krv
enumeration krw
enumeration krx
enumeration kry
enumeration krz
enumeration ksa
enumeration ksb
enumeration ksc
enumeration ksd
enumeration kse
enumeration ksf
enumeration ksg
enumeration ksh
enumeration ksi
enumeration ksj
enumeration ksk
enumeration ksl
enumeration ksm
enumeration ksn
enumeration kso
enumeration ksp
enumeration ksq
enumeration ksr
enumeration kss
enumeration kst
enumeration ksu
enumeration ksv
enumeration ksw
enumeration ksx
enumeration ksy
enumeration ksz
enumeration kta
enumeration ktb
enumeration ktc
enumeration ktd
enumeration kte
enumeration ktf
enumeration ktg
enumeration kth
enumeration kti
enumeration ktj
enumeration ktk
enumeration ktl
enumeration ktm
enumeration ktn
enumeration kto
enumeration ktp
enumeration ktq
enumeration ktr
enumeration kts
enumeration ktt
enumeration ktu
enumeration ktv
enumeration ktw
enumeration ktx
enumeration kty
enumeration ktz
enumeration kub
enumeration kuc
enumeration kud
enumeration kue
enumeration kuf
enumeration kug
enumeration kuh
enumeration kui
enumeration kuj
enumeration kuk
enumeration kul
enumeration kum
enumeration kun
enumeration kuo
enumeration kup
enumeration kuq
enumeration kus
enumeration kut
enumeration kuu
enumeration kuv
enumeration kuw
enumeration kux
enumeration kuy
enumeration kuz
enumeration kva
enumeration kvb
enumeration kvc
enumeration kvd
enumeration kve
enumeration kvf
enumeration kvg
enumeration kvh
enumeration kvi
enumeration kvj
enumeration kvk
enumeration kvl
enumeration kvm
enumeration kvn
enumeration kvo
enumeration kvp
enumeration kvq
enumeration kvr
enumeration kvs
enumeration kvt
enumeration kvu
enumeration kvv
enumeration kvw
enumeration kvx
enumeration kvy
enumeration kvz
enumeration kwa
enumeration kwb
enumeration kwc
enumeration kwd
enumeration kwe
enumeration kwf
enumeration kwg
enumeration kwh
enumeration kwi
enumeration kwj
enumeration kwk
enumeration kwl
enumeration kwm
enumeration kwn
enumeration kwo
enumeration kwp
enumeration kwq
enumeration kwr
enumeration kws
enumeration kwt
enumeration kwu
enumeration kwv
enumeration kww
enumeration kwx
enumeration kwy
enumeration kwz
enumeration kxa
enumeration kxb
enumeration kxc
enumeration kxd
enumeration kxe
enumeration kxf
enumeration kxh
enumeration kxi
enumeration kxj
enumeration kxk
enumeration kxl
enumeration kxm
enumeration kxn
enumeration kxo
enumeration kxp
enumeration kxq
enumeration kxr
enumeration kxs
enumeration kxt
enumeration kxu
enumeration kxv
enumeration kxw
enumeration kxx
enumeration kxy
enumeration kxz
enumeration kya
enumeration kyb
enumeration kyc
enumeration kyd
enumeration kye
enumeration kyf
enumeration kyg
enumeration kyh
enumeration kyi
enumeration kyj
enumeration kyk
enumeration kyl
enumeration kym
enumeration kyn
enumeration kyo
enumeration kyp
enumeration kyq
enumeration kyr
enumeration kys
enumeration kyt
enumeration kyu
enumeration kyv
enumeration kyw
enumeration kyx
enumeration kyy
enumeration kyz
enumeration kza
enumeration kzb
enumeration kzc
enumeration kzd
enumeration kze
enumeration kzf
enumeration kzg
enumeration kzi
enumeration kzj
enumeration kzk
enumeration kzl
enumeration kzm
enumeration kzn
enumeration kzo
enumeration kzp
enumeration kzq
enumeration kzr
enumeration kzs
enumeration kzt
enumeration kzu
enumeration kzv
enumeration kzw
enumeration kzx
enumeration kzy
enumeration kzz
enumeration laa
enumeration lab
enumeration lac
enumeration lad
enumeration lae
enumeration laf
enumeration lag
enumeration lah
enumeration lai
enumeration laj
enumeration lak
enumeration lal
enumeration lam
enumeration lan
enumeration lap
enumeration laq
enumeration lar
enumeration las
enumeration lau
enumeration law
enumeration lax
enumeration lay
enumeration laz
enumeration lba
enumeration lbb
enumeration lbc
enumeration lbe
enumeration lbf
enumeration lbg
enumeration lbi
enumeration lbj
enumeration lbk
enumeration lbl
enumeration lbm
enumeration lbn
enumeration lbo
enumeration lbq
enumeration lbr
enumeration lbs
enumeration lbt
enumeration lbu
enumeration lbv
enumeration lbw
enumeration lbx
enumeration lby
enumeration lbz
enumeration lcc
enumeration lcd
enumeration lce
enumeration lcf
enumeration lch
enumeration lcl
enumeration lcm
enumeration lcp
enumeration lcq
enumeration lcs
enumeration lda
enumeration ldb
enumeration ldd
enumeration ldg
enumeration ldh
enumeration ldi
enumeration ldj
enumeration ldk
enumeration ldl
enumeration ldm
enumeration ldn
enumeration ldo
enumeration ldp
enumeration ldq
enumeration lea
enumeration leb
enumeration lec
enumeration led
enumeration lee
enumeration lef
enumeration leh
enumeration lei
enumeration lej
enumeration lek
enumeration lel
enumeration lem
enumeration len
enumeration leo
enumeration lep
enumeration leq
enumeration ler
enumeration les
enumeration let
enumeration leu
enumeration lev
enumeration lew
enumeration lex
enumeration ley
enumeration lez
enumeration lfa
enumeration lfn
enumeration lga
enumeration lgb
enumeration lgg
enumeration lgh
enumeration lgi
enumeration lgk
enumeration lgl
enumeration lgm
enumeration lgn
enumeration lgq
enumeration lgr
enumeration lgt
enumeration lgu
enumeration lgz
enumeration lha
enumeration lhh
enumeration lhi
enumeration lhl
enumeration lhm
enumeration lhn
enumeration lhp
enumeration lhs
enumeration lht
enumeration lhu
enumeration lia
enumeration lib
enumeration lic
enumeration lid
enumeration lie
enumeration lif
enumeration lig
enumeration lih
enumeration lii
enumeration lij
enumeration lik
enumeration lil
enumeration lio
enumeration lip
enumeration liq
enumeration lir
enumeration lis
enumeration liu
enumeration liv
enumeration liw
enumeration lix
enumeration liy
enumeration liz
enumeration lja
enumeration lje
enumeration lji
enumeration ljl
enumeration ljp
enumeration ljw
enumeration ljx
enumeration lka
enumeration lkb
enumeration lkc
enumeration lkd
enumeration lke
enumeration lkh
enumeration lki
enumeration lkj
enumeration lkl
enumeration lkm
enumeration lkn
enumeration lko
enumeration lkr
enumeration lks
enumeration lkt
enumeration lku
enumeration lky
enumeration lla
enumeration llb
enumeration llc
enumeration lld
enumeration lle
enumeration llf
enumeration llg
enumeration llh
enumeration lli
enumeration llj
enumeration llk
enumeration lll
enumeration llm
enumeration lln
enumeration llo
enumeration llp
enumeration llq
enumeration lls
enumeration llu
enumeration llx
enumeration lma
enumeration lmb
enumeration lmc
enumeration lmd
enumeration lme
enumeration lmf
enumeration lmg
enumeration lmh
enumeration lmi
enumeration lmj
enumeration lmk
enumeration lml
enumeration lmn
enumeration lmo
enumeration lmp
enumeration lmq
enumeration lmr
enumeration lmu
enumeration lmv
enumeration lmw
enumeration lmx
enumeration lmy
enumeration lmz
enumeration lna
enumeration lnb
enumeration lnd
enumeration lng
enumeration lnh
enumeration lni
enumeration lnj
enumeration lnl
enumeration lnm
enumeration lnn
enumeration lno
enumeration lns
enumeration lnu
enumeration lnw
enumeration lnz
enumeration loa
enumeration lob
enumeration loc
enumeration loe
enumeration lof
enumeration log
enumeration loh
enumeration loi
enumeration loj
enumeration lok
enumeration lol
enumeration lom
enumeration lon
enumeration loo
enumeration lop
enumeration loq
enumeration lor
enumeration los
enumeration lot
enumeration lou
enumeration lov
enumeration low
enumeration lox
enumeration loy
enumeration loz
enumeration lpa
enumeration lpe
enumeration lpn
enumeration lpo
enumeration lpx
enumeration lra
enumeration lrc
enumeration lre
enumeration lrg
enumeration lri
enumeration lrk
enumeration lrl
enumeration lrm
enumeration lrn
enumeration lro
enumeration lrr
enumeration lrt
enumeration lrv
enumeration lrz
enumeration lsa
enumeration lsd
enumeration lse
enumeration lsg
enumeration lsh
enumeration lsi
enumeration lsl
enumeration lsm
enumeration lso
enumeration lsp
enumeration lsr
enumeration lss
enumeration lst
enumeration lsy
enumeration ltc
enumeration ltg
enumeration lti
enumeration ltn
enumeration lto
enumeration lts
enumeration ltu
enumeration lua
enumeration luc
enumeration lud
enumeration lue
enumeration luf
enumeration lui
enumeration luj
enumeration luk
enumeration lul
enumeration lum
enumeration lun
enumeration luo
enumeration lup
enumeration luq
enumeration lur
enumeration lus
enumeration lut
enumeration luu
enumeration luv
enumeration luw
enumeration luy
enumeration luz
enumeration lva
enumeration lvk
enumeration lvs
enumeration lvu
enumeration lwa
enumeration lwe
enumeration lwg
enumeration lwh
enumeration lwl
enumeration lwm
enumeration lwo
enumeration lwt
enumeration lwu
enumeration lww
enumeration lya
enumeration lyg
enumeration lyn
enumeration lzh
enumeration lzl
enumeration lzn
enumeration lzz
enumeration maa
enumeration mab
enumeration mad
enumeration mae
enumeration maf
enumeration mag
enumeration mai
enumeration maj
enumeration mak
enumeration mam
enumeration man
enumeration map
enumeration maq
enumeration mas
enumeration mat
enumeration mau
enumeration mav
enumeration maw
enumeration max
enumeration maz
enumeration mba
enumeration mbb
enumeration mbc
enumeration mbd
enumeration mbe
enumeration mbf
enumeration mbh
enumeration mbi
enumeration mbj
enumeration mbk
enumeration mbl
enumeration mbm
enumeration mbn
enumeration mbo
enumeration mbp
enumeration mbq
enumeration mbr
enumeration mbs
enumeration mbt
enumeration mbu
enumeration mbv
enumeration mbw
enumeration mbx
enumeration mby
enumeration mbz
enumeration mca
enumeration mcb
enumeration mcc
enumeration mcd
enumeration mce
enumeration mcf
enumeration mcg
enumeration mch
enumeration mci
enumeration mcj
enumeration mck
enumeration mcl
enumeration mcm
enumeration mcn
enumeration mco
enumeration mcp
enumeration mcq
enumeration mcr
enumeration mcs
enumeration mct
enumeration mcu
enumeration mcv
enumeration mcw
enumeration mcx
enumeration mcy
enumeration mcz
enumeration mda
enumeration mdb
enumeration mdc
enumeration mdd
enumeration mde
enumeration mdf
enumeration mdg
enumeration mdh
enumeration mdi
enumeration mdj
enumeration mdk
enumeration mdl
enumeration mdm
enumeration mdn
enumeration mdp
enumeration mdq
enumeration mdr
enumeration mds
enumeration mdt
enumeration mdu
enumeration mdv
enumeration mdw
enumeration mdx
enumeration mdy
enumeration mdz
enumeration mea
enumeration meb
enumeration mec
enumeration med
enumeration mee
enumeration mef
enumeration meh
enumeration mei
enumeration mej
enumeration mek
enumeration mel
enumeration mem
enumeration men
enumeration meo
enumeration mep
enumeration meq
enumeration mer
enumeration mes
enumeration met
enumeration meu
enumeration mev
enumeration mew
enumeration mey
enumeration mez
enumeration mfa
enumeration mfb
enumeration mfc
enumeration mfd
enumeration mfe
enumeration mff
enumeration mfg
enumeration mfh
enumeration mfi
enumeration mfj
enumeration mfk
enumeration mfl
enumeration mfm
enumeration mfn
enumeration mfo
enumeration mfp
enumeration mfq
enumeration mfr
enumeration mfs
enumeration mft
enumeration mfu
enumeration mfv
enumeration mfw
enumeration mfx
enumeration mfy
enumeration mfz
enumeration mga
enumeration mgb
enumeration mgc
enumeration mgd
enumeration mge
enumeration mgf
enumeration mgg
enumeration mgh
enumeration mgi
enumeration mgj
enumeration mgk
enumeration mgl
enumeration mgm
enumeration mgn
enumeration mgo
enumeration mgp
enumeration mgq
enumeration mgr
enumeration mgs
enumeration mgt
enumeration mgu
enumeration mgv
enumeration mgw
enumeration mgy
enumeration mgz
enumeration mha
enumeration mhb
enumeration mhc
enumeration mhd
enumeration mhe
enumeration mhf
enumeration mhg
enumeration mhi
enumeration mhj
enumeration mhk
enumeration mhl
enumeration mhm
enumeration mhn
enumeration mho
enumeration mhp
enumeration mhq
enumeration mhr
enumeration mhs
enumeration mht
enumeration mhu
enumeration mhw
enumeration mhx
enumeration mhy
enumeration mhz
enumeration mia
enumeration mib
enumeration mic
enumeration mid
enumeration mie
enumeration mif
enumeration mig
enumeration mih
enumeration mii
enumeration mij
enumeration mik
enumeration mil
enumeration mim
enumeration min
enumeration mio
enumeration mip
enumeration miq
enumeration mir
enumeration mis
enumeration mit
enumeration miu
enumeration miw
enumeration mix
enumeration miy
enumeration miz
enumeration mjc
enumeration mjd
enumeration mje
enumeration mjg
enumeration mjh
enumeration mji
enumeration mjj
enumeration mjk
enumeration mjl
enumeration mjm
enumeration mjn
enumeration mjo
enumeration mjp
enumeration mjq
enumeration mjr
enumeration mjs
enumeration mjt
enumeration mju
enumeration mjv
enumeration mjw
enumeration mjx
enumeration mjy
enumeration mjz
enumeration mka
enumeration mkb
enumeration mkc
enumeration mke
enumeration mkf
enumeration mkg
enumeration mkh
enumeration mki
enumeration mkj
enumeration mkk
enumeration mkl
enumeration mkm
enumeration mkn
enumeration mko
enumeration mkp
enumeration mkq
enumeration mkr
enumeration mks
enumeration mkt
enumeration mku
enumeration mkv
enumeration mkw
enumeration mkx
enumeration mky
enumeration mkz
enumeration mla
enumeration mlb
enumeration mlc
enumeration mle
enumeration mlf
enumeration mlh
enumeration mli
enumeration mlj
enumeration mlk
enumeration mll
enumeration mlm
enumeration mln
enumeration mlo
enumeration mlp
enumeration mlq
enumeration mlr
enumeration mls
enumeration mlu
enumeration mlv
enumeration mlw
enumeration mlx
enumeration mlz
enumeration mma
enumeration mmb
enumeration mmc
enumeration mmd
enumeration mme
enumeration mmf
enumeration mmg
enumeration mmh
enumeration mmi
enumeration mmj
enumeration mmk
enumeration mml
enumeration mmm
enumeration mmn
enumeration mmo
enumeration mmp
enumeration mmq
enumeration mmr
enumeration mmt
enumeration mmu
enumeration mmv
enumeration mmw
enumeration mmx
enumeration mmy
enumeration mmz
enumeration mna
enumeration mnb
enumeration mnc
enumeration mnd
enumeration mne
enumeration mnf
enumeration mng
enumeration mnh
enumeration mni
enumeration mnj
enumeration mnk
enumeration mnl
enumeration mnm
enumeration mnn
enumeration mno
enumeration mnp
enumeration mnq
enumeration mnr
enumeration mns
enumeration mnu
enumeration mnv
enumeration mnw
enumeration mnx
enumeration mny
enumeration mnz
enumeration moa
enumeration moc
enumeration mod
enumeration moe
enumeration mog
enumeration moh
enumeration moi
enumeration moj
enumeration mok
enumeration mom
enumeration moo
enumeration mop
enumeration moq
enumeration mor
enumeration mos
enumeration mot
enumeration mou
enumeration mov
enumeration mow
enumeration mox
enumeration moy
enumeration moz
enumeration mpa
enumeration mpb
enumeration mpc
enumeration mpd
enumeration mpe
enumeration mpg
enumeration mph
enumeration mpi
enumeration mpj
enumeration mpk
enumeration mpl
enumeration mpm
enumeration mpn
enumeration mpo
enumeration mpp
enumeration mpq
enumeration mpr
enumeration mps
enumeration mpt
enumeration mpu
enumeration mpv
enumeration mpw
enumeration mpx
enumeration mpy
enumeration mpz
enumeration mqa
enumeration mqb
enumeration mqc
enumeration mqe
enumeration mqf
enumeration mqg
enumeration mqh
enumeration mqi
enumeration mqj
enumeration mqk
enumeration mql
enumeration mqm
enumeration mqn
enumeration mqo
enumeration mqp
enumeration mqq
enumeration mqr
enumeration mqs
enumeration mqt
enumeration mqu
enumeration mqv
enumeration mqw
enumeration mqx
enumeration mqy
enumeration mqz
enumeration mra
enumeration mrb
enumeration mrc
enumeration mrd
enumeration mre
enumeration mrf
enumeration mrg
enumeration mrh
enumeration mrj
enumeration mrk
enumeration mrl
enumeration mrm
enumeration mrn
enumeration mro
enumeration mrp
enumeration mrq
enumeration mrr
enumeration mrs
enumeration mrt
enumeration mru
enumeration mrv
enumeration mrw
enumeration mrx
enumeration mry
enumeration mrz
enumeration msb
enumeration msc
enumeration msd
enumeration mse
enumeration msf
enumeration msg
enumeration msh
enumeration msi
enumeration msj
enumeration msk
enumeration msl
enumeration msm
enumeration msn
enumeration mso
enumeration msp
enumeration msq
enumeration msr
enumeration mss
enumeration msu
enumeration msv
enumeration msw
enumeration msx
enumeration msy
enumeration msz
enumeration mta
enumeration mtb
enumeration mtc
enumeration mtd
enumeration mte
enumeration mtf
enumeration mtg
enumeration mth
enumeration mti
enumeration mtj
enumeration mtk
enumeration mtl
enumeration mtm
enumeration mtn
enumeration mto
enumeration mtp
enumeration mtq
enumeration mtr
enumeration mts
enumeration mtt
enumeration mtu
enumeration mtv
enumeration mtw
enumeration mtx
enumeration mty
enumeration mua
enumeration mub
enumeration muc
enumeration mud
enumeration mue
enumeration mug
enumeration muh
enumeration mui
enumeration muj
enumeration muk
enumeration mul
enumeration mum
enumeration mun
enumeration muo
enumeration mup
enumeration muq
enumeration mur
enumeration mus
enumeration mut
enumeration muu
enumeration muv
enumeration mux
enumeration muy
enumeration muz
enumeration mva
enumeration mvb
enumeration mvd
enumeration mve
enumeration mvf
enumeration mvg
enumeration mvh
enumeration mvi
enumeration mvk
enumeration mvl
enumeration mvm
enumeration mvn
enumeration mvo
enumeration mvp
enumeration mvq
enumeration mvr
enumeration mvs
enumeration mvt
enumeration mvu
enumeration mvv
enumeration mvw
enumeration mvx
enumeration mvy
enumeration mvz
enumeration mwa
enumeration mwb
enumeration mwc
enumeration mwe
enumeration mwf
enumeration mwg
enumeration mwh
enumeration mwi
enumeration mwj
enumeration mwk
enumeration mwl
enumeration mwm
enumeration mwn
enumeration mwo
enumeration mwp
enumeration mwq
enumeration mwr
enumeration mws
enumeration mwt
enumeration mwu
enumeration mwv
enumeration mww
enumeration mwx
enumeration mwy
enumeration mwz
enumeration mxa
enumeration mxb
enumeration mxc
enumeration mxd
enumeration mxe
enumeration mxf
enumeration mxg
enumeration mxh
enumeration mxi
enumeration mxj
enumeration mxk
enumeration mxl
enumeration mxm
enumeration mxn
enumeration mxo
enumeration mxp
enumeration mxq
enumeration mxr
enumeration mxs
enumeration mxt
enumeration mxu
enumeration mxv
enumeration mxw
enumeration mxx
enumeration mxy
enumeration mxz
enumeration myb
enumeration myc
enumeration myd
enumeration mye
enumeration myf
enumeration myg
enumeration myh
enumeration myi
enumeration myj
enumeration myk
enumeration myl
enumeration mym
enumeration myn
enumeration myo
enumeration myp
enumeration myr
enumeration mys
enumeration myu
enumeration myv
enumeration myw
enumeration myx
enumeration myy
enumeration myz
enumeration mza
enumeration mzb
enumeration mzc
enumeration mzd
enumeration mze
enumeration mzg
enumeration mzh
enumeration mzi
enumeration mzj
enumeration mzk
enumeration mzl
enumeration mzm
enumeration mzn
enumeration mzo
enumeration mzp
enumeration mzq
enumeration mzr
enumeration mzs
enumeration mzt
enumeration mzu
enumeration mzv
enumeration mzw
enumeration mzx
enumeration mzy
enumeration mzz
enumeration naa
enumeration nab
enumeration nac
enumeration nad
enumeration nae
enumeration naf
enumeration nag
enumeration nah
enumeration nai
enumeration naj
enumeration nak
enumeration nal
enumeration nam
enumeration nan
enumeration nao
enumeration nap
enumeration naq
enumeration nar
enumeration nas
enumeration nat
enumeration naw
enumeration nax
enumeration nay
enumeration naz
enumeration nba
enumeration nbb
enumeration nbc
enumeration nbd
enumeration nbe
enumeration nbg
enumeration nbh
enumeration nbi
enumeration nbj
enumeration nbk
enumeration nbm
enumeration nbn
enumeration nbo
enumeration nbp
enumeration nbq
enumeration nbr
enumeration nbs
enumeration nbt
enumeration nbu
enumeration nbv
enumeration nbw
enumeration nby
enumeration nca
enumeration ncb
enumeration ncc
enumeration ncd
enumeration nce
enumeration ncf
enumeration ncg
enumeration nch
enumeration nci
enumeration ncj
enumeration nck
enumeration ncl
enumeration ncm
enumeration ncn
enumeration nco
enumeration ncp
enumeration ncr
enumeration ncs
enumeration nct
enumeration ncu
enumeration ncx
enumeration ncz
enumeration nda
enumeration ndb
enumeration ndc
enumeration ndd
enumeration ndf
enumeration ndg
enumeration ndh
enumeration ndi
enumeration ndj
enumeration ndk
enumeration ndl
enumeration ndm
enumeration ndn
enumeration ndp
enumeration ndq
enumeration ndr
enumeration nds
enumeration ndt
enumeration ndu
enumeration ndv
enumeration ndw
enumeration ndx
enumeration ndy
enumeration ndz
enumeration nea
enumeration neb
enumeration nec
enumeration ned
enumeration nee
enumeration nef
enumeration neg
enumeration neh
enumeration nei
enumeration nej
enumeration nek
enumeration nem
enumeration nen
enumeration neo
enumeration neq
enumeration ner
enumeration nes
enumeration net
enumeration neu
enumeration nev
enumeration new
enumeration nex
enumeration ney
enumeration nez
enumeration nfa
enumeration nfd
enumeration nfl
enumeration nfr
enumeration nfu
enumeration nga
enumeration ngb
enumeration ngc
enumeration ngd
enumeration nge
enumeration ngf
enumeration ngg
enumeration ngh
enumeration ngi
enumeration ngj
enumeration ngk
enumeration ngl
enumeration ngm
enumeration ngn
enumeration ngo
enumeration ngp
enumeration ngq
enumeration ngr
enumeration ngs
enumeration ngt
enumeration ngu
enumeration ngv
enumeration ngw
enumeration ngx
enumeration ngy
enumeration ngz
enumeration nha
enumeration nhb
enumeration nhc
enumeration nhd
enumeration nhe
enumeration nhf
enumeration nhg
enumeration nhh
enumeration nhi
enumeration nhk
enumeration nhm
enumeration nhn
enumeration nho
enumeration nhp
enumeration nhq
enumeration nhr
enumeration nht
enumeration nhu
enumeration nhv
enumeration nhw
enumeration nhx
enumeration nhy
enumeration nhz
enumeration nia
enumeration nib
enumeration nic
enumeration nid
enumeration nie
enumeration nif
enumeration nig
enumeration nih
enumeration nii
enumeration nij
enumeration nik
enumeration nil
enumeration nim
enumeration nin
enumeration nio
enumeration niq
enumeration nir
enumeration nis
enumeration nit
enumeration niu
enumeration niv
enumeration niw
enumeration nix
enumeration niy
enumeration niz
enumeration nja
enumeration njb
enumeration njd
enumeration njh
enumeration nji
enumeration njj
enumeration njl
enumeration njm
enumeration njn
enumeration njo
enumeration njr
enumeration njs
enumeration njt
enumeration nju
enumeration njx
enumeration njy
enumeration njz
enumeration nka
enumeration nkb
enumeration nkc
enumeration nkd
enumeration nke
enumeration nkf
enumeration nkg
enumeration nkh
enumeration nki
enumeration nkj
enumeration nkk
enumeration nkm
enumeration nkn
enumeration nko
enumeration nkp
enumeration nkq
enumeration nkr
enumeration nks
enumeration nkt
enumeration nku
enumeration nkv
enumeration nkw
enumeration nkx
enumeration nkz
enumeration nla
enumeration nlc
enumeration nle
enumeration nlg
enumeration nli
enumeration nlj
enumeration nlk
enumeration nll
enumeration nlo
enumeration nlq
enumeration nlu
enumeration nlv
enumeration nlw
enumeration nlx
enumeration nly
enumeration nlz
enumeration nma
enumeration nmb
enumeration nmc
enumeration nmd
enumeration nme
enumeration nmf
enumeration nmg
enumeration nmh
enumeration nmi
enumeration nmj
enumeration nmk
enumeration nml
enumeration nmm
enumeration nmn
enumeration nmo
enumeration nmp
enumeration nmq
enumeration nmr
enumeration nms
enumeration nmt
enumeration nmu
enumeration nmv
enumeration nmw
enumeration nmx
enumeration nmy
enumeration nmz
enumeration nna
enumeration nnb
enumeration nnc
enumeration nnd
enumeration nne
enumeration nnf
enumeration nng
enumeration nnh
enumeration nni
enumeration nnj
enumeration nnk
enumeration nnl
enumeration nnm
enumeration nnn
enumeration nnp
enumeration nnq
enumeration nnr
enumeration nns
enumeration nnt
enumeration nnu
enumeration nnv
enumeration nnw
enumeration nnx
enumeration nny
enumeration nnz
enumeration noa
enumeration noc
enumeration nod
enumeration noe
enumeration nof
enumeration nog
enumeration noh
enumeration noi
enumeration noj
enumeration nok
enumeration nol
enumeration nom
enumeration non
enumeration nop
enumeration noq
enumeration nos
enumeration not
enumeration nou
enumeration nov
enumeration now
enumeration noy
enumeration noz
enumeration npa
enumeration npb
enumeration npg
enumeration nph
enumeration npi
enumeration npl
enumeration npn
enumeration npo
enumeration nps
enumeration npu
enumeration npy
enumeration nqg
enumeration nqk
enumeration nqm
enumeration nqn
enumeration nqo
enumeration nqq
enumeration nqy
enumeration nra
enumeration nrb
enumeration nrc
enumeration nre
enumeration nrg
enumeration nri
enumeration nrk
enumeration nrl
enumeration nrm
enumeration nrn
enumeration nrp
enumeration nrr
enumeration nrt
enumeration nru
enumeration nrx
enumeration nrz
enumeration nsa
enumeration nsc
enumeration nsd
enumeration nse
enumeration nsf
enumeration nsg
enumeration nsh
enumeration nsi
enumeration nsk
enumeration nsl
enumeration nsm
enumeration nsn
enumeration nso
enumeration nsp
enumeration nsq
enumeration nsr
enumeration nss
enumeration nst
enumeration nsu
enumeration nsv
enumeration nsw
enumeration nsx
enumeration nsy
enumeration nsz
enumeration nte
enumeration ntg
enumeration nti
enumeration ntj
enumeration ntk
enumeration ntm
enumeration nto
enumeration ntp
enumeration ntr
enumeration nts
enumeration ntu
enumeration ntw
enumeration ntx
enumeration nty
enumeration ntz
enumeration nua
enumeration nub
enumeration nuc
enumeration nud
enumeration nue
enumeration nuf
enumeration nug
enumeration nuh
enumeration nui
enumeration nuj
enumeration nuk
enumeration nul
enumeration num
enumeration nun
enumeration nuo
enumeration nup
enumeration nuq
enumeration nur
enumeration nus
enumeration nut
enumeration nuu
enumeration nuv
enumeration nuw
enumeration nux
enumeration nuy
enumeration nuz
enumeration nvh
enumeration nvm
enumeration nvo
enumeration nwa
enumeration nwb
enumeration nwc
enumeration nwe
enumeration nwg
enumeration nwi
enumeration nwm
enumeration nwo
enumeration nwr
enumeration nwx
enumeration nwy
enumeration nxa
enumeration nxd
enumeration nxe
enumeration nxg
enumeration nxi
enumeration nxk
enumeration nxl
enumeration nxm
enumeration nxn
enumeration nxq
enumeration nxr
enumeration nxu
enumeration nxx
enumeration nyb
enumeration nyc
enumeration nyd
enumeration nye
enumeration nyf
enumeration nyg
enumeration nyh
enumeration nyi
enumeration nyj
enumeration nyk
enumeration nyl
enumeration nym
enumeration nyn
enumeration nyo
enumeration nyp
enumeration nyq
enumeration nyr
enumeration nys
enumeration nyt
enumeration nyu
enumeration nyv
enumeration nyw
enumeration nyx
enumeration nyy
enumeration nza
enumeration nzb
enumeration nzi
enumeration nzk
enumeration nzm
enumeration nzs
enumeration nzu
enumeration nzy
enumeration nzz
enumeration oaa
enumeration oac
enumeration oar
enumeration oav
enumeration obi
enumeration obk
enumeration obl
enumeration obm
enumeration obo
enumeration obr
enumeration obt
enumeration obu
enumeration oca
enumeration och
enumeration oco
enumeration ocu
enumeration oda
enumeration odk
enumeration odt
enumeration odu
enumeration ofo
enumeration ofs
enumeration ofu
enumeration ogb
enumeration ogc
enumeration oge
enumeration ogg
enumeration ogo
enumeration ogu
enumeration oht
enumeration ohu
enumeration oia
enumeration oin
enumeration ojb
enumeration ojc
enumeration ojg
enumeration ojp
enumeration ojs
enumeration ojv
enumeration ojw
enumeration oka
enumeration okb
enumeration okd
enumeration oke
enumeration okg
enumeration okh
enumeration oki
enumeration okj
enumeration okk
enumeration okl
enumeration okm
enumeration okn
enumeration oko
enumeration okr
enumeration oks
enumeration oku
enumeration okv
enumeration okx
enumeration ola
enumeration old
enumeration ole
enumeration olk
enumeration olm
enumeration olo
enumeration olr
enumeration olt
enumeration oma
enumeration omb
enumeration omc
enumeration ome
enumeration omg
enumeration omi
enumeration omk
enumeration oml
enumeration omn
enumeration omo
enumeration omp
enumeration omq
enumeration omr
enumeration omt
enumeration omu
enumeration omv
enumeration omw
enumeration omx
enumeration ona
enumeration onb
enumeration one
enumeration ong
enumeration oni
enumeration onj
enumeration onk
enumeration onn
enumeration ono
enumeration onp
enumeration onr
enumeration ons
enumeration ont
enumeration onu
enumeration onw
enumeration onx
enumeration ood
enumeration oog
enumeration oon
enumeration oor
enumeration oos
enumeration opa
enumeration opk
enumeration opm
enumeration opo
enumeration opt
enumeration opy
enumeration ora
enumeration orc
enumeration ore
enumeration org
enumeration orh
enumeration orn
enumeration oro
enumeration orr
enumeration ors
enumeration ort
enumeration oru
enumeration orv
enumeration orw
enumeration orx
enumeration ory
enumeration orz
enumeration osa
enumeration osc
enumeration osi
enumeration oso
enumeration osp
enumeration ost
enumeration osu
enumeration osx
enumeration ota
enumeration otb
enumeration otd
enumeration ote
enumeration oti
enumeration otk
enumeration otl
enumeration otm
enumeration otn
enumeration oto
enumeration otq
enumeration otr
enumeration ots
enumeration ott
enumeration otu
enumeration otw
enumeration otx
enumeration oty
enumeration otz
enumeration oua
enumeration oub
enumeration oue
enumeration oui
enumeration oum
enumeration oun
enumeration owi
enumeration owl
enumeration oyb
enumeration oyd
enumeration oym
enumeration oyy
enumeration ozm
enumeration paa
enumeration pab
enumeration pac
enumeration pad
enumeration pae
enumeration paf
enumeration pag
enumeration pah
enumeration pai
enumeration pak
enumeration pal
enumeration pam
enumeration pao
enumeration pap
enumeration paq
enumeration par
enumeration pas
enumeration pat
enumeration pau
enumeration pav
enumeration paw
enumeration pax
enumeration pay
enumeration paz
enumeration pbb
enumeration pbc
enumeration pbe
enumeration pbf
enumeration pbg
enumeration pbh
enumeration pbi
enumeration pbl
enumeration pbn
enumeration pbo
enumeration pbp
enumeration pbr
enumeration pbs
enumeration pbt
enumeration pbu
enumeration pbv
enumeration pby
enumeration pca
enumeration pcb
enumeration pcc
enumeration pcd
enumeration pce
enumeration pcf
enumeration pcg
enumeration pch
enumeration pci
enumeration pcj
enumeration pck
enumeration pcl
enumeration pcm
enumeration pcn
enumeration pcp
enumeration pcw
enumeration pda
enumeration pdc
enumeration pdi
enumeration pdn
enumeration pdo
enumeration pdt
enumeration pdu
enumeration pea
enumeration peb
enumeration ped
enumeration pee
enumeration pef
enumeration peg
enumeration peh
enumeration pei
enumeration pej
enumeration pek
enumeration pel
enumeration pem
enumeration peo
enumeration pep
enumeration peq
enumeration pes
enumeration pev
enumeration pex
enumeration pey
enumeration pez
enumeration pfa
enumeration pfe
enumeration pfl
enumeration pga
enumeration pgg
enumeration pgi
enumeration pgk
enumeration pgl
enumeration pgn
enumeration pgs
enumeration pgu
enumeration pha
enumeration phd
enumeration phg
enumeration phh
enumeration phi
enumeration phk
enumeration phl
enumeration phm
enumeration phn
enumeration pho
enumeration phq
enumeration phr
enumeration pht
enumeration phu
enumeration phv
enumeration phw
enumeration pia
enumeration pib
enumeration pic
enumeration pid
enumeration pie
enumeration pif
enumeration pig
enumeration pih
enumeration pii
enumeration pij
enumeration pil
enumeration pim
enumeration pin
enumeration pio
enumeration pip
enumeration pir
enumeration pis
enumeration pit
enumeration piu
enumeration piv
enumeration piw
enumeration pix
enumeration piy
enumeration piz
enumeration pjt
enumeration pka
enumeration pkb
enumeration pkc
enumeration pkg
enumeration pkh
enumeration pkn
enumeration pko
enumeration pkp
enumeration pkr
enumeration pks
enumeration pkt
enumeration pku
enumeration pla
enumeration plb
enumeration plc
enumeration pld
enumeration ple
enumeration plf
enumeration plg
enumeration plh
enumeration plj
enumeration plk
enumeration pll
enumeration pln
enumeration plo
enumeration plp
enumeration plq
enumeration plr
enumeration pls
enumeration plt
enumeration plu
enumeration plv
enumeration plw
enumeration ply
enumeration plz
enumeration pma
enumeration pmb
enumeration pmc
enumeration pmd
enumeration pme
enumeration pmf
enumeration pmh
enumeration pmi
enumeration pmj
enumeration pmk
enumeration pml
enumeration pmm
enumeration pmn
enumeration pmo
enumeration pmq
enumeration pmr
enumeration pms
enumeration pmt
enumeration pmu
enumeration pmw
enumeration pmx
enumeration pmy
enumeration pmz
enumeration pna
enumeration pnb
enumeration pnc
enumeration pne
enumeration png
enumeration pnh
enumeration pni
enumeration pnj
enumeration pnk
enumeration pnl
enumeration pnm
enumeration pnn
enumeration pno
enumeration pnp
enumeration pnq
enumeration pnr
enumeration pns
enumeration pnt
enumeration pnu
enumeration pnv
enumeration pnw
enumeration pnx
enumeration pny
enumeration pnz
enumeration poc
enumeration pod
enumeration poe
enumeration pof
enumeration pog
enumeration poh
enumeration poi
enumeration pok
enumeration pom
enumeration pon
enumeration poo
enumeration pop
enumeration poq
enumeration pos
enumeration pot
enumeration pov
enumeration pow
enumeration pox
enumeration poy
enumeration poz
enumeration ppa
enumeration ppe
enumeration ppi
enumeration ppk
enumeration ppl
enumeration ppm
enumeration ppn
enumeration ppo
enumeration ppp
enumeration ppq
enumeration pps
enumeration ppt
enumeration ppu
enumeration pqa
enumeration pqe
enumeration pqm
enumeration pqw
enumeration pra
enumeration prb
enumeration prc
enumeration prd
enumeration pre
enumeration prf
enumeration prg
enumeration prh
enumeration pri
enumeration prk
enumeration prl
enumeration prm
enumeration prn
enumeration pro
enumeration prp
enumeration prq
enumeration prr
enumeration prs
enumeration prt
enumeration pru
enumeration prw
enumeration prx
enumeration pry
enumeration prz
enumeration psa
enumeration psc
enumeration psd
enumeration pse
enumeration psg
enumeration psh
enumeration psi
enumeration psl
enumeration psm
enumeration psn
enumeration pso
enumeration psp
enumeration psq
enumeration psr
enumeration pss
enumeration pst
enumeration psu
enumeration psw
enumeration psy
enumeration pta
enumeration pth
enumeration pti
enumeration ptn
enumeration pto
enumeration ptp
enumeration ptq
enumeration ptr
enumeration ptt
enumeration ptu
enumeration ptv
enumeration ptw
enumeration pty
enumeration pua
enumeration pub
enumeration puc
enumeration pud
enumeration pue
enumeration puf
enumeration pug
enumeration pui
enumeration puj
enumeration puk
enumeration pum
enumeration puo
enumeration pup
enumeration puq
enumeration pur
enumeration put
enumeration puu
enumeration puw
enumeration pux
enumeration puy
enumeration pwa
enumeration pwb
enumeration pwg
enumeration pwi
enumeration pwm
enumeration pwn
enumeration pwo
enumeration pwr
enumeration pww
enumeration pxm
enumeration pye
enumeration pym
enumeration pyn
enumeration pys
enumeration pyu
enumeration pyx
enumeration pyy
enumeration pzn
enumeration qaa..qtz
enumeration qua
enumeration qub
enumeration quc
enumeration qud
enumeration quf
enumeration qug
enumeration quh
enumeration qui
enumeration quk
enumeration qul
enumeration qum
enumeration qun
enumeration qup
enumeration quq
enumeration qur
enumeration qus
enumeration quv
enumeration quw
enumeration qux
enumeration quy
enumeration quz
enumeration qva
enumeration qvc
enumeration qve
enumeration qvh
enumeration qvi
enumeration qvj
enumeration qvl
enumeration qvm
enumeration qvn
enumeration qvo
enumeration qvp
enumeration qvs
enumeration qvw
enumeration qvy
enumeration qvz
enumeration qwa
enumeration qwc
enumeration qwe
enumeration qwh
enumeration qwm
enumeration qws
enumeration qwt
enumeration qxa
enumeration qxc
enumeration qxh
enumeration qxl
enumeration qxn
enumeration qxo
enumeration qxp
enumeration qxq
enumeration qxr
enumeration qxs
enumeration qxt
enumeration qxu
enumeration qxw
enumeration qya
enumeration qyp
enumeration raa
enumeration rab
enumeration rac
enumeration rad
enumeration raf
enumeration rag
enumeration rah
enumeration rai
enumeration raj
enumeration rak
enumeration ral
enumeration ram
enumeration ran
enumeration rao
enumeration rap
enumeration raq
enumeration rar
enumeration ras
enumeration rat
enumeration rau
enumeration rav
enumeration raw
enumeration rax
enumeration ray
enumeration raz
enumeration rbb
enumeration rbk
enumeration rbl
enumeration rbp
enumeration rcf
enumeration rdb
enumeration rea
enumeration reb
enumeration ree
enumeration reg
enumeration rei
enumeration rej
enumeration rel
enumeration rem
enumeration ren
enumeration rer
enumeration res
enumeration ret
enumeration rey
enumeration rga
enumeration rge
enumeration rgk
enumeration rgn
enumeration rgr
enumeration rgs
enumeration rgu
enumeration rhg
enumeration rhp
enumeration ria
enumeration rie
enumeration rif
enumeration ril
enumeration rim
enumeration rin
enumeration rir
enumeration rit
enumeration riu
enumeration rjg
enumeration rji
enumeration rjs
enumeration rka
enumeration rkb
enumeration rkh
enumeration rki
enumeration rkm
enumeration rkt
enumeration rkw
enumeration rma
enumeration rmb
enumeration rmc
enumeration rmd
enumeration rme
enumeration rmf
enumeration rmg
enumeration rmh
enumeration rmi
enumeration rmk
enumeration rml
enumeration rmm
enumeration rmn
enumeration rmo
enumeration rmp
enumeration rmq
enumeration rms
enumeration rmt
enumeration rmu
enumeration rmv
enumeration rmw
enumeration rmx
enumeration rmy
enumeration rmz
enumeration rna
enumeration rnd
enumeration rng
enumeration rnl
enumeration rnn
enumeration rnp
enumeration rnr
enumeration rnw
enumeration roa
enumeration rob
enumeration roc
enumeration rod
enumeration roe
enumeration rof
enumeration rog
enumeration rol
enumeration rom
enumeration roo
enumeration rop
enumeration ror
enumeration rou
enumeration row
enumeration rpn
enumeration rpt
enumeration rri
enumeration rro
enumeration rrt
enumeration rsb
enumeration rsi
enumeration rsl
enumeration rtc
enumeration rth
enumeration rtm
enumeration rtw
enumeration rub
enumeration ruc
enumeration rue
enumeration ruf
enumeration rug
enumeration ruh
enumeration rui
