Declares whether the resource is meant for private use or can be publicly available
through the registry
Diagram
Type
xs:boolean
Element ms:contactInfo
Annotations
Groups information on the possible sources for obtaining further information regarding
the resource; at least a general email address or a landing page (website) must be
supplied, although the recommended practice is to describe a contact person or group
A URL used as the landing page of a resource providing general information; for instance,
it may present a description of the resource, its creators and possibly include links
to the URL where it can be accessed from
Specifies the name of the scheme according to which the person identifier is assigned
by the authority that issues it (e.g. ORCID, ScopusId, ResearcherID etc.)
Element ms:sex
Annotations
Either of the two main categories (male and female) into which humans and most other
living things are divided on the basis of their reproductive functions. (Source:OED)
Diagram
Type
restriction of xs:string
Facets
maxLength
30
enumeration
male
Of or denoting the sex that produces gametes, especially spermatozoa, with which a
female may be fertilized or inseminated to produce offspring. (Source:OED)
enumeration
female
Of or denoting the sex that can bear offspring or produce eggs, distinguished biologically
by the production of gametes (ova) which can be fertilized by male gametes. (Source:OED)
enumeration
unknown
Value for "sex"; to be used when the sex of a person is unknown
Element ms:communicationInfo
Annotations
Groups information on the communication details of a person or an organization
Associates a resource with a numeric pattern of the form major_version.minor_version.patch
(in accordance to the semantic versioning guidelines, cf. http://semver.org) that
identifies its version
A type of versioning vocabulary used mainly for works (e.g. scholarly articles, books
etc.) that go through a formal review process before final publication, marked with
major changes across the versions
Diagram
Type
restriction of xs:string
Facets
enumeration
accepted
For versions that have been accepted for publication but are not yet published
enumeration
published
For versions as they have been formally published in print or digital form
enumeration
draft
For versions during the writing up process
enumeration
submitted
For versions as submitted for publication
enumeration
updated
For versions that have been updated vis-a-vis the previous published version
A short free-text account of the revisions made to the current version vis-a-vis the
previous version or a link to a document reporting these revisions
Groups information on validation of a resource; it can be repeated to allow for different
validations (e.g. formal validation of the whole resource; content validation of one
part of the resource etc.).
Provides information on size or other details of partially validated data; to be used
if only part of the resource has been validated and as an alternative to SizeInfo
if the validated part cannot be counted otherwise
Link to a short account (prose description) of the validation details or the identifier
of a document with detailed information on the validation process and results
Specifies the name of the scheme according to which the publication identifier is
assigned by the authority that issues it (e.g. DOI, PubMed Central etc.)
The automated processing of unstructured text and/or structured data leading to the
extraction of previously hidden knowledge.
enumeration
contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text,
images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered
information (e.g. identification of relationships between entities).
enumeration
textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured
data that can be further analysed to extract knowledge, support decision making etc.
enumeration
knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of
a specific domain from external sources so that it can be used in a knowledge-based
system.
enumeration
informationExtraction
The process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used
in a particular context; the selection of the sense is made from a list of the word's
senses."
enumeration
eventDetection
The process/task of identifying events in data (text, video, images etc.), usually
combined with their classification into types of events and recognition of the event
attributes (e.g. time, place, participants and duration).
enumeration
namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities
in text into pre-defined categories such as the names of persons, organizations, locations,
expressions of times, quantities, monetary values, percentages, etc.
enumeration
knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that
can be considered knowledge about the data.
enumeration
knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of
data for patterns that can be considered knowledge about the data. Information extraction
is the process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
knowledgeRepresentation
The process/task of representing information about entities in a form that machines
are capable of understanding it.
enumeration
relationExtraction
The process/task of identifying and classifying relation mentions between entities
in text and/or data.
enumeration
coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same
entity in a certain text.
enumeration
textCategorisation
The process/task of assigning documents into classes or categories.
enumeration
summarisation
The process/task of reducing one or more textual documents with a computer program
in order to create a summary that retains the most important points of the original
document(s).
enumeration
sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed
in a piece of text, especially in order to determine whether the writer's attitude
towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration
emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness,
etc.) in the linguistic expression of texts.
enumeration
questionAnswering
The process/task of automatically answering questions posed by users in the form of
natural language.
enumeration
computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems
have the ability to use them in tasks, such as automated logical reasoning.
enumeration
informationRetrieval
The activity of obtaining information resources relevant to an information need from
a collection of information resources. Searches can be based on full-text or other
content-based indexing.
enumeration
exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class
of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration
semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's
intent and the contextual meaning of terms as they appear in the searchable dataspace,
whether on the Web or within a closed system, to generate more relevant results.
enumeration
informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from
an information stream using (semi)automated or computerized methods prior to presentation
to a human user. The selection of the items is based on the correlation between the
content of the items and the user’s preferences (content-based filtering) or the correlation
between people with similar preferences (collaborative filtering).
enumeration
recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration
recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning
of one text is entailed in that of the other, i.e. whether the truth of one text fragment
follows from that of the other fragment.
enumeration
paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that
conveys the same or similar information.
The automated processing of unstructured text and/or structured data leading to the
extraction of previously hidden knowledge.
enumeration
contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text,
images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered
information (e.g. identification of relationships between entities).
enumeration
textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured
data that can be further analysed to extract knowledge, support decision making etc.
enumeration
knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of
a specific domain from external sources so that it can be used in a knowledge-based
system.
enumeration
informationExtraction
The process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used
in a particular context; the selection of the sense is made from a list of the word's
senses."
enumeration
eventDetection
The process/task of identifying events in data (text, video, images etc.), usually
combined with their classification into types of events and recognition of the event
attributes (e.g. time, place, participants and duration).
enumeration
namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities
in text into pre-defined categories such as the names of persons, organizations, locations,
expressions of times, quantities, monetary values, percentages, etc.
enumeration
knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that
can be considered knowledge about the data.
enumeration
knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of
data for patterns that can be considered knowledge about the data. Information extraction
is the process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
knowledgeRepresentation
The process/task of representing information about entities in a form that machines
are capable of understanding it.
enumeration
relationExtraction
The process/task of identifying and classifying relation mentions between entities
in text and/or data.
enumeration
coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same
entity in a certain text.
enumeration
textCategorisation
The process/task of assigning documents into classes or categories.
enumeration
summarisation
The process/task of reducing one or more textual documents with a computer program
in order to create a summary that retains the most important points of the original
document(s).
enumeration
sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed
in a piece of text, especially in order to determine whether the writer's attitude
towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration
emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness,
etc.) in the linguistic expression of texts.
enumeration
questionAnswering
The process/task of automatically answering questions posed by users in the form of
natural language.
enumeration
computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems
have the ability to use them in tasks, such as automated logical reasoning.
enumeration
informationRetrieval
The activity of obtaining information resources relevant to an information need from
a collection of information resources. Searches can be based on full-text or other
content-based indexing.
enumeration
exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class
of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration
semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's
intent and the contextual meaning of terms as they appear in the searchable dataspace,
whether on the Web or within a closed system, to generate more relevant results.
enumeration
informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from
an information stream using (semi)automated or computerized methods prior to presentation
to a human user. The selection of the items is based on the correlation between the
content of the items and the user’s preferences (content-based filtering) or the correlation
between people with similar preferences (collaborative filtering).
enumeration
recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration
recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning
of one text is entailed in that of the other, i.e. whether the truth of one text fragment
follows from that of the other fragment.
enumeration
paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that
conveys the same or similar information.
Specifies one or more publication that must be used for citation purposes as requested
by the resource provider (usually a scientific article that describes the resource)
Specifies the type of relation holding between two entities (e.g. two resources that
comprise one new resource together, a corpus and the s/w component that has been used
for its creation or a corpus and the publication that describes it
Specifies the format that is used since often the mime type will not be sufficient
for machine processing; NOTE: normally the format should be represented as a combination
of the mimetype (e.g. application/xml) and some name and link to the documentation
about the supplementary conventions used (e.g xces, alvisED etc.)
Diagram
Type
restriction of xs:string
Facets
maxLength
100
enumeration
text/plain
enumeration
application/vnd.xmi+xml
enumeration
application/xml
enumeration
application/x-xces+xml
enumeration
application/tei+xml
enumeration
application/rdf+xml
enumeration
application/xhtml+xml
enumeration
application/emma+xml
enumeration
application/pls+xml
enumeration
application/postscript
enumeration
text/sgml
enumeration
text/html
enumeration
application/x-tex
enumeration
application/rtf
enumeration
application/json+ld
enumeration
application/x-latex
enumeration
text/csv
enumeration
text/tab-separated-values
enumeration
application/pdf
enumeration
application/x-msaccess
enumeration
application/msword
enumeration
application/vnd.ms-excel
enumeration
text/turtle
enumeration
aclAnthology
enumeration
alvisEnrichedDocument
enumeration
bnc
enumeration
bioNLP
enumeration
bioNLP; format-variant=ST2013a1_a2
enumeration
cadixeJSON
enumeration
conll2000
enumeration
conll2002
enumeration
conll2006
enumeration
conll2007
enumeration
conll2009
enumeration
conll2012
enumeration
dataSift
enumeration
factoredTagLem
enumeration
gate
enumeration
genia
enumeration
graf
enumeration
html5Microdata
enumeration
i2b2
enumeration
imsCwb
enumeration
jdbc
enumeration
keaCorpus
enumeration
lll
enumeration
negraExport
enumeration
ptb; format-variant=chunked
enumeration
ptb; format-variant=combined
enumeration
pml
enumeration
relp
enumeration
aimedCorpus
enumeration
tiger
enumeration
tupp-dz
enumeration
twitter
enumeration
xces; format-variant=ilsp
enumeration
web1t
enumeration
uimaCASDump
enumeration
uimaBinaryCas
Element ms:mimeType
Annotations
The mime-type of the resource which is a formalized specifier for the format included
or a mime-type that the tool/service accepts, in conformance with the values of the
IANA (Internet Assigned Numbers Authority); you can select one of the pre-defined
values or add a value, PREFERABLY FROM THE IANA MEDIA MIMETYPE RECOMMENDED VALUES
(http://www.iana.org/assignments/media-types/media-types.xhtml)
Groups information on licensing terms for the distribution of a resource; at least
a licence (preferred option) or formal rights statement (e.g. open access) must be
declared for the resource
Groups information on licences for the resource; can be repeated to allow for different
modes of access and restrictions of use (e.g. free for academic use, on-a-fee basis
for commercial use, download of a sample for free use etc.)
Eclipse Public License v1.0; cf. https://www.eclipse.org/legal/epl-v10.html
enumeration
NLM
U.S. National Library of Medicine (NLM) License Agreement for NLM Data; cf. https://www.nlm.nih.gov/databases/license/license.pdf
enumeration
f-DPPL-3.0
Free Digital Peer Publishing Licence (v3, en); cf. https://www.hbz-nrw.de/produkte/open-access/lizenzen/dppl/fdppl/f-DPPL_v3_en_11-2008
enumeration
M-DPPL-3.0
Modular Digital Peer Publishing Licence (v3, en); cf. https://www.hbz-nrw.de/produkte/open-access/lizenzen/dppl/mdppl/m-DPPL_v3_en_11-2008
enumeration
proprietary
Value for "licence"; to be used for licences that have a proprietary status
enumeration
underNegotiation
Value for "licence"; to be used for resources whose distribution status is still under
negotiation
enumeration
nonStandardLicenceTerms
Value for "licence"; to be used for resources that are licensed with a licence not
included in the OMTD list of licences; more information on the licence must be provided
in the relevant metadata elements
Used to provide a hyperlink to a URL containing the text of a licence not included
in the predefined list or describing the terms of use for a language resource or terms
of service for web services
Specifies the conditions and terms of use imposed by the licence. It is an optional
element and only to be taken as providing brief human readable information on the
fact that the LR is provided under a specific set of conditions. These correspond
to the most frequently used conditions imposed by the licensor of the LR (via the
specified licence). The proper exposition of all conditions and possible exceptions
is to be found inside the licence text. LR depositors should, hence, carefully choose
the values of this field to match the licence chosen and users should carefully read
that licence before using the LR.