enumeration ruk
enumeration ruo
enumeration rup
enumeration ruq
enumeration rut
enumeration ruu
enumeration ruy
enumeration ruz
enumeration rwa
enumeration rwk
enumeration rwm
enumeration rwo
enumeration rwr
enumeration rxd
enumeration rxw
enumeration ryn
enumeration rys
enumeration ryu
enumeration saa
enumeration sab
enumeration sac
enumeration sad
enumeration sae
enumeration saf
enumeration sah
enumeration sai
enumeration saj
enumeration sak
enumeration sal
enumeration sam
enumeration sao
enumeration saq
enumeration sar
enumeration sas
enumeration sat
enumeration sau
enumeration sav
enumeration saw
enumeration sax
enumeration say
enumeration saz
enumeration sba
enumeration sbb
enumeration sbc
enumeration sbd
enumeration sbe
enumeration sbf
enumeration sbg
enumeration sbh
enumeration sbi
enumeration sbj
enumeration sbk
enumeration sbl
enumeration sbm
enumeration sbn
enumeration sbo
enumeration sbp
enumeration sbq
enumeration sbr
enumeration sbs
enumeration sbt
enumeration sbu
enumeration sbv
enumeration sbw
enumeration sbx
enumeration sby
enumeration sbz
enumeration scb
enumeration sce
enumeration scf
enumeration scg
enumeration sch
enumeration sci
enumeration sck
enumeration scl
enumeration scn
enumeration sco
enumeration scp
enumeration scq
enumeration scs
enumeration scu
enumeration scv
enumeration scw
enumeration scx
enumeration sda
enumeration sdb
enumeration sdc
enumeration sde
enumeration sdf
enumeration sdg
enumeration sdh
enumeration sdj
enumeration sdk
enumeration sdl
enumeration sdm
enumeration sdn
enumeration sdo
enumeration sdp
enumeration sdr
enumeration sds
enumeration sdt
enumeration sdu
enumeration sdv
enumeration sdx
enumeration sdz
enumeration sea
enumeration seb
enumeration sec
enumeration sed
enumeration see
enumeration sef
enumeration seg
enumeration seh
enumeration sei
enumeration sej
enumeration sek
enumeration sel
enumeration sem
enumeration sen
enumeration seo
enumeration sep
enumeration seq
enumeration ser
enumeration ses
enumeration set
enumeration seu
enumeration sev
enumeration sew
enumeration sey
enumeration sez
enumeration sfb
enumeration sfe
enumeration sfm
enumeration sfs
enumeration sfw
enumeration sga
enumeration sgb
enumeration sgc
enumeration sgd
enumeration sge
enumeration sgg
enumeration sgh
enumeration sgi
enumeration sgj
enumeration sgk
enumeration sgm
enumeration sgn
enumeration sgo
enumeration sgp
enumeration sgr
enumeration sgs
enumeration sgt
enumeration sgu
enumeration sgw
enumeration sgx
enumeration sgy
enumeration sgz
enumeration sha
enumeration shb
enumeration shc
enumeration shd
enumeration she
enumeration shg
enumeration shh
enumeration shi
enumeration shj
enumeration shk
enumeration shl
enumeration shm
enumeration shn
enumeration sho
enumeration shp
enumeration shq
enumeration shr
enumeration shs
enumeration sht
enumeration shu
enumeration shv
enumeration shw
enumeration shx
enumeration shy
enumeration shz
enumeration sia
enumeration sib
enumeration sid
enumeration sie
enumeration sif
enumeration sig
enumeration sih
enumeration sii
enumeration sij
enumeration sik
enumeration sil
enumeration sim
enumeration sio
enumeration sip
enumeration siq
enumeration sir
enumeration sis
enumeration sit
enumeration siu
enumeration siv
enumeration siw
enumeration six
enumeration siy
enumeration siz
enumeration sja
enumeration sjb
enumeration sjd
enumeration sje
enumeration sjg
enumeration sjk
enumeration sjl
enumeration sjm
enumeration sjn
enumeration sjo
enumeration sjp
enumeration sjr
enumeration sjs
enumeration sjt
enumeration sju
enumeration sjw
enumeration ska
enumeration skb
enumeration skc
enumeration skd
enumeration ske
enumeration skf
enumeration skg
enumeration skh
enumeration ski
enumeration skj
enumeration skk
enumeration skm
enumeration skn
enumeration sko
enumeration skp
enumeration skq
enumeration skr
enumeration sks
enumeration skt
enumeration sku
enumeration skv
enumeration skw
enumeration skx
enumeration sky
enumeration skz
enumeration sla
enumeration slc
enumeration sld
enumeration sle
enumeration slf
enumeration slg
enumeration slh
enumeration sli
enumeration slj
enumeration sll
enumeration slm
enumeration sln
enumeration slp
enumeration slq
enumeration slr
enumeration sls
enumeration slt
enumeration slu
enumeration slw
enumeration slx
enumeration sly
enumeration slz
enumeration sma
enumeration smb
enumeration smc
enumeration smd
enumeration smf
enumeration smg
enumeration smh
enumeration smi
enumeration smj
enumeration smk
enumeration sml
enumeration smm
enumeration smn
enumeration smp
enumeration smq
enumeration smr
enumeration sms
enumeration smt
enumeration smu
enumeration smv
enumeration smw
enumeration smx
enumeration smy
enumeration smz
enumeration snb
enumeration snc
enumeration sne
enumeration snf
enumeration sng
enumeration snh
enumeration sni
enumeration snj
enumeration snk
enumeration snl
enumeration snm
enumeration snn
enumeration sno
enumeration snp
enumeration snq
enumeration snr
enumeration sns
enumeration snu
enumeration snv
enumeration snw
enumeration snx
enumeration sny
enumeration snz
enumeration soa
enumeration sob
enumeration soc
enumeration sod
enumeration soe
enumeration sog
enumeration soh
enumeration soi
enumeration soj
enumeration sok
enumeration sol
enumeration son
enumeration soo
enumeration sop
enumeration soq
enumeration sor
enumeration sos
enumeration sou
enumeration sov
enumeration sow
enumeration sox
enumeration soy
enumeration soz
enumeration spb
enumeration spc
enumeration spd
enumeration spe
enumeration spg
enumeration spi
enumeration spk
enumeration spl
enumeration spm
enumeration spn
enumeration spo
enumeration spp
enumeration spq
enumeration spr
enumeration sps
enumeration spt
enumeration spu
enumeration spv
enumeration spx
enumeration spy
enumeration sqa
enumeration sqh
enumeration sqj
enumeration sqk
enumeration sqm
enumeration sqn
enumeration sqo
enumeration sqq
enumeration sqr
enumeration sqs
enumeration sqt
enumeration squ
enumeration sra
enumeration srb
enumeration src
enumeration sre
enumeration srf
enumeration srg
enumeration srh
enumeration sri
enumeration srk
enumeration srl
enumeration srm
enumeration srn
enumeration sro
enumeration srq
enumeration srr
enumeration srs
enumeration srt
enumeration sru
enumeration srv
enumeration srw
enumeration srx
enumeration sry
enumeration srz
enumeration ssa
enumeration ssb
enumeration ssc
enumeration ssd
enumeration sse
enumeration ssf
enumeration ssg
enumeration ssh
enumeration ssi
enumeration ssj
enumeration ssk
enumeration ssl
enumeration ssm
enumeration ssn
enumeration sso
enumeration ssp
enumeration ssq
enumeration ssr
enumeration sss
enumeration sst
enumeration ssu
enumeration ssv
enumeration ssx
enumeration ssy
enumeration ssz
enumeration sta
enumeration stb
enumeration std
enumeration ste
enumeration stf
enumeration stg
enumeration sth
enumeration sti
enumeration stj
enumeration stk
enumeration stl
enumeration stm
enumeration stn
enumeration sto
enumeration stp
enumeration stq
enumeration str
enumeration sts
enumeration stt
enumeration stu
enumeration stv
enumeration stw
enumeration sty
enumeration sua
enumeration sub
enumeration suc
enumeration sue
enumeration sug
enumeration sui
enumeration suj
enumeration suk
enumeration suq
enumeration sur
enumeration sus
enumeration sut
enumeration suv
enumeration suw
enumeration sux
enumeration suy
enumeration suz
enumeration sva
enumeration svb
enumeration svc
enumeration sve
enumeration svk
enumeration svm
enumeration svr
enumeration svs
enumeration svx
enumeration swb
enumeration swc
enumeration swf
enumeration swg
enumeration swh
enumeration swi
enumeration swj
enumeration swk
enumeration swl
enumeration swm
enumeration swn
enumeration swo
enumeration swp
enumeration swq
enumeration swr
enumeration sws
enumeration swt
enumeration swu
enumeration swv
enumeration sww
enumeration swx
enumeration swy
enumeration sxb
enumeration sxc
enumeration sxe
enumeration sxg
enumeration sxk
enumeration sxl
enumeration sxm
enumeration sxn
enumeration sxo
enumeration sxr
enumeration sxs
enumeration sxu
enumeration sxw
enumeration sya
enumeration syb
enumeration syc
enumeration syd
enumeration syi
enumeration syk
enumeration syl
enumeration sym
enumeration syn
enumeration syo
enumeration syr
enumeration sys
enumeration syw
enumeration syy
enumeration sza
enumeration szb
enumeration szc
enumeration szd
enumeration sze
enumeration szg
enumeration szl
enumeration szn
enumeration szp
enumeration szv
enumeration szw
enumeration taa
enumeration tab
enumeration tac
enumeration tad
enumeration tae
enumeration taf
enumeration tag
enumeration tai
enumeration taj
enumeration tak
enumeration tal
enumeration tan
enumeration tao
enumeration tap
enumeration taq
enumeration tar
enumeration tas
enumeration tau
enumeration tav
enumeration taw
enumeration tax
enumeration tay
enumeration taz
enumeration tba
enumeration tbb
enumeration tbc
enumeration tbd
enumeration tbe
enumeration tbf
enumeration tbg
enumeration tbh
enumeration tbi
enumeration tbj
enumeration tbk
enumeration tbl
enumeration tbm
enumeration tbn
enumeration tbo
enumeration tbp
enumeration tbq
enumeration tbr
enumeration tbs
enumeration tbt
enumeration tbu
enumeration tbv
enumeration tbw
enumeration tbx
enumeration tby
enumeration tbz
enumeration tca
enumeration tcb
enumeration tcc
enumeration tcd
enumeration tce
enumeration tcf
enumeration tcg
enumeration tch
enumeration tci
enumeration tck
enumeration tcl
enumeration tcm
enumeration tcn
enumeration tco
enumeration tcp
enumeration tcq
enumeration tcs
enumeration tct
enumeration tcu
enumeration tcw
enumeration tcx
enumeration tcy
enumeration tcz
enumeration tda
enumeration tdb
enumeration tdc
enumeration tdd
enumeration tde
enumeration tdf
enumeration tdg
enumeration tdh
enumeration tdi
enumeration tdj
enumeration tdk
enumeration tdl
enumeration tdn
enumeration tdo
enumeration tdq
enumeration tdr
enumeration tds
enumeration tdt
enumeration tdu
enumeration tdv
enumeration tdx
enumeration tdy
enumeration tea
enumeration teb
enumeration tec
enumeration ted
enumeration tee
enumeration tef
enumeration teg
enumeration teh
enumeration tei
enumeration tek
enumeration tem
enumeration ten
enumeration teo
enumeration tep
enumeration teq
enumeration ter
enumeration tes
enumeration tet
enumeration teu
enumeration tev
enumeration tew
enumeration tex
enumeration tey
enumeration tfi
enumeration tfn
enumeration tfo
enumeration tfr
enumeration tft
enumeration tga
enumeration tgb
enumeration tgc
enumeration tgd
enumeration tge
enumeration tgf
enumeration tgh
enumeration tgi
enumeration tgj
enumeration tgn
enumeration tgo
enumeration tgp
enumeration tgq
enumeration tgr
enumeration tgs
enumeration tgt
enumeration tgu
enumeration tgv
enumeration tgw
enumeration tgx
enumeration tgy
enumeration tgz
enumeration thc
enumeration thd
enumeration the
enumeration thf
enumeration thh
enumeration thi
enumeration thk
enumeration thl
enumeration thm
enumeration thn
enumeration thp
enumeration thq
enumeration thr
enumeration ths
enumeration tht
enumeration thu
enumeration thv
enumeration thw
enumeration thx
enumeration thy
enumeration thz
enumeration tia
enumeration tic
enumeration tid
enumeration tif
enumeration tig
enumeration tih
enumeration tii
enumeration tij
enumeration tik
enumeration til
enumeration tim
enumeration tin
enumeration tio
enumeration tip
enumeration tiq
enumeration tis
enumeration tit
enumeration tiu
enumeration tiv
enumeration tiw
enumeration tix
enumeration tiy
enumeration tiz
enumeration tja
enumeration tjg
enumeration tji
enumeration tjl
enumeration tjm
enumeration tjn
enumeration tjo
enumeration tjs
enumeration tju
enumeration tjw
enumeration tka
enumeration tkb
enumeration tkd
enumeration tke
enumeration tkf
enumeration tkg
enumeration tkl
enumeration tkm
enumeration tkn
enumeration tkp
enumeration tkq
enumeration tkr
enumeration tks
enumeration tkt
enumeration tku
enumeration tkv
enumeration tkw
enumeration tkx
enumeration tkz
enumeration tla
enumeration tlb
enumeration tlc
enumeration tld
enumeration tlf
enumeration tlg
enumeration tlh
enumeration tli
enumeration tlj
enumeration tlk
enumeration tll
enumeration tlm
enumeration tln
enumeration tlo
enumeration tlp
enumeration tlq
enumeration tlr
enumeration tls
enumeration tlt
enumeration tlu
enumeration tlv
enumeration tlx
enumeration tly
enumeration tma
enumeration tmb
enumeration tmc
enumeration tmd
enumeration tme
enumeration tmf
enumeration tmg
enumeration tmh
enumeration tmi
enumeration tmj
enumeration tmk
enumeration tml
enumeration tmm
enumeration tmn
enumeration tmo
enumeration tmp
enumeration tmq
enumeration tmr
enumeration tms
enumeration tmt
enumeration tmu
enumeration tmv
enumeration tmw
enumeration tmy
enumeration tmz
enumeration tna
enumeration tnb
enumeration tnc
enumeration tnd
enumeration tne
enumeration tng
enumeration tnh
enumeration tni
enumeration tnk
enumeration tnl
enumeration tnm
enumeration tnn
enumeration tno
enumeration tnp
enumeration tnq
enumeration tnr
enumeration tns
enumeration tnt
enumeration tnu
enumeration tnv
enumeration tnw
enumeration tnx
enumeration tny
enumeration tnz
enumeration tob
enumeration toc
enumeration tod
enumeration toe
enumeration tof
enumeration tog
enumeration toh
enumeration toi
enumeration toj
enumeration tol
enumeration tom
enumeration too
enumeration top
enumeration toq
enumeration tor
enumeration tos
enumeration tou
enumeration tov
enumeration tow
enumeration tox
enumeration toy
enumeration toz
enumeration tpa
enumeration tpc
enumeration tpe
enumeration tpf
enumeration tpg
enumeration tpi
enumeration tpj
enumeration tpk
enumeration tpl
enumeration tpm
enumeration tpn
enumeration tpo
enumeration tpp
enumeration tpq
enumeration tpr
enumeration tpt
enumeration tpu
enumeration tpv
enumeration tpw
enumeration tpx
enumeration tpy
enumeration tpz
enumeration tqb
enumeration tql
enumeration tqm
enumeration tqn
enumeration tqo
enumeration tqp
enumeration tqq
enumeration tqr
enumeration tqt
enumeration tqu
enumeration tqw
enumeration tra
enumeration trb
enumeration trc
enumeration trd
enumeration tre
enumeration trf
enumeration trg
enumeration trh
enumeration tri
enumeration trj
enumeration trk
enumeration trl
enumeration trm
enumeration trn
enumeration tro
enumeration trp
enumeration trq
enumeration trr
enumeration trs
enumeration trt
enumeration tru
enumeration trv
enumeration trw
enumeration trx
enumeration try
enumeration trz
enumeration tsa
enumeration tsb
enumeration tsc
enumeration tsd
enumeration tse
enumeration tsf
enumeration tsg
enumeration tsh
enumeration tsi
enumeration tsj
enumeration tsk
enumeration tsl
enumeration tsm
enumeration tsp
enumeration tsq
enumeration tsr
enumeration tss
enumeration tst
enumeration tsu
enumeration tsv
enumeration tsw
enumeration tsx
enumeration tsy
enumeration tsz
enumeration tta
enumeration ttb
enumeration ttc
enumeration ttd
enumeration tte
enumeration ttf
enumeration ttg
enumeration tth
enumeration tti
enumeration ttj
enumeration ttk
enumeration ttl
enumeration ttm
enumeration ttn
enumeration tto
enumeration ttp
enumeration ttq
enumeration ttr
enumeration tts
enumeration ttt
enumeration ttu
enumeration ttv
enumeration ttw
enumeration tty
enumeration ttz
enumeration tua
enumeration tub
enumeration tuc
enumeration tud
enumeration tue
enumeration tuf
enumeration tug
enumeration tuh
enumeration tui
enumeration tuj
enumeration tul
enumeration tum
enumeration tun
enumeration tuo
enumeration tup
enumeration tuq
enumeration tus
enumeration tut
enumeration tuu
enumeration tuv
enumeration tuw
enumeration tux
enumeration tuy
enumeration tuz
enumeration tva
enumeration tvd
enumeration tve
enumeration tvk
enumeration tvl
enumeration tvm
enumeration tvn
enumeration tvo
enumeration tvs
enumeration tvt
enumeration tvu
enumeration tvw
enumeration tvy
enumeration twa
enumeration twb
enumeration twc
enumeration twd
enumeration twe
enumeration twf
enumeration twg
enumeration twh
enumeration twl
enumeration twm
enumeration twn
enumeration two
enumeration twp
enumeration twq
enumeration twr
enumeration twt
enumeration twu
enumeration tww
enumeration twx
enumeration twy
enumeration txa
enumeration txb
enumeration txc
enumeration txe
enumeration txg
enumeration txh
enumeration txi
enumeration txm
enumeration txn
enumeration txo
enumeration txq
enumeration txr
enumeration txs
enumeration txt
enumeration txu
enumeration txx
enumeration txy
enumeration tya
enumeration tye
enumeration tyh
enumeration tyi
enumeration tyj
enumeration tyl
enumeration tyn
enumeration typ
enumeration tyr
enumeration tys
enumeration tyt
enumeration tyu
enumeration tyv
enumeration tyx
enumeration tyz
enumeration tza
enumeration tzh
enumeration tzj
enumeration tzl
enumeration tzm
enumeration tzn
enumeration tzo
enumeration tzx
enumeration uam
enumeration uan
enumeration uar
enumeration uba
enumeration ubi
enumeration ubl
enumeration ubr
enumeration ubu
enumeration uby
enumeration uda
enumeration ude
enumeration udg
enumeration udi
enumeration udj
enumeration udl
enumeration udm
enumeration udu
enumeration ues
enumeration ufi
enumeration uga
enumeration ugb
enumeration uge
enumeration ugn
enumeration ugo
enumeration ugy
enumeration uha
enumeration uhn
enumeration uis
enumeration uiv
enumeration uji
enumeration uka
enumeration ukg
enumeration ukh
enumeration ukl
enumeration ukp
enumeration ukq
enumeration uks
enumeration uku
enumeration ukw
enumeration uky
enumeration ula
enumeration ulb
enumeration ulc
enumeration ule
enumeration ulf
enumeration uli
enumeration ulk
enumeration ull
enumeration ulm
enumeration uln
enumeration ulu
enumeration ulw
enumeration uma
enumeration umb
enumeration umc
enumeration umd
enumeration umg
enumeration umi
enumeration umm
enumeration umn
enumeration umo
enumeration ump
enumeration umr
enumeration ums
enumeration umu
enumeration una
enumeration und
enumeration une
enumeration ung
enumeration unk
enumeration unm
enumeration unn
enumeration unr
enumeration unu
enumeration unx
enumeration unz
enumeration uok
enumeration upi
enumeration upv
enumeration ura
enumeration urb
enumeration urc
enumeration ure
enumeration urf
enumeration urg
enumeration urh
enumeration uri
enumeration urj
enumeration urk
enumeration url
enumeration urm
enumeration urn
enumeration uro
enumeration urp
enumeration urr
enumeration urt
enumeration uru
enumeration urv
enumeration urw
enumeration urx
enumeration ury
enumeration urz
enumeration usa
enumeration ush
enumeration usi
enumeration usk
enumeration usp
enumeration usu
enumeration uta
enumeration ute
enumeration utp
enumeration utr
enumeration utu
enumeration uum
enumeration uun
enumeration uur
enumeration uuu
enumeration uve
enumeration uvh
enumeration uvl
enumeration uwa
enumeration uya
enumeration uzn
enumeration uzs
enumeration vaa
enumeration vae
enumeration vaf
enumeration vag
enumeration vah
enumeration vai
enumeration vaj
enumeration val
enumeration vam
enumeration van
enumeration vao
enumeration vap
enumeration var
enumeration vas
enumeration vau
enumeration vav
enumeration vay
enumeration vbb
enumeration vbk
enumeration vec
enumeration ved
enumeration vel
enumeration vem
enumeration veo
enumeration vep
enumeration ver
enumeration vgr
enumeration vgt
enumeration vic
enumeration vid
enumeration vif
enumeration vig
enumeration vil
enumeration vin
enumeration vis
enumeration vit
enumeration viv
enumeration vka
enumeration vki
enumeration vkj
enumeration vkk
enumeration vkl
enumeration vkm
enumeration vko
enumeration vkp
enumeration vkt
enumeration vku
enumeration vlp
enumeration vls
enumeration vma
enumeration vmb
enumeration vmc
enumeration vmd
enumeration vme
enumeration vmf
enumeration vmg
enumeration vmh
enumeration vmi
enumeration vmj
enumeration vmk
enumeration vml
enumeration vmm
enumeration vmp
enumeration vmq
enumeration vmr
enumeration vms
enumeration vmu
enumeration vmv
enumeration vmw
enumeration vmx
enumeration vmy
enumeration vmz
enumeration vnk
enumeration vnm
enumeration vnp
enumeration vor
enumeration vot
enumeration vra
enumeration vro
enumeration vrs
enumeration vrt
enumeration vsi
enumeration vsl
enumeration vsv
enumeration vto
enumeration vum
enumeration vun
enumeration vut
enumeration vwa
enumeration waa
enumeration wab
enumeration wac
enumeration wad
enumeration wae
enumeration waf
enumeration wag
enumeration wah
enumeration wai
enumeration waj
enumeration wak
enumeration wal
enumeration wam
enumeration wan
enumeration wao
enumeration wap
enumeration waq
enumeration war
enumeration was
enumeration wat
enumeration wau
enumeration wav
enumeration waw
enumeration wax
enumeration way
enumeration waz
enumeration wba
enumeration wbb
enumeration wbe
enumeration wbf
enumeration wbh
enumeration wbi
enumeration wbj
enumeration wbk
enumeration wbl
enumeration wbm
enumeration wbp
enumeration wbq
enumeration wbr
enumeration wbt
enumeration wbv
enumeration wbw
enumeration wca
enumeration wci
enumeration wdd
enumeration wdg
enumeration wdj
enumeration wdk
enumeration wdu
enumeration wdy
enumeration wea
enumeration wec
enumeration wed
enumeration weg
enumeration weh
enumeration wei
enumeration wem
enumeration wen
enumeration weo
enumeration wep
enumeration wer
enumeration wes
enumeration wet
enumeration weu
enumeration wew
enumeration wfg
enumeration wga
enumeration wgb
enumeration wgg
enumeration wgi
enumeration wgo
enumeration wgu
enumeration wgy
enumeration wha
enumeration whg
enumeration whk
enumeration whu
enumeration wib
enumeration wic
enumeration wie
enumeration wif
enumeration wig
enumeration wih
enumeration wii
enumeration wij
enumeration wik
enumeration wil
enumeration wim
enumeration win
enumeration wir
enumeration wiu
enumeration wiv
enumeration wiy
enumeration wja
enumeration wji
enumeration wka
enumeration wkb
enumeration wkd
enumeration wkl
enumeration wku
enumeration wkw
enumeration wky
enumeration wla
enumeration wlc
enumeration wle
enumeration wlg
enumeration wli
enumeration wlk
enumeration wll
enumeration wlm
enumeration wlo
enumeration wlr
enumeration wls
enumeration wlu
enumeration wlv
enumeration wlw
enumeration wlx
enumeration wly
enumeration wma
enumeration wmb
enumeration wmc
enumeration wmd
enumeration wme
enumeration wmh
enumeration wmi
enumeration wmm
enumeration wmn
enumeration wmo
enumeration wms
enumeration wmt
enumeration wmw
enumeration wmx
enumeration wnb
enumeration wnc
enumeration wnd
enumeration wne
enumeration wng
enumeration wni
enumeration wnk
enumeration wnm
enumeration wnn
enumeration wno
enumeration wnp
enumeration wnu
enumeration wnw
enumeration wny
enumeration woa
enumeration wob
enumeration woc
enumeration wod
enumeration woe
enumeration wof
enumeration wog
enumeration woi
enumeration wok
enumeration wom
enumeration won
enumeration woo
enumeration wor
enumeration wos
enumeration wow
enumeration woy
enumeration wpc
enumeration wra
enumeration wrb
enumeration wrd
enumeration wrg
enumeration wrh
enumeration wri
enumeration wrk
enumeration wrl
enumeration wrm
enumeration wrn
enumeration wro
enumeration wrp
enumeration wrr
enumeration wrs
enumeration wru
enumeration wrv
enumeration wrw
enumeration wrx
enumeration wry
enumeration wrz
enumeration wsa
enumeration wsi
enumeration wsk
enumeration wsr
enumeration wss
enumeration wsu
enumeration wsv
enumeration wtf
enumeration wth
enumeration wti
enumeration wtk
enumeration wtm
enumeration wtw
enumeration wua
enumeration wub
enumeration wud
enumeration wuh
enumeration wul
enumeration wum
enumeration wun
enumeration wur
enumeration wut
enumeration wuu
enumeration wuv
enumeration wux
enumeration wuy
enumeration wwa
enumeration wwb
enumeration wwo
enumeration wwr
enumeration www
enumeration wxa
enumeration wxw
enumeration wya
enumeration wyb
enumeration wyi
enumeration wym
enumeration wyr
enumeration wyy
enumeration xaa
enumeration xab
enumeration xac
enumeration xad
enumeration xae
enumeration xag
enumeration xai
enumeration xaj
enumeration xal
enumeration xam
enumeration xan
enumeration xao
enumeration xap
enumeration xaq
enumeration xar
enumeration xas
enumeration xat
enumeration xau
enumeration xav
enumeration xaw
enumeration xay
enumeration xba
enumeration xbb
enumeration xbc
enumeration xbd
enumeration xbe
enumeration xbg
enumeration xbi
enumeration xbj
enumeration xbm
enumeration xbn
enumeration xbo
enumeration xbp
enumeration xbr
enumeration xbw
enumeration xbx
enumeration xby
enumeration xcb
enumeration xcc
enumeration xce
enumeration xcg
enumeration xch
enumeration xcl
enumeration xcm
enumeration xcn
enumeration xco
enumeration xcr
enumeration xct
enumeration xcu
enumeration xcv
enumeration xcw
enumeration xcy
enumeration xda
enumeration xdc
enumeration xdk
enumeration xdm
enumeration xdy
enumeration xeb
enumeration xed
enumeration xeg
enumeration xel
enumeration xem
enumeration xep
enumeration xer
enumeration xes
enumeration xet
enumeration xeu
enumeration xfa
enumeration xga
enumeration xgb
enumeration xgd
enumeration xgf
enumeration xgg
enumeration xgi
enumeration xgl
enumeration xgm
enumeration xgn
enumeration xgr
enumeration xgu
enumeration xgw
enumeration xha
enumeration xhc
enumeration xhd
enumeration xhe
enumeration xhr
enumeration xht
enumeration xhu
enumeration xhv
enumeration xib
enumeration xii
enumeration xil
enumeration xin
enumeration xip
enumeration xir
enumeration xis
enumeration xiv
enumeration xiy
enumeration xjb
enumeration xjt
enumeration xka
enumeration xkb
enumeration xkc
enumeration xkd
enumeration xke
enumeration xkf
enumeration xkg
enumeration xkh
enumeration xki
enumeration xkj
enumeration xkk
enumeration xkl
enumeration xkn
enumeration xko
enumeration xkp
enumeration xkq
enumeration xkr
enumeration xks
enumeration xkt
enumeration xku
enumeration xkv
enumeration xkw
enumeration xkx
enumeration xky
enumeration xkz
enumeration xla
enumeration xlb
enumeration xlc
enumeration xld
enumeration xle
enumeration xlg
enumeration xli
enumeration xln
enumeration xlo
enumeration xlp
enumeration xls
enumeration xlu
enumeration xly
enumeration xma
enumeration xmb
enumeration xmc
enumeration xmd
enumeration xme
enumeration xmf
enumeration xmg
enumeration xmh
enumeration xmj
enumeration xmk
enumeration xml
enumeration xmm
enumeration xmn
enumeration xmo
enumeration xmp
enumeration xmq
enumeration xmr
enumeration xms
enumeration xmt
enumeration xmu
enumeration xmv
enumeration xmw
enumeration xmx
enumeration xmy
enumeration xmz
enumeration xna
enumeration xnb
enumeration xnd
enumeration xng
enumeration xnh
enumeration xni
enumeration xnk
enumeration xnn
enumeration xno
enumeration xnr
enumeration xns
enumeration xnt
enumeration xnu
enumeration xny
enumeration xnz
enumeration xoc
enumeration xod
enumeration xog
enumeration xoi
enumeration xok
enumeration xom
enumeration xon
enumeration xoo
enumeration xop
enumeration xor
enumeration xow
enumeration xpa
enumeration xpc
enumeration xpe
enumeration xpg
enumeration xpi
enumeration xpj
enumeration xpk
enumeration xpm
enumeration xpn
enumeration xpo
enumeration xpp
enumeration xpq
enumeration xpr
enumeration xps
enumeration xpt
enumeration xpu
enumeration xpy
enumeration xqa
enumeration xqt
enumeration xra
enumeration xrb
enumeration xrd
enumeration xre
enumeration xrg
enumeration xri
enumeration xrm
enumeration xrn
enumeration xrq
enumeration xrr
enumeration xrt
enumeration xru
enumeration xrw
enumeration xsa
enumeration xsb
enumeration xsc
enumeration xsd
enumeration xse
enumeration xsh
enumeration xsi
enumeration xsj
enumeration xsl
enumeration xsm
enumeration xsn
enumeration xso
enumeration xsp
enumeration xsq
enumeration xsr
enumeration xss
enumeration xsu
enumeration xsv
enumeration xsy
enumeration xta
enumeration xtb
enumeration xtc
enumeration xtd
enumeration xte
enumeration xtg
enumeration xth
enumeration xti
enumeration xtj
enumeration xtl
enumeration xtm
enumeration xtn
enumeration xto
enumeration xtp
enumeration xtq
enumeration xtr
enumeration xts
enumeration xtt
enumeration xtu
enumeration xtv
enumeration xtw
enumeration xty
enumeration xtz
enumeration xua
enumeration xub
enumeration xud
enumeration xug
enumeration xuj
enumeration xul
enumeration xum
enumeration xun
enumeration xuo
enumeration xup
enumeration xur
enumeration xut
enumeration xuu
enumeration xve
enumeration xvi
enumeration xvn
enumeration xvo
enumeration xvs
enumeration xwa
enumeration xwc
enumeration xwd
enumeration xwe
enumeration xwg
enumeration xwj
enumeration xwk
enumeration xwl
enumeration xwo
enumeration xwr
enumeration xwt
enumeration xww
enumeration xxb
enumeration xxk
enumeration xxm
enumeration xxr
enumeration xxt
enumeration xya
enumeration xyb
enumeration xyj
enumeration xyk
enumeration xyl
enumeration xyt
enumeration xyy
enumeration xzh
enumeration xzm
enumeration xzp
enumeration yaa
enumeration yab
enumeration yac
enumeration yad
enumeration yae
enumeration yaf
enumeration yag
enumeration yah
enumeration yai
enumeration yaj
enumeration yak
enumeration yal
enumeration yam
enumeration yan
enumeration yao
enumeration yap
enumeration yaq
enumeration yar
enumeration yas
enumeration yat
enumeration yau
enumeration yav
enumeration yaw
enumeration yax
enumeration yay
enumeration yaz
enumeration yba
enumeration ybb
enumeration ybe
enumeration ybh
enumeration ybi
enumeration ybj
enumeration ybk
enumeration ybl
enumeration ybm
enumeration ybn
enumeration ybo
enumeration ybx
enumeration yby
enumeration ych
enumeration ycl
enumeration ycn
enumeration ycp
enumeration yda
enumeration ydd
enumeration yde
enumeration ydg
enumeration ydk
enumeration yds
enumeration yea
enumeration yec
enumeration yee
enumeration yei
enumeration yej
enumeration yel
enumeration yer
enumeration yes
enumeration yet
enumeration yeu
enumeration yev
enumeration yey
enumeration yga
enumeration ygi
enumeration ygl
enumeration ygm
enumeration ygp
enumeration ygr
enumeration ygs
enumeration ygu
enumeration ygw
enumeration yha
enumeration yhd
enumeration yhl
enumeration yia
enumeration yif
enumeration yig
enumeration yih
enumeration yii
enumeration yij
enumeration yik
enumeration yil
enumeration yim
enumeration yin
enumeration yip
enumeration yiq
enumeration yir
enumeration yis
enumeration yit
enumeration yiu
enumeration yiv
enumeration yix
enumeration yiz
enumeration yka
enumeration ykg
enumeration yki
enumeration ykk
enumeration ykl
enumeration ykm
enumeration ykn
enumeration yko
enumeration ykr
enumeration ykt
enumeration yku
enumeration yky
enumeration yla
enumeration ylb
enumeration yle
enumeration ylg
enumeration yli
enumeration yll
enumeration ylm
enumeration yln
enumeration ylo
enumeration ylr
enumeration ylu
enumeration yly
enumeration ymb
enumeration ymc
enumeration ymd
enumeration yme
enumeration ymg
enumeration ymh
enumeration ymi
enumeration ymk
enumeration yml
enumeration ymm
enumeration ymn
enumeration ymo
enumeration ymp
enumeration ymq
enumeration ymr
enumeration yms
enumeration ymt
enumeration ymx
enumeration ymz
enumeration yna
enumeration ynd
enumeration yne
enumeration yng
enumeration ynh
enumeration ynk
enumeration ynl
enumeration ynn
enumeration yno
enumeration ynq
enumeration yns
enumeration ynu
enumeration yob
enumeration yog
enumeration yoi
enumeration yok
enumeration yol
enumeration yom
enumeration yon
enumeration yot
enumeration yox
enumeration yoy
enumeration ypa
enumeration ypb
enumeration ypg
enumeration yph
enumeration ypk
enumeration ypm
enumeration ypn
enumeration ypo
enumeration ypp
enumeration ypz
enumeration yra
enumeration yrb
enumeration yre
enumeration yri
enumeration yrk
enumeration yrl
enumeration yrm
enumeration yrn
enumeration yrs
enumeration yrw
enumeration yry
enumeration ysc
enumeration ysd
enumeration ysg
enumeration ysl
enumeration ysn
enumeration yso
enumeration ysp
enumeration ysr
enumeration yss
enumeration ysy
enumeration yta
enumeration ytl
enumeration ytp
enumeration ytw
enumeration yty
enumeration yua
enumeration yub
enumeration yuc
enumeration yud
enumeration yue
enumeration yuf
enumeration yug
enumeration yui
enumeration yuj
enumeration yuk
enumeration yul
enumeration yum
enumeration yun
enumeration yup
enumeration yuq
enumeration yur
enumeration yut
enumeration yuw
enumeration yux
enumeration yuy
enumeration yuz
enumeration yva
enumeration yvt
enumeration ywa
enumeration ywg
enumeration ywl
enumeration ywn
enumeration ywq
enumeration ywr
enumeration ywt
enumeration ywu
enumeration yww
enumeration yxa
enumeration yxg
enumeration yxl
enumeration yxm
enumeration yxu
enumeration yxy
enumeration yyr
enumeration yyu
enumeration yyz
enumeration yzg
enumeration yzk
enumeration zaa
enumeration zab
enumeration zac
enumeration zad
enumeration zae
enumeration zaf
enumeration zag
enumeration zah
enumeration zai
enumeration zaj
enumeration zak
enumeration zal
enumeration zam
enumeration zao
enumeration zap
enumeration zaq
enumeration zar
enumeration zas
enumeration zat
enumeration zau
enumeration zav
enumeration zaw
enumeration zax
enumeration zay
enumeration zaz
enumeration zbc
enumeration zbe
enumeration zbl
enumeration zbt
enumeration zbw
enumeration zca
enumeration zch
enumeration zdj
enumeration zea
enumeration zeg
enumeration zeh
enumeration zen
enumeration zga
enumeration zgb
enumeration zgh
enumeration zgm
enumeration zgn
enumeration zgr
enumeration zhb
enumeration zhd
enumeration zhi
enumeration zhn
enumeration zhw
enumeration zhx
enumeration zia
enumeration zib
enumeration zik
enumeration zil
enumeration zim
enumeration zin
enumeration zir
enumeration ziw
enumeration ziz
enumeration zka
enumeration zkb
enumeration zkd
enumeration zkg
enumeration zkh
enumeration zkk
enumeration zkn
enumeration zko
enumeration zkp
enumeration zkr
enumeration zkt
enumeration zku
enumeration zkv
enumeration zkz
enumeration zle
enumeration zlj
enumeration zlm
enumeration zln
enumeration zlq
enumeration zls
enumeration zlw
enumeration zma
enumeration zmb
enumeration zmc
enumeration zmd
enumeration zme
enumeration zmf
enumeration zmg
enumeration zmh
enumeration zmi
enumeration zmj
enumeration zmk
enumeration zml
enumeration zmm
enumeration zmn
enumeration zmo
enumeration zmp
enumeration zmq
enumeration zmr
enumeration zms
enumeration zmt
enumeration zmu
enumeration zmv
enumeration zmw
enumeration zmx
enumeration zmy
enumeration zmz
enumeration zna
enumeration znd
enumeration zne
enumeration zng
enumeration znk
enumeration zns
enumeration zoc
enumeration zoh
enumeration zom
enumeration zoo
enumeration zoq
enumeration zor
enumeration zos
enumeration zpa
enumeration zpb
enumeration zpc
enumeration zpd
enumeration zpe
enumeration zpf
enumeration zpg
enumeration zph
enumeration zpi
enumeration zpj
enumeration zpk
enumeration zpl
enumeration zpm
enumeration zpn
enumeration zpo
enumeration zpp
enumeration zpq
enumeration zpr
enumeration zps
enumeration zpt
enumeration zpu
enumeration zpv
enumeration zpw
enumeration zpx
enumeration zpy
enumeration zpz
enumeration zqe
enumeration zra
enumeration zrg
enumeration zrn
enumeration zro
enumeration zrp
enumeration zrs
enumeration zsa
enumeration zsk
enumeration zsl
enumeration zsm
enumeration zsr
enumeration zsu
enumeration zte
enumeration ztg
enumeration ztl
enumeration ztm
enumeration ztn
enumeration ztp
enumeration ztq
enumeration zts
enumeration ztt
enumeration ztu
enumeration ztx
enumeration zty
enumeration zua
enumeration zuh
enumeration zum
enumeration zun
enumeration zuy
enumeration zwa
enumeration zxx
enumeration zyb
enumeration zyg
enumeration zyj
enumeration zyn
enumeration zyp
enumeration zza
enumeration zzj
[ top ]
Element ms:metadataHeaderInfo
Annotations
Groups information on the metadata record itself
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataRecordIdentifier OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreationDate OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreators OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_sourceOfMetadataRecord OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_userQuery OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataLastDateUpdated OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_revision OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType
Type ms:metadataHeaderInfoType
[ top ]
Element ms:personInfo
Annotations
Groups information relevant to persons related to the resource; to be used mainly for contact persons, resource creators, validators, annotators etc. for whom personal data can be provided
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_surname OMTD-SHARE_XMLSchema.tmp#personInfoType_givenName OMTD-SHARE_XMLSchema.tmp#personInfoType_personIdentifiers OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#personInfoType_affiliation OMTD-SHARE_XMLSchema.tmp#personInfoType
Type ms:personInfoType
[ top ]
Element ms:organizationInfo
Annotations
Groups information on organizations related to the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#organizationInfoType
Type ms:organizationInfoType
[ top ]
Element ms:sex
Annotations
Either of the two main categories (male and female) into which humans and most other living things are divided on the basis of their reproductive functions. (Source:OED)
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration male
Of or denoting the sex that produces gametes, especially spermatozoa, with which a female may be fertilized or inseminated to produce offspring. (Source:OED)
enumeration female
Of or denoting the sex that can bear offspring or produce eggs, distinguished biologically by the production of gametes (ova) which can be fertilized by male gametes. (Source:OED)
enumeration unknown
Value for "sex"; to be used when the sex of a person is unknown
[ top ]
Element ms:distributionLoc
Diagram
Diagram
[ top ]
Element ms:documentDistributionInfoType / ms:hashkey
Annotations
Specifies the hashkey for indexing and downloading the publication
Diagram
Diagram
Type xs:string
[ top ]
Element ms:documentDistributionInfoType / ms:sizes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#sizeInfo
[ top ]
Element ms:componentDistributionInfoType / ms:componentDistributionForm
Annotations
Specifies the form of distribution of the component (e.g. as source code, executable programme etc.)