Diagram
Type
restriction of xs:string
Facets
maxLength
100
enumeration
attribution
enumeration
nonCommercialUse
enumeration
commercialUse
enumeration
shareAlike
enumeration
noDerivatives
enumeration
noRedistribution
enumeration
evaluationUse
enumeration
research
enumeration
languageEngineeringResearch
enumeration
education
enumeration
informLicensor
enumeration
redeposit
enumeration
compensate
enumeration
personalDataIncluded
enumeration
sensitiveDataIncluded
enumeration
requestPlan
enumeration
spatialConstraint
enumeration
userIdentified
enumeration
academicUsers
enumeration
commercialUsers
enumeration
membersOfGroup
enumeration
other
Element ms:rightsStatement
Annotations
The name (identifier) of a formal statement indicative of licensing terms for the
use of a resource (e.g. open access, free to read etc.); its semantics should be clear,
preferrably formally expressed and stored at a URL
Diagram
Type
restriction of xs:string
Facets
enumeration
openAccess
The free and online availability of literature, which allows to read, download, copy,
distribute, print, search, or link to the ful text, crawl articles for indexing, pass
them as data to software, or use them for any other useful purpose. An availability
that is granted without financial, legal, or technical barriers other than those inseparable
from gaining access to the internet itself, and those related to giving authors control
over the integrity of their work and the right to be properly acknowledged and cited.
enumeration
restrictedAccess
Access is subject to restrictions or controls regarding users (e.g. limited to researchers
or members of a specific group) or use (e.g. for research only, noncommercial use
etc.); subscription or registration may also be required and access may incur financial
costs.
A free text statement that may be included with the resource, usually containing the
name(s) of copyright holders and licensing terms (intended for resources that already
have such a statement); the element can be repeated for the different language versions
using the "lang" attribute to specify the language.
The text that must be quoted for attribution purposes when using a resource - for
cases where a resource is provided with a restriction on attribution; you can use
a standard text such as "Resource A by Resource Creator/Owner B used under licence
C as accessed at D"
Groups information on a person or an organization who holds the Copyright and SGDB
rights that subsist in the resource. The rights holder could be different from the
creator that may have assigned the rights to another person or organization (e.g.
an author as a creator assigns her rights to the publisher who is the rights holder)
and the distributor that holds a specific licence (i.e. a permission) to distribute
the work.
Specifies the media type of the resource and basically corresponds to the physical
medium of the content representation. Each media type is described through a distinctive
set of features. A resource may consist of parts attributed to different types of
media. A tool/service may take as input/output more than one different media types.
Diagram
Type
xs:string
Element ms:lingualityInfo
Annotations
Groups information on the number of languages of the resource part and of the way
they are combined to each other
The language that is used in the resource or supported by the component, as specified
in the BCP47 guidelines (https://tools.ietf.org/html/bcp47); the language tag is built
upon (a) language tag according to ISO 639-1 and for languages not covered by this,
the ISO 639-3; (b) the script tag according to ISO 15924; (c) the region tag according
to ISO 3166-1; (d) the variant subtag
The identifier of the language subelement according to the IETF BCP47 guidelines (i.e.
ISO 639-3 codes when existing supplemented with ISO 639-3 codes for new entries)
16th century French as in Jean Nicot, "Thresor de la langue francoyse", 1606, but
also including some French similar to that of Rabelais
enumeration
alalc97
Romanizations recommended by the American Library Association and the Library of Congress,
in "ALA-LC Romanization Tables: Transliteration Schemes for Non-Roman Scripts" (1997),
ISBN 978-0-8444-0940-5.
enumeration
fonipa
enumeration
fonupa
enumeration
fonxsamp
Indicates that the content is transcribed according to X-SAMPA
enumeration
1694acad
17th century French, as catalogued in the "Dictionnaire de l'acadιmie franηoise",
4eme ed. 1694; frequently includes elements of Middle French, as this is a transitional
period
enumeration
1901
enumeration
1959acad
enumeration
1994
For standardized Resian an orthography was published in 1994.
enumeration
1996
enumeration
aluku
Aluku dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
arevela
enumeration
arevmda
enumeration
baku1926
Denotes alphabet used in Turkic republics/regions of the former USSR in late 1920s,
and throughout 1930s, which aspired to represent equivalent phonemes in a unified
fashion. Also known as: New Turkic Alphabet; Birlәşdirilmiş Jeni Tyrk Әlifbasь (Birlesdirilmis
Jeni Tyrk Elifbasi); Jaŋalif (Janalif).
enumeration
balanka
Balanka is one of 19 Anii dialects.
enumeration
barla
Barlavento is one of the two main dialect groups of Kabuverdianu.
enumeration
bauddha
enumeration
biscayan
enumeration
biske
The dialect of San Giorgio/Bila is one of the four major local dialects of Resian
enumeration
bohoric
The subtag represents the alphabet codified by Adam Bohorič in 1584 and used from
the first printed Slovene book and up to the mid-19th century.
enumeration
boont
Jargon embedded in American English
enumeration
dajnko
The subtag represents the alphabet codified by Peter Dajnko and used from 1824 to
1839 mostly in Styria (in what is now Eastern Slovenia).
enumeration
ekavsk
enumeration
emodeng
enumeration
hepburn
enumeration
hognorsk
Norwegian following Ivar Aasen's orthographical principles, including modern usage.
enumeration
ijekavsk
enumeration
itihasa
enumeration
jauer
The spoken dialect of the Val Mόstair, which has no written standard.
enumeration
jyutping
Jyutping romanization of Cantonese
enumeration
kkcor
enumeration
kscor
enumeration
laukika
enumeration
lipaw
The dialect of Lipovaz/Lipovec is one of the minor local dialects of Resian
enumeration
luna1918
Russian orthography as established by the 1917/1918 orthographic reforms
enumeration
metelko
The subtag represents the alphabet codified by Franc Serafin Metelko and used from
1825 to 1833.
enumeration
monoton
enumeration
ndyuka
Ndyuka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
nedis
enumeration
njiva
enumeration
nulik
enumeration
osojs
The dialect of Oseacco/Osojane is one of the four major local dialects of Resian
enumeration
pamaka
Pamaka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
petr1708
Russian orthography from the Petrine orthographic reforms of 1708 to the 1917 orthographic
reform
enumeration
pinyin
enumeration
polyton
enumeration
puter
Puter is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
rigik
enumeration
rozaj
enumeration
rumgr
Supraregional Romansh written standard
enumeration
scotland
enumeration
scouse
English Liverpudlian dialect known as 'Scouse'
enumeration
solba
The dialect of Stolvizza/Solbica is one of the four major local dialects of Resian
enumeration
sotav
Sotavento is one of the two main dialect groups of Kabuverdianu.
enumeration
surmiran
Surmiran is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
sursilv
Sursilvan is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
sutsilv
Sutsilvan is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
tarask
The subtag represents Branislau Taraskievic's Belarusian orthography as published
in "Bielaruski klasycny pravapis" by Juras Buslakou, Vincuk Viacorka, Zmicier Sanko,
and Zmicier Sauka (Vilnia-Miensk 2005).
enumeration
uccor
enumeration
ucrcor
enumeration
ulster
enumeration
unifon
enumeration
vaidika
The most ancient dialect of Sanskrit used in verse and prose composed until about
the 4th century B.C.E.
enumeration
valencia
Variety spoken in the "Comunidad Valenciana" region of Spain, where it is co-official
with Spanish.
enumeration
vallader
Vallader is one of the five traditional written standards or "idioms" of the Romansh
language.
Groups together information on the resource creation (e.g. for corpora, selection
of texts/audio files/ video files etc.; for lexica, construction of lemma list etc.)
A name or an identifier (e.g. url reference) to the ancillary resource (e.g. tagset,
ontology, term list) used in the annotation of the resource or used by the component
Name of the theoretic model applied for the creation or enrichment of the resource,
and/or a reference (URL or bibliographic reference) to informative material about
the theoretic model used
Refers to the original data provider, in case the metadata record carries information
taken from previous repositories/journals/publishers (e.g. in case the record's last
source is an aggregator)
Groups information relevant to persons related to the resource; to be used mainly
for contact persons, resource creators, validators, annotators etc. for whom personal
data can be provided
Specifies the media type of the resource and basically corresponds to the physical
medium of the content representation. Each media type is described through a distinctive
set of features. A resource may consist of parts attributed to different types of
media.
Diagram
Type
restriction of xs:string
Facets
maxLength
30
enumeration
text
enumeration
audio
enumeration
video
enumeration
image
enumeration
textNumerical
Element ms:encodingLevel
Annotations
Information on the contents of the lexicalConceptualResource as regards the linguistic
level of analysis
Diagram
Type
restriction of xs:string
Facets
maxLength
30
enumeration
phonetics
enumeration
phonology
enumeration
semantics
enumeration
morphology
enumeration
syntax
enumeration
pragmatics
enumeration
other
Element ms:TDMMethod
Annotations
Diagram
Type
restriction of xs:string
Facets
enumeration
ruleBased
A type of method that makes use of set(s) of rules to perform the relevant task.
enumeration
machineLearning
A method of data analysis that automates model building. Using algorithms that iteratively
learn from data, machine learning allows computers to find hidden insights without
being explicitly programmed where to look.
enumeration
statisticalLearning
The process of using statistics and techniques related to statistics in order to understand
and learn from your data so that you can predict its future.
enumeration
machineAndStatisticalLearning
Methods and techniques used either in machine learning or statistical learning
enumeration
regressionAnalysis
A statistical process for estimating the relationships among variables. It includes
many techniques for modeling and analyzing several variables, when the focus is on
the relationship between a dependent variable and one or more independent variables
(or 'predictors').
enumeration
regularisation
A process of introducing additional information in order to solve an ill-posed problem
or to prevent overfitting.
enumeration
instanceBasedLearning
A family of learning algorithms that, instead of performing explicit generalization,
compares new problem instances with instances seen in training, which have been stored
in memory.
enumeration
decisionTrees
A non-parametric supervised learning method used for classification and regression.
The goal is to create a tree-like graph or model of decisions and their possible consequences
by learning simple decision rules inferred from the data features.
enumeration
bayesian
A method in probability and statistics based on Bayes' theorem, mainly related to
statistical inference.
enumeration
kernelMethod
Any method used in pattern analysis that relies on kernel functions, which enable
it to operate in a high-dimensional, implicit feature space without ever computing
the coordinates of the data in that space, but rather by simply computing the inner
products between the images of all pairs of data in the feature space.
enumeration
clusteringMethod
Any method used in clustering or cluster analysis, i.e. in grouping a set of objects
in such a way that objects in the same group (cluster) are more similar (in some sense
or another) to each other than to those in other groups (clusters).
enumeration
associationRuleLearning
A machine learning method used in recognising relationships among variables in databases
and extracted in the form of rules.
enumeration
artificialNeuralNetwork
A computational model based on a large collection of simple neural units (artificial
neurons), loosely analogous to the observed behavior of a biological brain's axons.
These systems are self-learning and trained, rather than explicitly programmed.
enumeration
deepLearning
A branch of machine learning based on deep neural networks. A deep neural network
(DNN) is an artificial neural network (ANN) with multiple hidden layers of units between
the input and output layers.
enumeration
ensembleMethod
Any method that uses multiple learning algorithms in an attempt to improve predictive
performance not obtainable otherwise with any of the constituent learning algorithms.
enumeration
dimensionalityReduction
A method based on reducing the number of random variables under consideration, via
obtaining a set of principal variables.
Element ms:projectInfo
Annotations
Groups information on a project related to the resource(e.g. a project the resource
has been used in; a funded project that led to the resource creation etc.)
Specifies the name of the scheme according to which the resource identifier is assigned
by the authority that issues it (e.g. DOI, ISLRN etc.)