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration webService
An app/component accessible through remote invocation typically using some REST-style APIs or SOAP protocols.
enumeration sourceCode
The distributable (delivery) form of an app/component containing the source code
enumeration executableCode
The distributable (delivery) form of an app/component with the executable code, i.e. that can be run on computer
enumeration sourceAndExecutableCode
The distributable (delivery) form of an app/component that contains both the source and the executable codes
enumeration dockerImage
For apps/components delivered as docker images
enumeration galaxyWorkflow
Workflows delivered wrapped in the Galaxy workflow system
enumeration workflowFile
A workflow description file following a standard language, such as a CWL
[ top ]
Element ms:componentDistributionInfoType / ms:command
Annotations
A command line used to invoke a component
Diagram
Diagram
Type xs:string
[ top ]
Element ms:componentDistributionInfoType / ms:webServiceType
Annotations
A classification of web services based on the protocol used for accessing them
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration REST
Web services that use REST (Representational State Transfer)
enumeration SOAP
Web services that use SOAP (Simple Object Access Protocol)
enumeration other
Value for webServiceType, to be used when the desired value is not included in the listed values
[ top ]
Element ms:componentDistributionInfoType / ms:operatingSystems
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_componentDistributionInfoType_operatingSystems_operatingSystem
[ top ]
Element ms:componentDistributionInfoType / ms:operatingSystems / ms:operatingSystem
Annotations
The operating system on which the tool can run
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 50
enumeration os-independent
Independent of operating systems
enumeration windows
Windows OS
enumeration linux
Linux OS
enumeration unix
Unix OS
enumeration mac-OS
MAC OS
enumeration googleChromeOS
Google chrome OS
enumeration iOS
iOS
enumeration android
Android OS
enumeration other
Value for operatingSystem, to be used when the desired value is not included in the listed values
[ top ]
Element ms:documentDistributionInfo
Annotations
Groups information on the distribution of a document (single file)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#documentDistributionInfoType_hashkey OMTD-SHARE_XMLSchema.tmp#dataFormatInfo OMTD-SHARE_XMLSchema.tmp#characterEncoding OMTD-SHARE_XMLSchema.tmp#documentDistributionInfoType_sizes OMTD-SHARE_XMLSchema.tmp#documentDistributionInfoType
Type ms:documentDistributionInfoType
[ top ]
Element ms:componentDistributionInfo
Annotations
Groups information on the distributable form of a component (e.g. as a software code, an executable programme, a web service etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_componentDistributionForm OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_command OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_webServiceType OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_operatingSystems OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType
Type ms:componentDistributionInfoType
[ top ]
Element ms:structuralEncodingInfoType / ms:structuralEncoding
Annotations
Information on whether the structure of the corpus documents is formally encoded and the scheme used for this
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_structuralEncodingInfoType_structuralEncoding_schemeName OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_structuralEncodingInfoType_structuralEncoding_schemeURI
Type extension of xs:string
Attributes
QName Type Use
schemeName restriction of xs:string required
schemeURI xs:anyURI optional
[ top ]
Element ms:structuralEncodingInfoType / ms:sizePerStructuralEncoding
Annotations
Provides information on the size of the resource parts with different format
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:structuralEncodingInfo
Annotations
Groups information on the encoding of the structure of the contents of the corpus
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_structuralEncoding OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_sizePerStructuralEncoding OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType
Type ms:structuralEncodingInfoType
[ top ]
Element ms:modalityType
Annotations
Specifies the type of the modality represented in the resource or processed by a tool/service
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration bodyGesture
enumeration facialExpression
enumeration voice
enumeration combinationOfModalities
enumeration signLanguage
enumeration spokenLanguage
enumeration writtenLanguage
enumeration other
[ top ]
Element ms:modalityInfoType / ms:modalityTypeDetails
Annotations
Provides further information on modalities
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:modalityInfoType / ms:sizePerModality
Annotations
Provides information on the size per modality component
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit OMTD-SHARE_XMLSchema.tmp#sizeInfoType
Type ms:sizeInfoType
[ top ]
Element ms:runningEnvironmentInfoType / ms:requiresSoftware
Annotations
Additional software required for running a s/w component and/or computational grammar
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:runningEnvironmentInfoType / ms:requiresLRs
Annotations
If for running a s/w component and/or computational grammar, specific LRs (e.g. a grammar, a list of words etc.) are required
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#relatedResourceType
Type ms:relatedResourceType
[ top ]
Element ms:runningEnvironmentInfoType / ms:runningEnvironmentDetails
Annotations
Provides further information on the running environment
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 200
[ top ]
Element ms:modalityInfo
Annotations
Groups information on the modalities represented in the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#modalityType OMTD-SHARE_XMLSchema.tmp#modalityInfoType_modalityTypeDetails OMTD-SHARE_XMLSchema.tmp#modalityInfoType_sizePerModality OMTD-SHARE_XMLSchema.tmp#modalityInfoType
Type ms:modalityInfoType
[ top ]
Element ms:runningEnvironmentInfo
Annotations
Groups together information on the running environment of a tool or a language description
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_requiresSoftware OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_requiresLRs OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_runningEnvironmentDetails OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType
Type ms:runningEnvironmentInfoType
[ top ]
Element ms:theoreticModel
Annotations
Name of the theoretic model applied for the creation or enrichment of the resource, and/or a reference (URL or bibliographic reference) to informative material about the theoretic model used
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 500
[ top ]
Element ms:hasOriginalSource
Annotations
The identifier of the original resources that were at the base of the creation process of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType_resourceIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType
Type ms:resourceIdentifierType
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
resourceIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the resource identifier is assigned by the authority that issues it (e.g. DOI, ISLRN etc.)
[ top ]
Element ms:metalanguageInfo
Annotations
Groups information on the languages used for the description of the resource
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#language OMTD-SHARE_XMLSchema.tmp#languageInfoType_sizePerLanguage OMTD-SHARE_XMLSchema.tmp#languageInfoType_languageVarieties OMTD-SHARE_XMLSchema.tmp#languageInfoType
Type ms:languageInfoType
[ top ]
Element ms:mediaType
Annotations
Specifies the media type of the resource and basically corresponds to the physical medium of the content representation. Each media type is described through a distinctive set of features. A resource may consist of parts attributed to different types of media.
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration text
enumeration audio
enumeration video
enumeration image
enumeration textNumerical
[ top ]
Element ms:mimeType
Annotations
The mime-type of the resource which is a formalized specifier for the format included or a mime-type that the tool/service accepts, in conformance with the values of the IANA (Internet Assigned Numbers Authority); you can select one of the pre-defined values or add a value, PREFERABLY FROM THE IANA MEDIA MIMETYPE RECOMMENDED VALUES (http://www.iana.org/assignments/media-types/media-types.xhtml)
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 50
enumeration text/plain
enumeration application/vnd.xmi+xml
enumeration text/xml
enumeration application/xml
enumeration application/x-xces+xml
enumeration application/tei+xml
enumeration application/rdf+xml
enumeration application/xhtml+xml
enumeration application/emma+xml
enumeration application/pls+xml
enumeration application/postscript
enumeration text/sgml
enumeration text/html
enumeration application/x-tex
enumeration application/rtf
enumeration application/json+ld
enumeration application/x-latex
enumeration text/csv
enumeration text/tab-separated-values
enumeration application/pdf
enumeration application/x-msaccess
enumeration application/msword
enumeration application/vnd.ms-excel
enumeration text/turtle
enumeration text/rtf
enumeration text/tcf+xml
enumeration other
[ top ]
Element ms:encodingLevel
Annotations
Information on the contents of the lexicalConceptualResource as regards the linguistic level of analysis
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 30
enumeration phonetics
enumeration phonology
enumeration semantics
enumeration morphology
enumeration syntax
enumeration pragmatics
enumeration other
[ top ]
Element ms:TDMMethod
Annotations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#TDMMethodType
Type ms:TDMMethodType
Facets
enumeration ruleBased
A type of method that makes use of set(s) of rules to perform the relevant task.
enumeration machineLearning
A method of data analysis that automates model building. Using algorithms that iteratively learn from data, machine learning allows computers to find hidden insights without being explicitly programmed where to look.
enumeration statisticalLearning
The process of using statistics and techniques related to statistics in order to understand and learn from your data so that you can predict its future.
enumeration machineAndStatisticalLearning
Methods and techniques used either in machine learning or statistical learning
enumeration regressionAnalysis
A statistical process for estimating the relationships among variables. It includes many techniques for modeling and analyzing several variables, when the focus is on the relationship between a dependent variable and one or more independent variables (or 'predictors').
enumeration regularisation
A process of introducing additional information in order to solve an ill-posed problem or to prevent overfitting.
enumeration instanceBasedLearning
A family of learning algorithms that, instead of performing explicit generalization, compares new problem instances with instances seen in training, which have been stored in memory.
enumeration decisionTrees
A non-parametric supervised learning method used for classification and regression. The goal is to create a tree-like graph or model of decisions and their possible consequences by learning simple decision rules inferred from the data features.
enumeration bayesian
A method in probability and statistics based on Bayes' theorem, mainly related to statistical inference.
enumeration kernelMethod
Any method used in pattern analysis that relies on kernel functions, which enable it to operate in a high-dimensional, implicit feature space without ever computing the coordinates of the data in that space, but rather by simply computing the inner products between the images of all pairs of data in the feature space.
enumeration clusteringMethod
Any method used in clustering or cluster analysis, i.e. in grouping a set of objects in such a way that objects in the same group (cluster) are more similar (in some sense or another) to each other than to those in other groups (clusters).
enumeration associationRuleLearning
A machine learning method used in recognising relationships among variables in databases and extracted in the form of rules.
enumeration artificialNeuralNetwork
A computational model based on a large collection of simple neural units (artificial neurons), loosely analogous to the observed behavior of a biological brain's axons. These systems are self-learning and trained, rather than explicitly programmed.
enumeration deepLearning
A branch of machine learning based on deep neural networks. A deep neural network (DNN) is an artificial neural network (ANN) with multiple hidden layers of units between the input and output layers.
enumeration ensembleMethod
Any method that uses multiple learning algorithms in an attempt to improve predictive performance not obtainable otherwise with any of the constituent learning algorithms.
enumeration dimensionalityReduction
A method based on reducing the number of random variables under consideration, via obtaining a set of principal variables.
[ top ]
Element ms:samplesLocation
Annotations
Links a resource to a url (or url's) with samples of the resource or, in the case of tools, of samples of input and/or output processes
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#httpURI
Type ms:httpURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Element ms:projectInfo
Annotations
Groups information on a project related to the resource(e.g. a project the resource has been used in; a funded project that led to the resource creation etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectShortNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectIdentifiers OMTD-SHARE_XMLSchema.tmp#projectInfoType_webpages OMTD-SHARE_XMLSchema.tmp#projectInfoType_funders OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingTypes OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingProgramme OMTD-SHARE_XMLSchema.tmp#projectInfoType_jurisdiction OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingCountries OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectDates OMTD-SHARE_XMLSchema.tmp#projectInfoType
Type ms:projectInfoType
[ top ]
Complex Type ms:corpusInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#corpusInfoType_resourceType OMTD-SHARE_XMLSchema.tmp#identificationInfo OMTD-SHARE_XMLSchema.tmp#versionInfo OMTD-SHARE_XMLSchema.tmp#contactInfo OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfo OMTD-SHARE_XMLSchema.tmp#rightsInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_resourceDocumentations OMTD-SHARE_XMLSchema.tmp#resourceCreationInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_validationInfos OMTD-SHARE_XMLSchema.tmp#usageInfo OMTD-SHARE_XMLSchema.tmp#corpusInfoType_relations OMTD-SHARE_XMLSchema.tmp#corpusInfoType_corpusSubtypeSpecificInfo
[ top ]
Complex Type ms:identificationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceNames OMTD-SHARE_XMLSchema.tmp#identificationInfoType_descriptions OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceShortName OMTD-SHARE_XMLSchema.tmp#identificationInfoType_resourceIdentifiers OMTD-SHARE_XMLSchema.tmp#identificationInfoType_public
[ top ]
Complex Type ms:myString
Annotations
Base type for multilingual elements
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#myString_lang
Type extension of xs:string
Attributes
QName Type Default Use
lang xs:language en optional
[ top ]
Complex Type ms:resourceIdentifierType
Annotations
Base type for identifier schemes for resources (corpora, lexical/conceptual resources etc.)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceIdentifierType_resourceIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
resourceIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the resource identifier is assigned by the authority that issues it (e.g. DOI, ISLRN etc.)
[ top ]
Complex Type ms:versionInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#versionInfoType_version OMTD-SHARE_XMLSchema.tmp#versionInfoType_versionDate OMTD-SHARE_XMLSchema.tmp#versionInfoType_versionType OMTD-SHARE_XMLSchema.tmp#versionInfoType_revision
[ top ]
Complex Type ms:contactInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactPoint OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactType OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactPersons OMTD-SHARE_XMLSchema.tmp#contactInfoType_contactGroups OMTD-SHARE_XMLSchema.tmp#contactInfoType_mailingLists
[ top ]
Complex Type ms:personInfoType
Annotations
Groups information relevant to persons related to the resource; to be used mainly for contact persons, resource creators, validators, annotators etc. for whom personal data can be provided
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personInfoType_surname OMTD-SHARE_XMLSchema.tmp#personInfoType_givenName OMTD-SHARE_XMLSchema.tmp#personInfoType_personIdentifiers OMTD-SHARE_XMLSchema.tmp#communicationInfo OMTD-SHARE_XMLSchema.tmp#personInfoType_affiliation
[ top ]
Complex Type ms:personIdentifierType
Annotations
Base type for identifiers for persons
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#personIdentifierType_personIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
personIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the person identifier is assigned by the authority that issues it (e.g. ORCID, ScopusId, ResearcherID etc.)
[ top ]
Complex Type ms:communicationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#communicationInfoType_emails OMTD-SHARE_XMLSchema.tmp#communicationInfoType_homepages OMTD-SHARE_XMLSchema.tmp#communicationInfoType_postalAddress OMTD-SHARE_XMLSchema.tmp#communicationInfoType_telephoneNumbers
[ top ]
Simple Type ms:emailAddress
Annotations
Base type for validating email addresses
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
pattern [^@]+@[^\.]+\..+|
[ top ]
Simple Type ms:httpURI
Annotations
Base type to be used for url's, ftp's, secure url's
Diagram
Diagram
Type restriction of xs:anyURI
Facets
pattern (http://.*)|(https://.*)|(ftp://.*)|(www.*)
[ top ]
Simple Type ms:regionIdType
Annotations
Base type for countries (regions) according to ISO 3166
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration AA
enumeration AC
enumeration AD
enumeration AE
enumeration AF
enumeration AG
enumeration AI
enumeration AL
enumeration AM
enumeration AO
enumeration AQ
enumeration AR
enumeration AS
enumeration AT
enumeration AU
enumeration AW
enumeration AX
enumeration AZ
enumeration BA
enumeration BB
enumeration BD
enumeration BE
enumeration BF
enumeration BG
enumeration BH
enumeration BI
enumeration BJ
enumeration BL
enumeration BM
enumeration BN
enumeration BO
enumeration BQ
enumeration BR
enumeration BS
enumeration BT
enumeration BV
enumeration BW
enumeration BY
enumeration BZ
enumeration CA
enumeration CC
enumeration CD
enumeration CF
enumeration CG
enumeration CH
enumeration CI
enumeration CK
enumeration CL
enumeration CM
enumeration CN
enumeration CO
enumeration CP
enumeration CR
enumeration CU
enumeration CV
enumeration CW
enumeration CX
enumeration CY
enumeration CZ
enumeration DE
enumeration DG
enumeration DJ
enumeration DK
enumeration DM
enumeration DO
enumeration DZ
enumeration EA
enumeration EC
enumeration EE
enumeration EG
enumeration EH
enumeration ER
enumeration ES
enumeration ET
enumeration EU
enumeration FI
enumeration FJ
enumeration FK
enumeration FM
enumeration FO
enumeration FR
enumeration GA
enumeration GB
enumeration GD
enumeration GE
enumeration GF
enumeration GG
enumeration GH
enumeration GI
enumeration GL
enumeration GM
enumeration GN
enumeration GP
enumeration GQ
enumeration GR
enumeration GS
enumeration GT
enumeration GU
enumeration GW
enumeration GY
enumeration HK
enumeration HM
enumeration HN
enumeration HR
enumeration HT
enumeration HU
enumeration IC
enumeration ID
enumeration IE
enumeration IL
enumeration IM
enumeration IN
enumeration IO
enumeration IQ
enumeration IR
enumeration IS
enumeration IT
enumeration JE
enumeration JM
enumeration JO
enumeration JP
enumeration KE
enumeration KG
enumeration KH
enumeration KI
enumeration KM
enumeration KN
enumeration KP
enumeration KR
enumeration KW
enumeration KY
enumeration KZ
enumeration LA
enumeration LB
enumeration LC
enumeration LI
enumeration LK
enumeration LR
enumeration LS
enumeration LT
enumeration LU
enumeration LV
enumeration LY
enumeration MA
enumeration MC
enumeration MD
enumeration ME
enumeration MF
enumeration MG
enumeration MH
enumeration MK
enumeration ML
enumeration MM
enumeration MN
enumeration MO
enumeration MP
enumeration MQ
enumeration MR
enumeration MS
enumeration MT
enumeration MU
enumeration MV
enumeration MW
enumeration MX
enumeration MY
enumeration MZ
enumeration NA
enumeration NC
enumeration NE
enumeration NF
enumeration NG
enumeration NI
enumeration NL
enumeration NO
enumeration NP
enumeration NR
enumeration NU
enumeration NZ
enumeration OM
enumeration PA
enumeration PE
enumeration PF
enumeration PG
enumeration PH
enumeration PK
enumeration PL
enumeration PM
enumeration PN
enumeration PR
enumeration PS
enumeration PT
enumeration PW
enumeration PY
enumeration QA
enumeration QM..QZ
enumeration RE
enumeration RO
enumeration RS
enumeration RU
enumeration RW
enumeration SA
enumeration SB
enumeration SC
enumeration SD
enumeration SE
enumeration SG
enumeration SH
enumeration SI
enumeration SJ
enumeration SK
enumeration SL
enumeration SM
enumeration SN
enumeration SO
enumeration SR
enumeration SS
enumeration ST
enumeration SV
enumeration SX
enumeration SY
enumeration SZ
enumeration TA
enumeration TC
enumeration TD
enumeration TF
enumeration TG
enumeration TH
enumeration TJ
enumeration TK
enumeration TL
enumeration TM
enumeration TN
enumeration TO
enumeration TR
enumeration TT
enumeration TV
enumeration TW
enumeration TZ
enumeration UA
enumeration UG
enumeration UM
enumeration US
enumeration UY
enumeration UZ
enumeration VA
enumeration VC
enumeration VE
enumeration VG
enumeration VI
enumeration VN
enumeration VU
enumeration WF
enumeration WS
enumeration XA..XZ
enumeration YE
enumeration YT
enumeration ZA
enumeration ZM
enumeration ZW
enumeration ZZ
enumeration 001
enumeration 002
enumeration 003
enumeration 005
enumeration 009
enumeration 011
enumeration 013
enumeration 014
enumeration 015
enumeration 017
enumeration 018
enumeration 019
enumeration 021
enumeration 029
enumeration 030
enumeration 034
enumeration 035
enumeration 039
enumeration 053
enumeration 054
enumeration 057
enumeration 061
enumeration 142
enumeration 143
enumeration 145
enumeration 150
enumeration 151
enumeration 154
enumeration 155
enumeration 419
[ top ]
Complex Type ms:organizationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationAlternativeNames OMTD-SHARE_XMLSchema.tmp#organizationInfoType_organizationIdentifiers OMTD-SHARE_XMLSchema.tmp#organizationInfoType_departmentNames OMTD-SHARE_XMLSchema.tmp#communicationInfo
[ top ]
Complex Type ms:organizationIdentifierType
Annotations
Base type for identifiers for organizations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#organizationIdentifierType_organizationIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
organizationIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the organization identifier is assigned by the authority that issues it
[ top ]
Complex Type ms:groupInfoType
Annotations
Base type for groups; group name and affiliations
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#groupInfoType_groupNames OMTD-SHARE_XMLSchema.tmp#groupInfoType_affiliatedOrganization
[ top ]
Complex Type ms:mailingListInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_mailingListName OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_subscribe OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_unsubscribe OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_post OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_archive OMTD-SHARE_XMLSchema.tmp#mailingListInfoType_otherArchives
[ top ]
Complex Type ms:datasetDistributionInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#distributionMedium OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_sizes OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_textFormats OMTD-SHARE_XMLSchema.tmp#datasetDistributionInfoType_characterEncodings
[ top ]
Complex Type ms:sizeInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#size OMTD-SHARE_XMLSchema.tmp#sizeInfoType_sizeUnit
[ top ]
Complex Type ms:textFormatInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dataFormatInfo OMTD-SHARE_XMLSchema.tmp#textFormatInfoType_sizePerTextFormat
[ top ]
Simple Type ms:dataFormatType
Annotations
Specifies the format that is used since often the mime type will not be sufficient for machine processing; NOTE: normally the format should be represented as a combination of the mimetype (e.g. application/xml) and some name and link to the documentation about the supplementary conventions used (e.g xces, alvisED etc.)
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration text/plain
enumeration application/vnd.xmi+xml
enumeration application/xml
enumeration application/x-xces+xml
enumeration application/tei+xml
enumeration application/rdf+xml
enumeration application/xhtml+xml
enumeration application/emma+xml
enumeration application/pls+xml
enumeration application/postscript
enumeration text/sgml
enumeration text/html
enumeration application/x-tex
enumeration application/rtf
enumeration application/json+ld
enumeration application/x-latex
enumeration text/csv
enumeration text/tab-separated-values
enumeration application/pdf
enumeration application/x-msaccess
enumeration application/msword
enumeration application/vnd.ms-excel
enumeration text/turtle
enumeration aclAnthology
enumeration alvisEnrichedDocument
enumeration bnc
enumeration bioNLP
enumeration bioNLP; format-variant=ST2013a1_a2
enumeration cadixeJSON
enumeration conll2000
enumeration conll2002
enumeration conll2006
enumeration conll2007
enumeration conll2009
enumeration conll2012
enumeration dataSift
enumeration factoredTagLem
enumeration gate
enumeration genia
enumeration graf
enumeration html5Microdata
enumeration i2b2
enumeration imsCwb
enumeration jdbc
enumeration keaCorpus
enumeration lll
enumeration negraExport
enumeration ptb; format-variant=chunked
enumeration ptb; format-variant=combined
enumeration pml
enumeration relp
enumeration aimedCorpus
enumeration tiger
enumeration tupp-dz
enumeration twitter
enumeration xces; format-variant=ilsp
enumeration web1t
enumeration uimaCASDump
enumeration uimaBinaryCas
[ top ]
Complex Type ms:characterEncodingInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#characterEncoding OMTD-SHARE_XMLSchema.tmp#characterEncodingInfoType_sizePerCharacterEncoding
[ top ]
Complex Type ms:licenceInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#licenceInfoType_licence OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandardLicenceName OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandardLicenceTermsURL OMTD-SHARE_XMLSchema.tmp#licenceInfoType_nonStandaradLicenceTermsText OMTD-SHARE_XMLSchema.tmp#licenceInfoType_conditionOfUse
[ top ]
Complex Type ms:actorInfoType
Annotations
Base type for actors/agents; choice between person and organization
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actorInfoType_actorType OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedPerson OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedGroup OMTD-SHARE_XMLSchema.tmp#actorInfoType_relatedOrganization
[ top ]
Complex Type ms:resourceDocumentationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_documentationDescription OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_documentationType OMTD-SHARE_XMLSchema.tmp#resourceDocumentationInfoType_publicationIdentifiers
[ top ]
Complex Type ms:publicationIdentifierType
Annotations
Base type for identifier schemes for publications
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#publicationIdentifierType_publicationIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#publicationIdentifierType_schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
publicationIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the publication identifier is assigned by the authority that issues it (e.g. DOI, PubMed Central etc.)
schemeURI xs:anyURI optional
[ top ]
Complex Type ms:resourceCreationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_resourceCreators OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_fundingProjects OMTD-SHARE_XMLSchema.tmp#resourceCreationInfoType_creationDate
[ top ]
Complex Type ms:projectInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectShortNames OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectIdentifiers OMTD-SHARE_XMLSchema.tmp#projectInfoType_webpages OMTD-SHARE_XMLSchema.tmp#projectInfoType_funders OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingTypes OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingProgramme OMTD-SHARE_XMLSchema.tmp#projectInfoType_jurisdiction OMTD-SHARE_XMLSchema.tmp#projectInfoType_fundingCountries OMTD-SHARE_XMLSchema.tmp#projectInfoType_projectDates
[ top ]
Complex Type ms:projectIdentifierType
Annotations
Base type for identifier schemes for projects
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#projectIdentifierType_projectIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
projectIdentifierSchemeName xs:string required
Specifies the name of the scheme according to which the project identifier is assigned by the authority that issues it
[ top ]
Complex Type ms:dateCombinationType
Annotations
Base type to be used for choice betwwen range of dates and exact date
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#date OMTD-SHARE_XMLSchema.tmp#dateRange
[ top ]
Complex Type ms:dateType
Annotations
Base type to be used for dates, allowing optional day and month
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#dateType_day OMTD-SHARE_XMLSchema.tmp#dateType_month OMTD-SHARE_XMLSchema.tmp#dateType_year
[ top ]
Complex Type ms:dateRangeType
Annotations
Base type to be used for range of dates (time periods)
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#startDate OMTD-SHARE_XMLSchema.tmp#endDate
[ top ]
Complex Type ms:validationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#validationInfoType_validated OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationType OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationMode OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationModeDetails OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationExtent OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationExtentDetails OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationReports OMTD-SHARE_XMLSchema.tmp#validationInfoType_validationSwComponents OMTD-SHARE_XMLSchema.tmp#validationInfoType_validators
[ top ]
Simple Type ms:processMode
Annotations
Base type for all modes of processing (e.g. annotation, conversion, creation etc.)
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 20
enumeration manual
For processes performed only manually, without automatic means or aids
enumeration automatic
For processes performed only with automatic means or aids
enumeration mixed
For processes performed in a mixed way, using manual and automatic means
enumeration interactive
For processes performed interactively
[ top ]
Complex Type ms:relatedDocumentInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_documentUnstructured OMTD-SHARE_XMLSchema.tmp#relatedDocumentInfoType_publicationIdentifiers
[ top ]
Complex Type ms:relatedResourceType
Annotations
Base type for related resources; sequence of resource names and identifiers
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceNames OMTD-SHARE_XMLSchema.tmp#relatedResourceType_resourceIdentifiers
[ top ]
Complex Type ms:usageInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#usageInfoType_intendedApplications OMTD-SHARE_XMLSchema.tmp#usageInfoType_actualUseInfos
[ top ]
Simple Type ms:applicationType
Annotations
A classification of NLP/TDM applications; please, note that the ontology is under revision
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration annotation
enumeration bilingualLexiconInduction
enumeration contradictionDetection
enumeration dependencyParsing
enumeration derivationalMorphologicalAnalysis
enumeration discourseAnalysis
enumeration documentClassification
enumeration emotionGeneration
enumeration emotionRecognition
enumeration entityMentionRecognition
enumeration eventExtraction
enumeration expressionRecognition
enumeration extractionOfFundingInformation
enumeration intra-documentCoreferenceResolution
enumeration languageIdentification
enumeration languageModelling
enumeration languageModelsTraining
enumeration lemmatization
enumeration lexiconAccess
enumeration lexiconAcquisitionFromCorpora
enumeration lexiconEnhancement
enumeration lexiconExtractionFromLexica
enumeration lexiconFormatConversion
enumeration lexiconMerging
enumeration lexiconVisualization
enumeration machineTranslation
enumeration morphologicalAnalysis
enumeration morphosyntacticAnnotation-bPosTagging
enumeration morphosyntacticAnnotation-posTagging
enumeration naturalLanguageGeneration
enumeration naturalLanguageUnderstanding
enumeration opinionMining
enumeration other
enumeration persuasiveExpressionMining
enumeration qualitativeAnalysis
enumeration questionAnswering
enumeration semanticRoleLabelling
enumeration sentenceSplitting
enumeration shallowParsing
enumeration spellChecking
enumeration temporalExpressionRecognition
enumeration terminologyExtraction
enumeration textGeneration
enumeration textMining
enumeration tokenization
enumeration tokenizationAndSentenceSplitting
enumeration topicDetection
enumeration topicDetectionAndTracking
enumeration topicModelling
enumeration textAndDataMining
The automated processing of unstructured text and/or structured data leading to the extraction of previously hidden knowledge.
enumeration contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text, images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered information (e.g. identification of relationships between entities).
enumeration textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured data that can be further analysed to extract knowledge, support decision making etc.
enumeration knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of a specific domain from external sources so that it can be used in a knowledge-based system.
enumeration informationExtraction
The process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used in a particular context; the selection of the sense is made from a list of the word's senses."
enumeration eventDetection
The process/task of identifying events in data (text, video, images etc.), usually combined with their classification into types of events and recognition of the event attributes (e.g. time, place, participants and duration).
enumeration namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities in text into pre-defined categories such as the names of persons, organizations, locations, expressions of times, quantities, monetary values, percentages, etc.
enumeration knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data.
enumeration knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of data for patterns that can be considered knowledge about the data. Information extraction is the process/task of automatically extracting structured information from unstructured and/or semi-structured data.
enumeration knowledgeRepresentation
The process/task of representing information about entities in a form that machines are capable of understanding it.
enumeration relationExtraction
The process/task of identifying and classifying relation mentions between entities in text and/or data.
enumeration http://www.meta-share.org/ontologies/OMTD_TDMontology/AccessComponent
A component used for providing access to data resources
enumeration coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same entity in a certain text.
enumeration textCategorisation
The process/task of assigning documents into classes or categories.
enumeration summarisation
The process/task of reducing one or more textual documents with a computer program in order to create a summary that retains the most important points of the original document(s).
enumeration sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed in a piece of text, especially in order to determine whether the writer's attitude towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness, etc.) in the linguistic expression of texts.
enumeration questionAnswering
The process/task of automatically answering questions posed by users in the form of natural language.
enumeration computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems have the ability to use them in tasks, such as automated logical reasoning.
enumeration informationRetrieval
The activity of obtaining information resources relevant to an information need from a collection of information resources. Searches can be based on full-text or other content-based indexing.
enumeration exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's intent and the contextual meaning of terms as they appear in the searchable dataspace, whether on the Web or within a closed system, to generate more relevant results.
enumeration informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from an information stream using (semi)automated or computerized methods prior to presentation to a human user. The selection of the items is based on the correlation between the content of the items and the user’s preferences (content-based filtering) or the correlation between people with similar preferences (collaborative filtering).
enumeration recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning of one text is entailed in that of the other, i.e. whether the truth of one text fragment follows from that of the other fragment.
enumeration paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that conveys the same or similar information.
[ top ]
Complex Type ms:actualUseInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_applicationsInvolved OMTD-SHARE_XMLSchema.tmp#applicationOther OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_usageReports OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_derivedResources OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_usageProjects OMTD-SHARE_XMLSchema.tmp#actualUseInfoType_actualUseDetails
[ top ]
Complex Type ms:relationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#relationInfoType_relationType OMTD-SHARE_XMLSchema.tmp#relationInfoType_relatedResource
[ top ]
Complex Type ms:rawCorpusInfoType
Annotations
Groups together all information related to raw corpora
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_corpusSubtype OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_mediaType OMTD-SHARE_XMLSchema.tmp#lingualityInfo OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_languages OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_textClassifications OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_domains OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_timeClassifications OMTD-SHARE_XMLSchema.tmp#rawCorpusInfoType_geographicClassifications OMTD-SHARE_XMLSchema.tmp#creationInfo
[ top ]
Complex Type ms:lingualityInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_lingualityType OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_multilingualityType OMTD-SHARE_XMLSchema.tmp#lingualityInfoType_multilingualityTypeDetails
[ top ]
Complex Type ms:languageInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#language OMTD-SHARE_XMLSchema.tmp#languageInfoType_sizePerLanguage OMTD-SHARE_XMLSchema.tmp#languageInfoType_languageVarieties
[ top ]
Simple Type ms:languageIdType
Annotations
Base type for languages according to ISO 639; the codes are taken from ISO 639-1 and, if not covered, from ISO 639-3, according to the BCP-47 guidlelines
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration bg
enumeration cs
enumeration hr
enumeration da
enumeration nl
enumeration en
enumeration et
enumeration fi
enumeration fr
enumeration de
enumeration hu
enumeration ga
enumeration it
enumeration lv
enumeration lt
enumeration mt
enumeration el
enumeration pl
enumeration pt
enumeration ro
enumeration sk
enumeration sl
enumeration es
enumeration sv
enumeration aa
enumeration ab
enumeration ae
enumeration af
enumeration ak
enumeration am
enumeration an
enumeration ar
enumeration as
enumeration av
enumeration ay
enumeration az
enumeration ba
enumeration be
enumeration bh
enumeration bi
enumeration bm
enumeration bn
enumeration bo
enumeration br
enumeration bs
enumeration ca
enumeration ce
enumeration ch
enumeration co
enumeration cr
enumeration cu
enumeration cv
enumeration cy
enumeration dv
enumeration dz
enumeration ee
enumeration eo
enumeration eu
enumeration fa
enumeration ff
enumeration fj
enumeration fo
enumeration fy
enumeration gd
enumeration gl
enumeration gn
enumeration gu
enumeration gv
enumeration ha
enumeration he
enumeration hi
enumeration ho
enumeration ht
enumeration hy
enumeration hz
enumeration ia
enumeration id
enumeration ie
enumeration ig
enumeration ii
enumeration ik
enumeration io
enumeration is
enumeration iu
enumeration ja
enumeration jv
enumeration ka
enumeration kg
enumeration ki
enumeration kj
enumeration kk
enumeration kl
enumeration km
enumeration kn
enumeration ko
enumeration kr
enumeration ks
enumeration ku
enumeration kv
enumeration kw
enumeration ky
enumeration la
enumeration lb
enumeration lg
enumeration li
enumeration ln
enumeration lo
enumeration lu
enumeration mg
enumeration mh
enumeration mi
enumeration mk
enumeration ml
enumeration mn
enumeration mr
enumeration ms
enumeration my
enumeration na
enumeration nb
enumeration nd
enumeration ne
enumeration ng
enumeration nn
enumeration no
enumeration nr
enumeration nv
enumeration ny
enumeration oc
enumeration oj
enumeration om
enumeration or
enumeration os
enumeration pa
enumeration pi
enumeration ps
enumeration qu
enumeration rm
enumeration rn
enumeration ru
enumeration rw
enumeration sa
enumeration sc
enumeration sd
enumeration se
enumeration sg
enumeration hbs
enumeration si
enumeration sm
enumeration sn
enumeration so
enumeration sq
enumeration sr
enumeration ss
enumeration st
enumeration su
enumeration sw
enumeration ta
enumeration te
enumeration tg
enumeration th
enumeration ti
enumeration tk
enumeration tl
enumeration tn
enumeration to
enumeration tr
enumeration ts
enumeration tt
enumeration tw
enumeration ty
enumeration ug
enumeration uk
enumeration ur
enumeration uz
enumeration ve
enumeration vi
enumeration vo
enumeration wa
enumeration wo
enumeration xh
enumeration yi
enumeration yo
enumeration za
enumeration zh
enumeration zu
enumeration aaa
enumeration aab
enumeration aac
enumeration aad
enumeration aae
enumeration aaf
enumeration aag
enumeration aah
enumeration aai
enumeration aak
enumeration aal
enumeration aam
enumeration aan
enumeration aao
enumeration aap
enumeration aaq
enumeration aas
enumeration aat
enumeration aau
enumeration aav
enumeration aaw
enumeration aax
enumeration aaz
enumeration aba
enumeration abb
enumeration abc
enumeration abd
enumeration abe
enumeration abf
enumeration abg
enumeration abh
enumeration abi
enumeration abj
enumeration abl
enumeration abm
enumeration abn
enumeration abo
enumeration abp
enumeration abq
enumeration abr
enumeration abs
enumeration abt
enumeration abu
enumeration abv
enumeration abw
enumeration abx
enumeration aby
enumeration abz
enumeration aca
enumeration acb
enumeration acd
enumeration ace
enumeration acf
enumeration ach
enumeration aci
enumeration ack
enumeration acl
enumeration acm
enumeration acn
enumeration acp
enumeration acq
enumeration acr
enumeration acs
enumeration act
enumeration acu
enumeration acv
enumeration acw
enumeration acx
enumeration acy
enumeration acz
enumeration ada
enumeration adb
enumeration add
enumeration ade
enumeration adf
enumeration adg
enumeration adh
enumeration adi
enumeration adj
enumeration adl
enumeration adn
enumeration ado
enumeration adp
enumeration adq
enumeration adr
enumeration ads
enumeration adt
enumeration adu
enumeration adw
enumeration adx
enumeration ady
enumeration adz
enumeration aea
enumeration aeb
enumeration aec
enumeration aed
enumeration aee
enumeration aek
enumeration ael
enumeration aem
enumeration aen
enumeration aeq
enumeration aer
enumeration aes
enumeration aeu
enumeration aew
enumeration aey
enumeration aez
enumeration afa
enumeration afb
enumeration afd
enumeration afe
enumeration afg
enumeration afh
enumeration afi
enumeration afk
enumeration afn
enumeration afo
enumeration afp
enumeration afs
enumeration aft
enumeration afu
enumeration afz
enumeration aga
enumeration agb
enumeration agc
enumeration agd
enumeration age
enumeration agf
enumeration agg
enumeration agh
enumeration agi
enumeration agj
enumeration agk
enumeration agl
enumeration agm
enumeration agn
enumeration ago
enumeration agq
enumeration agr
enumeration ags
enumeration agt
enumeration agu
enumeration agv
enumeration agw
enumeration agx
enumeration agy
enumeration agz
enumeration aha
enumeration ahb
enumeration ahg
enumeration ahh
enumeration ahi
enumeration ahk
enumeration ahl
enumeration ahm
enumeration ahn
enumeration aho
enumeration ahp
enumeration ahr
enumeration ahs
enumeration aht
enumeration aia
enumeration aib
enumeration aic
enumeration aid
enumeration aie
enumeration aif
enumeration aig
enumeration aih
enumeration aii
enumeration aij
enumeration aik
enumeration ail
enumeration aim
enumeration ain
enumeration aio
enumeration aip
enumeration aiq
enumeration air
enumeration ais
enumeration ait
enumeration aiw
enumeration aix
enumeration aiy
enumeration aja
enumeration ajg
enumeration aji
enumeration ajn
enumeration ajp
enumeration ajt
enumeration aju
enumeration ajw
enumeration ajz
enumeration akb
enumeration akc
enumeration akd
enumeration ake
enumeration akf
enumeration akg
enumeration akh
enumeration aki
enumeration akj
enumeration akk
enumeration akl
enumeration akm
enumeration ako
enumeration akp
enumeration akq
enumeration akr
enumeration aks
enumeration akt
enumeration aku
enumeration akv
enumeration akw
enumeration akx
enumeration aky
enumeration akz
enumeration ala
enumeration alc
enumeration ald
enumeration ale
enumeration alf
enumeration alg
enumeration alh
enumeration ali
enumeration alj
enumeration alk
enumeration all
enumeration alm
enumeration aln
enumeration alo
enumeration alp
enumeration alq
enumeration alr
enumeration als
enumeration alt
enumeration alu
enumeration alv
enumeration alw
enumeration alx
enumeration aly
enumeration alz
enumeration ama
enumeration amb
enumeration amc
enumeration ame
enumeration amf
enumeration amg
enumeration ami
enumeration amj
enumeration amk
enumeration aml
enumeration amm
enumeration amn
enumeration amo
enumeration amp
enumeration amq
enumeration amr
enumeration ams
enumeration amt
enumeration amu
enumeration amv
enumeration amw
enumeration amx
enumeration amy
enumeration amz
enumeration ana
enumeration anb
enumeration anc
enumeration and
enumeration ane
enumeration anf
enumeration ang
enumeration anh
enumeration ani
enumeration anj
enumeration ank
enumeration anl
enumeration anm
enumeration ann
enumeration ano
enumeration anp
enumeration anq
enumeration anr
enumeration ans
enumeration ant
enumeration anu
enumeration anv
enumeration anw
enumeration anx
enumeration any
enumeration anz
enumeration aoa
enumeration aob
enumeration aoc
enumeration aod
enumeration aoe
enumeration aof
enumeration aog
enumeration aoh
enumeration aoi
enumeration aoj
enumeration aok
enumeration aol
enumeration aom
enumeration aon
enumeration aor
enumeration aos
enumeration aot
enumeration aou
enumeration aox
enumeration aoz
enumeration apa
enumeration apb
enumeration apc
enumeration apd
enumeration ape
enumeration apf
enumeration apg
enumeration aph
enumeration api
enumeration apj
enumeration apk
enumeration apl
enumeration apm
enumeration apn
enumeration apo
enumeration app
enumeration apq
enumeration apr
enumeration aps
enumeration apt
enumeration apu
enumeration apv
enumeration apw
enumeration apx
enumeration apy
enumeration apz
enumeration aqa
enumeration aqc
enumeration aqd
enumeration aqg
enumeration aql
enumeration aqm
enumeration aqn
enumeration aqp
enumeration aqr
enumeration aqt
enumeration aqz
enumeration arb
enumeration arc
enumeration ard
enumeration are
enumeration arh
enumeration ari
enumeration arj
enumeration ark
enumeration arl
enumeration arn
enumeration aro
enumeration arp
enumeration arq
enumeration arr
enumeration ars
enumeration art
enumeration aru
enumeration arv
enumeration arw
enumeration arx
enumeration ary
enumeration arz
enumeration asa
enumeration asb
enumeration asc
enumeration asd
enumeration ase
enumeration asf
enumeration asg
enumeration ash
enumeration asi
enumeration asj
enumeration ask
enumeration asl
enumeration asn
enumeration aso
enumeration asp
enumeration asq
enumeration asr
enumeration ass
enumeration ast
enumeration asu
enumeration asv
enumeration asw
enumeration asx
enumeration asy
enumeration asz
enumeration ata
enumeration atb
enumeration atc
enumeration atd
enumeration ate
enumeration atg
enumeration ath
enumeration ati
enumeration atj
enumeration atk
enumeration atl
enumeration atm
enumeration atn
enumeration ato
enumeration atp
enumeration atq
enumeration atr
enumeration ats
enumeration att
enumeration atu
enumeration atv
enumeration atw
enumeration atx
enumeration aty
enumeration atz
enumeration aua
enumeration aub
enumeration auc
enumeration aud
enumeration aue
enumeration auf
enumeration aug
enumeration auh
enumeration aui
enumeration auj
enumeration auk
enumeration aul
enumeration aum
enumeration aun
enumeration auo
enumeration aup
enumeration auq
enumeration aur
enumeration aus
enumeration aut
enumeration auu
enumeration auw
enumeration aux
enumeration auy
enumeration auz
enumeration avb
enumeration avd
enumeration avi
enumeration avk
enumeration avl
enumeration avm
enumeration avn
enumeration avo
enumeration avs
enumeration avt
enumeration avu
enumeration avv
enumeration awa
enumeration awb
enumeration awc
enumeration awd
enumeration awe
enumeration awg
enumeration awh
enumeration awi
enumeration awk
enumeration awm
enumeration awn
enumeration awo
enumeration awr
enumeration aws
enumeration awt
enumeration awu
enumeration awv
enumeration aww
enumeration awx
enumeration awy
enumeration axb
enumeration axe
enumeration axg
enumeration axk
enumeration axl
enumeration axm
enumeration axx
enumeration aya
enumeration ayb
enumeration ayc
enumeration ayd
enumeration aye
enumeration ayg
enumeration ayh
enumeration ayi
enumeration ayk
enumeration ayl
enumeration ayn
enumeration ayo
enumeration ayp
enumeration ayq
enumeration ayr
enumeration ays
enumeration ayt
enumeration ayu
enumeration ayy
enumeration ayz
enumeration aza
enumeration azb
enumeration azc
enumeration azd
enumeration azg
enumeration azj
enumeration azm
enumeration azn
enumeration azo
enumeration azt
enumeration azz
enumeration baa
enumeration bab
enumeration bac
enumeration bad
enumeration bae
enumeration baf
enumeration bag
enumeration bah
enumeration bai
enumeration baj
enumeration bal
enumeration ban
enumeration bao
enumeration bap
enumeration bar
enumeration bas
enumeration bat
enumeration bau
enumeration bav
enumeration baw
enumeration bax
enumeration bay
enumeration bba
enumeration bbb
enumeration bbc
enumeration bbd
enumeration bbe
enumeration bbf
enumeration bbg
enumeration bbh
enumeration bbi
enumeration bbj
enumeration bbk
enumeration bbl
enumeration bbm
enumeration bbn
enumeration bbo
enumeration bbp
enumeration bbq
enumeration bbr
enumeration bbs
enumeration bbt
enumeration bbu
enumeration bbv
enumeration bbw
enumeration bbx
enumeration bby
enumeration bbz
enumeration bca
enumeration bcb
enumeration bcc
enumeration bcd
enumeration bce
enumeration bcf
enumeration bcg
enumeration bch
enumeration bci
enumeration bcj
enumeration bck
enumeration bcl
enumeration bcm
enumeration bcn
enumeration bco
enumeration bcp
enumeration bcq
enumeration bcr
enumeration bcs
enumeration bct
enumeration bcu
enumeration bcv
enumeration bcw
enumeration bcy
enumeration bcz
enumeration bda
enumeration bdb
enumeration bdc
enumeration bdd
enumeration bde
enumeration bdf
enumeration bdg
enumeration bdh
enumeration bdi
enumeration bdj
enumeration bdk
enumeration bdl
enumeration bdm
enumeration bdn
enumeration bdo
enumeration bdp
enumeration bdq
enumeration bdr
enumeration bds
enumeration bdt
enumeration bdu
enumeration bdv
enumeration bdw
enumeration bdx
enumeration bdy
enumeration bdz
enumeration bea
enumeration beb
enumeration bec
enumeration bed
enumeration bee
enumeration bef
enumeration beg
enumeration beh
enumeration bei
enumeration bej
enumeration bek
enumeration bem
enumeration beo
enumeration bep
enumeration beq
enumeration ber
enumeration bes
enumeration bet
enumeration beu
enumeration bev
enumeration bew
enumeration bex
enumeration bey
enumeration bez
enumeration bfa
enumeration bfb
enumeration bfc
enumeration bfd
enumeration bfe
enumeration bff
enumeration bfg
enumeration bfh
enumeration bfi
enumeration bfj
enumeration bfk
enumeration bfl
enumeration bfm
enumeration bfn
enumeration bfo
enumeration bfp
enumeration bfq
enumeration bfr
enumeration bfs
enumeration bft
enumeration bfu
enumeration bfw
enumeration bfx
enumeration bfy
enumeration bfz
enumeration bga
enumeration bgb
enumeration bgc
enumeration bgd
enumeration bge
enumeration bgf
enumeration bgg
enumeration bgi
enumeration bgj
enumeration bgk
enumeration bgl
enumeration bgm
enumeration bgn
enumeration bgo
enumeration bgp
enumeration bgq
enumeration bgr
enumeration bgs
enumeration bgt
enumeration bgu
enumeration bgv
enumeration bgw
enumeration bgx
enumeration bgy
enumeration bgz
enumeration bha
enumeration bhb
enumeration bhc
enumeration bhd
enumeration bhe
enumeration bhf
enumeration bhg
enumeration bhh
enumeration bhi
enumeration bhj
enumeration bhl
enumeration bhm
enumeration bhn
enumeration bho
enumeration bhp
enumeration bhq
enumeration bhr
enumeration bhs
enumeration bht
enumeration bhu
enumeration bhv
enumeration bhw
enumeration bhx
enumeration bhy
enumeration bhz
enumeration bia
enumeration bib
enumeration bic
enumeration bid
enumeration bie
enumeration bif
enumeration big
enumeration bij
enumeration bik
enumeration bil
enumeration bim
enumeration bin
enumeration bio
enumeration bip
enumeration biq
enumeration bir
enumeration bit
enumeration biu
enumeration biv
enumeration biw
enumeration bix
enumeration biy
enumeration biz
enumeration bja
enumeration bjb
enumeration bjc
enumeration bje
enumeration bjf
enumeration bjg
enumeration bjh
enumeration bji
enumeration bjj
enumeration bjk
enumeration bjl
enumeration bjm
enumeration bjn
enumeration bjo
enumeration bjp
enumeration bjr
enumeration bjs
enumeration bjt
enumeration bju
enumeration bjv
enumeration bjw
enumeration bjx
enumeration bjy
enumeration bjz
enumeration bka
enumeration bkc
enumeration bkd
enumeration bkf
enumeration bkg
enumeration bkh
enumeration bki
enumeration bkj
enumeration bkk
enumeration bkl
enumeration bkm
enumeration bkn
enumeration bko
enumeration bkp
enumeration bkq
enumeration bkr
enumeration bks
enumeration bkt
enumeration bku
enumeration bkv
enumeration bkw
enumeration bkx
enumeration bky
enumeration bkz
enumeration bla
enumeration blb
enumeration blc
enumeration bld
enumeration ble
enumeration blf
enumeration blg
enumeration blh
enumeration bli
enumeration blj
enumeration blk
enumeration bll
enumeration blm
enumeration bln
enumeration blo
enumeration blp
enumeration blq
enumeration blr
enumeration bls
enumeration blt
enumeration blv
enumeration blw
enumeration blx
enumeration bly
enumeration blz
enumeration bma
enumeration bmb
enumeration bmc
enumeration bmd
enumeration bme
enumeration bmf
enumeration bmg
enumeration bmh
enumeration bmi
enumeration bmj
enumeration bmk
enumeration bml
enumeration bmm
enumeration bmn
enumeration bmo
enumeration bmp
enumeration bmq
enumeration bmr
enumeration bms
enumeration bmt
enumeration bmu
enumeration bmv
enumeration bmw
enumeration bmx
enumeration bmy
enumeration bmz
enumeration bna
enumeration bnb
enumeration bnc
enumeration bnd
enumeration bne
enumeration bnf
enumeration bng
enumeration bni
enumeration bnj
enumeration bnk
enumeration bnl
enumeration bnm
enumeration bnn
enumeration bno
enumeration bnp
enumeration bnq
enumeration bnr
enumeration bns
enumeration bnt
enumeration bnu
enumeration bnv
enumeration bnw
enumeration bnx
enumeration bny
enumeration bnz
enumeration boa
enumeration bob
enumeration boe
enumeration bof
enumeration bog
enumeration boh
enumeration boi
enumeration boj
enumeration bok
enumeration bol
enumeration bom
enumeration bon
enumeration boo
enumeration bop
enumeration boq
enumeration bor
enumeration bot
enumeration bou
enumeration bov
enumeration bow
enumeration box
enumeration boy
enumeration boz
enumeration bpa
enumeration bpb
enumeration bpd
enumeration bpg
enumeration bph
enumeration bpi
enumeration bpj
enumeration bpk
enumeration bpl
enumeration bpm
enumeration bpn
enumeration bpo
enumeration bpp
enumeration bpq
enumeration bpr
enumeration bps
enumeration bpt
enumeration bpu
enumeration bpv
enumeration bpw
enumeration bpx
enumeration bpy
enumeration bpz
enumeration bqa
enumeration bqb
enumeration bqc
enumeration bqd
enumeration bqf
enumeration bqg
enumeration bqh
enumeration bqi
enumeration bqj
enumeration bqk
enumeration bql
enumeration bqm
enumeration bqn
enumeration bqo
enumeration bqp
enumeration bqq
enumeration bqr
enumeration bqs
enumeration bqt
enumeration bqu
enumeration bqv
enumeration bqw
enumeration bqx
enumeration bqy
enumeration bqz
enumeration bra
enumeration brb
enumeration brc
enumeration brd
enumeration brf
enumeration brg
enumeration brh
enumeration bri
enumeration brj
enumeration brk
enumeration brl
enumeration brm
enumeration brn
enumeration bro
enumeration brp
enumeration brq
enumeration brr
enumeration brs
enumeration brt
enumeration bru
enumeration brv
enumeration brw
enumeration brx
enumeration bry
enumeration brz
enumeration bsa
enumeration bsb
enumeration bsc
enumeration bse
enumeration bsf
enumeration bsg
enumeration bsh
enumeration bsi
enumeration bsj
enumeration bsk
enumeration bsl
enumeration bsm
enumeration bsn
enumeration bso
enumeration bsp
enumeration bsq
enumeration bsr
enumeration bss
enumeration bst
enumeration bsu
enumeration bsv
enumeration bsw
enumeration bsx
enumeration bsy
enumeration bta
enumeration btc
enumeration btd
enumeration bte
enumeration btf
enumeration btg
enumeration bth
enumeration bti
enumeration btj
enumeration btk
enumeration btl
enumeration btm
enumeration btn
enumeration bto
enumeration btp
enumeration btq
enumeration btr
enumeration bts
enumeration btt
enumeration btu
enumeration btv
enumeration btw
enumeration btx
enumeration bty
enumeration btz
enumeration bua
enumeration bub
enumeration buc
enumeration bud
enumeration bue
enumeration buf
enumeration bug
enumeration buh
enumeration bui
enumeration buj
enumeration buk
enumeration bum
enumeration bun
enumeration buo
enumeration bup
enumeration buq
enumeration bus
enumeration but
enumeration buu
enumeration buv
enumeration buw
enumeration bux
enumeration buy
enumeration buz
enumeration bva
enumeration bvb
enumeration bvc
enumeration bvd
enumeration bve
enumeration bvf
enumeration bvg
enumeration bvh
enumeration bvi
enumeration bvj
enumeration bvk
enumeration bvl
enumeration bvm
enumeration bvn
enumeration bvo
enumeration bvp
enumeration bvq
enumeration bvr
enumeration bvt
enumeration bvu
enumeration bvv
enumeration bvw
enumeration bvx
enumeration bvy
enumeration bvz
enumeration bwa
enumeration bwb
enumeration bwc
enumeration bwd
enumeration bwe
enumeration bwf
enumeration bwg
enumeration bwh
enumeration bwi
enumeration bwj
enumeration bwk
enumeration bwl
enumeration bwm
enumeration bwn
enumeration bwo
enumeration bwp
enumeration bwq
enumeration bwr
enumeration bws
enumeration bwt
enumeration bwu
enumeration bww
enumeration bwx
enumeration bwy
enumeration bwz
enumeration bxa
enumeration bxb
enumeration bxc
enumeration bxd
enumeration bxe
enumeration bxf
enumeration bxg
enumeration bxh
enumeration bxi
enumeration bxj
enumeration bxk
enumeration bxl
enumeration bxm
enumeration bxn
enumeration bxo
enumeration bxp
enumeration bxq
enumeration bxr
enumeration bxs
enumeration bxu
enumeration bxv
enumeration bxw
enumeration bxx
enumeration bxz
enumeration bya
enumeration byb
enumeration byc
enumeration byd
enumeration bye
enumeration byf
enumeration byg
enumeration byh
enumeration byi
enumeration byj
enumeration byk
enumeration byl
enumeration bym
enumeration byn
enumeration byo
enumeration byp
enumeration byq
enumeration byr
enumeration bys
enumeration byt
enumeration byv
enumeration byw
enumeration byx
enumeration byy
enumeration byz
enumeration bza
enumeration bzb
enumeration bzc
enumeration bzd
enumeration bze
enumeration bzf
enumeration bzg
enumeration bzh
enumeration bzi
enumeration bzj
enumeration bzk
enumeration bzl
enumeration bzm
enumeration bzn
enumeration bzo
enumeration bzp
enumeration bzq
enumeration bzr
enumeration bzs
enumeration bzt
enumeration bzu
enumeration bzv
enumeration bzw
enumeration bzx
enumeration bzy
enumeration bzz
enumeration caa
enumeration cab
enumeration cac
enumeration cad
enumeration cae
enumeration caf
enumeration cag
enumeration cah
enumeration cai
enumeration caj
enumeration cak
enumeration cal
enumeration cam
enumeration can
enumeration cao
enumeration cap
enumeration caq
enumeration car
enumeration cas
enumeration cau
enumeration cav
enumeration caw
enumeration cax
enumeration cay
enumeration caz
enumeration cba
enumeration cbb
enumeration cbc
enumeration cbd
enumeration cbe
enumeration cbg
enumeration cbh
enumeration cbi
enumeration cbj
enumeration cbk
enumeration cbl
enumeration cbn
enumeration cbo
enumeration cbr
enumeration cbs
enumeration cbt
enumeration cbu
enumeration cbv
enumeration cbw
enumeration cby
enumeration cca
enumeration ccc
enumeration ccd
enumeration cce
enumeration ccg
enumeration cch
enumeration ccj
enumeration ccl
enumeration ccm
enumeration ccn
enumeration cco
enumeration ccp
enumeration ccr
enumeration ccs
enumeration cda
enumeration cdc
enumeration cdd
enumeration cde
enumeration cdf
enumeration cdg
enumeration cdh
enumeration cdi
enumeration cdj
enumeration cdm
enumeration cdn
enumeration cdo
enumeration cdr
enumeration cds
enumeration cdy
enumeration cdz
enumeration cea
enumeration ceb
enumeration ceg
enumeration cek
enumeration cel
enumeration cen
enumeration cet
enumeration cfa
enumeration cfd
enumeration cfg
enumeration cfm
enumeration cga
enumeration cgc
enumeration cgg
enumeration cgk
enumeration chb
enumeration chc
enumeration chd
enumeration chf
enumeration chg
enumeration chh
enumeration chj
enumeration chk
enumeration chl
enumeration chm
enumeration chn
enumeration cho
enumeration chp
enumeration chq
enumeration chr
enumeration cht
enumeration chw
enumeration chx
enumeration chy
enumeration chz
enumeration cia
enumeration cib
enumeration cic
enumeration cid
enumeration cie
enumeration cih
enumeration cik
enumeration cim
enumeration cin
enumeration cip
enumeration cir
enumeration ciw
enumeration ciy
enumeration cja
enumeration cje
enumeration cjh
enumeration cji
enumeration cjk
enumeration cjm
enumeration cjn
enumeration cjo
enumeration cjp
enumeration cjs
enumeration cjv
enumeration cjy
enumeration ckb
enumeration ckh
enumeration ckl
enumeration ckn
enumeration cko
enumeration ckq
enumeration ckr
enumeration cks
enumeration ckt
enumeration cku
enumeration ckv
enumeration ckx
enumeration cky
enumeration ckz
enumeration cla
enumeration clc
enumeration cld
enumeration cle
enumeration clh
enumeration cli
enumeration clj
enumeration clk
enumeration cll
enumeration clm
enumeration clo
enumeration clt
enumeration clu
enumeration clw
enumeration cly
enumeration cma
enumeration cmc
enumeration cme
enumeration cmg
enumeration cmi
enumeration cml
enumeration cmm
enumeration cmn
enumeration cmo
enumeration cmr
enumeration cms
enumeration cmt
enumeration cna
enumeration cnb
enumeration cnc
enumeration cng
enumeration cnh
enumeration cni
enumeration cnk
enumeration cnl
enumeration cno
enumeration cns
enumeration cnt
enumeration cnu
enumeration cnw
enumeration cnx
enumeration coa
enumeration cob
enumeration coc
enumeration cod
enumeration coe
enumeration cof
enumeration cog
enumeration coh
enumeration coj
enumeration cok
enumeration col
enumeration com
enumeration con
enumeration coo
enumeration cop
enumeration coq
enumeration cot
enumeration cou
enumeration cov
enumeration cow
enumeration cox
enumeration coy
enumeration coz
enumeration cpa
enumeration cpb
enumeration cpc
enumeration cpe
enumeration cpf
enumeration cpg
enumeration cpi
enumeration cpn
enumeration cpo
enumeration cpp
enumeration cps
enumeration cpu
enumeration cpx
enumeration cpy
enumeration cqd
enumeration cqu
enumeration cra
enumeration crb
enumeration crc
enumeration crd
enumeration crf
enumeration crg
enumeration crh
enumeration cri
enumeration crj
enumeration crk
enumeration crl
enumeration crm
enumeration crn
enumeration cro
enumeration crp
enumeration crq
enumeration crr
enumeration crs
enumeration crt
enumeration crv
enumeration crw
enumeration crx
enumeration cry
enumeration crz
enumeration csa
enumeration csb
enumeration csc
enumeration csd
enumeration cse
enumeration csf
enumeration csg
enumeration csh
enumeration csi
enumeration csj
enumeration csk
enumeration csl
enumeration csm
enumeration csn
enumeration cso
enumeration csq
enumeration csr
enumeration css
enumeration cst
enumeration csu
enumeration csv
enumeration csw
enumeration csy
enumeration csz
enumeration cta
enumeration ctc
enumeration ctd
enumeration cte
enumeration ctg
enumeration cth
enumeration ctl
enumeration ctm
enumeration ctn
enumeration cto
enumeration ctp
enumeration cts
enumeration ctt
enumeration ctu
enumeration ctz
enumeration cua
enumeration cub
enumeration cuc
enumeration cug
enumeration cuh
enumeration cui
enumeration cuj
enumeration cuk
enumeration cul
enumeration cum
enumeration cuo
enumeration cup
enumeration cuq
enumeration cur
enumeration cus
enumeration cut
enumeration cuu
enumeration cuv
enumeration cuw
enumeration cux
enumeration cvg
enumeration cvn
enumeration cwa
enumeration cwb