Complex Type ms:contactInfoType
Diagram
Simple Type ms:emailAddress
Annotations
Base type for validating email addresses
Diagram
Type
restriction of xs:string
Facets
maxLength
100
pattern
[^@]+@[^\.]+\..+|
Simple Type ms:httpURI
Annotations
Base type to be used for url's, ftp's, secure url's
Diagram
Type
restriction of xs:anyURI
Facets
pattern
(http://.*)|(https://.*)|(ftp://.*)|(www.*)
Complex Type ms:personInfoType
Annotations
Groups information relevant to persons related to the resource; to be used mainly
for contact persons, resource creators, validators, annotators etc. for whom personal
data can be provided
Specifies the name of the scheme according to which the person identifier is assigned
by the authority that issues it (e.g. ORCID, ScopusId, ResearcherID etc.)
Complex Type ms:communicationInfoType
Diagram
Simple Type ms:regionIdType
Annotations
Base type for countries (regions) according to ISO 3166
Specifies the name of the scheme according to which the publication identifier is
assigned by the authority that issues it (e.g. DOI, PubMed Central etc.)
Base type for related resources; sequence of resource names and identifiers
Diagram
Complex Type ms:actorInfoType
Annotations
Base type for actors/agents; choice between person and organization
Diagram
Complex Type ms:usageInfoType
Diagram
Simple Type ms:applicationType
Annotations
A classification of NLP/TDM applications; please, note that the ontology is under
revision
Diagram
Type
restriction of xs:string
Facets
maxLength
100
enumeration
annotation
enumeration
bilingualLexiconInduction
enumeration
contradictionDetection
enumeration
dependencyParsing
enumeration
derivationalMorphologicalAnalysis
enumeration
discourseAnalysis
enumeration
documentClassification
enumeration
emotionGeneration
enumeration
emotionRecognition
enumeration
entityMentionRecognition
enumeration
eventExtraction
enumeration
expressionRecognition
enumeration
extractionOfFundingInformation
enumeration
intra-documentCoreferenceResolution
enumeration
languageIdentification
enumeration
languageModelling
enumeration
languageModelsTraining
enumeration
lemmatization
enumeration
lexiconAccess
enumeration
lexiconAcquisitionFromCorpora
enumeration
lexiconEnhancement
enumeration
lexiconExtractionFromLexica
enumeration
lexiconFormatConversion
enumeration
lexiconMerging
enumeration
lexiconVisualization
enumeration
machineTranslation
enumeration
morphologicalAnalysis
enumeration
morphosyntacticAnnotation-bPosTagging
enumeration
morphosyntacticAnnotation-posTagging
enumeration
naturalLanguageGeneration
enumeration
naturalLanguageUnderstanding
enumeration
opinionMining
enumeration
other
enumeration
persuasiveExpressionMining
enumeration
qualitativeAnalysis
enumeration
questionAnswering
enumeration
semanticRoleLabelling
enumeration
sentenceSplitting
enumeration
shallowParsing
enumeration
spellChecking
enumeration
temporalExpressionRecognition
enumeration
terminologyExtraction
enumeration
textGeneration
enumeration
textMining
enumeration
tokenization
enumeration
tokenizationAndSentenceSplitting
enumeration
topicDetection
enumeration
topicDetectionAndTracking
enumeration
topicModelling
enumeration
textAndDataMining
The automated processing of unstructured text and/or structured data leading to the
extraction of previously hidden knowledge.
enumeration
contentMining
The automated analysis of large volumes of content of any form or medium (e.g. text,
images, videos, graphs, metadata etc.) that leads to the discovery of previously undiscovered
information (e.g. identification of relationships between entities).
enumeration
textAndDataAnalytics
The process/task of converting unstructured text and data into high-quality structured
data that can be further analysed to extract knowledge, support decision making etc.
enumeration
knowledgeAcquisition
The process/task of extracting, organising and systematising knowledge usually of
a specific domain from external sources so that it can be used in a knowledge-based
system.
enumeration
informationExtraction
The process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
wordSenseDisambiguation
"The process/task of identifying which sense of a word with multiple meanings is used
in a particular context; the selection of the sense is made from a list of the word's
senses."
enumeration
eventDetection
The process/task of identifying events in data (text, video, images etc.), usually
combined with their classification into types of events and recognition of the event
attributes (e.g. time, place, participants and duration).
enumeration
namedEntityRecognition
A subtask of information extraction that seeks to locate and classify named entities
in text into pre-defined categories such as the names of persons, organizations, locations,
expressions of times, quantities, monetary values, percentages, etc.
enumeration
knowledgeDiscovery
The process/task of automatically searching large volumes of data for patterns that
can be considered knowledge about the data.
enumeration
knowledgeDiscoveryAndInformationExtraction
Knowledge discovery is the process/task of automatically searching large volumes of
data for patterns that can be considered knowledge about the data. Information extraction
is the process/task of automatically extracting structured information from unstructured
and/or semi-structured data.
enumeration
knowledgeRepresentation
The process/task of representing information about entities in a form that machines
are capable of understanding it.
enumeration
relationExtraction
The process/task of identifying and classifying relation mentions between entities
in text and/or data.
enumeration
coreferenceResolution
The process/task of determining all linguistic expressions that refer to the same
entity in a certain text.
enumeration
textCategorisation
The process/task of assigning documents into classes or categories.
enumeration
summarisation
The process/task of reducing one or more textual documents with a computer program
in order to create a summary that retains the most important points of the original
document(s).
enumeration
sentimentAnalysis
The process/task of computationally identifying and categorizing opinions expressed
in a piece of text, especially in order to determine whether the writer's attitude
towards a particular topic, product, etc. is positive, negative, or neutral.
enumeration
emotionDetection
The process/task of identifying types of feelings (e.g. anger, fear, happiness, sadness,
etc.) in the linguistic expression of texts.
enumeration
questionAnswering
The process/task of automatically answering questions posed by users in the form of
natural language.
enumeration
computationalArgumentation
The process/task of identifying and representing argumentation in text, so that systems
have the ability to use them in tasks, such as automated logical reasoning.
enumeration
informationRetrieval
The activity of obtaining information resources relevant to an information need from
a collection of information resources. Searches can be based on full-text or other
content-based indexing.
enumeration
exploratorySearch
A type of search which, in contrast to traditional lookup search, covers a broad class
of activities, such as investigating, evaluating, comparing, and synthesizing.
enumeration
semanticSearch
A type of search that seeks to improve search accuracy by understanding the searcher's
intent and the contextual meaning of terms as they appear in the searchable dataspace,
whether on the Web or within a closed system, to generate more relevant results.
enumeration
informationFiltering
The process/task of removing (filtering out) redundant or unwanted information from
an information stream using (semi)automated or computerized methods prior to presentation
to a human user. The selection of the items is based on the correlation between the
content of the items and the user’s preferences (content-based filtering) or the correlation
between people with similar preferences (collaborative filtering).
enumeration
recommenderSystem
An information filtering system that delivers information in the form of suggestions.
enumeration
recognizingTextualEntailment
A task/process that intends to recognize for two text fragments whether the meaning
of one text is entailed in that of the other, i.e. whether the truth of one text fragment
follows from that of the other fragment.
enumeration
paraphrasing
A task/process whereby a text fragment is reproduced with another text fragment that
conveys the same or similar information.
Specifies the name of the scheme according to which the project identifier is assigned
by the authority that issues it
Complex Type ms:dateCombinationType
Annotations
Base type to be used for choice betwwen range of dates and exact date
Diagram
Complex Type ms:dateRangeType
Annotations
Base type to be used for range of dates (time periods)
Diagram
Complex Type ms:resourceDocumentationInfoType
Diagram
Complex Type ms:resourceCreationInfoType
Diagram
Complex Type ms:relationInfoType
Diagram
Complex Type ms:datasetDistributionInfoType
Diagram
Complex Type ms:textFormatInfoType
Diagram
Complex Type ms:characterEncodingInfoType
Diagram
Complex Type ms:licenceInfoType
Diagram
Complex Type ms:rawCorpusInfoType
Annotations
Groups together all information related to raw corpora
Diagram
Complex Type ms:corpusTextPartInfoType
Diagram
Complex Type ms:lingualityInfoType
Diagram
Complex Type ms:languageInfoType
Diagram
Complex Type ms:languageType
Annotations
The container for the language elements (i.e. identifier according to BCP47 guidelines
and all the elements that produce this id)
Diagram
Simple Type ms:languageIdType
Annotations
Base type for languages according to ISO 639; the codes are taken from ISO 639-1 and,
if not covered, from ISO 639-3, according to the BCP-47 guidlelines
Diagram
Type
restriction of xs:string
Facets
enumeration
bg
enumeration
cs
enumeration
hr
enumeration
da
enumeration
nl
enumeration
en
enumeration
et
enumeration
fi
enumeration
fr
enumeration
de
enumeration
hu
enumeration
ga
enumeration
it
enumeration
lv
enumeration
lt
enumeration
mt
enumeration
el
enumeration
pl
enumeration
pt
enumeration
ro
enumeration
sk
enumeration
sl
enumeration
es
enumeration
sv
enumeration
aa
enumeration
ab
enumeration
ae
enumeration
af
enumeration
ak
enumeration
am
enumeration
an
enumeration
ar
enumeration
as
enumeration
av
enumeration
ay
enumeration
az
enumeration
ba
enumeration
be
enumeration
bh
enumeration
bi
enumeration
bm
enumeration
bn
enumeration
bo
enumeration
br
enumeration
bs
enumeration
ca
enumeration
ce
enumeration
ch
enumeration
co
enumeration
cr
enumeration
cu
enumeration
cv
enumeration
cy
enumeration
dv
enumeration
dz
enumeration
ee
enumeration
eo
enumeration
eu
enumeration
fa
enumeration
ff
enumeration
fj
enumeration
fo
enumeration
fy
enumeration
gd
enumeration
gl
enumeration
gn
enumeration
gu
enumeration
gv
enumeration
ha
enumeration
he
enumeration
hi
enumeration
ho
enumeration
ht
enumeration
hy
enumeration
hz
enumeration
ia
enumeration
id
enumeration
ie
enumeration
ig
enumeration
ii
enumeration
ik
enumeration
io
enumeration
is
enumeration
iu
enumeration
ja
enumeration
jv
enumeration
ka
enumeration
kg
enumeration
ki
enumeration
kj
enumeration
kk
enumeration
kl
enumeration
km
enumeration
kn
enumeration
ko
enumeration
kr
enumeration
ks
enumeration
ku
enumeration
kv
enumeration
kw
enumeration
ky
enumeration
la
enumeration
lb
enumeration
lg
enumeration
li
enumeration
ln
enumeration
lo
enumeration
lu
enumeration
mg
enumeration
mh
enumeration
mi
enumeration
mk
enumeration
ml
enumeration
mn
enumeration
mr
enumeration
ms
enumeration
my
enumeration
na
enumeration
nb
enumeration
nd
enumeration
ne
enumeration
ng
enumeration
nn
enumeration
no
enumeration
nr
enumeration
nv
enumeration
ny
enumeration
oc
enumeration
oj
enumeration
om
enumeration
or
enumeration
os
enumeration
pa
enumeration
pi
enumeration
ps
enumeration
qu
enumeration
rm
enumeration
rn
enumeration
ru
enumeration
rw
enumeration
sa
enumeration
sc
enumeration
sd
enumeration
se
enumeration
sg
enumeration
sh
enumeration
si
enumeration
sm
enumeration
sn
enumeration
so
enumeration
sq
enumeration
sr
enumeration
ss
enumeration
st
enumeration
su
enumeration
sw
enumeration
ta
enumeration
te
enumeration
tg
enumeration
th
enumeration
ti
enumeration
tk
enumeration
tl
enumeration
tn
enumeration
to
enumeration
tr
enumeration
ts
enumeration
tt
enumeration
tw
enumeration
ty
enumeration
ug
enumeration
uk
enumeration
ur
enumeration
uz
enumeration
ve
enumeration
vi
enumeration
vo
enumeration
wa
enumeration
wo
enumeration
xh
enumeration
yi
enumeration
yo
enumeration
za
enumeration
zh
enumeration
zu
enumeration
aaa
enumeration
aab
enumeration
aac
enumeration
aad
enumeration
aae
enumeration
aaf
enumeration
aag
enumeration
aah
enumeration
aai
enumeration
aak
enumeration
aal
enumeration
aam
enumeration
aan
enumeration
aao
enumeration
aap
enumeration
aaq
enumeration
aas
enumeration
aat
enumeration
aau
enumeration
aav
enumeration
aaw
enumeration
aax
enumeration
aaz
enumeration
aba
enumeration
abb
enumeration
abc
enumeration
abd
enumeration
abe
enumeration
abf
enumeration
abg
enumeration
abh
enumeration
abi
enumeration
abj
enumeration
abl
enumeration
abm
enumeration
abn
enumeration
abo
enumeration
abp
enumeration
abq
enumeration
abr
enumeration
abs
enumeration
abt
enumeration
abu
enumeration
abv
enumeration
abw
enumeration
abx
enumeration
aby
enumeration
abz
enumeration
aca
enumeration
acb
enumeration
acd
enumeration
ace
enumeration
acf
enumeration
ach
enumeration
aci
enumeration
ack
enumeration
acl
enumeration
acm
enumeration
acn
enumeration
acp
enumeration
acq
enumeration
acr
enumeration
acs
enumeration
act
enumeration
acu
enumeration
acv
enumeration
acw
enumeration
acx
enumeration
acy
enumeration
acz
enumeration
ada
enumeration
adb
enumeration
add
enumeration
ade
enumeration
adf
enumeration
adg
enumeration
adh
enumeration
adi
enumeration
adj
enumeration
adl
enumeration
adn
enumeration
ado
enumeration
adp
enumeration
adq
enumeration
adr
enumeration
ads
enumeration
adt
enumeration
adu
enumeration
adw
enumeration
adx
enumeration
ady
enumeration
adz
enumeration
aea
enumeration
aeb
enumeration
aec
enumeration
aed
enumeration
aee
enumeration
aek
enumeration
ael
enumeration
aem
enumeration
aen
enumeration
aeq
enumeration
aer
enumeration
aes
enumeration
aeu
enumeration
aew
enumeration
aey
enumeration
aez
enumeration
afa
enumeration
afb
enumeration
afd
enumeration
afe
enumeration
afg
enumeration
afh
enumeration
afi
enumeration
afk
enumeration
afn
enumeration
afo
enumeration
afp
enumeration
afs
enumeration
aft
enumeration
afu
enumeration
afz
enumeration
aga
enumeration
agb
enumeration
agc
enumeration
agd
enumeration
age
enumeration
agf
enumeration
agg
enumeration
agh
enumeration
agi
enumeration
agj
enumeration
agk
enumeration
agl
enumeration
agm
enumeration
agn
enumeration
ago
enumeration
agq
enumeration
agr
enumeration
ags
enumeration
agt
enumeration
agu
enumeration
agv
enumeration
agw
enumeration
agx
enumeration
agy
enumeration
agz
enumeration
aha
enumeration
ahb
enumeration
ahg
enumeration
ahh
enumeration
ahi
enumeration
ahk
enumeration
ahl
enumeration
ahm
enumeration
ahn
enumeration
aho
enumeration
ahp
enumeration
ahr
enumeration
ahs
enumeration
aht
enumeration
aia
enumeration
aib
enumeration
aic
enumeration
aid
enumeration
aie
enumeration
aif
enumeration
aig
enumeration
aih
enumeration
aii
enumeration
aij
enumeration
aik
enumeration
ail
enumeration
aim
enumeration
ain
enumeration
aio
enumeration
aip
enumeration
aiq
enumeration
air
enumeration
ais
enumeration
ait
enumeration
aiw
enumeration
aix
enumeration
aiy
enumeration
aja
enumeration
ajg
enumeration
aji
enumeration
ajn
enumeration
ajp
enumeration
ajt
enumeration
aju
enumeration
ajw
enumeration
ajz
enumeration
akb
enumeration
akc
enumeration
akd
enumeration
ake
enumeration
akf
enumeration
akg
enumeration
akh
enumeration
aki
enumeration
akj
enumeration
akk
enumeration
akl
enumeration
akm
enumeration
ako
enumeration
akp
enumeration
akq
enumeration
akr
enumeration
aks
enumeration
akt
enumeration
aku
enumeration
akv
enumeration
akw
enumeration
akx
enumeration
aky
enumeration
akz
enumeration
ala
enumeration
alc
enumeration
ald
enumeration
ale
enumeration
alf
enumeration
alg
enumeration
alh
enumeration
ali
enumeration
alj
enumeration
alk
enumeration
all
enumeration
alm
enumeration
aln
enumeration
alo
enumeration
alp
enumeration
alq
enumeration
alr
enumeration
als
enumeration
alt
enumeration
alu
enumeration
alv
enumeration
alw
enumeration
alx
enumeration
aly
enumeration
alz
enumeration
ama
enumeration
amb
enumeration
amc
enumeration
ame
enumeration
amf
enumeration
amg
enumeration
ami
enumeration
amj
enumeration
amk
enumeration
aml
enumeration
amm
enumeration
amn
enumeration
amo
enumeration
amp
enumeration
amq
enumeration
amr
enumeration
ams
enumeration
amt
enumeration
amu
enumeration
amv
enumeration
amw
enumeration
amx
enumeration
amy
enumeration
amz
enumeration
ana
enumeration
anb
enumeration
anc
enumeration
and
enumeration
ane
enumeration
anf
enumeration
ang
enumeration
anh
enumeration
ani
enumeration
anj
enumeration
ank
enumeration
anl
enumeration
anm
enumeration
ann
enumeration
ano
enumeration
anp
enumeration
anq
enumeration
anr
enumeration
ans
enumeration
ant
enumeration
anu
enumeration
anv
enumeration
anw
enumeration
anx
enumeration
any
enumeration
anz
enumeration
aoa
enumeration
aob
enumeration
aoc
enumeration
aod
enumeration
aoe
enumeration
aof
enumeration
aog
enumeration
aoh
enumeration
aoi
enumeration
aoj
enumeration
aok
enumeration
aol
enumeration
aom
enumeration
aon
enumeration
aor
enumeration
aos
enumeration
aot
enumeration
aou
enumeration
aox
enumeration
aoz
enumeration
apa
enumeration
apb
enumeration
apc
enumeration
apd
enumeration
ape
enumeration
apf
enumeration
apg
enumeration
aph
enumeration
api
enumeration
apj
enumeration
apk
enumeration
apl
enumeration
apm
enumeration
apn
enumeration
apo
enumeration
app
enumeration
apq
enumeration
apr
enumeration
aps
enumeration
apt
enumeration
apu
enumeration
apv
enumeration
apw
enumeration
apx
enumeration
apy
enumeration
apz
enumeration
aqa
enumeration
aqc
enumeration
aqd
enumeration
aqg
enumeration
aql
enumeration
aqm
enumeration
aqn
enumeration
aqp
enumeration
aqr
enumeration
aqt
enumeration
aqz
enumeration
arb
enumeration
arc
enumeration
ard
enumeration
are
enumeration
arh
enumeration
ari
enumeration
arj
enumeration
ark
enumeration
arl
enumeration
arn
enumeration
aro
enumeration
arp
enumeration
arq
enumeration
arr
enumeration
ars
enumeration
art
enumeration
aru
enumeration
arv
enumeration
arw
enumeration
arx
enumeration
ary
enumeration
arz
enumeration
asa
enumeration
asb
enumeration
asc
enumeration
asd
enumeration
ase
enumeration
asf
enumeration
asg
enumeration
ash
enumeration
asi
enumeration
asj
enumeration
ask
enumeration
asl
enumeration
asn
enumeration
aso
enumeration
asp
enumeration
asq
enumeration
asr
enumeration
ass
enumeration
ast
enumeration
asu
enumeration
asv
enumeration
asw
enumeration
asx
enumeration
asy
enumeration
asz
enumeration
ata
enumeration
atb
enumeration
atc
enumeration
atd
enumeration
ate
enumeration
atg
enumeration
ath
enumeration
ati
enumeration
atj
enumeration
atk
enumeration
atl
enumeration
atm
enumeration
atn
enumeration
ato
enumeration
atp
enumeration
atq
enumeration
atr
enumeration
ats
enumeration
att
enumeration
atu
enumeration
atv
enumeration
atw
enumeration
atx
enumeration
aty
enumeration
atz
enumeration
aua
enumeration
aub
enumeration
auc
enumeration
aud
enumeration
aue
enumeration
auf
enumeration
aug
enumeration
auh
enumeration
aui
enumeration
auj
enumeration
auk
enumeration
aul
enumeration
aum
enumeration
aun
enumeration
auo
enumeration
aup
enumeration
auq
enumeration
aur
enumeration
aus
enumeration
aut
enumeration
auu
enumeration
auw
enumeration
aux
enumeration
auy
enumeration
auz