enumeration cwd
enumeration cwe
enumeration cwg
enumeration cwt
enumeration cya
enumeration cyb
enumeration cyo
enumeration czh
enumeration czk
enumeration czn
enumeration czo
enumeration czt
enumeration daa
enumeration dac
enumeration dad
enumeration dae
enumeration dag
enumeration dah
enumeration dai
enumeration daj
enumeration dak
enumeration dal
enumeration dam
enumeration dao
enumeration daq
enumeration dar
enumeration das
enumeration dau
enumeration dav
enumeration daw
enumeration dax
enumeration day
enumeration daz
enumeration dba
enumeration dbb
enumeration dbd
enumeration dbe
enumeration dbf
enumeration dbg
enumeration dbi
enumeration dbj
enumeration dbl
enumeration dbm
enumeration dbn
enumeration dbo
enumeration dbp
enumeration dbq
enumeration dbr
enumeration dbt
enumeration dbu
enumeration dbv
enumeration dbw
enumeration dby
enumeration dcc
enumeration dcr
enumeration dda
enumeration ddd
enumeration dde
enumeration ddg
enumeration ddi
enumeration ddj
enumeration ddn
enumeration ddo
enumeration ddr
enumeration dds
enumeration ddw
enumeration dec
enumeration ded
enumeration dee
enumeration def
enumeration deg
enumeration deh
enumeration dei
enumeration dek
enumeration del
enumeration dem
enumeration den
enumeration dep
enumeration deq
enumeration der
enumeration des
enumeration dev
enumeration dez
enumeration dga
enumeration dgb
enumeration dgc
enumeration dgd
enumeration dge
enumeration dgg
enumeration dgh
enumeration dgi
enumeration dgk
enumeration dgl
enumeration dgn
enumeration dgo
enumeration dgr
enumeration dgs
enumeration dgt
enumeration dgu
enumeration dgw
enumeration dgx
enumeration dgz
enumeration dhd
enumeration dhg
enumeration dhi
enumeration dhl
enumeration dhm
enumeration dhn
enumeration dho
enumeration dhr
enumeration dhs
enumeration dhu
enumeration dhv
enumeration dhw
enumeration dhx
enumeration dia
enumeration dib
enumeration dic
enumeration did
enumeration dif
enumeration dig
enumeration dih
enumeration dii
enumeration dij
enumeration dik
enumeration dil
enumeration dim
enumeration din
enumeration dio
enumeration dip
enumeration diq
enumeration dir
enumeration dis
enumeration dit
enumeration diu
enumeration diw
enumeration dix
enumeration diy
enumeration diz
enumeration dja
enumeration djb
enumeration djc
enumeration djd
enumeration dje
enumeration djf
enumeration dji
enumeration djj
enumeration djk
enumeration djm
enumeration djn
enumeration djo
enumeration djr
enumeration dju
enumeration djw
enumeration dka
enumeration dkk
enumeration dkr
enumeration dks
enumeration dkx
enumeration dlg
enumeration dlk
enumeration dlm
enumeration dln
enumeration dma
enumeration dmb
enumeration dmc
enumeration dmd
enumeration dme
enumeration dmg
enumeration dmk
enumeration dml
enumeration dmm
enumeration dmn
enumeration dmo
enumeration dmr
enumeration dms
enumeration dmu
enumeration dmv
enumeration dmw
enumeration dmx
enumeration dmy
enumeration dna
enumeration dnd
enumeration dne
enumeration dng
enumeration dni
enumeration dnj
enumeration dnk
enumeration dnn
enumeration dnr
enumeration dnt
enumeration dnu
enumeration dnv
enumeration dnw
enumeration dny
enumeration doa
enumeration dob
enumeration doc
enumeration doe
enumeration dof
enumeration doh
enumeration doi
enumeration dok
enumeration dol
enumeration don
enumeration doo
enumeration dop
enumeration doq
enumeration dor
enumeration dos
enumeration dot
enumeration dov
enumeration dow
enumeration dox
enumeration doy
enumeration doz
enumeration dpp
enumeration dra
enumeration drb
enumeration drc
enumeration drd
enumeration dre
enumeration drg
enumeration dri
enumeration drl
enumeration drn
enumeration dro
enumeration drq
enumeration drr
enumeration drs
enumeration drt
enumeration dru
enumeration dry
enumeration dsb
enumeration dse
enumeration dsh
enumeration dsi
enumeration dsl
enumeration dsn
enumeration dso
enumeration dsq
enumeration dta
enumeration dtb
enumeration dtd
enumeration dth
enumeration dti
enumeration dtk
enumeration dtm
enumeration dto
enumeration dtp
enumeration dtr
enumeration dts
enumeration dtt
enumeration dtu
enumeration dty
enumeration dua
enumeration dub
enumeration duc
enumeration dud
enumeration due
enumeration duf
enumeration dug
enumeration duh
enumeration dui
enumeration duj
enumeration duk
enumeration dul
enumeration dum
enumeration dun
enumeration duo
enumeration dup
enumeration duq
enumeration dur
enumeration dus
enumeration duu
enumeration duv
enumeration duw
enumeration dux
enumeration duy
enumeration duz
enumeration dva
enumeration dwa
enumeration dwr
enumeration dws
enumeration dww
enumeration dya
enumeration dyb
enumeration dyd
enumeration dyg
enumeration dyi
enumeration dym
enumeration dyn
enumeration dyo
enumeration dyu
enumeration dyy
enumeration dza
enumeration dzd
enumeration dze
enumeration dzg
enumeration dzl
enumeration dzn
enumeration eaa
enumeration ebg
enumeration ebk
enumeration ebo
enumeration ebr
enumeration ebu
enumeration ecr
enumeration ecs
enumeration ecy
enumeration eee
enumeration efa
enumeration efe
enumeration efi
enumeration ega
enumeration egl
enumeration ego
enumeration egx
enumeration egy
enumeration ehu
enumeration eip
enumeration eit
enumeration eiv
enumeration eja
enumeration eka
enumeration ekc
enumeration eke
enumeration ekg
enumeration eki
enumeration ekk
enumeration ekl
enumeration ekm
enumeration eko
enumeration ekp
enumeration ekr
enumeration eky
enumeration ele
enumeration elh
enumeration eli
enumeration elk
enumeration elm
enumeration elo
enumeration elu
enumeration elx
enumeration ema
enumeration emb
enumeration eme
enumeration emg
enumeration emi
enumeration emk
enumeration emm
enumeration emn
enumeration emp
enumeration ems
enumeration emu
enumeration emw
enumeration emx
enumeration emy
enumeration ena
enumeration enb
enumeration enc
enumeration end
enumeration enf
enumeration enh
enumeration enl
enumeration enm
enumeration enn
enumeration eno
enumeration enq
enumeration enr
enumeration enu
enumeration env
enumeration enw
enumeration enx
enumeration eot
enumeration epi
enumeration era
enumeration erg
enumeration erh
enumeration eri
enumeration erk
enumeration ero
enumeration err
enumeration ers
enumeration ert
enumeration erw
enumeration ese
enumeration esh
enumeration esi
enumeration esk
enumeration esl
enumeration esm
enumeration esn
enumeration eso
enumeration esq
enumeration ess
enumeration esu
enumeration esx
enumeration esy
enumeration etb
enumeration etc
enumeration eth
enumeration etn
enumeration eto
enumeration etr
enumeration ets
enumeration ett
enumeration etu
enumeration etx
enumeration etz
enumeration euq
enumeration eve
enumeration evh
enumeration evn
enumeration ewo
enumeration ext
enumeration eya
enumeration eyo
enumeration eza
enumeration eze
enumeration faa
enumeration fab
enumeration fad
enumeration faf
enumeration fag
enumeration fah
enumeration fai
enumeration faj
enumeration fak
enumeration fal
enumeration fam
enumeration fan
enumeration fap
enumeration far
enumeration fat
enumeration fau
enumeration fax
enumeration fay
enumeration faz
enumeration fbl
enumeration fcs
enumeration fer
enumeration ffi
enumeration ffm
enumeration fgr
enumeration fia
enumeration fie
enumeration fil
enumeration fip
enumeration fir
enumeration fit
enumeration fiu
enumeration fiw
enumeration fkk
enumeration fkv
enumeration fla
enumeration flh
enumeration fli
enumeration fll
enumeration fln
enumeration flr
enumeration fly
enumeration fmp
enumeration fmu
enumeration fng
enumeration fni
enumeration fod
enumeration foi
enumeration fom
enumeration fon
enumeration for
enumeration fos
enumeration fox
enumeration fpe
enumeration fqs
enumeration frc
enumeration frd
enumeration frk
enumeration frm
enumeration fro
enumeration frp
enumeration frq
enumeration frr
enumeration frs
enumeration frt
enumeration fse
enumeration fsl
enumeration fss
enumeration fub
enumeration fuc
enumeration fud
enumeration fue
enumeration fuf
enumeration fuh
enumeration fui
enumeration fuj
enumeration fum
enumeration fun
enumeration fuq
enumeration fur
enumeration fut
enumeration fuu
enumeration fuv
enumeration fuy
enumeration fvr
enumeration fwa
enumeration fwe
enumeration gaa
enumeration gab
enumeration gac
enumeration gad
enumeration gae
enumeration gaf
enumeration gag
enumeration gah
enumeration gai
enumeration gaj
enumeration gak
enumeration gal
enumeration gam
enumeration gan
enumeration gao
enumeration gap
enumeration gaq
enumeration gar
enumeration gas
enumeration gat
enumeration gau
enumeration gaw
enumeration gax
enumeration gay
enumeration gaz
enumeration gba
enumeration gbb
enumeration gbd
enumeration gbe
enumeration gbf
enumeration gbg
enumeration gbh
enumeration gbi
enumeration gbj
enumeration gbk
enumeration gbl
enumeration gbm
enumeration gbn
enumeration gbo
enumeration gbp
enumeration gbq
enumeration gbr
enumeration gbs
enumeration gbu
enumeration gbv
enumeration gbw
enumeration gbx
enumeration gby
enumeration gbz
enumeration gcc
enumeration gcd
enumeration gce
enumeration gcf
enumeration gcl
enumeration gcn
enumeration gcr
enumeration gct
enumeration gda
enumeration gdb
enumeration gdc
enumeration gdd
enumeration gde
enumeration gdf
enumeration gdg
enumeration gdh
enumeration gdi
enumeration gdj
enumeration gdk
enumeration gdl
enumeration gdm
enumeration gdn
enumeration gdo
enumeration gdq
enumeration gdr
enumeration gds
enumeration gdt
enumeration gdu
enumeration gdx
enumeration gea
enumeration geb
enumeration gec
enumeration ged
enumeration geg
enumeration geh
enumeration gei
enumeration gej
enumeration gek
enumeration gel
enumeration gem
enumeration geq
enumeration ges
enumeration gev
enumeration gew
enumeration gex
enumeration gey
enumeration gez
enumeration gfk
enumeration gft
enumeration gfx
enumeration gga
enumeration ggb
enumeration ggd
enumeration gge
enumeration ggg
enumeration ggk
enumeration ggl
enumeration ggn
enumeration ggo
enumeration ggt
enumeration ggu
enumeration ggw
enumeration gha
enumeration ghc
enumeration ghe
enumeration ghh
enumeration ghk
enumeration ghl
enumeration ghn
enumeration gho
enumeration ghr
enumeration ghs
enumeration ght
enumeration gia
enumeration gib
enumeration gic
enumeration gid
enumeration gig
enumeration gih
enumeration gil
enumeration gim
enumeration gin
enumeration gip
enumeration giq
enumeration gir
enumeration gis
enumeration git
enumeration giu
enumeration giw
enumeration gix
enumeration giy
enumeration giz
enumeration gji
enumeration gjk
enumeration gjm
enumeration gjn
enumeration gju
enumeration gka
enumeration gke
enumeration gkn
enumeration gko
enumeration gkp
enumeration glc
enumeration gld
enumeration glh
enumeration gli
enumeration glj
enumeration glk
enumeration gll
enumeration glo
enumeration glr
enumeration glu
enumeration glw
enumeration gly
enumeration gma
enumeration gmb
enumeration gmd
enumeration gme
enumeration gmg
enumeration gmh
enumeration gml
enumeration gmm
enumeration gmn
enumeration gmq
enumeration gmu
enumeration gmv
enumeration gmw
enumeration gmx
enumeration gmy
enumeration gmz
enumeration gna
enumeration gnb
enumeration gnc
enumeration gnd
enumeration gne
enumeration gng
enumeration gnh
enumeration gni
enumeration gnk
enumeration gnl
enumeration gnm
enumeration gnn
enumeration gno
enumeration gnq
enumeration gnr
enumeration gnt
enumeration gnu
enumeration gnw
enumeration gnz
enumeration goa
enumeration gob
enumeration goc
enumeration god
enumeration goe
enumeration gof
enumeration gog
enumeration goh
enumeration goi
enumeration goj
enumeration gok
enumeration gol
enumeration gom
enumeration gon
enumeration goo
enumeration gop
enumeration goq
enumeration gor
enumeration gos
enumeration got
enumeration gou
enumeration gow
enumeration gox
enumeration goy
enumeration goz
enumeration gpa
enumeration gpe
enumeration gpn
enumeration gqa
enumeration gqi
enumeration gqn
enumeration gqr
enumeration gqu
enumeration gra
enumeration grb
enumeration grc
enumeration grd
enumeration grg
enumeration grh
enumeration gri
enumeration grj
enumeration grk
enumeration grm
enumeration gro
enumeration grq
enumeration grr
enumeration grs
enumeration grt
enumeration gru
enumeration grv
enumeration grw
enumeration grx
enumeration gry
enumeration grz
enumeration gse
enumeration gsg
enumeration gsl
enumeration gsm
enumeration gsn
enumeration gso
enumeration gsp
enumeration gss
enumeration gsw
enumeration gta
enumeration gti
enumeration gtu
enumeration gua
enumeration gub
enumeration guc
enumeration gud
enumeration gue
enumeration guf
enumeration gug
enumeration guh
enumeration gui
enumeration guk
enumeration gul
enumeration gum
enumeration gun
enumeration guo
enumeration gup
enumeration guq
enumeration gur
enumeration gus
enumeration gut
enumeration guu
enumeration guv
enumeration guw
enumeration gux
enumeration guz
enumeration gva
enumeration gvc
enumeration gve
enumeration gvf
enumeration gvj
enumeration gvl
enumeration gvm
enumeration gvn
enumeration gvo
enumeration gvp
enumeration gvr
enumeration gvs
enumeration gvy
enumeration gwa
enumeration gwb
enumeration gwc
enumeration gwd
enumeration gwe
enumeration gwf
enumeration gwg
enumeration gwi
enumeration gwj
enumeration gwm
enumeration gwn
enumeration gwr
enumeration gwt
enumeration gwu
enumeration gww
enumeration gwx
enumeration gxx
enumeration gya
enumeration gyb
enumeration gyd
enumeration gye
enumeration gyf
enumeration gyg
enumeration gyi
enumeration gyl
enumeration gym
enumeration gyn
enumeration gyr
enumeration gyy
enumeration gza
enumeration gzi
enumeration gzn
enumeration haa
enumeration hab
enumeration hac
enumeration had
enumeration hae
enumeration haf
enumeration hag
enumeration hah
enumeration hai
enumeration haj
enumeration hak
enumeration hal
enumeration ham
enumeration han
enumeration hao
enumeration hap
enumeration haq
enumeration har
enumeration has
enumeration hav
enumeration haw
enumeration hax
enumeration hay
enumeration haz
enumeration hba
enumeration hbb
enumeration hbn
enumeration hbo
enumeration hbu
enumeration hca
enumeration hch
enumeration hdn
enumeration hds
enumeration hdy
enumeration hea
enumeration hed
enumeration heg
enumeration heh
enumeration hei
enumeration hem
enumeration hgm
enumeration hgw
enumeration hhi
enumeration hhr
enumeration hhy
enumeration hia
enumeration hib
enumeration hid
enumeration hif
enumeration hig
enumeration hih
enumeration hii
enumeration hij
enumeration hik
enumeration hil
enumeration him
enumeration hio
enumeration hir
enumeration hit
enumeration hiw
enumeration hix
enumeration hji
enumeration hka
enumeration hke
enumeration hkk
enumeration hks
enumeration hla
enumeration hlb
enumeration hld
enumeration hle
enumeration hlt
enumeration hlu
enumeration hma
enumeration hmb
enumeration hmc
enumeration hmd
enumeration hme
enumeration hmf
enumeration hmg
enumeration hmh
enumeration hmi
enumeration hmj
enumeration hmk
enumeration hml
enumeration hmm
enumeration hmn
enumeration hmp
enumeration hmq
enumeration hmr
enumeration hms
enumeration hmt
enumeration hmu
enumeration hmv
enumeration hmw
enumeration hmx
enumeration hmy
enumeration hmz
enumeration hna
enumeration hnd
enumeration hne
enumeration hnh
enumeration hni
enumeration hnj
enumeration hnn
enumeration hno
enumeration hns
enumeration hnu
enumeration hoa
enumeration hob
enumeration hoc
enumeration hod
enumeration hoe
enumeration hoh
enumeration hoi
enumeration hoj
enumeration hok
enumeration hol
enumeration hom
enumeration hoo
enumeration hop
enumeration hor
enumeration hos
enumeration hot
enumeration hov
enumeration how
enumeration hoy
enumeration hoz
enumeration hpo
enumeration hps
enumeration hra
enumeration hrc
enumeration hre
enumeration hrk
enumeration hrm
enumeration hro
enumeration hrp
enumeration hrt
enumeration hru
enumeration hrw
enumeration hrx
enumeration hrz
enumeration hsb
enumeration hsh
enumeration hsl
enumeration hsn
enumeration hss
enumeration hti
enumeration hto
enumeration hts
enumeration htu
enumeration htx
enumeration hub
enumeration huc
enumeration hud
enumeration hue
enumeration huf
enumeration hug
enumeration huh
enumeration hui
enumeration huj
enumeration huk
enumeration hul
enumeration hum
enumeration huo
enumeration hup
enumeration huq
enumeration hur
enumeration hus
enumeration hut
enumeration huu
enumeration huv
enumeration huw
enumeration hux
enumeration huy
enumeration huz
enumeration hvc
enumeration hve
enumeration hvk
enumeration hvn
enumeration hvv
enumeration hwa
enumeration hwc
enumeration hwo
enumeration hya
enumeration hyx
enumeration iai
enumeration ian
enumeration iap
enumeration iar
enumeration iba
enumeration ibb
enumeration ibd
enumeration ibe
enumeration ibg
enumeration ibl
enumeration ibm
enumeration ibn
enumeration ibr
enumeration ibu
enumeration iby
enumeration ica
enumeration ich
enumeration icl
enumeration icr
enumeration ida
enumeration idb
enumeration idc
enumeration idd
enumeration ide
enumeration idi
enumeration idr
enumeration ids
enumeration idt
enumeration idu
enumeration ifa
enumeration ifb
enumeration ife
enumeration iff
enumeration ifk
enumeration ifm
enumeration ifu
enumeration ify
enumeration igb
enumeration ige
enumeration igg
enumeration igl
enumeration igm
enumeration ign
enumeration igo
enumeration igs
enumeration igw
enumeration ihb
enumeration ihi
enumeration ihp
enumeration ihw
enumeration iin
enumeration iir
enumeration ijc
enumeration ije
enumeration ijj
enumeration ijn
enumeration ijo
enumeration ijs
enumeration ike
enumeration iki
enumeration ikk
enumeration ikl
enumeration iko
enumeration ikp
enumeration ikr
enumeration ikt
enumeration ikv
enumeration ikw
enumeration ikx
enumeration ikz
enumeration ila
enumeration ilb
enumeration ilg
enumeration ili
enumeration ilk
enumeration ill
enumeration ilo
enumeration ils
enumeration ilu
enumeration ilv
enumeration ima
enumeration ime
enumeration imi
enumeration iml
enumeration imn
enumeration imo
enumeration imr
enumeration ims
enumeration imy
enumeration inb
enumeration inc
enumeration ine
enumeration ing
enumeration inh
enumeration inj
enumeration inl
enumeration inm
enumeration inn
enumeration ino
enumeration inp
enumeration ins
enumeration int
enumeration inz
enumeration ior
enumeration iou
enumeration iow
enumeration ipi
enumeration ipo
enumeration iqu
enumeration iqw
enumeration ira
enumeration ire
enumeration irh
enumeration iri
enumeration irk
enumeration irn
enumeration iro
enumeration irr
enumeration iru
enumeration irx
enumeration iry
enumeration isa
enumeration isc
enumeration isd
enumeration ise
enumeration isg
enumeration ish
enumeration isi
enumeration isk
enumeration ism
enumeration isn
enumeration iso
enumeration isr
enumeration ist
enumeration isu
enumeration itb
enumeration itc
enumeration ite
enumeration iti
enumeration itk
enumeration itl
enumeration itm
enumeration ito
enumeration itr
enumeration its
enumeration itt
enumeration itv
enumeration itw
enumeration itx
enumeration ity
enumeration itz
enumeration ium
enumeration ivb
enumeration ivv
enumeration iwk
enumeration iwm
enumeration iwo
enumeration iws
enumeration ixc
enumeration ixl
enumeration iya
enumeration iyo
enumeration iyx
enumeration izh
enumeration izr
enumeration izz
enumeration jaa
enumeration jab
enumeration jac
enumeration jad
enumeration jae
enumeration jaf
enumeration jah
enumeration jaj
enumeration jak
enumeration jal
enumeration jam
enumeration jan
enumeration jao
enumeration jaq
enumeration jas
enumeration jat
enumeration jau
enumeration jax
enumeration jay
enumeration jaz
enumeration jbe
enumeration jbi
enumeration jbj
enumeration jbk
enumeration jbn
enumeration jbo
enumeration jbr
enumeration jbt
enumeration jbu
enumeration jbw
enumeration jcs
enumeration jct
enumeration jda
enumeration jdg
enumeration jdt
enumeration jeb
enumeration jee
enumeration jeg
enumeration jeh
enumeration jei
enumeration jek
enumeration jel
enumeration jen
enumeration jer
enumeration jet
enumeration jeu
enumeration jgb
enumeration jge
enumeration jgk
enumeration jgo
enumeration jhi
enumeration jhs
enumeration jia
enumeration jib
enumeration jic
enumeration jid
enumeration jie
enumeration jig
enumeration jih
enumeration jii
enumeration jil
enumeration jim
enumeration jio
enumeration jiq
enumeration jit
enumeration jiu
enumeration jiv
enumeration jiy
enumeration jjr
enumeration jkm
enumeration jko
enumeration jkp
enumeration jkr
enumeration jku
enumeration jle
enumeration jls
enumeration jma
enumeration jmb
enumeration jmc
enumeration jmd
enumeration jmi
enumeration jml
enumeration jmn
enumeration jmr
enumeration jms
enumeration jmw
enumeration jmx
enumeration jna
enumeration jnd
enumeration jng
enumeration jni
enumeration jnj
enumeration jnl
enumeration jns
enumeration job
enumeration jod
enumeration jor
enumeration jos
enumeration jow
enumeration jpa
enumeration jpr
enumeration jpx
enumeration jqr
enumeration jra
enumeration jrb
enumeration jrr
enumeration jrt
enumeration jru
enumeration jsl
enumeration jua
enumeration jub
enumeration juc
enumeration jud
enumeration juh
enumeration jui
enumeration juk
enumeration jul
enumeration jum
enumeration jun
enumeration juo
enumeration jup
enumeration jur
enumeration jus
enumeration jut
enumeration juu
enumeration juw
enumeration juy
enumeration jvd
enumeration jvn
enumeration jwi
enumeration jya
enumeration jye
enumeration jyy
enumeration kaa
enumeration kab
enumeration kac
enumeration kad
enumeration kae
enumeration kaf
enumeration kag
enumeration kah
enumeration kai
enumeration kaj
enumeration kak
enumeration kam
enumeration kao
enumeration kap
enumeration kaq
enumeration kar
enumeration kav
enumeration kaw
enumeration kax
enumeration kay
enumeration kba
enumeration kbb
enumeration kbc
enumeration kbd
enumeration kbe
enumeration kbf
enumeration kbg
enumeration kbh
enumeration kbi
enumeration kbj
enumeration kbk
enumeration kbl
enumeration kbm
enumeration kbn
enumeration kbo
enumeration kbp
enumeration kbq
enumeration kbr
enumeration kbs
enumeration kbt
enumeration kbu
enumeration kbv
enumeration kbw
enumeration kbx
enumeration kby
enumeration kbz
enumeration kca
enumeration kcb
enumeration kcc
enumeration kcd
enumeration kce
enumeration kcf
enumeration kcg
enumeration kch
enumeration kci
enumeration kcj
enumeration kck
enumeration kcl
enumeration kcm
enumeration kcn
enumeration kco
enumeration kcp
enumeration kcq
enumeration kcr
enumeration kcs
enumeration kct
enumeration kcu
enumeration kcv
enumeration kcw
enumeration kcx
enumeration kcy
enumeration kcz
enumeration kda
enumeration kdc
enumeration kdd
enumeration kde
enumeration kdf
enumeration kdg
enumeration kdh
enumeration kdi
enumeration kdj
enumeration kdk
enumeration kdl
enumeration kdm
enumeration kdn
enumeration kdo
enumeration kdp
enumeration kdq
enumeration kdr
enumeration kdt
enumeration kdu
enumeration kdw
enumeration kdx
enumeration kdy
enumeration kdz
enumeration kea
enumeration keb
enumeration kec
enumeration ked
enumeration kee
enumeration kef
enumeration keg
enumeration keh
enumeration kei
enumeration kej
enumeration kek
enumeration kel
enumeration kem
enumeration ken
enumeration keo
enumeration kep
enumeration keq
enumeration ker
enumeration kes
enumeration ket
enumeration keu
enumeration kev
enumeration kew
enumeration kex
enumeration key
enumeration kez
enumeration kfa
enumeration kfb
enumeration kfc
enumeration kfd
enumeration kfe
enumeration kff
enumeration kfg
enumeration kfh
enumeration kfi
enumeration kfj
enumeration kfk
enumeration kfl
enumeration kfm
enumeration kfn
enumeration kfo
enumeration kfp
enumeration kfq
enumeration kfr
enumeration kfs
enumeration kft
enumeration kfu
enumeration kfv
enumeration kfw
enumeration kfx
enumeration kfy
enumeration kfz
enumeration kga
enumeration kgb
enumeration kgc
enumeration kgd
enumeration kge
enumeration kgf
enumeration kgg
enumeration kgi
enumeration kgj
enumeration kgk
enumeration kgl
enumeration kgm
enumeration kgn
enumeration kgo
enumeration kgp
enumeration kgq
enumeration kgr
enumeration kgs
enumeration kgt
enumeration kgu
enumeration kgv
enumeration kgw
enumeration kgx
enumeration kgy
enumeration kha
enumeration khb
enumeration khc
enumeration khd
enumeration khe
enumeration khf
enumeration khg
enumeration khh
enumeration khi
enumeration khj
enumeration khk
enumeration khl
enumeration khn
enumeration kho
enumeration khp
enumeration khq
enumeration khr
enumeration khs
enumeration kht
enumeration khu
enumeration khv
enumeration khw
enumeration khx
enumeration khy
enumeration khz
enumeration kia
enumeration kib
enumeration kic
enumeration kid
enumeration kie
enumeration kif
enumeration kig
enumeration kih
enumeration kii
enumeration kij
enumeration kil
enumeration kim
enumeration kio
enumeration kip
enumeration kiq
enumeration kis
enumeration kit
enumeration kiu
enumeration kiv
enumeration kiw
enumeration kix
enumeration kiy
enumeration kiz
enumeration kja
enumeration kjb
enumeration kjc
enumeration kjd
enumeration kje
enumeration kjf
enumeration kjg
enumeration kjh
enumeration kji
enumeration kjj
enumeration kjk
enumeration kjl
enumeration kjm
enumeration kjn
enumeration kjo
enumeration kjp
enumeration kjq
enumeration kjr
enumeration kjs
enumeration kjt
enumeration kju
enumeration kjx
enumeration kjy
enumeration kjz
enumeration kka
enumeration kkb
enumeration kkc
enumeration kkd
enumeration kke
enumeration kkf
enumeration kkg
enumeration kkh
enumeration kki
enumeration kkj
enumeration kkk
enumeration kkl
enumeration kkm
enumeration kkn
enumeration kko
enumeration kkp
enumeration kkq
enumeration kkr
enumeration kks
enumeration kkt
enumeration kku
enumeration kkv
enumeration kkw
enumeration kkx
enumeration kky
enumeration kkz
enumeration kla
enumeration klb
enumeration klc
enumeration kld
enumeration kle
enumeration klf
enumeration klg
enumeration klh
enumeration kli
enumeration klj
enumeration klk
enumeration kll
enumeration klm
enumeration kln
enumeration klo
enumeration klp
enumeration klq
enumeration klr
enumeration kls
enumeration klt
enumeration klu
enumeration klv
enumeration klw
enumeration klx
enumeration kly
enumeration klz
enumeration kma
enumeration kmb
enumeration kmc
enumeration kmd
enumeration kme
enumeration kmf
enumeration kmg
enumeration kmh
enumeration kmi
enumeration kmj
enumeration kmk
enumeration kml
enumeration kmm
enumeration kmn
enumeration kmo
enumeration kmp
enumeration kmq
enumeration kmr
enumeration kms
enumeration kmt
enumeration kmu
enumeration kmv
enumeration kmw
enumeration kmx
enumeration kmy
enumeration kmz
enumeration kna
enumeration knb
enumeration knc
enumeration knd
enumeration kne
enumeration knf
enumeration kng
enumeration kni
enumeration knj
enumeration knk
enumeration knl
enumeration knm
enumeration knn
enumeration kno
enumeration knp
enumeration knq
enumeration knr
enumeration kns
enumeration knt
enumeration knu
enumeration knv
enumeration knw
enumeration knx
enumeration kny
enumeration knz
enumeration koa
enumeration koc
enumeration kod
enumeration koe
enumeration kof
enumeration kog
enumeration koh
enumeration koi
enumeration koj
enumeration kok
enumeration kol
enumeration koo
enumeration kop
enumeration koq
enumeration kos
enumeration kot
enumeration kou
enumeration kov
enumeration kow
enumeration kox
enumeration koy
enumeration koz
enumeration kpa
enumeration kpb
enumeration kpc
enumeration kpd
enumeration kpe
enumeration kpf
enumeration kpg
enumeration kph
enumeration kpi
enumeration kpj
enumeration kpk
enumeration kpl
enumeration kpm
enumeration kpn
enumeration kpo
enumeration kpq
enumeration kpr
enumeration kps
enumeration kpt
enumeration kpu
enumeration kpv
enumeration kpw
enumeration kpx
enumeration kpy
enumeration kpz
enumeration kqa
enumeration kqb
enumeration kqc
enumeration kqd
enumeration kqe
enumeration kqf
enumeration kqg
enumeration kqh
enumeration kqi
enumeration kqj
enumeration kqk
enumeration kql
enumeration kqm
enumeration kqn
enumeration kqo
enumeration kqp
enumeration kqq
enumeration kqr
enumeration kqs
enumeration kqt
enumeration kqu
enumeration kqv
enumeration kqw
enumeration kqx
enumeration kqy
enumeration kqz
enumeration kra
enumeration krb
enumeration krc
enumeration krd
enumeration kre
enumeration krf
enumeration krh
enumeration kri
enumeration krj
enumeration krk
enumeration krl
enumeration krm
enumeration krn
enumeration kro
enumeration krp
enumeration krr
enumeration krs
enumeration krt
enumeration kru
enumeration krv
enumeration krw
enumeration krx
enumeration kry
enumeration krz
enumeration ksa
enumeration ksb
enumeration ksc
enumeration ksd
enumeration kse
enumeration ksf
enumeration ksg
enumeration ksh
enumeration ksi
enumeration ksj
enumeration ksk
enumeration ksl
enumeration ksm
enumeration ksn
enumeration kso
enumeration ksp
enumeration ksq
enumeration ksr
enumeration kss
enumeration kst
enumeration ksu
enumeration ksv
enumeration ksw
enumeration ksx
enumeration ksy
enumeration ksz
enumeration kta
enumeration ktb
enumeration ktc
enumeration ktd
enumeration kte
enumeration ktf
enumeration ktg
enumeration kth
enumeration kti
enumeration ktj
enumeration ktk
enumeration ktl
enumeration ktm
enumeration ktn
enumeration kto
enumeration ktp
enumeration ktq
enumeration ktr
enumeration kts
enumeration ktt
enumeration ktu
enumeration ktv
enumeration ktw
enumeration ktx
enumeration kty
enumeration ktz
enumeration kub
enumeration kuc
enumeration kud
enumeration kue
enumeration kuf
enumeration kug
enumeration kuh
enumeration kui
enumeration kuj
enumeration kuk
enumeration kul
enumeration kum
enumeration kun
enumeration kuo
enumeration kup
enumeration kuq
enumeration kus
enumeration kut
enumeration kuu
enumeration kuv
enumeration kuw
enumeration kux
enumeration kuy
enumeration kuz
enumeration kva
enumeration kvb
enumeration kvc
enumeration kvd
enumeration kve
enumeration kvf
enumeration kvg
enumeration kvh
enumeration kvi
enumeration kvj
enumeration kvk
enumeration kvl
enumeration kvm
enumeration kvn
enumeration kvo
enumeration kvp
enumeration kvq
enumeration kvr
enumeration kvs
enumeration kvt
enumeration kvu
enumeration kvv
enumeration kvw
enumeration kvx
enumeration kvy
enumeration kvz
enumeration kwa
enumeration kwb
enumeration kwc
enumeration kwd
enumeration kwe
enumeration kwf
enumeration kwg
enumeration kwh
enumeration kwi
enumeration kwj
enumeration kwk
enumeration kwl
enumeration kwm
enumeration kwn
enumeration kwo
enumeration kwp
enumeration kwq
enumeration kwr
enumeration kws
enumeration kwt
enumeration kwu
enumeration kwv
enumeration kww
enumeration kwx
enumeration kwy
enumeration kwz
enumeration kxa
enumeration kxb
enumeration kxc
enumeration kxd
enumeration kxe
enumeration kxf
enumeration kxh
enumeration kxi
enumeration kxj
enumeration kxk
enumeration kxl
enumeration kxm
enumeration kxn
enumeration kxo
enumeration kxp
enumeration kxq
enumeration kxr
enumeration kxs
enumeration kxt
enumeration kxu
enumeration kxv
enumeration kxw
enumeration kxx
enumeration kxy
enumeration kxz
enumeration kya
enumeration kyb
enumeration kyc
enumeration kyd
enumeration kye
enumeration kyf
enumeration kyg
enumeration kyh
enumeration kyi
enumeration kyj
enumeration kyk
enumeration kyl
enumeration kym
enumeration kyn
enumeration kyo
enumeration kyp
enumeration kyq
enumeration kyr
enumeration kys
enumeration kyt
enumeration kyu
enumeration kyv
enumeration kyw
enumeration kyx
enumeration kyy
enumeration kyz
enumeration kza
enumeration kzb
enumeration kzc
enumeration kzd
enumeration kze
enumeration kzf
enumeration kzg
enumeration kzi
enumeration kzj
enumeration kzk
enumeration kzl
enumeration kzm
enumeration kzn
enumeration kzo
enumeration kzp
enumeration kzq
enumeration kzr
enumeration kzs
enumeration kzt
enumeration kzu
enumeration kzv
enumeration kzw
enumeration kzx
enumeration kzy
enumeration kzz
enumeration laa
enumeration lab
enumeration lac
enumeration lad
enumeration lae
enumeration laf
enumeration lag
enumeration lah
enumeration lai
enumeration laj
enumeration lak
enumeration lal
enumeration lam
enumeration lan
enumeration lap
enumeration laq
enumeration lar
enumeration las
enumeration lau
enumeration law
enumeration lax
enumeration lay
enumeration laz
enumeration lba
enumeration lbb
enumeration lbc
enumeration lbe
enumeration lbf
enumeration lbg
enumeration lbi
enumeration lbj
enumeration lbk
enumeration lbl
enumeration lbm
enumeration lbn
enumeration lbo
enumeration lbq
enumeration lbr
enumeration lbs
enumeration lbt
enumeration lbu
enumeration lbv
enumeration lbw
enumeration lbx
enumeration lby
enumeration lbz
enumeration lcc
enumeration lcd
enumeration lce
enumeration lcf
enumeration lch
enumeration lcl
enumeration lcm
enumeration lcp
enumeration lcq
enumeration lcs
enumeration lda
enumeration ldb
enumeration ldd
enumeration ldg
enumeration ldh
enumeration ldi
enumeration ldj
enumeration ldk
enumeration ldl
enumeration ldm
enumeration ldn
enumeration ldo
enumeration ldp
enumeration ldq
enumeration lea
enumeration leb
enumeration lec
enumeration led
enumeration lee
enumeration lef
enumeration leh
enumeration lei
enumeration lej
enumeration lek
enumeration lel
enumeration lem
enumeration len
enumeration leo
enumeration lep
enumeration leq
enumeration ler
enumeration les
enumeration let
enumeration leu
enumeration lev
enumeration lew
enumeration lex
enumeration ley
enumeration lez
enumeration lfa
enumeration lfn
enumeration lga
enumeration lgb
enumeration lgg
enumeration lgh
enumeration lgi
enumeration lgk
enumeration lgl
enumeration lgm
enumeration lgn
enumeration lgq
enumeration lgr
enumeration lgt
enumeration lgu
enumeration lgz
enumeration lha
enumeration lhh
enumeration lhi
enumeration lhl
enumeration lhm
enumeration lhn
enumeration lhp
enumeration lhs
enumeration lht
enumeration lhu
enumeration lia
enumeration lib
enumeration lic
enumeration lid
enumeration lie
enumeration lif
enumeration lig
enumeration lih
enumeration lii
enumeration lij
enumeration lik
enumeration lil
enumeration lio
enumeration lip
enumeration liq
enumeration lir
enumeration lis
enumeration liu
enumeration liv
enumeration liw
enumeration lix
enumeration liy
enumeration liz
enumeration lja
enumeration lje
enumeration lji
enumeration ljl
enumeration ljp
enumeration ljw
enumeration ljx
enumeration lka
enumeration lkb
enumeration lkc
enumeration lkd
enumeration lke
enumeration lkh
enumeration lki
enumeration lkj
enumeration lkl
enumeration lkm
enumeration lkn
enumeration lko
enumeration lkr
enumeration lks
enumeration lkt
enumeration lku
enumeration lky
enumeration lla
enumeration llb
enumeration llc
enumeration lld
enumeration lle
enumeration llf
enumeration llg
enumeration llh
enumeration lli
enumeration llj
enumeration llk
enumeration lll
enumeration llm
enumeration lln
enumeration llo
enumeration llp
enumeration llq
enumeration lls
enumeration llu
enumeration llx
enumeration lma
enumeration lmb
enumeration lmc
enumeration lmd
enumeration lme
enumeration lmf
enumeration lmg
enumeration lmh
enumeration lmi
enumeration lmj
enumeration lmk
enumeration lml
enumeration lmn
enumeration lmo
enumeration lmp
enumeration lmq
enumeration lmr
enumeration lmu
enumeration lmv
enumeration lmw
enumeration lmx
enumeration lmy
enumeration lmz
enumeration lna
enumeration lnb
enumeration lnd
enumeration lng
enumeration lnh
enumeration lni
enumeration lnj
enumeration lnl
enumeration lnm
enumeration lnn
enumeration lno
enumeration lns
enumeration lnu
enumeration lnw
enumeration lnz
enumeration loa
enumeration lob
enumeration loc
enumeration loe
enumeration lof
enumeration log
enumeration loh
enumeration loi
enumeration loj
enumeration lok
enumeration lol
enumeration lom
enumeration lon
enumeration loo
enumeration lop
enumeration loq
enumeration lor
enumeration los