enumeration
avb
enumeration
avd
enumeration
avi
enumeration
avk
enumeration
avl
enumeration
avm
enumeration
avn
enumeration
avo
enumeration
avs
enumeration
avt
enumeration
avu
enumeration
avv
enumeration
awa
enumeration
awb
enumeration
awc
enumeration
awd
enumeration
awe
enumeration
awg
enumeration
awh
enumeration
awi
enumeration
awk
enumeration
awm
enumeration
awn
enumeration
awo
enumeration
awr
enumeration
aws
enumeration
awt
enumeration
awu
enumeration
awv
enumeration
aww
enumeration
awx
enumeration
awy
enumeration
axb
enumeration
axe
enumeration
axg
enumeration
axk
enumeration
axl
enumeration
axm
enumeration
axx
enumeration
aya
enumeration
ayb
enumeration
ayc
enumeration
ayd
enumeration
aye
enumeration
ayg
enumeration
ayh
enumeration
ayi
enumeration
ayk
enumeration
ayl
enumeration
ayn
enumeration
ayo
enumeration
ayp
enumeration
ayq
enumeration
ayr
enumeration
ays
enumeration
ayt
enumeration
ayu
enumeration
ayy
enumeration
ayz
enumeration
aza
enumeration
azb
enumeration
azc
enumeration
azd
enumeration
azg
enumeration
azj
enumeration
azm
enumeration
azn
enumeration
azo
enumeration
azt
enumeration
azz
enumeration
baa
enumeration
bab
enumeration
bac
enumeration
bad
enumeration
bae
enumeration
baf
enumeration
bag
enumeration
bah
enumeration
bai
enumeration
baj
enumeration
bal
enumeration
ban
enumeration
bao
enumeration
bap
enumeration
bar
enumeration
bas
enumeration
bat
enumeration
bau
enumeration
bav
enumeration
baw
enumeration
bax
enumeration
bay
enumeration
bba
enumeration
bbb
enumeration
bbc
enumeration
bbd
enumeration
bbe
enumeration
bbf
enumeration
bbg
enumeration
bbh
enumeration
bbi
enumeration
bbj
enumeration
bbk
enumeration
bbl
enumeration
bbm
enumeration
bbn
enumeration
bbo
enumeration
bbp
enumeration
bbq
enumeration
bbr
enumeration
bbs
enumeration
bbt
enumeration
bbu
enumeration
bbv
enumeration
bbw
enumeration
bbx
enumeration
bby
enumeration
bbz
enumeration
bca
enumeration
bcb
enumeration
bcc
enumeration
bcd
enumeration
bce
enumeration
bcf
enumeration
bcg
enumeration
bch
enumeration
bci
enumeration
bcj
enumeration
bck
enumeration
bcl
enumeration
bcm
enumeration
bcn
enumeration
bco
enumeration
bcp
enumeration
bcq
enumeration
bcr
enumeration
bcs
enumeration
bct
enumeration
bcu
enumeration
bcv
enumeration
bcw
enumeration
bcy
enumeration
bcz
enumeration
bda
enumeration
bdb
enumeration
bdc
enumeration
bdd
enumeration
bde
enumeration
bdf
enumeration
bdg
enumeration
bdh
enumeration
bdi
enumeration
bdj
enumeration
bdk
enumeration
bdl
enumeration
bdm
enumeration
bdn
enumeration
bdo
enumeration
bdp
enumeration
bdq
enumeration
bdr
enumeration
bds
enumeration
bdt
enumeration
bdu
enumeration
bdv
enumeration
bdw
enumeration
bdx
enumeration
bdy
enumeration
bdz
enumeration
bea
enumeration
beb
enumeration
bec
enumeration
bed
enumeration
bee
enumeration
bef
enumeration
beg
enumeration
beh
enumeration
bei
enumeration
bej
enumeration
bek
enumeration
bem
enumeration
beo
enumeration
bep
enumeration
beq
enumeration
ber
enumeration
bes
enumeration
bet
enumeration
beu
enumeration
bev
enumeration
bew
enumeration
bex
enumeration
bey
enumeration
bez
enumeration
bfa
enumeration
bfb
enumeration
bfc
enumeration
bfd
enumeration
bfe
enumeration
bff
enumeration
bfg
enumeration
bfh
enumeration
bfi
enumeration
bfj
enumeration
bfk
enumeration
bfl
enumeration
bfm
enumeration
bfn
enumeration
bfo
enumeration
bfp
enumeration
bfq
enumeration
bfr
enumeration
bfs
enumeration
bft
enumeration
bfu
enumeration
bfw
enumeration
bfx
enumeration
bfy
enumeration
bfz
enumeration
bga
enumeration
bgb
enumeration
bgc
enumeration
bgd
enumeration
bge
enumeration
bgf
enumeration
bgg
enumeration
bgi
enumeration
bgj
enumeration
bgk
enumeration
bgl
enumeration
bgm
enumeration
bgn
enumeration
bgo
enumeration
bgp
enumeration
bgq
enumeration
bgr
enumeration
bgs
enumeration
bgt
enumeration
bgu
enumeration
bgv
enumeration
bgw
enumeration
bgx
enumeration
bgy
enumeration
bgz
enumeration
bha
enumeration
bhb
enumeration
bhc
enumeration
bhd
enumeration
bhe
enumeration
bhf
enumeration
bhg
enumeration
bhh
enumeration
bhi
enumeration
bhj
enumeration
bhl
enumeration
bhm
enumeration
bhn
enumeration
bho
enumeration
bhp
enumeration
bhq
enumeration
bhr
enumeration
bhs
enumeration
bht
enumeration
bhu
enumeration
bhv
enumeration
bhw
enumeration
bhx
enumeration
bhy
enumeration
bhz
enumeration
bia
enumeration
bib
enumeration
bic
enumeration
bid
enumeration
bie
enumeration
bif
enumeration
big
enumeration
bij
enumeration
bik
enumeration
bil
enumeration
bim
enumeration
bin
enumeration
bio
enumeration
bip
enumeration
biq
enumeration
bir
enumeration
bit
enumeration
biu
enumeration
biv
enumeration
biw
enumeration
bix
enumeration
biy
enumeration
biz
enumeration
bja
enumeration
bjb
enumeration
bjc
enumeration
bje
enumeration
bjf
enumeration
bjg
enumeration
bjh
enumeration
bji
enumeration
bjj
enumeration
bjk
enumeration
bjl
enumeration
bjm
enumeration
bjn
enumeration
bjo
enumeration
bjp
enumeration
bjr
enumeration
bjs
enumeration
bjt
enumeration
bju
enumeration
bjv
enumeration
bjw
enumeration
bjx
enumeration
bjy
enumeration
bjz
enumeration
bka
enumeration
bkc
enumeration
bkd
enumeration
bkf
enumeration
bkg
enumeration
bkh
enumeration
bki
enumeration
bkj
enumeration
bkk
enumeration
bkl
enumeration
bkm
enumeration
bkn
enumeration
bko
enumeration
bkp
enumeration
bkq
enumeration
bkr
enumeration
bks
enumeration
bkt
enumeration
bku
enumeration
bkv
enumeration
bkw
enumeration
bkx
enumeration
bky
enumeration
bkz
enumeration
bla
enumeration
blb
enumeration
blc
enumeration
bld
enumeration
ble
enumeration
blf
enumeration
blg
enumeration
blh
enumeration
bli
enumeration
blj
enumeration
blk
enumeration
bll
enumeration
blm
enumeration
bln
enumeration
blo
enumeration
blp
enumeration
blq
enumeration
blr
enumeration
bls
enumeration
blt
enumeration
blv
enumeration
blw
enumeration
blx
enumeration
bly
enumeration
blz
enumeration
bma
enumeration
bmb
enumeration
bmc
enumeration
bmd
enumeration
bme
enumeration
bmf
enumeration
bmg
enumeration
bmh
enumeration
bmi
enumeration
bmj
enumeration
bmk
enumeration
bml
enumeration
bmm
enumeration
bmn
enumeration
bmo
enumeration
bmp
enumeration
bmq
enumeration
bmr
enumeration
bms
enumeration
bmt
enumeration
bmu
enumeration
bmv
enumeration
bmw
enumeration
bmx
enumeration
bmy
enumeration
bmz
enumeration
bna
enumeration
bnb
enumeration
bnc
enumeration
bnd
enumeration
bne
enumeration
bnf
enumeration
bng
enumeration
bni
enumeration
bnj
enumeration
bnk
enumeration
bnl
enumeration
bnm
enumeration
bnn
enumeration
bno
enumeration
bnp
enumeration
bnq
enumeration
bnr
enumeration
bns
enumeration
bnt
enumeration
bnu
enumeration
bnv
enumeration
bnw
enumeration
bnx
enumeration
bny
enumeration
bnz
enumeration
boa
enumeration
bob
enumeration
boe
enumeration
bof
enumeration
bog
enumeration
boh
enumeration
boi
enumeration
boj
enumeration
bok
enumeration
bol
enumeration
bom
enumeration
bon
enumeration
boo
enumeration
bop
enumeration
boq
enumeration
bor
enumeration
bot
enumeration
bou
enumeration
bov
enumeration
bow
enumeration
box
enumeration
boy
enumeration
boz
enumeration
bpa
enumeration
bpb
enumeration
bpd
enumeration
bpg
enumeration
bph
enumeration
bpi
enumeration
bpj
enumeration
bpk
enumeration
bpl
enumeration
bpm
enumeration
bpn
enumeration
bpo
enumeration
bpp
enumeration
bpq
enumeration
bpr
enumeration
bps
enumeration
bpt
enumeration
bpu
enumeration
bpv
enumeration
bpw
enumeration
bpx
enumeration
bpy
enumeration
bpz
enumeration
bqa
enumeration
bqb
enumeration
bqc
enumeration
bqd
enumeration
bqf
enumeration
bqg
enumeration
bqh
enumeration
bqi
enumeration
bqj
enumeration
bqk
enumeration
bql
enumeration
bqm
enumeration
bqn
enumeration
bqo
enumeration
bqp
enumeration
bqq
enumeration
bqr
enumeration
bqs
enumeration
bqt
enumeration
bqu
enumeration
bqv
enumeration
bqw
enumeration
bqx
enumeration
bqy
enumeration
bqz
enumeration
bra
enumeration
brb
enumeration
brc
enumeration
brd
enumeration
brf
enumeration
brg
enumeration
brh
enumeration
bri
enumeration
brj
enumeration
brk
enumeration
brl
enumeration
brm
enumeration
brn
enumeration
bro
enumeration
brp
enumeration
brq
enumeration
brr
enumeration
brs
enumeration
brt
enumeration
bru
enumeration
brv
enumeration
brw
enumeration
brx
enumeration
bry
enumeration
brz
enumeration
bsa
enumeration
bsb
enumeration
bsc
enumeration
bse
enumeration
bsf
enumeration
bsg
enumeration
bsh
enumeration
bsi
enumeration
bsj
enumeration
bsk
enumeration
bsl
enumeration
bsm
enumeration
bsn
enumeration
bso
enumeration
bsp
enumeration
bsq
enumeration
bsr
enumeration
bss
enumeration
bst
enumeration
bsu
enumeration
bsv
enumeration
bsw
enumeration
bsx
enumeration
bsy
enumeration
bta
enumeration
btc
enumeration
btd
enumeration
bte
enumeration
btf
enumeration
btg
enumeration
bth
enumeration
bti
enumeration
btj
enumeration
btk
enumeration
btl
enumeration
btm
enumeration
btn
enumeration
bto
enumeration
btp
enumeration
btq
enumeration
btr
enumeration
bts
enumeration
btt
enumeration
btu
enumeration
btv
enumeration
btw
enumeration
btx
enumeration
bty
enumeration
btz
enumeration
bua
enumeration
bub
enumeration
buc
enumeration
bud
enumeration
bue
enumeration
buf
enumeration
bug
enumeration
buh
enumeration
bui
enumeration
buj
enumeration
buk
enumeration
bum
enumeration
bun
enumeration
buo
enumeration
bup
enumeration
buq
enumeration
bus
enumeration
but
enumeration
buu
enumeration
buv
enumeration
buw
enumeration
bux
enumeration
buy
enumeration
buz
enumeration
bva
enumeration
bvb
enumeration
bvc
enumeration
bvd
enumeration
bve
enumeration
bvf
enumeration
bvg
enumeration
bvh
enumeration
bvi
enumeration
bvj
enumeration
bvk
enumeration
bvl
enumeration
bvm
enumeration
bvn
enumeration
bvo
enumeration
bvp
enumeration
bvq
enumeration
bvr
enumeration
bvt
enumeration
bvu
enumeration
bvv
enumeration
bvw
enumeration
bvx
enumeration
bvy
enumeration
bvz
enumeration
bwa
enumeration
bwb
enumeration
bwc
enumeration
bwd
enumeration
bwe
enumeration
bwf
enumeration
bwg
enumeration
bwh
enumeration
bwi
enumeration
bwj
enumeration
bwk
enumeration
bwl
enumeration
bwm
enumeration
bwn
enumeration
bwo
enumeration
bwp
enumeration
bwq
enumeration
bwr
enumeration
bws
enumeration
bwt
enumeration
bwu
enumeration
bww
enumeration
bwx
enumeration
bwy
enumeration
bwz
enumeration
bxa
enumeration
bxb
enumeration
bxc
enumeration
bxd
enumeration
bxe
enumeration
bxf
enumeration
bxg
enumeration
bxh
enumeration
bxi
enumeration
bxj
enumeration
bxk
enumeration
bxl
enumeration
bxm
enumeration
bxn
enumeration
bxo
enumeration
bxp
enumeration
bxq
enumeration
bxr
enumeration
bxs
enumeration
bxu
enumeration
bxv
enumeration
bxw
enumeration
bxx
enumeration
bxz
enumeration
bya
enumeration
byb
enumeration
byc
enumeration
byd
enumeration
bye
enumeration
byf
enumeration
byg
enumeration
byh
enumeration
byi
enumeration
byj
enumeration
byk
enumeration
byl
enumeration
bym
enumeration
byn
enumeration
byo
enumeration
byp
enumeration
byq
enumeration
byr
enumeration
bys
enumeration
byt
enumeration
byv
enumeration
byw
enumeration
byx
enumeration
byy
enumeration
byz
enumeration
bza
enumeration
bzb
enumeration
bzc
enumeration
bzd
enumeration
bze
enumeration
bzf
enumeration
bzg
enumeration
bzh
enumeration
bzi
enumeration
bzj
enumeration
bzk
enumeration
bzl
enumeration
bzm
enumeration
bzn
enumeration
bzo
enumeration
bzp
enumeration
bzq
enumeration
bzr
enumeration
bzs
enumeration
bzt
enumeration
bzu
enumeration
bzv
enumeration
bzw
enumeration
bzx
enumeration
bzy
enumeration
bzz
enumeration
caa
enumeration
cab
enumeration
cac
enumeration
cad
enumeration
cae
enumeration
caf
enumeration
cag
enumeration
cah
enumeration
cai
enumeration
caj
enumeration
cak
enumeration
cal
enumeration
cam
enumeration
can
enumeration
cao
enumeration
cap
enumeration
caq
enumeration
car
enumeration
cas
enumeration
cau
enumeration
cav
enumeration
caw
enumeration
cax
enumeration
cay
enumeration
caz
enumeration
cba
enumeration
cbb
enumeration
cbc
enumeration
cbd
enumeration
cbe
enumeration
cbg
enumeration
cbh
enumeration
cbi
enumeration
cbj
enumeration
cbk
enumeration
cbl
enumeration
cbn
enumeration
cbo
enumeration
cbr
enumeration
cbs
enumeration
cbt
enumeration
cbu
enumeration
cbv
enumeration
cbw
enumeration
cby
enumeration
cca
enumeration
ccc
enumeration
ccd
enumeration
cce
enumeration
ccg
enumeration
cch
enumeration
ccj
enumeration
ccl
enumeration
ccm
enumeration
ccn
enumeration
cco
enumeration
ccp
enumeration
ccr
enumeration
ccs
enumeration
cda
enumeration
cdc
enumeration
cdd
enumeration
cde
enumeration
cdf
enumeration
cdg
enumeration
cdh
enumeration
cdi
enumeration
cdj
enumeration
cdm
enumeration
cdn
enumeration
cdo
enumeration
cdr
enumeration
cds
enumeration
cdy
enumeration
cdz
enumeration
cea
enumeration
ceb
enumeration
ceg
enumeration
cek
enumeration
cel
enumeration
cen
enumeration
cet
enumeration
cfa
enumeration
cfd
enumeration
cfg
enumeration
cfm
enumeration
cga
enumeration
cgc
enumeration
cgg
enumeration
cgk
enumeration
chb
enumeration
chc
enumeration
chd
enumeration
chf
enumeration
chg
enumeration
chh
enumeration
chj
enumeration
chk
enumeration
chl
enumeration
chm
enumeration
chn
enumeration
cho
enumeration
chp
enumeration
chq
enumeration
chr
enumeration
cht
enumeration
chw
enumeration
chx
enumeration
chy
enumeration
chz
enumeration
cia
enumeration
cib
enumeration
cic
enumeration
cid
enumeration
cie
enumeration
cih
enumeration
cik
enumeration
cim
enumeration
cin
enumeration
cip
enumeration
cir
enumeration
ciw
enumeration
ciy
enumeration
cja
enumeration
cje
enumeration
cjh
enumeration
cji
enumeration
cjk
enumeration
cjm
enumeration
cjn
enumeration
cjo
enumeration
cjp
enumeration
cjs
enumeration
cjv
enumeration
cjy
enumeration
ckb
enumeration
ckh
enumeration
ckl
enumeration
ckn
enumeration
cko
enumeration
ckq
enumeration
ckr
enumeration
cks
enumeration
ckt
enumeration
cku
enumeration
ckv
enumeration
ckx
enumeration
cky
enumeration
ckz
enumeration
cla
enumeration
clc
enumeration
cld
enumeration
cle
enumeration
clh
enumeration
cli
enumeration
clj
enumeration
clk
enumeration
cll
enumeration
clm
enumeration
clo
enumeration
clt
enumeration
clu
enumeration
clw
enumeration
cly
enumeration
cma
enumeration
cmc
enumeration
cme
enumeration
cmg
enumeration
cmi
enumeration
cml
enumeration
cmm
enumeration
cmn
enumeration
cmo
enumeration
cmr
enumeration
cms
enumeration
cmt
enumeration
cna
enumeration
cnb
enumeration
cnc
enumeration
cng
enumeration
cnh
enumeration
cni
enumeration
cnk
enumeration
cnl
enumeration
cno
enumeration
cns
enumeration
cnt
enumeration
cnu
enumeration
cnw
enumeration
cnx
enumeration
coa
enumeration
cob
enumeration
coc
enumeration
cod
enumeration
coe
enumeration
cof
enumeration
cog
enumeration
coh
enumeration
coj
enumeration
cok
enumeration
col
enumeration
com
enumeration
con
enumeration
coo
enumeration
cop
enumeration
coq
enumeration
cot
enumeration
cou
enumeration
cov
enumeration
cow
enumeration
cox
enumeration
coy
enumeration
coz
enumeration
cpa
enumeration
cpb
enumeration
cpc
enumeration
cpe
enumeration
cpf
enumeration
cpg
enumeration
cpi
enumeration
cpn
enumeration
cpo
enumeration
cpp
enumeration
cps
enumeration
cpu
enumeration
cpx
enumeration
cpy
enumeration
cqd
enumeration
cqu
enumeration
cra
enumeration
crb
enumeration
crc
enumeration
crd
enumeration
crf
enumeration
crg
enumeration
crh
enumeration
cri
enumeration
crj
enumeration
crk
enumeration
crl
enumeration
crm
enumeration
crn
enumeration
cro
enumeration
crp
enumeration
crq
enumeration
crr
enumeration
crs
enumeration
crt
enumeration
crv
enumeration
crw
enumeration
crx
enumeration
cry
enumeration
crz
enumeration
csa
enumeration
csb
enumeration
csc
enumeration
csd
enumeration
cse
enumeration
csf
enumeration
csg
enumeration
csh
enumeration
csi
enumeration
csj
enumeration
csk
enumeration
csl
enumeration
csm
enumeration
csn
enumeration
cso
enumeration
csq
enumeration
csr
enumeration
css
enumeration
cst
enumeration
csu
enumeration
csv
enumeration
csw
enumeration
csy
enumeration
csz
enumeration
cta
enumeration
ctc
enumeration
ctd
enumeration
cte
enumeration
ctg
enumeration
cth
enumeration
ctl
enumeration
ctm
enumeration
ctn
enumeration
cto
enumeration
ctp
enumeration
cts
enumeration
ctt
enumeration
ctu
enumeration
ctz
enumeration
cua
enumeration
cub
enumeration
cuc
enumeration
cug
enumeration
cuh
enumeration
cui
enumeration
cuj
enumeration
cuk
enumeration
cul
enumeration
cum
enumeration
cuo
enumeration
cup
enumeration
cuq
enumeration
cur
enumeration
cus
enumeration
cut
enumeration
cuu
enumeration
cuv
enumeration
cuw
enumeration
cux
enumeration
cvg
enumeration
cvn
enumeration
cwa
enumeration
cwb
enumeration
cwd
enumeration
cwe
enumeration
cwg
enumeration
cwt
enumeration
cya
enumeration
cyb
enumeration
cyo
enumeration
czh
enumeration
czk
enumeration
czn
enumeration
czo
enumeration
czt
enumeration
daa
enumeration
dac
enumeration
dad
enumeration
dae
enumeration
dag
enumeration
dah
enumeration
dai
enumeration
daj
enumeration
dak
enumeration
dal
enumeration
dam
enumeration
dao
enumeration
daq
enumeration
dar
enumeration
das
enumeration
dau
enumeration
dav
enumeration
daw
enumeration
dax
enumeration
day
enumeration
daz
enumeration
dba
enumeration
dbb
enumeration
dbd
enumeration
dbe
enumeration
dbf
enumeration
dbg
enumeration
dbi
enumeration
dbj
enumeration
dbl
enumeration
dbm
enumeration
dbn
enumeration
dbo
enumeration
dbp
enumeration
dbq
enumeration
dbr
enumeration
dbt
enumeration
dbu
enumeration
dbv
enumeration
dbw
enumeration
dby
enumeration
dcc
enumeration
dcr
enumeration
dda
enumeration
ddd
enumeration
dde
enumeration
ddg
enumeration
ddi
enumeration
ddj
enumeration
ddn
enumeration
ddo
enumeration
ddr
enumeration
dds
enumeration
ddw
enumeration
dec
enumeration
ded
enumeration
dee
enumeration
def
enumeration
deg
enumeration
deh
enumeration
dei
enumeration
dek
enumeration
del
enumeration
dem
enumeration
den
enumeration
dep
enumeration
deq
enumeration
der
enumeration
des
enumeration
dev
enumeration
dez
enumeration
dga
enumeration
dgb
enumeration
dgc
enumeration
dgd
enumeration
dge
enumeration
dgg
enumeration
dgh
enumeration
dgi
enumeration
dgk
enumeration
dgl
enumeration
dgn
enumeration
dgo
enumeration
dgr
enumeration
dgs
enumeration
dgt
enumeration
dgu
enumeration
dgw
enumeration
dgx
enumeration
dgz
enumeration
dhd
enumeration
dhg
enumeration
dhi
enumeration
dhl
enumeration
dhm
enumeration
dhn
enumeration
dho
enumeration
dhr
enumeration
dhs
enumeration
dhu
enumeration
dhv
enumeration
dhw
enumeration
dhx
enumeration
dia
enumeration
dib
enumeration
dic
enumeration
did
enumeration
dif
enumeration
dig
enumeration
dih
enumeration
dii
enumeration
dij
enumeration
dik
enumeration
dil
enumeration
dim
enumeration
din
enumeration
dio
enumeration
dip
enumeration
diq
enumeration
dir
enumeration
dis
enumeration
dit
enumeration
diu
enumeration
diw
enumeration
dix
enumeration
diy
enumeration
diz
enumeration
dja
enumeration
djb
enumeration
djc
enumeration
djd
enumeration
dje
enumeration
djf
enumeration
dji
enumeration
djj
enumeration
djk
enumeration
djm
enumeration
djn
enumeration
djo
enumeration
djr
enumeration
dju
enumeration
djw
enumeration
dka
enumeration
dkk
enumeration
dkr
enumeration
dks
enumeration
dkx
enumeration
dlg
enumeration
dlk
enumeration
dlm
enumeration
dln
enumeration
dma
enumeration
dmb
enumeration
dmc
enumeration
dmd
enumeration
dme
enumeration
dmg
enumeration
dmk
enumeration
dml
enumeration
dmm
enumeration
dmn
enumeration
dmo
enumeration
dmr
enumeration
dms
enumeration
dmu
enumeration
dmv
enumeration
dmw
enumeration
dmx
enumeration
dmy
enumeration
dna
enumeration
dnd
enumeration
dne
enumeration
dng
enumeration
dni
enumeration
dnj
enumeration
dnk
enumeration
dnn
enumeration
dnr
enumeration
dnt
enumeration
dnu
enumeration
dnv
enumeration
dnw
enumeration
dny
enumeration
doa
enumeration
dob
enumeration
doc
enumeration
doe
enumeration
dof
enumeration
doh
enumeration
doi
enumeration
dok
enumeration
dol
enumeration
don
enumeration
doo
enumeration
dop
enumeration
doq
enumeration
dor
enumeration
dos
enumeration
dot
enumeration
dov