enumeration lot
enumeration lou
enumeration lov
enumeration low
enumeration lox
enumeration loy
enumeration loz
enumeration lpa
enumeration lpe
enumeration lpn
enumeration lpo
enumeration lpx
enumeration lra
enumeration lrc
enumeration lre
enumeration lrg
enumeration lri
enumeration lrk
enumeration lrl
enumeration lrm
enumeration lrn
enumeration lro
enumeration lrr
enumeration lrt
enumeration lrv
enumeration lrz
enumeration lsa
enumeration lsd
enumeration lse
enumeration lsg
enumeration lsh
enumeration lsi
enumeration lsl
enumeration lsm
enumeration lso
enumeration lsp
enumeration lsr
enumeration lss
enumeration lst
enumeration lsy
enumeration ltc
enumeration ltg
enumeration lti
enumeration ltn
enumeration lto
enumeration lts
enumeration ltu
enumeration lua
enumeration luc
enumeration lud
enumeration lue
enumeration luf
enumeration lui
enumeration luj
enumeration luk
enumeration lul
enumeration lum
enumeration lun
enumeration luo
enumeration lup
enumeration luq
enumeration lur
enumeration lus
enumeration lut
enumeration luu
enumeration luv
enumeration luw
enumeration luy
enumeration luz
enumeration lva
enumeration lvk
enumeration lvs
enumeration lvu
enumeration lwa
enumeration lwe
enumeration lwg
enumeration lwh
enumeration lwl
enumeration lwm
enumeration lwo
enumeration lwt
enumeration lwu
enumeration lww
enumeration lya
enumeration lyg
enumeration lyn
enumeration lzh
enumeration lzl
enumeration lzn
enumeration lzz
enumeration maa
enumeration mab
enumeration mad
enumeration mae
enumeration maf
enumeration mag
enumeration mai
enumeration maj
enumeration mak
enumeration mam
enumeration man
enumeration map
enumeration maq
enumeration mas
enumeration mat
enumeration mau
enumeration mav
enumeration maw
enumeration max
enumeration maz
enumeration mba
enumeration mbb
enumeration mbc
enumeration mbd
enumeration mbe
enumeration mbf
enumeration mbh
enumeration mbi
enumeration mbj
enumeration mbk
enumeration mbl
enumeration mbm
enumeration mbn
enumeration mbo
enumeration mbp
enumeration mbq
enumeration mbr
enumeration mbs
enumeration mbt
enumeration mbu
enumeration mbv
enumeration mbw
enumeration mbx
enumeration mby
enumeration mbz
enumeration mca
enumeration mcb
enumeration mcc
enumeration mcd
enumeration mce
enumeration mcf
enumeration mcg
enumeration mch
enumeration mci
enumeration mcj
enumeration mck
enumeration mcl
enumeration mcm
enumeration mcn
enumeration mco
enumeration mcp
enumeration mcq
enumeration mcr
enumeration mcs
enumeration mct
enumeration mcu
enumeration mcv
enumeration mcw
enumeration mcx
enumeration mcy
enumeration mcz
enumeration mda
enumeration mdb
enumeration mdc
enumeration mdd
enumeration mde
enumeration mdf
enumeration mdg
enumeration mdh
enumeration mdi
enumeration mdj
enumeration mdk
enumeration mdl
enumeration mdm
enumeration mdn
enumeration mdp
enumeration mdq
enumeration mdr
enumeration mds
enumeration mdt
enumeration mdu
enumeration mdv
enumeration mdw
enumeration mdx
enumeration mdy
enumeration mdz
enumeration mea
enumeration meb
enumeration mec
enumeration med
enumeration mee
enumeration mef
enumeration meh
enumeration mei
enumeration mej
enumeration mek
enumeration mel
enumeration mem
enumeration men
enumeration meo
enumeration mep
enumeration meq
enumeration mer
enumeration mes
enumeration met
enumeration meu
enumeration mev
enumeration mew
enumeration mey
enumeration mez
enumeration mfa
enumeration mfb
enumeration mfc
enumeration mfd
enumeration mfe
enumeration mff
enumeration mfg
enumeration mfh
enumeration mfi
enumeration mfj
enumeration mfk
enumeration mfl
enumeration mfm
enumeration mfn
enumeration mfo
enumeration mfp
enumeration mfq
enumeration mfr
enumeration mfs
enumeration mft
enumeration mfu
enumeration mfv
enumeration mfw
enumeration mfx
enumeration mfy
enumeration mfz
enumeration mga
enumeration mgb
enumeration mgc
enumeration mgd
enumeration mge
enumeration mgf
enumeration mgg
enumeration mgh
enumeration mgi
enumeration mgj
enumeration mgk
enumeration mgl
enumeration mgm
enumeration mgn
enumeration mgo
enumeration mgp
enumeration mgq
enumeration mgr
enumeration mgs
enumeration mgt
enumeration mgu
enumeration mgv
enumeration mgw
enumeration mgy
enumeration mgz
enumeration mha
enumeration mhb
enumeration mhc
enumeration mhd
enumeration mhe
enumeration mhf
enumeration mhg
enumeration mhi
enumeration mhj
enumeration mhk
enumeration mhl
enumeration mhm
enumeration mhn
enumeration mho
enumeration mhp
enumeration mhq
enumeration mhr
enumeration mhs
enumeration mht
enumeration mhu
enumeration mhw
enumeration mhx
enumeration mhy
enumeration mhz
enumeration mia
enumeration mib
enumeration mic
enumeration mid
enumeration mie
enumeration mif
enumeration mig
enumeration mih
enumeration mii
enumeration mij
enumeration mik
enumeration mil
enumeration mim
enumeration min
enumeration mio
enumeration mip
enumeration miq
enumeration mir
enumeration mis
enumeration mit
enumeration miu
enumeration miw
enumeration mix
enumeration miy
enumeration miz
enumeration mjc
enumeration mjd
enumeration mje
enumeration mjg
enumeration mjh
enumeration mji
enumeration mjj
enumeration mjk
enumeration mjl
enumeration mjm
enumeration mjn
enumeration mjo
enumeration mjp
enumeration mjq
enumeration mjr
enumeration mjs
enumeration mjt
enumeration mju
enumeration mjv
enumeration mjw
enumeration mjx
enumeration mjy
enumeration mjz
enumeration mka
enumeration mkb
enumeration mkc
enumeration mke
enumeration mkf
enumeration mkg
enumeration mkh
enumeration mki
enumeration mkj
enumeration mkk
enumeration mkl
enumeration mkm
enumeration mkn
enumeration mko
enumeration mkp
enumeration mkq
enumeration mkr
enumeration mks
enumeration mkt
enumeration mku
enumeration mkv
enumeration mkw
enumeration mkx
enumeration mky
enumeration mkz
enumeration mla
enumeration mlb
enumeration mlc
enumeration mle
enumeration mlf
enumeration mlh
enumeration mli
enumeration mlj
enumeration mlk
enumeration mll
enumeration mlm
enumeration mln
enumeration mlo
enumeration mlp
enumeration mlq
enumeration mlr
enumeration mls
enumeration mlu
enumeration mlv
enumeration mlw
enumeration mlx
enumeration mlz
enumeration mma
enumeration mmb
enumeration mmc
enumeration mmd
enumeration mme
enumeration mmf
enumeration mmg
enumeration mmh
enumeration mmi
enumeration mmj
enumeration mmk
enumeration mml
enumeration mmm
enumeration mmn
enumeration mmo
enumeration mmp
enumeration mmq
enumeration mmr
enumeration mmt
enumeration mmu
enumeration mmv
enumeration mmw
enumeration mmx
enumeration mmy
enumeration mmz
enumeration mna
enumeration mnb
enumeration mnc
enumeration mnd
enumeration mne
enumeration mnf
enumeration mng
enumeration mnh
enumeration mni
enumeration mnj
enumeration mnk
enumeration mnl
enumeration mnm
enumeration mnn
enumeration mno
enumeration mnp
enumeration mnq
enumeration mnr
enumeration mns
enumeration mnu
enumeration mnv
enumeration mnw
enumeration mnx
enumeration mny
enumeration mnz
enumeration moa
enumeration moc
enumeration mod
enumeration moe
enumeration mog
enumeration moh
enumeration moi
enumeration moj
enumeration mok
enumeration mom
enumeration moo
enumeration mop
enumeration moq
enumeration mor
enumeration mos
enumeration mot
enumeration mou
enumeration mov
enumeration mow
enumeration mox
enumeration moy
enumeration moz
enumeration mpa
enumeration mpb
enumeration mpc
enumeration mpd
enumeration mpe
enumeration mpg
enumeration mph
enumeration mpi
enumeration mpj
enumeration mpk
enumeration mpl
enumeration mpm
enumeration mpn
enumeration mpo
enumeration mpp
enumeration mpq
enumeration mpr
enumeration mps
enumeration mpt
enumeration mpu
enumeration mpv
enumeration mpw
enumeration mpx
enumeration mpy
enumeration mpz
enumeration mqa
enumeration mqb
enumeration mqc
enumeration mqe
enumeration mqf
enumeration mqg
enumeration mqh
enumeration mqi
enumeration mqj
enumeration mqk
enumeration mql
enumeration mqm
enumeration mqn
enumeration mqo
enumeration mqp
enumeration mqq
enumeration mqr
enumeration mqs
enumeration mqt
enumeration mqu
enumeration mqv
enumeration mqw
enumeration mqx
enumeration mqy
enumeration mqz
enumeration mra
enumeration mrb
enumeration mrc
enumeration mrd
enumeration mre
enumeration mrf
enumeration mrg
enumeration mrh
enumeration mrj
enumeration mrk
enumeration mrl
enumeration mrm
enumeration mrn
enumeration mro
enumeration mrp
enumeration mrq
enumeration mrr
enumeration mrs
enumeration mrt
enumeration mru
enumeration mrv
enumeration mrw
enumeration mrx
enumeration mry
enumeration mrz
enumeration msb
enumeration msc
enumeration msd
enumeration mse
enumeration msf
enumeration msg
enumeration msh
enumeration msi
enumeration msj
enumeration msk
enumeration msl
enumeration msm
enumeration msn
enumeration mso
enumeration msp
enumeration msq
enumeration msr
enumeration mss
enumeration msu
enumeration msv
enumeration msw
enumeration msx
enumeration msy
enumeration msz
enumeration mta
enumeration mtb
enumeration mtc
enumeration mtd
enumeration mte
enumeration mtf
enumeration mtg
enumeration mth
enumeration mti
enumeration mtj
enumeration mtk
enumeration mtl
enumeration mtm
enumeration mtn
enumeration mto
enumeration mtp
enumeration mtq
enumeration mtr
enumeration mts
enumeration mtt
enumeration mtu
enumeration mtv
enumeration mtw
enumeration mtx
enumeration mty
enumeration mua
enumeration mub
enumeration muc
enumeration mud
enumeration mue
enumeration mug
enumeration muh
enumeration mui
enumeration muj
enumeration muk
enumeration mul
enumeration mum
enumeration mun
enumeration muo
enumeration mup
enumeration muq
enumeration mur
enumeration mus
enumeration mut
enumeration muu
enumeration muv
enumeration mux
enumeration muy
enumeration muz
enumeration mva
enumeration mvb
enumeration mvd
enumeration mve
enumeration mvf
enumeration mvg
enumeration mvh
enumeration mvi
enumeration mvk
enumeration mvl
enumeration mvm
enumeration mvn
enumeration mvo
enumeration mvp
enumeration mvq
enumeration mvr
enumeration mvs
enumeration mvt
enumeration mvu
enumeration mvv
enumeration mvw
enumeration mvx
enumeration mvy
enumeration mvz
enumeration mwa
enumeration mwb
enumeration mwc
enumeration mwe
enumeration mwf
enumeration mwg
enumeration mwh
enumeration mwi
enumeration mwj
enumeration mwk
enumeration mwl
enumeration mwm
enumeration mwn
enumeration mwo
enumeration mwp
enumeration mwq
enumeration mwr
enumeration mws
enumeration mwt
enumeration mwu
enumeration mwv
enumeration mww
enumeration mwx
enumeration mwy
enumeration mwz
enumeration mxa
enumeration mxb
enumeration mxc
enumeration mxd
enumeration mxe
enumeration mxf
enumeration mxg
enumeration mxh
enumeration mxi
enumeration mxj
enumeration mxk
enumeration mxl
enumeration mxm
enumeration mxn
enumeration mxo
enumeration mxp
enumeration mxq
enumeration mxr
enumeration mxs
enumeration mxt
enumeration mxu
enumeration mxv
enumeration mxw
enumeration mxx
enumeration mxy
enumeration mxz
enumeration myb
enumeration myc
enumeration myd
enumeration mye
enumeration myf
enumeration myg
enumeration myh
enumeration myi
enumeration myj
enumeration myk
enumeration myl
enumeration mym
enumeration myn
enumeration myo
enumeration myp
enumeration myr
enumeration mys
enumeration myu
enumeration myv
enumeration myw
enumeration myx
enumeration myy
enumeration myz
enumeration mza
enumeration mzb
enumeration mzc
enumeration mzd
enumeration mze
enumeration mzg
enumeration mzh
enumeration mzi
enumeration mzj
enumeration mzk
enumeration mzl
enumeration mzm
enumeration mzn
enumeration mzo
enumeration mzp
enumeration mzq
enumeration mzr
enumeration mzs
enumeration mzt
enumeration mzu
enumeration mzv
enumeration mzw
enumeration mzx
enumeration mzy
enumeration mzz
enumeration naa
enumeration nab
enumeration nac
enumeration nad
enumeration nae
enumeration naf
enumeration nag
enumeration nah
enumeration nai
enumeration naj
enumeration nak
enumeration nal
enumeration nam
enumeration nan
enumeration nao
enumeration nap
enumeration naq
enumeration nar
enumeration nas
enumeration nat
enumeration naw
enumeration nax
enumeration nay
enumeration naz
enumeration nba
enumeration nbb
enumeration nbc
enumeration nbd
enumeration nbe
enumeration nbg
enumeration nbh
enumeration nbi
enumeration nbj
enumeration nbk
enumeration nbm
enumeration nbn
enumeration nbo
enumeration nbp
enumeration nbq
enumeration nbr
enumeration nbs
enumeration nbt
enumeration nbu
enumeration nbv
enumeration nbw
enumeration nby
enumeration nca
enumeration ncb
enumeration ncc
enumeration ncd
enumeration nce
enumeration ncf
enumeration ncg
enumeration nch
enumeration nci
enumeration ncj
enumeration nck
enumeration ncl
enumeration ncm
enumeration ncn
enumeration nco
enumeration ncp
enumeration ncr
enumeration ncs
enumeration nct
enumeration ncu
enumeration ncx
enumeration ncz
enumeration nda
enumeration ndb
enumeration ndc
enumeration ndd
enumeration ndf
enumeration ndg
enumeration ndh
enumeration ndi
enumeration ndj
enumeration ndk
enumeration ndl
enumeration ndm
enumeration ndn
enumeration ndp
enumeration ndq
enumeration ndr
enumeration nds
enumeration ndt
enumeration ndu
enumeration ndv
enumeration ndw
enumeration ndx
enumeration ndy
enumeration ndz
enumeration nea
enumeration neb
enumeration nec
enumeration ned
enumeration nee
enumeration nef
enumeration neg
enumeration neh
enumeration nei
enumeration nej
enumeration nek
enumeration nem
enumeration nen
enumeration neo
enumeration neq
enumeration ner
enumeration nes
enumeration net
enumeration neu
enumeration nev
enumeration new
enumeration nex
enumeration ney
enumeration nez
enumeration nfa
enumeration nfd
enumeration nfl
enumeration nfr
enumeration nfu
enumeration nga
enumeration ngb
enumeration ngc
enumeration ngd
enumeration nge
enumeration ngf
enumeration ngg
enumeration ngh
enumeration ngi
enumeration ngj
enumeration ngk
enumeration ngl
enumeration ngm
enumeration ngn
enumeration ngo
enumeration ngp
enumeration ngq
enumeration ngr
enumeration ngs
enumeration ngt
enumeration ngu
enumeration ngv
enumeration ngw
enumeration ngx
enumeration ngy
enumeration ngz
enumeration nha
enumeration nhb
enumeration nhc
enumeration nhd
enumeration nhe
enumeration nhf
enumeration nhg
enumeration nhh
enumeration nhi
enumeration nhk
enumeration nhm
enumeration nhn
enumeration nho
enumeration nhp
enumeration nhq
enumeration nhr
enumeration nht
enumeration nhu
enumeration nhv
enumeration nhw
enumeration nhx
enumeration nhy
enumeration nhz
enumeration nia
enumeration nib
enumeration nic
enumeration nid
enumeration nie
enumeration nif
enumeration nig
enumeration nih
enumeration nii
enumeration nij
enumeration nik
enumeration nil
enumeration nim
enumeration nin
enumeration nio
enumeration niq
enumeration nir
enumeration nis
enumeration nit
enumeration niu
enumeration niv
enumeration niw
enumeration nix
enumeration niy
enumeration niz
enumeration nja
enumeration njb
enumeration njd
enumeration njh
enumeration nji
enumeration njj
enumeration njl
enumeration njm
enumeration njn
enumeration njo
enumeration njr
enumeration njs
enumeration njt
enumeration nju
enumeration njx
enumeration njy
enumeration njz
enumeration nka
enumeration nkb
enumeration nkc
enumeration nkd
enumeration nke
enumeration nkf
enumeration nkg
enumeration nkh
enumeration nki
enumeration nkj
enumeration nkk
enumeration nkm
enumeration nkn
enumeration nko
enumeration nkp
enumeration nkq
enumeration nkr
enumeration nks
enumeration nkt
enumeration nku
enumeration nkv
enumeration nkw
enumeration nkx
enumeration nkz
enumeration nla
enumeration nlc
enumeration nle
enumeration nlg
enumeration nli
enumeration nlj
enumeration nlk
enumeration nll
enumeration nlo
enumeration nlq
enumeration nlu
enumeration nlv
enumeration nlw
enumeration nlx
enumeration nly
enumeration nlz
enumeration nma
enumeration nmb
enumeration nmc
enumeration nmd
enumeration nme
enumeration nmf
enumeration nmg
enumeration nmh
enumeration nmi
enumeration nmj
enumeration nmk
enumeration nml
enumeration nmm
enumeration nmn
enumeration nmo
enumeration nmp
enumeration nmq
enumeration nmr
enumeration nms
enumeration nmt
enumeration nmu
enumeration nmv
enumeration nmw
enumeration nmx
enumeration nmy
enumeration nmz
enumeration nna
enumeration nnb
enumeration nnc
enumeration nnd
enumeration nne
enumeration nnf
enumeration nng
enumeration nnh
enumeration nni
enumeration nnj
enumeration nnk
enumeration nnl
enumeration nnm
enumeration nnn
enumeration nnp
enumeration nnq
enumeration nnr
enumeration nns
enumeration nnt
enumeration nnu
enumeration nnv
enumeration nnw
enumeration nnx
enumeration nny
enumeration nnz
enumeration noa
enumeration noc
enumeration nod
enumeration noe
enumeration nof
enumeration nog
enumeration noh
enumeration noi
enumeration noj
enumeration nok
enumeration nol
enumeration nom
enumeration non
enumeration nop
enumeration noq
enumeration nos
enumeration not
enumeration nou
enumeration nov
enumeration now
enumeration noy
enumeration noz
enumeration npa
enumeration npb
enumeration npg
enumeration nph
enumeration npi
enumeration npl
enumeration npn
enumeration npo
enumeration nps
enumeration npu
enumeration npy
enumeration nqg
enumeration nqk
enumeration nqm
enumeration nqn
enumeration nqo
enumeration nqq
enumeration nqy
enumeration nra
enumeration nrb
enumeration nrc
enumeration nre
enumeration nrg
enumeration nri
enumeration nrk
enumeration nrl
enumeration nrm
enumeration nrn
enumeration nrp
enumeration nrr
enumeration nrt
enumeration nru
enumeration nrx
enumeration nrz
enumeration nsa
enumeration nsc
enumeration nsd
enumeration nse
enumeration nsf
enumeration nsg
enumeration nsh
enumeration nsi
enumeration nsk
enumeration nsl
enumeration nsm
enumeration nsn
enumeration nso
enumeration nsp
enumeration nsq
enumeration nsr
enumeration nss
enumeration nst
enumeration nsu
enumeration nsv
enumeration nsw
enumeration nsx
enumeration nsy
enumeration nsz
enumeration nte
enumeration ntg
enumeration nti
enumeration ntj
enumeration ntk
enumeration ntm
enumeration nto
enumeration ntp
enumeration ntr
enumeration nts
enumeration ntu
enumeration ntw
enumeration ntx
enumeration nty
enumeration ntz
enumeration nua
enumeration nub
enumeration nuc
enumeration nud
enumeration nue
enumeration nuf
enumeration nug
enumeration nuh
enumeration nui
enumeration nuj
enumeration nuk
enumeration nul
enumeration num
enumeration nun
enumeration nuo
enumeration nup
enumeration nuq
enumeration nur
enumeration nus
enumeration nut
enumeration nuu
enumeration nuv
enumeration nuw
enumeration nux
enumeration nuy
enumeration nuz
enumeration nvh
enumeration nvm
enumeration nvo
enumeration nwa
enumeration nwb
enumeration nwc
enumeration nwe
enumeration nwg
enumeration nwi
enumeration nwm
enumeration nwo
enumeration nwr
enumeration nwx
enumeration nwy
enumeration nxa
enumeration nxd
enumeration nxe
enumeration nxg
enumeration nxi
enumeration nxk
enumeration nxl
enumeration nxm
enumeration nxn
enumeration nxq
enumeration nxr
enumeration nxu
enumeration nxx
enumeration nyb
enumeration nyc
enumeration nyd
enumeration nye
enumeration nyf
enumeration nyg
enumeration nyh
enumeration nyi
enumeration nyj
enumeration nyk
enumeration nyl
enumeration nym
enumeration nyn
enumeration nyo
enumeration nyp
enumeration nyq
enumeration nyr
enumeration nys
enumeration nyt
enumeration nyu
enumeration nyv
enumeration nyw
enumeration nyx
enumeration nyy
enumeration nza
enumeration nzb
enumeration nzi
enumeration nzk
enumeration nzm
enumeration nzs
enumeration nzu
enumeration nzy
enumeration nzz
enumeration oaa
enumeration oac
enumeration oar
enumeration oav
enumeration obi
enumeration obk
enumeration obl
enumeration obm
enumeration obo
enumeration obr
enumeration obt
enumeration obu
enumeration oca
enumeration och
enumeration oco
enumeration ocu
enumeration oda
enumeration odk
enumeration odt
enumeration odu
enumeration ofo
enumeration ofs
enumeration ofu
enumeration ogb
enumeration ogc
enumeration oge
enumeration ogg
enumeration ogo
enumeration ogu
enumeration oht
enumeration ohu
enumeration oia
enumeration oin
enumeration ojb
enumeration ojc
enumeration ojg
enumeration ojp
enumeration ojs
enumeration ojv
enumeration ojw
enumeration oka
enumeration okb
enumeration okd
enumeration oke
enumeration okg
enumeration okh
enumeration oki
enumeration okj
enumeration okk
enumeration okl
enumeration okm
enumeration okn
enumeration oko
enumeration okr
enumeration oks
enumeration oku
enumeration okv
enumeration okx
enumeration ola
enumeration old
enumeration ole
enumeration olk
enumeration olm
enumeration olo
enumeration olr
enumeration olt
enumeration oma
enumeration omb
enumeration omc
enumeration ome
enumeration omg
enumeration omi
enumeration omk
enumeration oml
enumeration omn
enumeration omo
enumeration omp
enumeration omq
enumeration omr
enumeration omt
enumeration omu
enumeration omv
enumeration omw
enumeration omx
enumeration ona
enumeration onb
enumeration one
enumeration ong
enumeration oni
enumeration onj
enumeration onk
enumeration onn
enumeration ono
enumeration onp
enumeration onr
enumeration ons
enumeration ont
enumeration onu
enumeration onw
enumeration onx
enumeration ood
enumeration oog
enumeration oon
enumeration oor
enumeration oos
enumeration opa
enumeration opk
enumeration opm
enumeration opo
enumeration opt
enumeration opy
enumeration ora
enumeration orc
enumeration ore
enumeration org
enumeration orh
enumeration orn
enumeration oro
enumeration orr
enumeration ors
enumeration ort
enumeration oru
enumeration orv
enumeration orw
enumeration orx
enumeration ory
enumeration orz
enumeration osa
enumeration osc
enumeration osi
enumeration oso
enumeration osp
enumeration ost
enumeration osu
enumeration osx
enumeration ota
enumeration otb
enumeration otd
enumeration ote
enumeration oti
enumeration otk
enumeration otl
enumeration otm
enumeration otn
enumeration oto
enumeration otq
enumeration otr
enumeration ots
enumeration ott
enumeration otu
enumeration otw
enumeration otx
enumeration oty
enumeration otz
enumeration oua
enumeration oub
enumeration oue
enumeration oui
enumeration oum
enumeration oun
enumeration owi
enumeration owl
enumeration oyb
enumeration oyd
enumeration oym
enumeration oyy
enumeration ozm
enumeration paa
enumeration pab
enumeration pac
enumeration pad
enumeration pae
enumeration paf
enumeration pag
enumeration pah
enumeration pai
enumeration pak
enumeration pal
enumeration pam
enumeration pao
enumeration pap
enumeration paq
enumeration par
enumeration pas
enumeration pat
enumeration pau
enumeration pav
enumeration paw
enumeration pax
enumeration pay
enumeration paz
enumeration pbb
enumeration pbc
enumeration pbe
enumeration pbf
enumeration pbg
enumeration pbh
enumeration pbi
enumeration pbl
enumeration pbn
enumeration pbo
enumeration pbp
enumeration pbr
enumeration pbs
enumeration pbt
enumeration pbu
enumeration pbv
enumeration pby
enumeration pca
enumeration pcb
enumeration pcc
enumeration pcd
enumeration pce
enumeration pcf
enumeration pcg
enumeration pch
enumeration pci
enumeration pcj
enumeration pck
enumeration pcl
enumeration pcm
enumeration pcn
enumeration pcp
enumeration pcw
enumeration pda
enumeration pdc
enumeration pdi
enumeration pdn
enumeration pdo
enumeration pdt
enumeration pdu
enumeration pea
enumeration peb
enumeration ped
enumeration pee
enumeration pef
enumeration peg
enumeration peh
enumeration pei
enumeration pej
enumeration pek
enumeration pel
enumeration pem
enumeration peo
enumeration pep
enumeration peq
enumeration pes
enumeration pev
enumeration pex
enumeration pey
enumeration pez
enumeration pfa
enumeration pfe
enumeration pfl
enumeration pga
enumeration pgg
enumeration pgi
enumeration pgk
enumeration pgl
enumeration pgn
enumeration pgs
enumeration pgu
enumeration pha
enumeration phd
enumeration phg
enumeration phh
enumeration phi
enumeration phk
enumeration phl
enumeration phm
enumeration phn
enumeration pho
enumeration phq
enumeration phr
enumeration pht
enumeration phu
enumeration phv
enumeration phw
enumeration pia
enumeration pib
enumeration pic
enumeration pid
enumeration pie
enumeration pif
enumeration pig
enumeration pih
enumeration pii
enumeration pij
enumeration pil
enumeration pim
enumeration pin
enumeration pio
enumeration pip
enumeration pir
enumeration pis
enumeration pit
enumeration piu
enumeration piv
enumeration piw
enumeration pix
enumeration piy
enumeration piz
enumeration pjt
enumeration pka
enumeration pkb
enumeration pkc
enumeration pkg
enumeration pkh
enumeration pkn
enumeration pko
enumeration pkp
enumeration pkr
enumeration pks
enumeration pkt
enumeration pku
enumeration pla
enumeration plb
enumeration plc
enumeration pld
enumeration ple
enumeration plf
enumeration plg
enumeration plh
enumeration plj
enumeration plk
enumeration pll
enumeration pln
enumeration plo
enumeration plp
enumeration plq
enumeration plr
enumeration pls
enumeration plt
enumeration plu
enumeration plv
enumeration plw
enumeration ply
enumeration plz
enumeration pma
enumeration pmb
enumeration pmc
enumeration pmd
enumeration pme
enumeration pmf
enumeration pmh
enumeration pmi
enumeration pmj
enumeration pmk
enumeration pml
enumeration pmm
enumeration pmn
enumeration pmo
enumeration pmq
enumeration pmr
enumeration pms
enumeration pmt
enumeration pmu
enumeration pmw
enumeration pmx
enumeration pmy
enumeration pmz
enumeration pna
enumeration pnb
enumeration pnc
enumeration pne
enumeration png
enumeration pnh
enumeration pni
enumeration pnj
enumeration pnk
enumeration pnl
enumeration pnm
enumeration pnn
enumeration pno
enumeration pnp
enumeration pnq
enumeration pnr
enumeration pns
enumeration pnt
enumeration pnu
enumeration pnv
enumeration pnw
enumeration pnx
enumeration pny
enumeration pnz
enumeration poc
enumeration pod
enumeration poe
enumeration pof
enumeration pog
enumeration poh
enumeration poi
enumeration pok
enumeration pom
enumeration pon
enumeration poo
enumeration pop
enumeration poq
enumeration pos
enumeration pot
enumeration pov
enumeration pow
enumeration pox
enumeration poy
enumeration poz
enumeration ppa
enumeration ppe
enumeration ppi
enumeration ppk
enumeration ppl
enumeration ppm
enumeration ppn
enumeration ppo
enumeration ppp
enumeration ppq
enumeration pps
enumeration ppt
enumeration ppu
enumeration pqa
enumeration pqe
enumeration pqm
enumeration pqw
enumeration pra
enumeration prb
enumeration prc
enumeration prd
enumeration pre
enumeration prf
enumeration prg
enumeration prh
enumeration pri
enumeration prk
enumeration prl
enumeration prm
enumeration prn
enumeration pro
enumeration prp
enumeration prq
enumeration prr
enumeration prs
enumeration prt
enumeration pru
enumeration prw
enumeration prx
enumeration pry
enumeration prz
enumeration psa
enumeration psc
enumeration psd
enumeration pse
enumeration psg
enumeration psh
enumeration psi
enumeration psl
enumeration psm
enumeration psn
enumeration pso
enumeration psp
enumeration psq
enumeration psr
enumeration pss
enumeration pst
enumeration psu
enumeration psw
enumeration psy
enumeration pta
enumeration pth
enumeration pti
enumeration ptn
enumeration pto
enumeration ptp
enumeration ptq
enumeration ptr
enumeration ptt
enumeration ptu
enumeration ptv
enumeration ptw
enumeration pty
enumeration pua
enumeration pub
enumeration puc
enumeration pud
enumeration pue
enumeration puf
enumeration pug
enumeration pui
enumeration puj
enumeration puk
enumeration pum
enumeration puo
enumeration pup
enumeration puq
enumeration pur
enumeration put
enumeration puu
enumeration puw
enumeration pux
enumeration puy
enumeration pwa
enumeration pwb
enumeration pwg
enumeration pwi
enumeration pwm
enumeration pwn
enumeration pwo
enumeration pwr
enumeration pww
enumeration pxm
enumeration pye
enumeration pym
enumeration pyn
enumeration pys
enumeration pyu
enumeration pyx
enumeration pyy
enumeration pzn
enumeration qaa..qtz
enumeration qua
enumeration qub
enumeration quc
enumeration qud
enumeration quf
enumeration qug
enumeration quh
enumeration qui
enumeration quk
enumeration qul
enumeration qum
enumeration qun
enumeration qup
enumeration quq
enumeration qur
enumeration qus
enumeration quv
enumeration quw
enumeration qux
enumeration quy
enumeration quz
enumeration qva
enumeration qvc
enumeration qve
enumeration qvh
enumeration qvi
enumeration qvj
enumeration qvl
enumeration qvm
enumeration qvn
enumeration qvo
enumeration qvp
enumeration qvs
enumeration qvw
enumeration qvy
enumeration qvz
enumeration qwa
enumeration qwc
enumeration qwe
enumeration qwh
enumeration qwm
enumeration qws
enumeration qwt
enumeration qxa
enumeration qxc
enumeration qxh
enumeration qxl
enumeration qxn
enumeration qxo
enumeration qxp
enumeration qxq
enumeration qxr
enumeration qxs
enumeration qxt
enumeration qxu
enumeration qxw
enumeration qya
enumeration qyp
enumeration raa
enumeration rab
enumeration rac
enumeration rad
enumeration raf
enumeration rag
enumeration rah
enumeration rai
enumeration raj
enumeration rak
enumeration ral
enumeration ram
enumeration ran
enumeration rao
enumeration rap
enumeration raq
enumeration rar
enumeration ras
enumeration rat
enumeration rau
enumeration rav
enumeration raw
enumeration rax
enumeration ray
enumeration raz
enumeration rbb
enumeration rbk
enumeration rbl
enumeration rbp
enumeration rcf
enumeration rdb
enumeration rea
enumeration reb
enumeration ree
enumeration reg
enumeration rei
enumeration rej
enumeration rel
enumeration rem
enumeration ren
enumeration rer
enumeration res
enumeration ret
enumeration rey
enumeration rga
enumeration rge
enumeration rgk
enumeration rgn
enumeration rgr
enumeration rgs
enumeration rgu
enumeration rhg
enumeration rhp
enumeration ria
enumeration rie
enumeration rif
enumeration ril
enumeration rim
enumeration rin
enumeration rir
enumeration rit
enumeration riu
enumeration rjg
enumeration rji
enumeration rjs
enumeration rka
enumeration rkb
enumeration rkh
enumeration rki
enumeration rkm
enumeration rkt
enumeration rkw
enumeration rma
enumeration rmb
enumeration rmc
enumeration rmd
enumeration rme
enumeration rmf
enumeration rmg
enumeration rmh
enumeration rmi
enumeration rmk
enumeration rml
enumeration rmm
enumeration rmn
enumeration rmo
enumeration rmp
enumeration rmq
enumeration rms
enumeration rmt
enumeration rmu
enumeration rmv
enumeration rmw
enumeration rmx
enumeration rmy
enumeration rmz
enumeration rna
enumeration rnd
enumeration rng
enumeration rnl
enumeration rnn
enumeration rnp
enumeration rnr
enumeration rnw
enumeration roa
enumeration rob
enumeration roc
enumeration rod
enumeration roe
enumeration rof
enumeration rog
enumeration rol
enumeration rom
enumeration roo
enumeration rop
enumeration ror
enumeration rou
enumeration row
enumeration rpn
enumeration rpt
enumeration rri
enumeration rro
enumeration rrt
enumeration rsb
enumeration rsi
enumeration rsl
enumeration rtc
enumeration rth
enumeration rtm
enumeration rtw
enumeration rub
enumeration ruc
enumeration rue
enumeration ruf
enumeration rug
enumeration ruh
enumeration rui
enumeration ruk
enumeration ruo
enumeration rup
enumeration ruq
enumeration rut
enumeration ruu
enumeration ruy
enumeration ruz
enumeration rwa
enumeration rwk
enumeration rwm
enumeration rwo
enumeration rwr
enumeration rxd
enumeration rxw
enumeration ryn
enumeration rys
enumeration ryu
enumeration saa
enumeration sab
enumeration sac
enumeration sad
enumeration sae
enumeration saf
enumeration sah
enumeration sai
enumeration saj
enumeration sak
enumeration sal
enumeration sam
enumeration sao
enumeration saq
enumeration sar
enumeration sas
enumeration sat
enumeration sau
enumeration sav
enumeration saw
enumeration sax
enumeration say
enumeration saz
enumeration sba
enumeration sbb
enumeration sbc
enumeration sbd
enumeration sbe
enumeration sbf
enumeration sbg
enumeration sbh
enumeration sbi
enumeration sbj
enumeration sbk
enumeration sbl
enumeration sbm
enumeration sbn
enumeration sbo
enumeration sbp
enumeration sbq
enumeration sbr
enumeration sbs
enumeration sbt
enumeration sbu
enumeration sbv
enumeration sbw
enumeration sbx
enumeration sby
enumeration sbz
enumeration scb
enumeration sce
enumeration scf
enumeration scg
enumeration sch
enumeration sci
enumeration sck
enumeration scl
enumeration scn
enumeration sco
enumeration scp
enumeration scq
enumeration scs
enumeration scu
enumeration scv
enumeration scw
enumeration scx
enumeration sda
enumeration sdb
enumeration sdc
enumeration sde
enumeration sdf
enumeration sdg
enumeration sdh
enumeration sdj
enumeration sdk
enumeration sdl
enumeration sdm
enumeration sdn
enumeration sdo
enumeration sdp
enumeration sdr
enumeration sds
enumeration sdt
enumeration sdu
enumeration sdv
enumeration sdx
enumeration sdz
enumeration sea
enumeration seb
enumeration sec
enumeration sed
enumeration see
enumeration sef
enumeration seg
enumeration seh
enumeration sei
enumeration sej
enumeration sek
enumeration sel
enumeration sem
enumeration sen
enumeration seo
enumeration sep
enumeration seq
enumeration ser
enumeration ses
enumeration set
enumeration seu
enumeration sev
enumeration sew
enumeration sey
enumeration sez
enumeration sfb
enumeration sfe
enumeration sfm
enumeration sfs
enumeration sfw
enumeration sga
enumeration sgb
enumeration sgc
enumeration sgd
enumeration sge
enumeration sgg
enumeration sgh
enumeration sgi
enumeration sgj
enumeration sgk
enumeration sgm
enumeration sgn
enumeration sgo
enumeration sgp
enumeration sgr
enumeration sgs
enumeration sgt
enumeration sgu
enumeration sgw
enumeration sgx
enumeration sgy
enumeration sgz
enumeration sha
enumeration shb
enumeration shc
enumeration shd
enumeration she
enumeration shg
enumeration shh
enumeration shi
enumeration shj
enumeration shk
enumeration shl
enumeration shm
enumeration shn
enumeration sho
enumeration shp
enumeration shq
enumeration shr
enumeration shs
enumeration sht
enumeration shu
enumeration shv
enumeration shw
enumeration shx
enumeration shy
enumeration shz
enumeration sia
enumeration sib
enumeration sid
enumeration sie
enumeration sif
enumeration sig
enumeration sih
enumeration sii
enumeration sij
enumeration sik
enumeration sil
enumeration sim
enumeration sio
enumeration sip
enumeration siq
enumeration sir
enumeration sis
enumeration sit
enumeration siu
enumeration siv
enumeration siw
enumeration six
enumeration siy
enumeration siz
enumeration sja
enumeration sjb
enumeration sjd
enumeration sje
enumeration sjg
enumeration sjk
enumeration sjl
enumeration sjm
enumeration sjn
enumeration sjo
enumeration sjp
enumeration sjr
enumeration sjs
enumeration sjt
enumeration sju
enumeration sjw
enumeration ska
enumeration skb
enumeration skc
enumeration skd
enumeration ske
enumeration skf
enumeration skg
enumeration skh
enumeration ski
enumeration skj
enumeration skk
enumeration skm
enumeration skn
enumeration sko
enumeration skp
enumeration skq
enumeration skr
enumeration sks
enumeration skt
enumeration sku
enumeration skv
enumeration skw
enumeration skx
enumeration sky
enumeration skz
enumeration sla
enumeration slc
enumeration sld
enumeration sle
enumeration slf
enumeration slg
enumeration slh
enumeration sli
enumeration slj
enumeration sll
enumeration slm
enumeration sln
enumeration slp
enumeration slq
enumeration slr
enumeration sls
enumeration slt
enumeration slu
enumeration slw
enumeration slx
enumeration sly
enumeration slz
enumeration sma
enumeration smb
enumeration smc
enumeration smd
enumeration smf
enumeration smg
enumeration smh
enumeration smi
enumeration smj
enumeration smk
enumeration sml
enumeration smm
enumeration smn
enumeration smp
enumeration smq
enumeration smr
enumeration sms
enumeration smt
enumeration smu
enumeration smv
enumeration smw
enumeration smx
enumeration smy
enumeration smz
enumeration snb
enumeration snc