enumeration
dow
enumeration
dox
enumeration
doy
enumeration
doz
enumeration
dpp
enumeration
dra
enumeration
drb
enumeration
drc
enumeration
drd
enumeration
dre
enumeration
drg
enumeration
dri
enumeration
drl
enumeration
drn
enumeration
dro
enumeration
drq
enumeration
drr
enumeration
drs
enumeration
drt
enumeration
dru
enumeration
dry
enumeration
dsb
enumeration
dse
enumeration
dsh
enumeration
dsi
enumeration
dsl
enumeration
dsn
enumeration
dso
enumeration
dsq
enumeration
dta
enumeration
dtb
enumeration
dtd
enumeration
dth
enumeration
dti
enumeration
dtk
enumeration
dtm
enumeration
dto
enumeration
dtp
enumeration
dtr
enumeration
dts
enumeration
dtt
enumeration
dtu
enumeration
dty
enumeration
dua
enumeration
dub
enumeration
duc
enumeration
dud
enumeration
due
enumeration
duf
enumeration
dug
enumeration
duh
enumeration
dui
enumeration
duj
enumeration
duk
enumeration
dul
enumeration
dum
enumeration
dun
enumeration
duo
enumeration
dup
enumeration
duq
enumeration
dur
enumeration
dus
enumeration
duu
enumeration
duv
enumeration
duw
enumeration
dux
enumeration
duy
enumeration
duz
enumeration
dva
enumeration
dwa
enumeration
dwr
enumeration
dws
enumeration
dww
enumeration
dya
enumeration
dyb
enumeration
dyd
enumeration
dyg
enumeration
dyi
enumeration
dym
enumeration
dyn
enumeration
dyo
enumeration
dyu
enumeration
dyy
enumeration
dza
enumeration
dzd
enumeration
dze
enumeration
dzg
enumeration
dzl
enumeration
dzn
enumeration
eaa
enumeration
ebg
enumeration
ebk
enumeration
ebo
enumeration
ebr
enumeration
ebu
enumeration
ecr
enumeration
ecs
enumeration
ecy
enumeration
eee
enumeration
efa
enumeration
efe
enumeration
efi
enumeration
ega
enumeration
egl
enumeration
ego
enumeration
egx
enumeration
egy
enumeration
ehu
enumeration
eip
enumeration
eit
enumeration
eiv
enumeration
eja
enumeration
eka
enumeration
ekc
enumeration
eke
enumeration
ekg
enumeration
eki
enumeration
ekk
enumeration
ekl
enumeration
ekm
enumeration
eko
enumeration
ekp
enumeration
ekr
enumeration
eky
enumeration
ele
enumeration
elh
enumeration
eli
enumeration
elk
enumeration
elm
enumeration
elo
enumeration
elu
enumeration
elx
enumeration
ema
enumeration
emb
enumeration
eme
enumeration
emg
enumeration
emi
enumeration
emk
enumeration
emm
enumeration
emn
enumeration
emp
enumeration
ems
enumeration
emu
enumeration
emw
enumeration
emx
enumeration
emy
enumeration
ena
enumeration
enb
enumeration
enc
enumeration
end
enumeration
enf
enumeration
enh
enumeration
enl
enumeration
enm
enumeration
enn
enumeration
eno
enumeration
enq
enumeration
enr
enumeration
enu
enumeration
env
enumeration
enw
enumeration
enx
enumeration
eot
enumeration
epi
enumeration
era
enumeration
erg
enumeration
erh
enumeration
eri
enumeration
erk
enumeration
ero
enumeration
err
enumeration
ers
enumeration
ert
enumeration
erw
enumeration
ese
enumeration
esh
enumeration
esi
enumeration
esk
enumeration
esl
enumeration
esm
enumeration
esn
enumeration
eso
enumeration
esq
enumeration
ess
enumeration
esu
enumeration
esx
enumeration
esy
enumeration
etb
enumeration
etc
enumeration
eth
enumeration
etn
enumeration
eto
enumeration
etr
enumeration
ets
enumeration
ett
enumeration
etu
enumeration
etx
enumeration
etz
enumeration
euq
enumeration
eve
enumeration
evh
enumeration
evn
enumeration
ewo
enumeration
ext
enumeration
eya
enumeration
eyo
enumeration
eza
enumeration
eze
enumeration
faa
enumeration
fab
enumeration
fad
enumeration
faf
enumeration
fag
enumeration
fah
enumeration
fai
enumeration
faj
enumeration
fak
enumeration
fal
enumeration
fam
enumeration
fan
enumeration
fap
enumeration
far
enumeration
fat
enumeration
fau
enumeration
fax
enumeration
fay
enumeration
faz
enumeration
fbl
enumeration
fcs
enumeration
fer
enumeration
ffi
enumeration
ffm
enumeration
fgr
enumeration
fia
enumeration
fie
enumeration
fil
enumeration
fip
enumeration
fir
enumeration
fit
enumeration
fiu
enumeration
fiw
enumeration
fkk
enumeration
fkv
enumeration
fla
enumeration
flh
enumeration
fli
enumeration
fll
enumeration
fln
enumeration
flr
enumeration
fly
enumeration
fmp
enumeration
fmu
enumeration
fng
enumeration
fni
enumeration
fod
enumeration
foi
enumeration
fom
enumeration
fon
enumeration
for
enumeration
fos
enumeration
fox
enumeration
fpe
enumeration
fqs
enumeration
frc
enumeration
frd
enumeration
frk
enumeration
frm
enumeration
fro
enumeration
frp
enumeration
frq
enumeration
frr
enumeration
frs
enumeration
frt
enumeration
fse
enumeration
fsl
enumeration
fss
enumeration
fub
enumeration
fuc
enumeration
fud
enumeration
fue
enumeration
fuf
enumeration
fuh
enumeration
fui
enumeration
fuj
enumeration
fum
enumeration
fun
enumeration
fuq
enumeration
fur
enumeration
fut
enumeration
fuu
enumeration
fuv
enumeration
fuy
enumeration
fvr
enumeration
fwa
enumeration
fwe
enumeration
gaa
enumeration
gab
enumeration
gac
enumeration
gad
enumeration
gae
enumeration
gaf
enumeration
gag
enumeration
gah
enumeration
gai
enumeration
gaj
enumeration
gak
enumeration
gal
enumeration
gam
enumeration
gan
enumeration
gao
enumeration
gap
enumeration
gaq
enumeration
gar
enumeration
gas
enumeration
gat
enumeration
gau
enumeration
gaw
enumeration
gax
enumeration
gay
enumeration
gaz
enumeration
gba
enumeration
gbb
enumeration
gbd
enumeration
gbe
enumeration
gbf
enumeration
gbg
enumeration
gbh
enumeration
gbi
enumeration
gbj
enumeration
gbk
enumeration
gbl
enumeration
gbm
enumeration
gbn
enumeration
gbo
enumeration
gbp
enumeration
gbq
enumeration
gbr
enumeration
gbs
enumeration
gbu
enumeration
gbv
enumeration
gbw
enumeration
gbx
enumeration
gby
enumeration
gbz
enumeration
gcc
enumeration
gcd
enumeration
gce
enumeration
gcf
enumeration
gcl
enumeration
gcn
enumeration
gcr
enumeration
gct
enumeration
gda
enumeration
gdb
enumeration
gdc
enumeration
gdd
enumeration
gde
enumeration
gdf
enumeration
gdg
enumeration
gdh
enumeration
gdi
enumeration
gdj
enumeration
gdk
enumeration
gdl
enumeration
gdm
enumeration
gdn
enumeration
gdo
enumeration
gdq
enumeration
gdr
enumeration
gds
enumeration
gdt
enumeration
gdu
enumeration
gdx
enumeration
gea
enumeration
geb
enumeration
gec
enumeration
ged
enumeration
geg
enumeration
geh
enumeration
gei
enumeration
gej
enumeration
gek
enumeration
gel
enumeration
gem
enumeration
geq
enumeration
ges
enumeration
gev
enumeration
gew
enumeration
gex
enumeration
gey
enumeration
gez
enumeration
gfk
enumeration
gft
enumeration
gfx
enumeration
gga
enumeration
ggb
enumeration
ggd
enumeration
gge
enumeration
ggg
enumeration
ggk
enumeration
ggl
enumeration
ggn
enumeration
ggo
enumeration
ggt
enumeration
ggu
enumeration
ggw
enumeration
gha
enumeration
ghc
enumeration
ghe
enumeration
ghh
enumeration
ghk
enumeration
ghl
enumeration
ghn
enumeration
gho
enumeration
ghr
enumeration
ghs
enumeration
ght
enumeration
gia
enumeration
gib
enumeration
gic
enumeration
gid
enumeration
gig
enumeration
gih
enumeration
gil
enumeration
gim
enumeration
gin
enumeration
gip
enumeration
giq
enumeration
gir
enumeration
gis
enumeration
git
enumeration
giu
enumeration
giw
enumeration
gix
enumeration
giy
enumeration
giz
enumeration
gji
enumeration
gjk
enumeration
gjm
enumeration
gjn
enumeration
gju
enumeration
gka
enumeration
gke
enumeration
gkn
enumeration
gko
enumeration
gkp
enumeration
glc
enumeration
gld
enumeration
glh
enumeration
gli
enumeration
glj
enumeration
glk
enumeration
gll
enumeration
glo
enumeration
glr
enumeration
glu
enumeration
glw
enumeration
gly
enumeration
gma
enumeration
gmb
enumeration
gmd
enumeration
gme
enumeration
gmg
enumeration
gmh
enumeration
gml
enumeration
gmm
enumeration
gmn
enumeration
gmq
enumeration
gmu
enumeration
gmv
enumeration
gmw
enumeration
gmx
enumeration
gmy
enumeration
gmz
enumeration
gna
enumeration
gnb
enumeration
gnc
enumeration
gnd
enumeration
gne
enumeration
gng
enumeration
gnh
enumeration
gni
enumeration
gnk
enumeration
gnl
enumeration
gnm
enumeration
gnn
enumeration
gno
enumeration
gnq
enumeration
gnr
enumeration
gnt
enumeration
gnu
enumeration
gnw
enumeration
gnz
enumeration
goa
enumeration
gob
enumeration
goc
enumeration
god
enumeration
goe
enumeration
gof
enumeration
gog
enumeration
goh
enumeration
goi
enumeration
goj
enumeration
gok
enumeration
gol
enumeration
gom
enumeration
gon
enumeration
goo
enumeration
gop
enumeration
goq
enumeration
gor
enumeration
gos
enumeration
got
enumeration
gou
enumeration
gow
enumeration
gox
enumeration
goy
enumeration
goz
enumeration
gpa
enumeration
gpe
enumeration
gpn
enumeration
gqa
enumeration
gqi
enumeration
gqn
enumeration
gqr
enumeration
gqu
enumeration
gra
enumeration
grb
enumeration
grc
enumeration
grd
enumeration
grg
enumeration
grh
enumeration
gri
enumeration
grj
enumeration
grk
enumeration
grm
enumeration
gro
enumeration
grq
enumeration
grr
enumeration
grs
enumeration
grt
enumeration
gru
enumeration
grv
enumeration
grw
enumeration
grx
enumeration
gry
enumeration
grz
enumeration
gse
enumeration
gsg
enumeration
gsl
enumeration
gsm
enumeration
gsn
enumeration
gso
enumeration
gsp
enumeration
gss
enumeration
gsw
enumeration
gta
enumeration
gti
enumeration
gtu
enumeration
gua
enumeration
gub
enumeration
guc
enumeration
gud
enumeration
gue
enumeration
guf
enumeration
gug
enumeration
guh
enumeration
gui
enumeration
guk
enumeration
gul
enumeration
gum
enumeration
gun
enumeration
guo
enumeration
gup
enumeration
guq
enumeration
gur
enumeration
gus
enumeration
gut
enumeration
guu
enumeration
guv
enumeration
guw
enumeration
gux
enumeration
guz
enumeration
gva
enumeration
gvc
enumeration
gve
enumeration
gvf
enumeration
gvj
enumeration
gvl
enumeration
gvm
enumeration
gvn
enumeration
gvo
enumeration
gvp
enumeration
gvr
enumeration
gvs
enumeration
gvy
enumeration
gwa
enumeration
gwb
enumeration
gwc
enumeration
gwd
enumeration
gwe
enumeration
gwf
enumeration
gwg
enumeration
gwi
enumeration
gwj
enumeration
gwm
enumeration
gwn
enumeration
gwr
enumeration
gwt
enumeration
gwu
enumeration
gww
enumeration
gwx
enumeration
gxx
enumeration
gya
enumeration
gyb
enumeration
gyd
enumeration
gye
enumeration
gyf
enumeration