enumeration sne
enumeration snf
enumeration sng
enumeration snh
enumeration sni
enumeration snj
enumeration snk
enumeration snl
enumeration snm
enumeration snn
enumeration sno
enumeration snp
enumeration snq
enumeration snr
enumeration sns
enumeration snu
enumeration snv
enumeration snw
enumeration snx
enumeration sny
enumeration snz
enumeration soa
enumeration sob
enumeration soc
enumeration sod
enumeration soe
enumeration sog
enumeration soh
enumeration soi
enumeration soj
enumeration sok
enumeration sol
enumeration son
enumeration soo
enumeration sop
enumeration soq
enumeration sor
enumeration sos
enumeration sou
enumeration sov
enumeration sow
enumeration sox
enumeration soy
enumeration soz
enumeration spb
enumeration spc
enumeration spd
enumeration spe
enumeration spg
enumeration spi
enumeration spk
enumeration spl
enumeration spm
enumeration spn
enumeration spo
enumeration spp
enumeration spq
enumeration spr
enumeration sps
enumeration spt
enumeration spu
enumeration spv
enumeration spx
enumeration spy
enumeration sqa
enumeration sqh
enumeration sqj
enumeration sqk
enumeration sqm
enumeration sqn
enumeration sqo
enumeration sqq
enumeration sqr
enumeration sqs
enumeration sqt
enumeration squ
enumeration sra
enumeration srb
enumeration src
enumeration sre
enumeration srf
enumeration srg
enumeration srh
enumeration sri
enumeration srk
enumeration srl
enumeration srm
enumeration srn
enumeration sro
enumeration srq
enumeration srr
enumeration srs
enumeration srt
enumeration sru
enumeration srv
enumeration srw
enumeration srx
enumeration sry
enumeration srz
enumeration ssa
enumeration ssb
enumeration ssc
enumeration ssd
enumeration sse
enumeration ssf
enumeration ssg
enumeration ssh
enumeration ssi
enumeration ssj
enumeration ssk
enumeration ssl
enumeration ssm
enumeration ssn
enumeration sso
enumeration ssp
enumeration ssq
enumeration ssr
enumeration sss
enumeration sst
enumeration ssu
enumeration ssv
enumeration ssx
enumeration ssy
enumeration ssz
enumeration sta
enumeration stb
enumeration std
enumeration ste
enumeration stf
enumeration stg
enumeration sth
enumeration sti
enumeration stj
enumeration stk
enumeration stl
enumeration stm
enumeration stn
enumeration sto
enumeration stp
enumeration stq
enumeration str
enumeration sts
enumeration stt
enumeration stu
enumeration stv
enumeration stw
enumeration sty
enumeration sua
enumeration sub
enumeration suc
enumeration sue
enumeration sug
enumeration sui
enumeration suj
enumeration suk
enumeration suq
enumeration sur
enumeration sus
enumeration sut
enumeration suv
enumeration suw
enumeration sux
enumeration suy
enumeration suz
enumeration sva
enumeration svb
enumeration svc
enumeration sve
enumeration svk
enumeration svm
enumeration svr
enumeration svs
enumeration svx
enumeration swb
enumeration swc
enumeration swf
enumeration swg
enumeration swh
enumeration swi
enumeration swj
enumeration swk
enumeration swl
enumeration swm
enumeration swn
enumeration swo
enumeration swp
enumeration swq
enumeration swr
enumeration sws
enumeration swt
enumeration swu
enumeration swv
enumeration sww
enumeration swx
enumeration swy
enumeration sxb
enumeration sxc
enumeration sxe
enumeration sxg
enumeration sxk
enumeration sxl
enumeration sxm
enumeration sxn
enumeration sxo
enumeration sxr
enumeration sxs
enumeration sxu
enumeration sxw
enumeration sya
enumeration syb
enumeration syc
enumeration syd
enumeration syi
enumeration syk
enumeration syl
enumeration sym
enumeration syn
enumeration syo
enumeration syr
enumeration sys
enumeration syw
enumeration syy
enumeration sza
enumeration szb
enumeration szc
enumeration szd
enumeration sze
enumeration szg
enumeration szl
enumeration szn
enumeration szp
enumeration szv
enumeration szw
enumeration taa
enumeration tab
enumeration tac
enumeration tad
enumeration tae
enumeration taf
enumeration tag
enumeration tai
enumeration taj
enumeration tak
enumeration tal
enumeration tan
enumeration tao
enumeration tap
enumeration taq
enumeration tar
enumeration tas
enumeration tau
enumeration tav
enumeration taw
enumeration tax
enumeration tay
enumeration taz
enumeration tba
enumeration tbb
enumeration tbc
enumeration tbd
enumeration tbe
enumeration tbf
enumeration tbg
enumeration tbh
enumeration tbi
enumeration tbj
enumeration tbk
enumeration tbl
enumeration tbm
enumeration tbn
enumeration tbo
enumeration tbp
enumeration tbq
enumeration tbr
enumeration tbs
enumeration tbt
enumeration tbu
enumeration tbv
enumeration tbw
enumeration tbx
enumeration tby
enumeration tbz
enumeration tca
enumeration tcb
enumeration tcc
enumeration tcd
enumeration tce
enumeration tcf
enumeration tcg
enumeration tch
enumeration tci
enumeration tck
enumeration tcl
enumeration tcm
enumeration tcn
enumeration tco
enumeration tcp
enumeration tcq
enumeration tcs
enumeration tct
enumeration tcu
enumeration tcw
enumeration tcx
enumeration tcy
enumeration tcz
enumeration tda
enumeration tdb
enumeration tdc
enumeration tdd
enumeration tde
enumeration tdf
enumeration tdg
enumeration tdh
enumeration tdi
enumeration tdj
enumeration tdk
enumeration tdl
enumeration tdn
enumeration tdo
enumeration tdq
enumeration tdr
enumeration tds
enumeration tdt
enumeration tdu
enumeration tdv
enumeration tdx
enumeration tdy
enumeration tea
enumeration teb
enumeration tec
enumeration ted
enumeration tee
enumeration tef
enumeration teg
enumeration teh
enumeration tei
enumeration tek
enumeration tem
enumeration ten
enumeration teo
enumeration tep
enumeration teq
enumeration ter
enumeration tes
enumeration tet
enumeration teu
enumeration tev
enumeration tew
enumeration tex
enumeration tey
enumeration tfi
enumeration tfn
enumeration tfo
enumeration tfr
enumeration tft
enumeration tga
enumeration tgb
enumeration tgc
enumeration tgd
enumeration tge
enumeration tgf
enumeration tgh
enumeration tgi
enumeration tgj
enumeration tgn
enumeration tgo
enumeration tgp
enumeration tgq
enumeration tgr
enumeration tgs
enumeration tgt
enumeration tgu
enumeration tgv
enumeration tgw
enumeration tgx
enumeration tgy
enumeration tgz
enumeration thc
enumeration thd
enumeration the
enumeration thf
enumeration thh
enumeration thi
enumeration thk
enumeration thl
enumeration thm
enumeration thn
enumeration thp
enumeration thq
enumeration thr
enumeration ths
enumeration tht
enumeration thu
enumeration thv
enumeration thw
enumeration thx
enumeration thy
enumeration thz
enumeration tia
enumeration tic
enumeration tid
enumeration tif
enumeration tig
enumeration tih
enumeration tii
enumeration tij
enumeration tik
enumeration til
enumeration tim
enumeration tin
enumeration tio
enumeration tip
enumeration tiq
enumeration tis
enumeration tit
enumeration tiu
enumeration tiv
enumeration tiw
enumeration tix
enumeration tiy
enumeration tiz
enumeration tja
enumeration tjg
enumeration tji
enumeration tjl
enumeration tjm
enumeration tjn
enumeration tjo
enumeration tjs
enumeration tju
enumeration tjw
enumeration tka
enumeration tkb
enumeration tkd
enumeration tke
enumeration tkf
enumeration tkg
enumeration tkl
enumeration tkm
enumeration tkn
enumeration tkp
enumeration tkq
enumeration tkr
enumeration tks
enumeration tkt
enumeration tku
enumeration tkv
enumeration tkw
enumeration tkx
enumeration tkz
enumeration tla
enumeration tlb
enumeration tlc
enumeration tld
enumeration tlf
enumeration tlg
enumeration tlh
enumeration tli
enumeration tlj
enumeration tlk
enumeration tll
enumeration tlm
enumeration tln
enumeration tlo
enumeration tlp
enumeration tlq
enumeration tlr
enumeration tls
enumeration tlt
enumeration tlu
enumeration tlv
enumeration tlx
enumeration tly
enumeration tma
enumeration tmb
enumeration tmc
enumeration tmd
enumeration tme
enumeration tmf
enumeration tmg
enumeration tmh
enumeration tmi
enumeration tmj
enumeration tmk
enumeration tml
enumeration tmm
enumeration tmn
enumeration tmo
enumeration tmp
enumeration tmq
enumeration tmr
enumeration tms
enumeration tmt
enumeration tmu
enumeration tmv
enumeration tmw
enumeration tmy
enumeration tmz
enumeration tna
enumeration tnb
enumeration tnc
enumeration tnd
enumeration tne
enumeration tng
enumeration tnh
enumeration tni
enumeration tnk
enumeration tnl
enumeration tnm
enumeration tnn
enumeration tno
enumeration tnp
enumeration tnq
enumeration tnr
enumeration tns
enumeration tnt
enumeration tnu
enumeration tnv
enumeration tnw
enumeration tnx
enumeration tny
enumeration tnz
enumeration tob
enumeration toc
enumeration tod
enumeration toe
enumeration tof
enumeration tog
enumeration toh
enumeration toi
enumeration toj
enumeration tol
enumeration tom
enumeration too
enumeration top
enumeration toq
enumeration tor
enumeration tos
enumeration tou
enumeration tov
enumeration tow
enumeration tox
enumeration toy
enumeration toz
enumeration tpa
enumeration tpc
enumeration tpe
enumeration tpf
enumeration tpg
enumeration tpi
enumeration tpj
enumeration tpk
enumeration tpl
enumeration tpm
enumeration tpn
enumeration tpo
enumeration tpp
enumeration tpq
enumeration tpr
enumeration tpt
enumeration tpu
enumeration tpv
enumeration tpw
enumeration tpx
enumeration tpy
enumeration tpz
enumeration tqb
enumeration tql
enumeration tqm
enumeration tqn
enumeration tqo
enumeration tqp
enumeration tqq
enumeration tqr
enumeration tqt
enumeration tqu
enumeration tqw
enumeration tra
enumeration trb
enumeration trc
enumeration trd
enumeration tre
enumeration trf
enumeration trg
enumeration trh
enumeration tri
enumeration trj
enumeration trk
enumeration trl
enumeration trm
enumeration trn
enumeration tro
enumeration trp
enumeration trq
enumeration trr
enumeration trs
enumeration trt
enumeration tru
enumeration trv
enumeration trw
enumeration trx
enumeration try
enumeration trz
enumeration tsa
enumeration tsb
enumeration tsc
enumeration tsd
enumeration tse
enumeration tsf
enumeration tsg
enumeration tsh
enumeration tsi
enumeration tsj
enumeration tsk
enumeration tsl
enumeration tsm
enumeration tsp
enumeration tsq
enumeration tsr
enumeration tss
enumeration tst
enumeration tsu
enumeration tsv
enumeration tsw
enumeration tsx
enumeration tsy
enumeration tsz
enumeration tta
enumeration ttb
enumeration ttc
enumeration ttd
enumeration tte
enumeration ttf
enumeration ttg
enumeration tth
enumeration tti
enumeration ttj
enumeration ttk
enumeration ttl
enumeration ttm
enumeration ttn
enumeration tto
enumeration ttp
enumeration ttq
enumeration ttr
enumeration tts
enumeration ttt
enumeration ttu
enumeration ttv
enumeration ttw
enumeration tty
enumeration ttz
enumeration tua
enumeration tub
enumeration tuc
enumeration tud
enumeration tue
enumeration tuf
enumeration tug
enumeration tuh
enumeration tui
enumeration tuj
enumeration tul
enumeration tum
enumeration tun
enumeration tuo
enumeration tup
enumeration tuq
enumeration tus
enumeration tut
enumeration tuu
enumeration tuv
enumeration tuw
enumeration tux
enumeration tuy
enumeration tuz
enumeration tva
enumeration tvd
enumeration tve
enumeration tvk
enumeration tvl
enumeration tvm
enumeration tvn
enumeration tvo
enumeration tvs
enumeration tvt
enumeration tvu
enumeration tvw
enumeration tvy
enumeration twa
enumeration twb
enumeration twc
enumeration twd
enumeration twe
enumeration twf
enumeration twg
enumeration twh
enumeration twl
enumeration twm
enumeration twn
enumeration two
enumeration twp
enumeration twq
enumeration twr
enumeration twt
enumeration twu
enumeration tww
enumeration twx
enumeration twy
enumeration txa
enumeration txb
enumeration txc
enumeration txe
enumeration txg
enumeration txh
enumeration txi
enumeration txm
enumeration txn
enumeration txo
enumeration txq
enumeration txr
enumeration txs
enumeration txt
enumeration txu
enumeration txx
enumeration txy
enumeration tya
enumeration tye
enumeration tyh
enumeration tyi
enumeration tyj
enumeration tyl
enumeration tyn
enumeration typ
enumeration tyr
enumeration tys
enumeration tyt
enumeration tyu
enumeration tyv
enumeration tyx
enumeration tyz
enumeration tza
enumeration tzh
enumeration tzj
enumeration tzl
enumeration tzm
enumeration tzn
enumeration tzo
enumeration tzx
enumeration uam
enumeration uan
enumeration uar
enumeration uba
enumeration ubi
enumeration ubl
enumeration ubr
enumeration ubu
enumeration uby
enumeration uda
enumeration ude
enumeration udg
enumeration udi
enumeration udj
enumeration udl
enumeration udm
enumeration udu
enumeration ues
enumeration ufi
enumeration uga
enumeration ugb
enumeration uge
enumeration ugn
enumeration ugo
enumeration ugy
enumeration uha
enumeration uhn
enumeration uis
enumeration uiv
enumeration uji
enumeration uka
enumeration ukg
enumeration ukh
enumeration ukl
enumeration ukp
enumeration ukq
enumeration uks
enumeration uku
enumeration ukw
enumeration uky
enumeration ula
enumeration ulb
enumeration ulc
enumeration ule
enumeration ulf
enumeration uli
enumeration ulk
enumeration ull
enumeration ulm
enumeration uln
enumeration ulu
enumeration ulw
enumeration uma
enumeration umb
enumeration umc
enumeration umd
enumeration umg
enumeration umi
enumeration umm
enumeration umn
enumeration umo
enumeration ump
enumeration umr
enumeration ums
enumeration umu
enumeration una
enumeration und
enumeration une
enumeration ung
enumeration unk
enumeration unm
enumeration unn
enumeration unr
enumeration unu
enumeration unx
enumeration unz
enumeration uok
enumeration upi
enumeration upv
enumeration ura
enumeration urb
enumeration urc
enumeration ure
enumeration urf
enumeration urg
enumeration urh
enumeration uri
enumeration urj
enumeration urk
enumeration url
enumeration urm
enumeration urn
enumeration uro
enumeration urp
enumeration urr
enumeration urt
enumeration uru
enumeration urv
enumeration urw
enumeration urx
enumeration ury
enumeration urz
enumeration usa
enumeration ush
enumeration usi
enumeration usk
enumeration usp
enumeration usu
enumeration uta
enumeration ute
enumeration utp
enumeration utr
enumeration utu
enumeration uum
enumeration uun
enumeration uur
enumeration uuu
enumeration uve
enumeration uvh
enumeration uvl
enumeration uwa
enumeration uya
enumeration uzn
enumeration uzs
enumeration vaa
enumeration vae
enumeration vaf
enumeration vag
enumeration vah
enumeration vai
enumeration vaj
enumeration val
enumeration vam
enumeration van
enumeration vao
enumeration vap
enumeration var
enumeration vas
enumeration vau
enumeration vav
enumeration vay
enumeration vbb
enumeration vbk
enumeration vec
enumeration ved
enumeration vel
enumeration vem
enumeration veo
enumeration vep
enumeration ver
enumeration vgr
enumeration vgt
enumeration vic
enumeration vid
enumeration vif
enumeration vig
enumeration vil
enumeration vin
enumeration vis
enumeration vit
enumeration viv
enumeration vka
enumeration vki
enumeration vkj
enumeration vkk
enumeration vkl
enumeration vkm
enumeration vko
enumeration vkp
enumeration vkt
enumeration vku
enumeration vlp
enumeration vls
enumeration vma
enumeration vmb
enumeration vmc
enumeration vmd
enumeration vme
enumeration vmf
enumeration vmg
enumeration vmh
enumeration vmi
enumeration vmj
enumeration vmk
enumeration vml
enumeration vmm
enumeration vmp
enumeration vmq
enumeration vmr
enumeration vms
enumeration vmu
enumeration vmv
enumeration vmw
enumeration vmx
enumeration vmy
enumeration vmz
enumeration vnk
enumeration vnm
enumeration vnp
enumeration vor
enumeration vot
enumeration vra
enumeration vro
enumeration vrs
enumeration vrt
enumeration vsi
enumeration vsl
enumeration vsv
enumeration vto
enumeration vum
enumeration vun
enumeration vut
enumeration vwa
enumeration waa
enumeration wab
enumeration wac
enumeration wad
enumeration wae
enumeration waf
enumeration wag
enumeration wah
enumeration wai
enumeration waj
enumeration wak
enumeration wal
enumeration wam
enumeration wan
enumeration wao
enumeration wap
enumeration waq
enumeration war
enumeration was
enumeration wat
enumeration wau
enumeration wav
enumeration waw
enumeration wax
enumeration way
enumeration waz
enumeration wba
enumeration wbb
enumeration wbe
enumeration wbf
enumeration wbh
enumeration wbi
enumeration wbj
enumeration wbk
enumeration wbl
enumeration wbm
enumeration wbp
enumeration wbq
enumeration wbr
enumeration wbt
enumeration wbv
enumeration wbw
enumeration wca
enumeration wci
enumeration wdd
enumeration wdg
enumeration wdj
enumeration wdk
enumeration wdu
enumeration wdy
enumeration wea
enumeration wec
enumeration wed
enumeration weg
enumeration weh
enumeration wei
enumeration wem
enumeration wen
enumeration weo
enumeration wep
enumeration wer
enumeration wes
enumeration wet
enumeration weu
enumeration wew
enumeration wfg
enumeration wga
enumeration wgb
enumeration wgg
enumeration wgi
enumeration wgo
enumeration wgu
enumeration wgy
enumeration wha
enumeration whg
enumeration whk
enumeration whu
enumeration wib
enumeration wic
enumeration wie
enumeration wif
enumeration wig
enumeration wih
enumeration wii
enumeration wij
enumeration wik
enumeration wil
enumeration wim
enumeration win
enumeration wir
enumeration wiu
enumeration wiv
enumeration wiy
enumeration wja
enumeration wji
enumeration wka
enumeration wkb
enumeration wkd
enumeration wkl
enumeration wku
enumeration wkw
enumeration wky
enumeration wla
enumeration wlc
enumeration wle
enumeration wlg
enumeration wli
enumeration wlk
enumeration wll
enumeration wlm
enumeration wlo
enumeration wlr
enumeration wls
enumeration wlu
enumeration wlv
enumeration wlw
enumeration wlx
enumeration wly
enumeration wma
enumeration wmb
enumeration wmc
enumeration wmd
enumeration wme
enumeration wmh
enumeration wmi
enumeration wmm
enumeration wmn
enumeration wmo
enumeration wms
enumeration wmt
enumeration wmw
enumeration wmx
enumeration wnb
enumeration wnc
enumeration wnd
enumeration wne
enumeration wng
enumeration wni
enumeration wnk
enumeration wnm
enumeration wnn
enumeration wno
enumeration wnp
enumeration wnu
enumeration wnw
enumeration wny
enumeration woa
enumeration wob
enumeration woc
enumeration wod
enumeration woe
enumeration wof
enumeration wog
enumeration woi
enumeration wok
enumeration wom
enumeration won
enumeration woo
enumeration wor
enumeration wos
enumeration wow
enumeration woy
enumeration wpc
enumeration wra
enumeration wrb
enumeration wrd
enumeration wrg
enumeration wrh
enumeration wri
enumeration wrk
enumeration wrl
enumeration wrm
enumeration wrn
enumeration wro
enumeration wrp
enumeration wrr
enumeration wrs
enumeration wru
enumeration wrv
enumeration wrw
enumeration wrx
enumeration wry
enumeration wrz
enumeration wsa
enumeration wsi
enumeration wsk
enumeration wsr
enumeration wss
enumeration wsu
enumeration wsv
enumeration wtf
enumeration wth
enumeration wti
enumeration wtk
enumeration wtm
enumeration wtw
enumeration wua
enumeration wub
enumeration wud
enumeration wuh
enumeration wul
enumeration wum
enumeration wun
enumeration wur
enumeration wut
enumeration wuu
enumeration wuv
enumeration wux
enumeration wuy
enumeration wwa
enumeration wwb
enumeration wwo
enumeration wwr
enumeration www
enumeration wxa
enumeration wxw
enumeration wya
enumeration wyb
enumeration wyi
enumeration wym
enumeration wyr
enumeration wyy
enumeration xaa
enumeration xab
enumeration xac
enumeration xad
enumeration xae
enumeration xag
enumeration xai
enumeration xaj
enumeration xal
enumeration xam
enumeration xan
enumeration xao
enumeration xap
enumeration xaq
enumeration xar
enumeration xas
enumeration xat
enumeration xau
enumeration xav
enumeration xaw
enumeration xay
enumeration xba
enumeration xbb
enumeration xbc
enumeration xbd
enumeration xbe
enumeration xbg
enumeration xbi
enumeration xbj
enumeration xbm
enumeration xbn
enumeration xbo
enumeration xbp
enumeration xbr
enumeration xbw
enumeration xbx
enumeration xby
enumeration xcb
enumeration xcc
enumeration xce
enumeration xcg
enumeration xch
enumeration xcl
enumeration xcm
enumeration xcn
enumeration xco
enumeration xcr
enumeration xct
enumeration xcu
enumeration xcv
enumeration xcw
enumeration xcy
enumeration xda
enumeration xdc
enumeration xdk
enumeration xdm
enumeration xdy
enumeration xeb
enumeration xed
enumeration xeg
enumeration xel
enumeration xem
enumeration xep
enumeration xer
enumeration xes
enumeration xet
enumeration xeu
enumeration xfa
enumeration xga
enumeration xgb
enumeration xgd
enumeration xgf
enumeration xgg
enumeration xgi
enumeration xgl
enumeration xgm
enumeration xgn
enumeration xgr
enumeration xgu
enumeration xgw
enumeration xha
enumeration xhc
enumeration xhd
enumeration xhe
enumeration xhr
enumeration xht
enumeration xhu
enumeration xhv
enumeration xib
enumeration xii
enumeration xil
enumeration xin
enumeration xip
enumeration xir
enumeration xis
enumeration xiv
enumeration xiy
enumeration xjb
enumeration xjt
enumeration xka
enumeration xkb
enumeration xkc
enumeration xkd
enumeration xke
enumeration xkf
enumeration xkg
enumeration xkh
enumeration xki
enumeration xkj
enumeration xkk
enumeration xkl
enumeration xkn
enumeration xko
enumeration xkp
enumeration xkq
enumeration xkr
enumeration xks
enumeration xkt
enumeration xku
enumeration xkv
enumeration xkw
enumeration xkx
enumeration xky
enumeration xkz
enumeration xla
enumeration xlb
enumeration xlc
enumeration xld
enumeration xle
enumeration xlg
enumeration xli
enumeration xln
enumeration xlo
enumeration xlp
enumeration xls
enumeration xlu
enumeration xly
enumeration xma
enumeration xmb
enumeration xmc
enumeration xmd
enumeration xme
enumeration xmf
enumeration xmg
enumeration xmh
enumeration xmj
enumeration xmk
enumeration xml
enumeration xmm
enumeration xmn
enumeration xmo
enumeration xmp
enumeration xmq
enumeration xmr
enumeration xms
enumeration xmt
enumeration xmu
enumeration xmv
enumeration xmw
enumeration xmx
enumeration xmy
enumeration xmz
enumeration xna
enumeration xnb
enumeration xnd
enumeration xng
enumeration xnh
enumeration xni
enumeration xnk
enumeration xnn
enumeration xno
enumeration xnr
enumeration xns
enumeration xnt
enumeration xnu
enumeration xny
enumeration xnz
enumeration xoc
enumeration xod
enumeration xog
enumeration xoi
enumeration xok
enumeration xom
enumeration xon
enumeration xoo
enumeration xop
enumeration xor
enumeration xow
enumeration xpa
enumeration xpc
enumeration xpe
enumeration xpg
enumeration xpi
enumeration xpj
enumeration xpk
enumeration xpm
enumeration xpn
enumeration xpo
enumeration xpp
enumeration xpq
enumeration xpr
enumeration xps
enumeration xpt
enumeration xpu
enumeration xpy
enumeration xqa
enumeration xqt
enumeration xra
enumeration xrb
enumeration xrd
enumeration xre
enumeration xrg
enumeration xri
enumeration xrm
enumeration xrn
enumeration xrq
enumeration xrr
enumeration xrt
enumeration xru
enumeration xrw
enumeration xsa
enumeration xsb
enumeration xsc
enumeration xsd
enumeration xse
enumeration xsh
enumeration xsi
enumeration xsj
enumeration xsl
enumeration xsm
enumeration xsn
enumeration xso
enumeration xsp
enumeration xsq
enumeration xsr
enumeration xss
enumeration xsu
enumeration xsv
enumeration xsy
enumeration xta
enumeration xtb
enumeration xtc
enumeration xtd
enumeration xte
enumeration xtg
enumeration xth
enumeration xti
enumeration xtj
enumeration xtl
enumeration xtm
enumeration xtn
enumeration xto
enumeration xtp
enumeration xtq
enumeration xtr
enumeration xts
enumeration xtt
enumeration xtu
enumeration xtv
enumeration xtw
enumeration xty
enumeration xtz
enumeration xua
enumeration xub
enumeration xud
enumeration xug
enumeration xuj
enumeration xul
enumeration xum
enumeration xun
enumeration xuo
enumeration xup
enumeration xur
enumeration xut
enumeration xuu
enumeration xve
enumeration xvi
enumeration xvn
enumeration xvo
enumeration xvs
enumeration xwa
enumeration xwc
enumeration xwd
enumeration xwe
enumeration xwg
enumeration xwj
enumeration xwk
enumeration xwl
enumeration xwo
enumeration xwr
enumeration xwt
enumeration xww
enumeration xxb
enumeration xxk
enumeration xxm
enumeration xxr
enumeration xxt
enumeration xya
enumeration xyb
enumeration xyj
enumeration xyk
enumeration xyl
enumeration xyt
enumeration xyy
enumeration xzh
enumeration xzm
enumeration xzp
enumeration yaa
enumeration yab
enumeration yac
enumeration yad
enumeration yae
enumeration yaf
enumeration yag
enumeration yah
enumeration yai
enumeration yaj
enumeration yak
enumeration yal
enumeration yam
enumeration yan
enumeration yao
enumeration yap
enumeration yaq
enumeration yar
enumeration yas
enumeration yat
enumeration yau
enumeration yav
enumeration yaw
enumeration yax
enumeration yay
enumeration yaz
enumeration yba
enumeration ybb
enumeration ybe
enumeration ybh
enumeration ybi
enumeration ybj
enumeration ybk
enumeration ybl
enumeration ybm
enumeration ybn
enumeration ybo
enumeration ybx
enumeration yby
enumeration ych
enumeration ycl
enumeration ycn
enumeration ycp
enumeration yda
enumeration ydd
enumeration yde
enumeration ydg
enumeration ydk
enumeration yds
enumeration yea
enumeration yec
enumeration yee
enumeration yei
enumeration yej
enumeration yel
enumeration yer
enumeration yes
enumeration yet
enumeration yeu
enumeration yev
enumeration yey
enumeration yga
enumeration ygi
enumeration ygl
enumeration ygm
enumeration ygp
enumeration ygr
enumeration ygs
enumeration ygu
enumeration ygw
enumeration yha
enumeration yhd
enumeration yhl
enumeration yia
enumeration yif
enumeration yig
enumeration yih
enumeration yii
enumeration yij
enumeration yik
enumeration yil
enumeration yim
enumeration yin
enumeration yip
enumeration yiq
enumeration yir
enumeration yis
enumeration yit
enumeration yiu
enumeration yiv
enumeration yix
enumeration yiz
enumeration yka
enumeration ykg
enumeration yki
enumeration ykk
enumeration ykl
enumeration ykm
enumeration ykn
enumeration yko
enumeration ykr
enumeration ykt
enumeration yku
enumeration yky
enumeration yla
enumeration ylb
enumeration yle
enumeration ylg
enumeration yli
enumeration yll
enumeration ylm
enumeration yln
enumeration ylo
enumeration ylr
enumeration ylu
enumeration yly
enumeration ymb
enumeration ymc
enumeration ymd
enumeration yme
enumeration ymg
enumeration ymh
enumeration ymi
enumeration ymk
enumeration yml
enumeration ymm
enumeration ymn
enumeration ymo
enumeration ymp
enumeration ymq
enumeration ymr
enumeration yms
enumeration ymt
enumeration ymx
enumeration ymz
enumeration yna
enumeration ynd
enumeration yne
enumeration yng
enumeration ynh
enumeration ynk
enumeration ynl
enumeration ynn
enumeration yno
enumeration ynq
enumeration yns
enumeration ynu
enumeration yob
enumeration yog
enumeration yoi
enumeration yok
enumeration yol
enumeration yom
enumeration yon
enumeration yot
enumeration yox
enumeration yoy
enumeration ypa
enumeration ypb
enumeration ypg
enumeration yph
enumeration ypk
enumeration ypm
enumeration ypn
enumeration ypo
enumeration ypp
enumeration ypz
enumeration yra
enumeration yrb
enumeration yre
enumeration yri
enumeration yrk
enumeration yrl
enumeration yrm
enumeration yrn
enumeration yrs
enumeration yrw
enumeration yry
enumeration ysc
enumeration ysd
enumeration ysg
enumeration ysl
enumeration ysn
enumeration yso
enumeration ysp
enumeration ysr
enumeration yss
enumeration ysy
enumeration yta
enumeration ytl
enumeration ytp
enumeration ytw
enumeration yty
enumeration yua
enumeration yub
enumeration yuc
enumeration yud
enumeration yue
enumeration yuf
enumeration yug
enumeration yui
enumeration yuj
enumeration yuk
enumeration yul
enumeration yum
enumeration yun
enumeration yup
enumeration yuq
enumeration yur
enumeration yut
enumeration yuw
enumeration yux
enumeration yuy
enumeration yuz
enumeration yva
enumeration yvt
enumeration ywa
enumeration ywg
enumeration ywl
enumeration ywn
enumeration ywq
enumeration ywr
enumeration ywt
enumeration ywu
enumeration yww
enumeration yxa
enumeration yxg
enumeration yxl
enumeration yxm
enumeration yxu
enumeration yxy
enumeration yyr
enumeration yyu
enumeration yyz
enumeration yzg
enumeration yzk
enumeration zaa
enumeration zab
enumeration zac
enumeration zad
enumeration zae
enumeration zaf
enumeration zag
enumeration zah
enumeration zai
enumeration zaj
enumeration zak
enumeration zal
enumeration zam
enumeration zao
enumeration zap
enumeration zaq
enumeration zar
enumeration zas
enumeration zat
enumeration zau
enumeration zav
enumeration zaw
enumeration zax
enumeration zay
enumeration zaz
enumeration zbc
enumeration zbe
enumeration zbl
enumeration zbt
enumeration zbw
enumeration zca
enumeration zch
enumeration zdj
enumeration zea
enumeration zeg
enumeration zeh
enumeration zen
enumeration zga
enumeration zgb
enumeration zgh
enumeration zgm
enumeration zgn
enumeration zgr
enumeration zhb
enumeration zhd
enumeration zhi
enumeration zhn
enumeration zhw
enumeration zhx
enumeration zia
enumeration zib
enumeration zik
enumeration zil
enumeration zim
enumeration zin
enumeration zir
enumeration ziw
enumeration ziz
enumeration zka
enumeration zkb
enumeration zkd
enumeration zkg
enumeration zkh
enumeration zkk
enumeration zkn
enumeration zko
enumeration zkp
enumeration zkr
enumeration zkt
enumeration zku
enumeration zkv
enumeration zkz
enumeration zle
enumeration zlj
enumeration zlm
enumeration zln
enumeration zlq
enumeration zls
enumeration zlw
enumeration zma
enumeration zmb
enumeration zmc
enumeration zmd
enumeration zme
enumeration zmf
enumeration zmg
enumeration zmh
enumeration zmi
enumeration zmj
enumeration zmk
enumeration zml
enumeration zmm
enumeration zmn
enumeration zmo
enumeration zmp
enumeration zmq
enumeration zmr
enumeration zms
enumeration zmt
enumeration zmu
enumeration zmv
enumeration zmw
enumeration zmx
enumeration zmy
enumeration zmz
enumeration zna
enumeration znd
enumeration zne
enumeration zng
enumeration znk
enumeration zns
enumeration zoc
enumeration zoh
enumeration zom
enumeration zoo
enumeration zoq
enumeration zor
enumeration zos
enumeration zpa
enumeration zpb
enumeration zpc
enumeration zpd
enumeration zpe
enumeration zpf
enumeration zpg
enumeration zph
enumeration zpi
enumeration zpj
enumeration zpk
enumeration zpl
enumeration zpm
enumeration zpn
enumeration zpo
enumeration zpp
enumeration zpq
enumeration zpr
enumeration zps
enumeration zpt
enumeration zpu
enumeration zpv
enumeration zpw
enumeration zpx
enumeration zpy
enumeration zpz
enumeration zqe
enumeration zra
enumeration zrg
enumeration zrn
enumeration zro
enumeration zrp
enumeration zrs
enumeration zsa
enumeration zsk
enumeration zsl
enumeration zsm
enumeration zsr
enumeration zsu
enumeration zte
enumeration ztg
enumeration ztl
enumeration ztm
enumeration ztn
enumeration ztp
enumeration ztq
enumeration zts
enumeration ztt
enumeration ztu
enumeration ztx
enumeration zty
enumeration zua
enumeration zuh
enumeration zum
enumeration zun
enumeration zuy
enumeration zwa
enumeration zxx
enumeration zyb
enumeration zyg
enumeration zyj
enumeration zyn
enumeration zyp
enumeration zza
enumeration zzj
[ top ]
Complex Type ms:languageVarietyInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#languageVarietyInfoType_languageVarietyType OMTD-SHARE_XMLSchema.tmp#languageVarietyName OMTD-SHARE_XMLSchema.tmp#languageVarietyInfoType_sizePerLanguageVariety
[ top ]
Complex Type ms:textClassificationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#textClassificationInfoType_keywords OMTD-SHARE_XMLSchema.tmp#textGenre OMTD-SHARE_XMLSchema.tmp#textType OMTD-SHARE_XMLSchema.tmp#register OMTD-SHARE_XMLSchema.tmp#subject OMTD-SHARE_XMLSchema.tmp#textClassificationInfoType_sizePerTextClassification
[ top ]
Simple Type ms:classificationSchemeName
Annotations
Base type for listing recommended/popular classification schemes
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Complex Type ms:domainInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#domain OMTD-SHARE_XMLSchema.tmp#domainInfoType_sizePerDomain
[ top ]
Complex Type ms:timeCoverageInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#timeCoverageInfoType_timeCoverage OMTD-SHARE_XMLSchema.tmp#timeCoverageInfoType_sizePerTimeCoverage
[ top ]
Complex Type ms:geographicCoverageInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfoType_geographicCoverage OMTD-SHARE_XMLSchema.tmp#geographicCoverageInfoType_sizePerGeographicCoverage
[ top ]
Complex Type ms:creationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#creationInfoType_originalSources OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationMode OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationModeDetails OMTD-SHARE_XMLSchema.tmp#creationInfoType_creationSwComponents
[ top ]
Complex Type ms:annotatedCorpusInfoType
Annotations
Groups together all information related to annotated corpora
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_corpusSubtype OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_mediaType OMTD-SHARE_XMLSchema.tmp#lingualityInfo OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_languages OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_annotations OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_textClassifications OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_domains OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_timeClassifications OMTD-SHARE_XMLSchema.tmp#annotatedCorpusInfoType_geographicClassifications
[ top ]
Complex Type ms:annotationInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationTypes OMTD-SHARE_XMLSchema.tmp#typesystem OMTD-SHARE_XMLSchema.tmp#annotationSchema OMTD-SHARE_XMLSchema.tmp#annotationResource OMTD-SHARE_XMLSchema.tmp#annotationInfoType_guidelinesDocumentedIn OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationMode OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationModeDetails OMTD-SHARE_XMLSchema.tmp#annotationInfoType_isAnnotatedBy OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotationDate OMTD-SHARE_XMLSchema.tmp#annotationInfoType_interannotatorAgreement OMTD-SHARE_XMLSchema.tmp#annotationInfoType_intraannotatorAgreement OMTD-SHARE_XMLSchema.tmp#annotationInfoType_annotators
[ top ]
Simple Type ms:annotationTypeType
Annotations
Specifies the annotation type of the resource or what a s/w component consumes or produces as an output
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration lemma
enumeration token
[ top ]
Complex Type ms:corpusTextPartInfoType
Diagram
Diagram
[ top ]
Complex Type ms:baseMetadataRecord
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#baseMetadataRecord_metadataHeaderInfo
[ top ]
Complex Type ms:metadataHeaderInfoType
Annotations
Base type for metadata header
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataRecordIdentifier OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreationDate OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataCreators OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_sourceOfMetadataRecord OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_userQuery OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_metadataLastDateUpdated OMTD-SHARE_XMLSchema.tmp#metadataHeaderInfoType_revision
[ top ]
Complex Type ms:metadataIdentifierType
Annotations
Base type for identifier schemes for metadata records
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#metadataIdentifierType_metadataIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
metadataIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the metadata record identifier is assigned by the authority that issues it
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
[ top ]
Complex Type ms:repositoryInfoType
Annotations
Base type for repositories
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryNames OMTD-SHARE_XMLSchema.tmp#repositoryInfoType_repositoryIdentifiers
[ top ]
Complex Type ms:repositoryIdentifierType
Annotations
Base type for identifier schemes for repositories, archives etc.
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#repositoryIdentifierType_repositoryIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
repositoryIdentifierSchemeName restriction of xs:string required
[ top ]
Complex Type ms:journalInfoType
Annotations
Base type for journals
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalInfoType_journalTitles OMTD-SHARE_XMLSchema.tmp#journalInfoType_identifiers OMTD-SHARE_XMLSchema.tmp#publisher OMTD-SHARE_XMLSchema.tmp#journalInfoType_languages OMTD-SHARE_XMLSchema.tmp#journalInfoType_subjects OMTD-SHARE_XMLSchema.tmp#journalInfoType_rights
[ top ]
Complex Type ms:journalIdentifierType
Annotations
Base type for identifier schemes for journals
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#journalIdentifierType_journalIdentifierSchemeName OMTD-SHARE_XMLSchema.tmp#schemeURI
Type extension of xs:string
Attributes
QName Type Use Annotation
journalIdentifierSchemeName restriction of xs:string required
Specifies the name of the scheme according to which the journal identifier is assigned by the authority that issues it
ms:schemeURI xs:anyURI optional
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
[ top ]
Simple Type ms:conformanceToStandardsBestPractices
Annotations
List of standards and best practices used for annotation for formats and content specification
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration AgroVoc
enumeration ALVIS
enumeration ARGO
enumeration BML
enumeration CES
enumeration DKPro_Core
enumeration EAGLES
enumeration EDAMontology
enumeration ELSST
enumeration EML
enumeration EMMA
enumeration GATE
enumeration GESIS
enumeration GMX
enumeration GrAF
enumeration HamNoSys
enumeration HASSET
enumeration InkML
enumeration ILSP_NLP
enumeration ISO12620
enumeration ISO16642
enumeration ISO1987
enumeration ISO26162
enumeration ISO30042
enumeration ISO704
enumeration JATS
enumeration LAF
enumeration LAPPS
enumeration Lemon
enumeration LMF
enumeration MAF
enumeration MLIF
enumeration MOSES
enumeration MULTEXT
enumeration MUMIN
enumeration multimodalInteractionFramework
enumeration OAXAL
enumeration OLIA
enumeration OWL
enumeration PANACEA
enumeration pennTreeBank
enumeration pragueTreebank
enumeration RDF
enumeration SemAF
enumeration SemAF_DA
enumeration SemAF_NE
enumeration SemAF_SRL
enumeration SemAF_DS
enumeration SKOS
enumeration SRX
enumeration SynAF
enumeration TBX
enumeration TMX
enumeration TEI
enumeration TEI_P3
enumeration TEI_P4
enumeration TEI_P5
enumeration TimeML
enumeration XCES
enumeration XLIFF
enumeration UD
enumeration WordNet
enumeration other
[ top ]
Simple Type ms:scriptIdType
Annotations
Base type for scripts according to ISO 15924
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration Afak
enumeration Aghb
enumeration Ahom
enumeration Arab
enumeration Armi
enumeration Armn
enumeration Avst
enumeration Bali
enumeration Bamu
enumeration Bass
enumeration Batk
enumeration Beng
enumeration Blis
enumeration Bopo
enumeration Brah
enumeration Brai
enumeration Bugi
enumeration Buhd
enumeration Cakm
enumeration Cans
enumeration Cari
enumeration Cham
enumeration Cher
enumeration Cirt
enumeration Copt
enumeration Cprt
enumeration Cyrl
enumeration Cyrs
enumeration Deva
enumeration Dsrt
enumeration Dupl
enumeration Egyd
enumeration Egyh
enumeration Egyp
enumeration Elba
enumeration Ethi
enumeration Geok
enumeration Geor
enumeration Glag
enumeration Goth
enumeration Gran
enumeration Grek
enumeration Gujr
enumeration Guru
enumeration Hang
enumeration Hani
enumeration Hano
enumeration Hans
enumeration Hant
enumeration Hatr
enumeration Hebr
enumeration Hira
enumeration Hluw
enumeration Hmng
enumeration Hrkt
enumeration Hung
enumeration Inds
enumeration Ital
enumeration Java
enumeration Jpan
enumeration Jurc
enumeration Kali
enumeration Kana
enumeration Khar
enumeration Khmr
enumeration Khoj
enumeration Knda
enumeration Kore
enumeration Kpel
enumeration Kthi
enumeration Lana
enumeration Laoo
enumeration Latf
enumeration Latg
enumeration Latn
enumeration Lepc
enumeration Limb
enumeration Lina
enumeration Linb
enumeration Lisu
enumeration Loma
enumeration Lyci
enumeration Lydi
enumeration Mahj
enumeration Mand
enumeration Mani
enumeration Maya
enumeration Mend
enumeration Merc
enumeration Mero
enumeration Mlym
enumeration Modi
enumeration Mong
enumeration Moon
enumeration Mroo
enumeration Mtei
enumeration Mult
enumeration Mymr
enumeration Narb
enumeration Nbat
enumeration Nkgb
enumeration Nkoo
enumeration Nshu
enumeration Ogam
enumeration Olck
enumeration Orkh
enumeration Orya
enumeration Osma
enumeration Palm
enumeration Pauc
enumeration Perm
enumeration Phag
enumeration Phli
enumeration Phlp
enumeration Phlv
enumeration Phnx
enumeration Plrd
enumeration Prti
enumeration Qaaa..Qabx
enumeration Rjng
enumeration Roro
enumeration Runr
enumeration Samr
enumeration Sara
enumeration Sarb
enumeration Saur
enumeration Sgnw
enumeration Shaw
enumeration Shrd
enumeration Sidd
enumeration Sind
enumeration Sinh
enumeration Sora
enumeration Sund
enumeration Sylo
enumeration Syrc
enumeration Syre
enumeration Syrj
enumeration Syrn
enumeration Tagb
enumeration Takr
enumeration Tale
enumeration Talu
enumeration Taml
enumeration Tang
enumeration Tavt
enumeration Telu
enumeration Teng
enumeration Tfng
enumeration Tglg
enumeration Thaa
enumeration Thai
enumeration Tibt
enumeration Tirh
enumeration Ugar
enumeration Vaii
enumeration Visp
enumeration Wara
enumeration Wole
enumeration Xpeo
enumeration Xsux
enumeration Yiii
enumeration Zinh
enumeration Zmth
enumeration Zsym
enumeration Zxxx
enumeration Zyyy
enumeration Zzzz
[ top ]
Simple Type ms:variantIdType
Annotations
Base type for language variants according to the BCP-47 guidlelines
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration 1606nict
16th century French as in Jean Nicot, "Thresor de la langue francoyse", 1606, but also including some French similar to that of Rabelais
enumeration alalc97
Romanizations recommended by the American Library Association and the Library of Congress, in "ALA-LC Romanization Tables: Transliteration Schemes for Non-Roman Scripts" (1997), ISBN 978-0-8444-0940-5.
enumeration fonipa
enumeration fonupa
enumeration fonxsamp
Indicates that the content is transcribed according to X-SAMPA
enumeration 1694acad
17th century French, as catalogued in the "Dictionnaire de l'acadιmie franηoise", 4eme ed. 1694; frequently includes elements of Middle French, as this is a transitional period
enumeration 1901
enumeration 1959acad
enumeration 1994
For standardized Resian an orthography was published in 1994.
enumeration 1996
enumeration aluku
Aluku dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern Suriname and Western French Guiana
enumeration arevela
enumeration arevmda
enumeration baku1926
Denotes alphabet used in Turkic republics/regions of the former USSR in late 1920s, and throughout 1930s, which aspired to represent equivalent phonemes in a unified fashion. Also known as: New Turkic Alphabet; Birlәşdirilmiş Jeni Tyrk Әlifbasь (Birlesdirilmis Jeni Tyrk Elifbasi); Jaŋalif (Janalif).
enumeration balanka
Balanka is one of 19 Anii dialects.
enumeration barla
Barlavento is one of the two main dialect groups of Kabuverdianu.
enumeration bauddha
enumeration biscayan
enumeration biske
The dialect of San Giorgio/Bila is one of the four major local dialects of Resian
enumeration bohoric
The subtag represents the alphabet codified by Adam Bohorič in 1584 and used from the first printed Slovene book and up to the mid-19th century.
enumeration boont
Jargon embedded in American English
enumeration dajnko
The subtag represents the alphabet codified by Peter Dajnko and used from 1824 to 1839 mostly in Styria (in what is now Eastern Slovenia).
enumeration ekavsk
enumeration emodeng
enumeration hepburn
enumeration hognorsk
Norwegian following Ivar Aasen's orthographical principles, including modern usage.
enumeration ijekavsk
enumeration itihasa
enumeration jauer
The spoken dialect of the Val Mόstair, which has no written standard.
enumeration jyutping
Jyutping romanization of Cantonese
enumeration kkcor
enumeration kscor
enumeration laukika
enumeration lipaw
The dialect of Lipovaz/Lipovec is one of the minor local dialects of Resian
enumeration luna1918
Russian orthography as established by the 1917/1918 orthographic reforms
enumeration metelko
The subtag represents the alphabet codified by Franc Serafin Metelko and used from 1825 to 1833.
enumeration monoton
enumeration ndyuka
Ndyuka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern Suriname and Western French Guiana
enumeration nedis
enumeration njiva
enumeration nulik
enumeration osojs
The dialect of Oseacco/Osojane is one of the four major local dialects of Resian
enumeration pamaka
Pamaka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern Suriname and Western French Guiana
enumeration petr1708
Russian orthography from the Petrine orthographic reforms of 1708 to the 1917 orthographic reform
enumeration pinyin
enumeration polyton
enumeration puter
Puter is one of the five traditional written standards or "idioms" of the Romansh language.
enumeration rigik
enumeration rozaj
enumeration rumgr
Supraregional Romansh written standard
enumeration scotland
enumeration scouse
English Liverpudlian dialect known as 'Scouse'
enumeration solba
The dialect of Stolvizza/Solbica is one of the four major local dialects of Resian
enumeration sotav
Sotavento is one of the two main dialect groups of Kabuverdianu.
enumeration surmiran
Surmiran is one of the five traditional written standards or "idioms" of the Romansh language.
enumeration sursilv
Sursilvan is one of the five traditional written standards or "idioms" of the Romansh language.
enumeration sutsilv
Sutsilvan is one of the five traditional written standards or "idioms" of the Romansh language.
enumeration tarask
The subtag represents Branislau Taraskievic's Belarusian orthography as published in "Bielaruski klasycny pravapis" by Juras Buslakou, Vincuk Viacorka, Zmicier Sanko, and Zmicier Sauka (Vilnia-Miensk 2005).
enumeration uccor
enumeration ucrcor
enumeration ulster
enumeration unifon
enumeration vaidika
The most ancient dialect of Sanskrit used in verse and prose composed until about the 4th century B.C.E.
enumeration valencia
Variety spoken in the "Comunidad Valenciana" region of Spain, where it is co-official with Spanish.
enumeration vallader
Vallader is one of the five traditional written standards or "idioms" of the Romansh language.
enumeration wadegile
[ top ]
Complex Type ms:documentDistributionInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#documentDistributionInfoType_hashkey OMTD-SHARE_XMLSchema.tmp#dataFormatInfo OMTD-SHARE_XMLSchema.tmp#characterEncoding OMTD-SHARE_XMLSchema.tmp#documentDistributionInfoType_sizes
[ top ]
Complex Type ms:componentDistributionInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_componentDistributionForm OMTD-SHARE_XMLSchema.tmp#distributionLocation OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_command OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_webServiceType OMTD-SHARE_XMLSchema.tmp#componentDistributionInfoType_operatingSystems
[ top ]
Complex Type ms:structuralEncodingInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_structuralEncoding OMTD-SHARE_XMLSchema.tmp#structuralEncodingInfoType_sizePerStructuralEncoding
[ top ]
Complex Type ms:modalityInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#modalityType OMTD-SHARE_XMLSchema.tmp#modalityInfoType_modalityTypeDetails OMTD-SHARE_XMLSchema.tmp#modalityInfoType_sizePerModality
[ top ]
Complex Type ms:runningEnvironmentInfoType
Diagram
Diagram OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_requiresSoftware OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_requiresLRs OMTD-SHARE_XMLSchema.tmp#runningEnvironmentInfoType_runningEnvironmentDetails
[ top ]
Simple Type ms:TDMMethodType
Diagram
Diagram
Type restriction of xs:string
Facets
enumeration ruleBased
A type of method that makes use of set(s) of rules to perform the relevant task.
enumeration machineLearning
A method of data analysis that automates model building. Using algorithms that iteratively learn from data, machine learning allows computers to find hidden insights without being explicitly programmed where to look.
enumeration statisticalLearning
The process of using statistics and techniques related to statistics in order to understand and learn from your data so that you can predict its future.
enumeration machineAndStatisticalLearning
Methods and techniques used either in machine learning or statistical learning
enumeration regressionAnalysis
A statistical process for estimating the relationships among variables. It includes many techniques for modeling and analyzing several variables, when the focus is on the relationship between a dependent variable and one or more independent variables (or 'predictors').
enumeration regularisation
A process of introducing additional information in order to solve an ill-posed problem or to prevent overfitting.
enumeration instanceBasedLearning
A family of learning algorithms that, instead of performing explicit generalization, compares new problem instances with instances seen in training, which have been stored in memory.
enumeration decisionTrees
A non-parametric supervised learning method used for classification and regression. The goal is to create a tree-like graph or model of decisions and their possible consequences by learning simple decision rules inferred from the data features.
enumeration bayesian
A method in probability and statistics based on Bayes' theorem, mainly related to statistical inference.
enumeration kernelMethod
Any method used in pattern analysis that relies on kernel functions, which enable it to operate in a high-dimensional, implicit feature space without ever computing the coordinates of the data in that space, but rather by simply computing the inner products between the images of all pairs of data in the feature space.
enumeration clusteringMethod
Any method used in clustering or cluster analysis, i.e. in grouping a set of objects in such a way that objects in the same group (cluster) are more similar (in some sense or another) to each other than to those in other groups (clusters).
enumeration associationRuleLearning
A machine learning method used in recognising relationships among variables in databases and extracted in the form of rules.
enumeration artificialNeuralNetwork
A computational model based on a large collection of simple neural units (artificial neurons), loosely analogous to the observed behavior of a biological brain's axons. These systems are self-learning and trained, rather than explicitly programmed.
enumeration deepLearning
A branch of machine learning based on deep neural networks. A deep neural network (DNN) is an artificial neural network (ANN) with multiple hidden layers of units between the input and output layers.
enumeration ensembleMethod
Any method that uses multiple learning algorithms in an attempt to improve predictive performance not obtainable otherwise with any of the constituent learning algorithms.
enumeration dimensionalityReduction
A method based on reducing the number of random variables under consideration, via obtaining a set of principal variables.
[ top ]
Simple Type ms:operationType
Annotations
Specifies the function/task the component/application performs
Diagram
Diagram
Type restriction of xs:string
Facets
maxLength 100
enumeration accessComponent
A component used for providing access to data resources
enumeration reader
A component that reads content of various types (pdf, txt, xml etc.)
enumeration writer
A component that writes processing results in various formats
enumeration supportComponent
A component that provides support to developers
enumeration visualiser
A component or interface that renders the contents of a resource in a graphic way for visualisation purposes
enumeration debugger
A component that helps in the debugging process
enumeration validator
A component used to confirm that a system/resource meets the specifications and fulfills its intended purpose
enumeration viewer
A component that provides access to the contents of a resource but intended only for access by humans
enumeration corpusViewer
A component that provides access to the contents of a corpus but intended only for access by humans
enumeration lexiconViewer
A component that provides access to the contents of a lexical/conceptual resoruces but intended only for access by humans
enumeration editor
A component that allows humans to edit the contents of a resource
enumeration mlTrainer
A component that is used in training models for machine learning
enumeration mlPredictor
A component that is used in predicting based on machine learning models
enumeration featureExtractor
A component that is used for extracting features
enumeration dataSplitter
A component that performs data splitting for cross validation purposes
enumeration dataMerger
A component that supports data merging from various sources
enumeration converter
A component that performs conversion between formats of a resource
enumeration dependencyConverter
A component that converts a constituency tree into a dependency tree
enumeration dependencyParser
A component that generates a dependency tree from typically token and POS annotations
enumeration constituencyParser
A component that a constituency tree from typically token and POS annotations
enumeration evaluator
A component that is used in the evaluation of the performance of a component
enumeration flowController
A component that supports controlling flows
enumeration scriptBasedAnalyser
A component that performs analysis tasks based on a script
enumeration matcher
A component that allows matching (mapping) of elements
enumeration gazeteerBasedMatcher
A component that allows matching of elements based on a gazeteer
enumeration crowdSourcingComponent
A component that supports crowd sourcing operations
enumeration dataCollector
A component that collects (retrieves) data from various sources
enumeration crawler
A component that crawls the web and collects data from various web sites
enumeration processor
A component that is used in processing operations
enumeration annotator
A component that annotates any language data (text, video, audio etc.), i.e. adds any descriptive or analytic notations (structural, linguistic, etc) to raw language data
enumeration segmenter
A component that segments a text into structural untis (chapters, paragraphs, sentences, words, tokens etc.)
enumeration stemmer
A component that extracts stems from words in a text, usually by removing the most common morphological and inflectional endings from words
enumeration lemmatizer
A component that annotates the tokens of a text with lemma information
enumeration morphologicalTagger
A component that annotates tokens of a text with morphological information (part-of-speech and morphological features)
enumeration chunker
A component that groups tokens of a text into chunks
enumeration parser
A component that takes as input text and returns a form of data structure (e.g. syntactic parse as a tree, or bracketed structure etc.)
enumeration coreferenceAnnotator
A component that annotates tokens of a text with coreference information, i.e. annotating expressions that refer to the same entity in the text
enumeration namedEntityRecognizer
A component that seeks to locate and classify elements in a text into pre-defined categories such as the names of persons, organizations, locations, expressions of times, etc.
enumeration semanticsAnnotator
A component that annotates the tokens of a text with semantic features
enumeration srlAnnotator
A component that annotates the tokens of a text with Semantic Role labels
enumeration readabilityAnnotator
A component that annotates the tokens of a text with readability scores
enumeration aligner
A component that detects and annotates equivalence relations between items (corpora, texts, paragraphs, sentences, phrases, words) in two languages
enumeration generator
A component that generates (semi-)automatically natural language texts (based on non-linguistic data, keywords, logical forms, knowledge bases...)
enumeration summarizer
A component that produces a natural language synopsis of a longer text
enumeration simplifier
A component that outputs a simpler rendition of a given item (sentence, text etc.)
enumeration preOrPostProcessingComponent
A component that is used at pre- or post-processing stages in order to normalize input/output
enumeration spellingChecker
A component that corrects spelling mistakes in a text
enumeration grammarChecker
A component that corrects grammatical mistakes in a text
enumeration normalizer
A component that removes unwanted material from text, usually as a pre-processing step
enumeration filters
A component that is used for filtering text input or annotations based on specific criteria
enumeration analyzer
A component that is used for analysing an input text in order to perform extraction of features/information (e.g. word list), or characterization of the whole text
enumeration topicExtractor
A component that guesses the topic of a text
enumeration documentClassifier
A component that tries to classify a document into one or more categories
enumeration languageIdentifier
A component that identifies the language of a given text based on its contents
enumeration sentimentAnalyzer
A component that tries to identify sentences that express the author’s negative or positive feelings on something; (Sentiment analysis (also known as opinion mining) refers to the use of natural language processing, text analysis and computational linguistics to identify and extract subjective information in source materials (wikipedia) )
enumeration emotionRecognizer
A component that tries to recognize and annotate emotions (e.g. fear, anger, happiness etc.) from text, video, audio and image
enumeration keywordsExtractor
A component that tries to extract keywords from a given text
enumeration termExtractor
A component that tries to extract terms from a corpus
enumeration contradictionDetector
A component that tries to automatically recognise elements that reveal contradiction in a text
enumeration eventExtractor
A component that tries to extract information related to incidents referred to in a text
enumeration persuasiveExpressionMiner
A component that tries to identify persuasive expressions in a given text
enumeration informationExtractor
A component that automatically extracts structured information from unstructured and/or semi-structured machine-readable documents
enumeration lexiconExtractorFromCorpora
A component that extracts structured lexical resources from corpora
enumeration lexiconExtractorFromLexica
A component that extracts specific lexical information contained in other lexica
enumeration wordSenseDisambiguator
A component that tries to identify which sense of a word (i.e. meaning) is used in a sentence, when the word has multiple meanings (Source: wikipedia)
enumeration other
Value for componentType, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:myString / @lang
Type xs:language
[ top ]
Attribute ms:resourceIdentifierType / @resourceIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the resource identifier is assigned by the authority that issues it (e.g. DOI, ISLRN etc.)
Type restriction of xs:string
Facets
enumeration DOI
Value for resourceIdentifierSchemeName, referring to the DOI system (Digital Object Identifier, https://www.doi.org/)
enumeration ISLRN
Value for resourceIdentifierSchemeName, referring to ISLRN (International Standard Language Resource Number, http://www.islrn.org/)
enumeration Handle
Value for resourceIdentifierSchemeName, referring to the Handle system for identifiers (https://www.handle.net/)
enumeration ARK
Value for resourceIdentifierSchemeName, referring to the Archival Resource Key identifiers (https://confluence.ucop.edu/display/Curation/ARK)
enumeration arXiv
Value for resourceIdentifierSchemeName, referring to the identifiers issued by arXiv (https://arxiv.org/)
enumeration bibcode
Value for resourceIdentifierSchemeName, referring to bibcode identifiers, i.e. a type of identifier used for literature references by astronomical data systems (Bibliographic Code, http://adsabs.harvard.edu/abs_doc/help_pages/data.html)
enumeration EAN13
Value for resourceIdentifierSchemeName, referring to EAN (International Article Number, also known as European Article Number) and more specifically to the EAN 13 standard (cf. https://en.wikipedia.org/wiki/International_Article_Number)
enumeration EISSN
Value for resourceIdentifierSchemeName, referring to the e-ISSN (electronic International Standard Serial Number, https://en.wikipedia.org/wiki/International_Standard_Serial_Number)
enumeration ISBN
Value for resourceIdentifierSchemeName, referring to the ISBN (International Standard Book Number, https://www.isbn-international.org/content/what-isbn)
enumeration ISSN
Value for resourceIdentifierSchemeName, referring to the ISSN (International Standard Serial Number, http://www.issn.org/)
enumeration ISTC
Value for resourceIdentifierSchemeName, referring to the ISTC (International Standard Text Code, http://www.istc-international.org/)
enumeration LISSN
Value for resourceIdentifierSchemeName, referring to the linking ISSN or ISSN-L
enumeration LSID
Value for resourceIdentifierSchemeName, referring to the LSID (Life Sciences Identifier, http://www.webcitation.org/getfile?fileid=27fcd073ea70199946ace15c6868520be2cab2ab)
enumeration PURL
Value for resourceIdentifierSchemeName, referring to PURL (Persistent URL, https://archive.org/services/purl/help)
enumeration UPC
Value for resourceIdentifierSchemeName, referring to UPC (Universal Product Number, http://www.gtin.info/upc/)
enumeration URL
Value for resourceIdentifierSchemeName, referring to the URL (Uniform Resource Locator, https://en.wikipedia.org/wiki/URL)
enumeration URN
Value for resourceIdentifierSchemeName, referring to the URN (Uniform Resource Name, https://en.wikipedia.org/wiki/Uniform_Resource_Name)
enumeration OAI
Value for resourceIdentifierSchemeName, referring to the OAI identifier (Open Archives Initiative, http://www.openarchives.org/OAI/2.0/guidelines-oai-identifier.htm)
enumeration PMCID
Value for resourceIdentifierSchemeName, referring to the PMCID (PubMed Central Identifier, https://www.ncbi.nlm.nih.gov/pmc/pmctopmid/)
enumeration PMID
Value for resourceIdentifierSchemeName, referring to the PMID (PubMed Identifier, https://www.ncbi.nlm.nih.gov/pmc/pmctopmid/)
enumeration maven
Value for resourceIdentifierSchemeName, referring to the Maven coordinates (cf. Maven POM, https://maven.apache.org/pom.html#Maven_Coordinates)
enumeration docker
Value for resourceIdentifierSchemeName, referring to the Docker (https://hub.docker.com/help/)
enumeration OMTD-docker
enumeration OMTD
Value for resourceIdentifierSchemeName, referring to OpenMinTeD (http://www.openminted.eu)
enumeration other
Value for resourceSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute @ms:schemeURI
Annotations
Specifies the URI of the scheme according to which the resource identifier is assigned by the authority that issues it
Type xs:anyURI
[ top ]
Attribute ms:personIdentifierType / @personIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the person identifier is assigned by the authority that issues it (e.g. ORCID, ScopusId, ResearcherID etc.)
Type restriction of xs:string
Facets
enumeration ORCID
Value for personIdentifierSchemeName, referring to the ORCID identifier for researchers (https://orcid.org/)
enumeration ISNI
Value for personIdentifierSchemeName, referring to the ISNI authority (International Standard Name Identifier, http://www.isni.org/)
enumeration researcherId
Value for personIdentifierSchemeName, referring to the ResearcherID identifier for researchers (http://www.researcherid.com/)
enumeration scopusId
Value for personIdentifierSchemeName, referring to the Scopus identifier for authors (https://www.scopus.com)
enumeration other
Value for personIdentifierSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute @ms:nameType
Annotations
Allows to classify the type of the name of an entity
Type restriction of xs:string
Facets
enumeration shortName
Value for the type of name of an entity, indicating that it's a short form (e.g. abbreviation, acronym etc.)
enumeration alternativeName
Value for the type of name of an entity, indicating that it's an alternative form without further indication
enumeration translatedName
Value for the type of name of an entity, indicating that it's a translated form into another language
[ top ]
Attribute ms:organizationIdentifierType / @organizationIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the organization identifier is assigned by the authority that issues it
Type restriction of xs:string
Facets
enumeration ISNI
Value for organizationIdentifierSchemeName, referring to the ISNI authority (International Standard Name Identifier, http://www.isni.org/)
enumeration GRID
Value for organizationIdentifierSchemeName, referring to the GRID (Global Research Identifier Database, https://www.grid.ac/)
enumeration FundRef
Value for organizationIdentifierSchemeName, referring to the CrossRef Funder ID (https://www.crossref.org/services/funder-registry/)
enumeration other
Value for organizationIdentifierSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:publicationIdentifierType / @publicationIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the publication identifier is assigned by the authority that issues it (e.g. DOI, PubMed Central etc.)
Type restriction of xs:string
Facets
enumeration DOI
Value for publicationIdentifierSchemeName, referring to the DOI system (Digital Object Identifier, https://www.doi.org/)
enumeration Handle
Value for publicationIdentifierSchemeName, referring to the Handle system for identifiers (https://www.handle.net/)
enumeration ARK
Value for publicationIdentifierSchemeName, referring to the Archival Resource Key identifiers (https://confluence.ucop.edu/display/Curation/ARK)
enumeration arXiv
Value for publicationIdentifierSchemeName, referring to the identifiers issued by arXiv (https://arxiv.org/)
enumeration bibcode
Value for publicationIdentifierSchemeName, referring to bibcode identifiers, i.e. a type of identifier used for literature references by astronomical data systems (Bibliographic Code, http://adsabs.harvard.edu/abs_doc/help_pages/data.html)
enumeration EAN13
Value for publicationIdentifierSchemeName, referring to EAN (International Article Number, also known as European Article Number) and more specifically to the EAN 13 standard (cf. https://en.wikipedia.org/wiki/International_Article_Number)
enumeration EISSN
Value for publicationIdentifierSchemeName, referring to the e-ISSN (electronic International Standard Serial Number, https://en.wikipedia.org/wiki/International_Standard_Serial_Number)
enumeration ISBN
Value for publicationIdentifierSchemeName, referring to the ISBN (International Standard Book Number, https://www.isbn-international.org/content/what-isbn)
enumeration ISSN
Value for publicationIdentifierSchemeName, referring to the ISSN (International Standard Serial Number, http://www.issn.org/)
enumeration ISTC
Value for publicationIdentifierSchemeName, referring to the ISTC (International Standard Text Code, http://www.istc-international.org/)
enumeration LISSN
Value for publicationIdentifierSchemeName, referring to the linking ISSN or ISSN-L
enumeration LSID
Value for publicationIdentifierSchemeName, referring to the LSID (Life Sciences Identifier, http://www.webcitation.org/getfile?fileid=27fcd073ea70199946ace15c6868520be2cab2ab)
enumeration PURL
Value for publicationIdentifierSchemeName, referring to PURL (Persistent URL, https://archive.org/services/purl/help)
enumeration UPC
Value for publicationIdentifierSchemeName, referring to UPC (Universal Product Number, http://www.gtin.info/upc/)
enumeration URL
Value for publicationIdentifierSchemeName, referring to the URL (Uniform Resource Locator, https://en.wikipedia.org/wiki/URL)
enumeration URN
Value for publicationIdentifierSchemeName, referring to the URN (Uniform Resource Name, https://en.wikipedia.org/wiki/Uniform_Resource_Name)
enumeration OAI
Value for publicationIdentifierSchemeName, referring to the OAI identifier (Open Archives Initiative, http://www.openarchives.org/OAI/2.0/guidelines-oai-identifier.htm)
enumeration PMCID
Value for publicationIdentifierSchemeName, referring to the PMCID (PubMed Central Identifier, https://www.ncbi.nlm.nih.gov/pmc/pmctopmid/)
enumeration PMID
Value for publicationIdentifierSchemeName, referring to the PMID (PubMed Identifier, https://www.ncbi.nlm.nih.gov/pmc/pmctopmid/)
enumeration OpenAIRE
Value for publicationIdentifierSchemeName, referring to the OpenAIRE identifier (www.openaire.eu)
enumeration CORE
Value for publicationIdentifierSchemeName, referring to the CORE identifier (core.ac.uk)
enumeration other
Value for resourceSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:publicationIdentifierType / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:projectIdentifierType / @projectIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the project identifier is assigned by the authority that issues it
Type xs:string
[ top ]
Attribute ms:textGenre / @classificationSchemeName
Type ms:classificationSchemeName
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:textGenre / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:textType / @classificationSchemeName
Type ms:classificationSchemeName
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:textType / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:register / @classificationSchemeName
Type ms:classificationSchemeName
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:register / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:subject / @classificationSchemeName
Type ms:classificationSchemeName
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:subject / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:domain / @classificationSchemeName
Type ms:classificationSchemeName
Facets
enumeration DDC
Dewey Decimal Classification system; https://www.oclc.org/dewey.en.html
enumeration UDC
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/ subsections on selection and descriptive features
enumeration NLK_classification
enumeration PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text corpora in the LE-PAROLE project
enumeration other
Value for classificationSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:domain / @schemeURI
Type xs:anyURI
[ top ]
Attribute ms:metadataIdentifierType / @metadataIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the metadata record identifier is assigned by the authority that issues it
Type restriction of xs:string
Facets
enumeration Handle
Value for metadataIdentifierSchemeName, referring to the Handle system for identifiers (https://www.handle.net/)
enumeration PURL
Value for metadataIdentifierSchemeName, referring to PURL (Persistent URL, https://archive.org/services/purl/help)
enumeration URL
Value for metadataIdentifierSchemeName, referring to the URL (Uniform Resource Locator, https://en.wikipedia.org/wiki/URL)
enumeration URN
Value for metadataIdentifierSchemeName, referring to the URN (Uniform Resource Name, https://en.wikipedia.org/wiki/Uniform_Resource_Name)
enumeration OMTD
enumeration OpenAIRE
enumeration CORE
enumeration other
Value for metadataIdentifierSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:repositoryIdentifierType / @repositoryIdentifierSchemeName
Type restriction of xs:string
Facets
enumeration DOI
Value for repositoryIdentifierSchemeName, referring to the DOI system (Digital Object Identifier, https://www.doi.org/)
enumeration Handle
Value for repositoryIdentifierSchemeName, referring to the Handle system for identifiers (https://www.handle.net/)
enumeration URL
Value for repositoryIdentifierSchemeName, referring to the URL (Uniform Resource Locator, https://en.wikipedia.org/wiki/URL)
enumeration OAI
Value for repositoryIdentifierSchemeName, referring to the OAI identifier (Open Archives Initiative, http://www.openarchives.org/OAI/2.0/guidelines-oai-identifier.htm)
enumeration OpenDOAR
Value for repositoryIdentifierSchemeName, referring to the OpenDOAR identifier (Directory of Open Access Repositories, http://www.opendoar.org/)
enumeration re3data
Value for repositoryIdentifierSchemeName, referring to the re3data identifier (Registry of Research Data Repositories, http://www.re3data.org/)
enumeration ROAR
Value for repositoryIdentifierSchemeName, referring to the ROAR identifier (Registry of Open Access Repositories, http://roar.eprints.org/)
enumeration other
Value for repositoryIdentifierSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:journalIdentifierType / @journalIdentifierSchemeName
Annotations
Specifies the name of the scheme according to which the journal identifier is assigned by the authority that issues it
Type restriction of xs:string
Facets
enumeration DOI
Value for journalIdentifierSchemeName, referring to the DOI system (Digital Object Identifier, https://www.doi.org/)
enumeration Handle
Value for journalIdentifierSchemeName, referring to the Handle system for identifiers (https://www.handle.net/)
enumeration ISSN
Value for journalIdentifierSchemeName, referring to the ISSN (International Standard Serial Number, http://www.issn.org/)
enumeration other
Value for journalIdentifierSchemeName, to be used when the desired value is not included in the listed values
[ top ]
Attribute ms:structuralEncodingInfoType / ms:structuralEncoding / @schemeName
Type restriction of xs:string
Facets
enumeration jats
enumeration teiP5
enumeration other
[ top ]
Attribute ms:structuralEncodingInfoType / ms:structuralEncoding / @schemeURI
Type xs:anyURI
[ top ]