gyg
enumeration
gyi
enumeration
gyl
enumeration
gym
enumeration
gyn
enumeration
gyr
enumeration
gyy
enumeration
gza
enumeration
gzi
enumeration
gzn
enumeration
haa
enumeration
hab
enumeration
hac
enumeration
had
enumeration
hae
enumeration
haf
enumeration
hag
enumeration
hah
enumeration
hai
enumeration
haj
enumeration
hak
enumeration
hal
enumeration
ham
enumeration
han
enumeration
hao
enumeration
hap
enumeration
haq
enumeration
har
enumeration
has
enumeration
hav
enumeration
haw
enumeration
hax
enumeration
hay
enumeration
haz
enumeration
hba
enumeration
hbb
enumeration
hbn
enumeration
hbo
enumeration
hbu
enumeration
hca
enumeration
hch
enumeration
hdn
enumeration
hds
enumeration
hdy
enumeration
hea
enumeration
hed
enumeration
heg
enumeration
heh
enumeration
hei
enumeration
hem
enumeration
hgm
enumeration
hgw
enumeration
hhi
enumeration
hhr
enumeration
hhy
enumeration
hia
enumeration
hib
enumeration
hid
enumeration
hif
enumeration
hig
enumeration
hih
enumeration
hii
enumeration
hij
enumeration
hik
enumeration
hil
enumeration
him
enumeration
hio
enumeration
hir
enumeration
hit
enumeration
hiw
enumeration
hix
enumeration
hji
enumeration
hka
enumeration
hke
enumeration
hkk
enumeration
hks
enumeration
hla
enumeration
hlb
enumeration
hld
enumeration
hle
enumeration
hlt
enumeration
hlu
enumeration
hma
enumeration
hmb
enumeration
hmc
enumeration
hmd
enumeration
hme
enumeration
hmf
enumeration
hmg
enumeration
hmh
enumeration
hmi
enumeration
hmj
enumeration
hmk
enumeration
hml
enumeration
hmm
enumeration
hmn
enumeration
hmp
enumeration
hmq
enumeration
hmr
enumeration
hms
enumeration
hmt
enumeration
hmu
enumeration
hmv
enumeration
hmw
enumeration
hmx
enumeration
hmy
enumeration
hmz
enumeration
hna
enumeration
hnd
enumeration
hne
enumeration
hnh
enumeration
hni
enumeration
hnj
enumeration
hnn
enumeration
hno
enumeration
hns
enumeration
hnu
enumeration
hoa
enumeration
hob
enumeration
hoc
enumeration
hod
enumeration
hoe
enumeration
hoh
enumeration
hoi
enumeration
hoj
enumeration
hok
enumeration
hol
enumeration
hom
enumeration
hoo
enumeration
hop
enumeration
hor
enumeration
hos
enumeration
hot
enumeration
hov
enumeration
how
enumeration
hoy
enumeration
hoz
enumeration
hpo
enumeration
hps
enumeration
hra
enumeration
hrc
enumeration
hre
enumeration
hrk
enumeration
hrm
enumeration
hro
enumeration
hrp
enumeration
hrt
enumeration
hru
enumeration
hrw
enumeration
hrx
enumeration
hrz
enumeration
hsb
enumeration
hsh
enumeration
hsl
enumeration
hsn
enumeration
hss
enumeration
hti
enumeration
hto
enumeration
hts
enumeration
htu
enumeration
htx
enumeration
hub
enumeration
huc
enumeration
hud
enumeration
hue
enumeration
huf
enumeration
hug
enumeration
huh
enumeration
hui
enumeration
huj
enumeration
huk
enumeration
hul
enumeration
hum
enumeration
huo
enumeration
hup
enumeration
huq
enumeration
hur
enumeration
hus
enumeration
hut
enumeration
huu
enumeration
huv
enumeration
huw
enumeration
hux
enumeration
huy
enumeration
huz
enumeration
hvc
enumeration
hve
enumeration
hvk
enumeration
hvn
enumeration
hvv
enumeration
hwa
enumeration
hwc
enumeration
hwo
enumeration
hya
enumeration
hyx
enumeration
iai
enumeration
ian
enumeration
iap
enumeration
iar
enumeration
iba
enumeration
ibb
enumeration
ibd
enumeration
ibe
enumeration
ibg
enumeration
ibl
enumeration
ibm
enumeration
ibn
enumeration
ibr
enumeration
ibu
enumeration
iby
enumeration
ica
enumeration
ich
enumeration
icl
enumeration
icr
enumeration
ida
enumeration
idb
enumeration
idc
enumeration
idd
enumeration
ide
enumeration
idi
enumeration
idr
enumeration
ids
enumeration
idt
enumeration
idu
enumeration
ifa
enumeration
ifb
enumeration
ife
enumeration
iff
enumeration
ifk
enumeration
ifm
enumeration
ifu
enumeration
ify
enumeration
igb
enumeration
ige
enumeration
igg
enumeration
igl
enumeration
igm
enumeration
ign
enumeration
igo
enumeration
igs
enumeration
igw
enumeration
ihb
enumeration
ihi
enumeration
ihp
enumeration
ihw
enumeration
iin
enumeration
iir
enumeration
ijc
enumeration
ije
enumeration
ijj
enumeration
ijn
enumeration
ijo
enumeration
ijs
enumeration
ike
enumeration
iki
enumeration
ikk
enumeration
ikl
enumeration
iko
enumeration
ikp
enumeration
ikr
enumeration
ikt
enumeration
ikv
enumeration
ikw
enumeration
ikx
enumeration
ikz
enumeration
ila
enumeration
ilb
enumeration
ilg
enumeration
ili
enumeration
ilk
enumeration
ill
enumeration
ilo
enumeration
ils
enumeration
ilu
enumeration
ilv
enumeration
ima
enumeration
ime
enumeration
imi
enumeration
iml
enumeration
imn
enumeration
imo
enumeration
imr
enumeration
ims
enumeration
imy
enumeration
inb
enumeration
inc
enumeration
ine
enumeration
ing
enumeration
inh
enumeration
inj
enumeration
inl
enumeration
inm
enumeration
inn
enumeration
ino
enumeration
inp
enumeration
ins
enumeration
int
enumeration
inz
enumeration
ior
enumeration
iou
enumeration
iow
enumeration
ipi
enumeration
ipo
enumeration
iqu
enumeration
iqw
enumeration
ira
enumeration
ire
enumeration
irh
enumeration
iri
enumeration
irk
enumeration
irn
enumeration
iro
enumeration
irr
enumeration
iru
enumeration
irx
enumeration
iry
enumeration
isa
enumeration
isc
enumeration
isd
enumeration
ise
enumeration
isg
enumeration
ish
enumeration
isi
enumeration
isk
enumeration
ism
enumeration
isn
enumeration
iso
enumeration
isr
enumeration
ist
enumeration
isu
enumeration
itb
enumeration
itc
enumeration
ite
enumeration
iti
enumeration
itk
enumeration
itl
enumeration
itm
enumeration
ito
enumeration
itr
enumeration
its
enumeration
itt
enumeration
itv
enumeration
itw
enumeration
itx
enumeration
ity
enumeration
itz
enumeration
ium
enumeration
ivb
enumeration
ivv
enumeration
iwk
enumeration
iwm
enumeration
iwo
enumeration
iws
enumeration
ixc
enumeration
ixl
enumeration
iya
enumeration
iyo
enumeration
iyx
enumeration
izh
enumeration
izr
enumeration
izz
enumeration
jaa
enumeration
jab
enumeration
jac
enumeration
jad
enumeration
jae
enumeration
jaf
enumeration
jah
enumeration
jaj
enumeration
jak
enumeration
jal
enumeration
jam
enumeration
jan
enumeration
jao
enumeration
jaq
enumeration
jas
enumeration
jat
enumeration
jau
enumeration
jax
enumeration
jay
enumeration
jaz
enumeration
jbe
enumeration
jbi
enumeration
jbj
enumeration
jbk
enumeration
jbn
enumeration
jbo
enumeration
jbr
enumeration
jbt
enumeration
jbu
enumeration
jbw
enumeration
jcs
enumeration
jct
enumeration
jda
enumeration
jdg
enumeration
jdt
enumeration
jeb
enumeration
jee
enumeration
jeg
enumeration
jeh
enumeration
jei
enumeration
jek
enumeration
jel
enumeration
jen
enumeration
jer
enumeration
jet
enumeration
jeu
enumeration
jgb
enumeration
jge
enumeration
jgk
enumeration
jgo
enumeration
jhi
enumeration
jhs
enumeration
jia
enumeration
jib
enumeration
jic
enumeration
jid
enumeration
jie
enumeration
jig
enumeration
jih
enumeration
jii
enumeration
jil
enumeration
jim
enumeration
jio
enumeration
jiq
enumeration
jit
enumeration
jiu
enumeration
jiv
enumeration
jiy
enumeration
jjr
enumeration
jkm
enumeration
jko
enumeration
jkp
enumeration
jkr
enumeration
jku
enumeration
jle
enumeration
jls
enumeration
jma
enumeration
jmb
enumeration
jmc
enumeration
jmd
enumeration
jmi
enumeration
jml
enumeration
jmn
enumeration
jmr
enumeration
jms
enumeration
jmw
enumeration
jmx
enumeration
jna
enumeration
jnd
enumeration
jng
enumeration
jni
enumeration
jnj
enumeration
jnl
enumeration
jns
enumeration
job
enumeration
jod
enumeration
jor
enumeration
jos
enumeration
jow
enumeration
jpa
enumeration
jpr
enumeration
jpx
enumeration
jqr
enumeration
jra
enumeration
jrb
enumeration
jrr
enumeration
jrt
enumeration
jru
enumeration
jsl
enumeration
jua
enumeration
jub
enumeration
juc
enumeration
jud
enumeration
juh
enumeration
jui
enumeration
juk
enumeration
jul
enumeration
jum
enumeration
jun
enumeration
juo
enumeration
jup
enumeration
jur
enumeration
jus
enumeration
jut
enumeration
juu
enumeration
juw
enumeration
juy
enumeration
jvd
enumeration
jvn
enumeration
jwi
enumeration
jya
enumeration
jye
enumeration
jyy
enumeration
kaa
enumeration
kab
enumeration
kac
enumeration
kad
enumeration
kae
enumeration
kaf
enumeration
kag
enumeration
kah
enumeration
kai
enumeration
kaj
enumeration
kak
enumeration
kam
enumeration
kao
enumeration
kap
enumeration
kaq
enumeration
kar
enumeration
kav
enumeration
kaw
enumeration
kax
enumeration
kay
enumeration
kba
enumeration
kbb
enumeration
kbc
enumeration
kbd
enumeration
kbe
enumeration
kbf
enumeration
kbg
enumeration
kbh
enumeration
kbi
enumeration
kbj
enumeration
kbk
enumeration
kbl
enumeration
kbm
enumeration
kbn
enumeration
kbo
enumeration
kbp
enumeration
kbq
enumeration
kbr
enumeration
kbs
enumeration
kbt
enumeration
kbu
enumeration
kbv
enumeration
kbw
enumeration
kbx
enumeration
kby
enumeration
kbz
enumeration
kca
enumeration
kcb
enumeration
kcc
enumeration
kcd
enumeration
kce
enumeration
kcf
enumeration
kcg
enumeration
kch
enumeration
kci
enumeration
kcj
enumeration
kck
enumeration
kcl
enumeration
kcm
enumeration
kcn
enumeration
kco
enumeration
kcp
enumeration
kcq
enumeration
kcr
enumeration
kcs
enumeration
kct
enumeration
kcu
enumeration
kcv
enumeration
kcw
enumeration
kcx
enumeration
kcy
enumeration
kcz
enumeration
kda
enumeration
kdc
enumeration
kdd
enumeration
kde
enumeration
kdf
enumeration
kdg
enumeration
kdh
enumeration
kdi
enumeration
kdj
enumeration
kdk
enumeration
kdl
enumeration
kdm
enumeration
kdn
enumeration
kdo
enumeration
kdp
enumeration
kdq
enumeration
kdr
enumeration
kdt
enumeration
kdu
enumeration
kdw
enumeration
kdx
enumeration
kdy
enumeration
kdz
enumeration
kea
enumeration
keb
enumeration
kec
enumeration
ked
enumeration
kee
enumeration
kef
enumeration
keg
enumeration
keh
enumeration
kei
enumeration
kej
enumeration
kek
enumeration
kel
enumeration
kem
enumeration
ken
enumeration
keo
enumeration
kep
enumeration
keq
enumeration
ker
enumeration
kes
enumeration
ket
enumeration
keu
enumeration
kev
enumeration
kew
enumeration
kex
enumeration
key
enumeration
kez
enumeration
kfa
enumeration
kfb
enumeration
kfc
enumeration
kfd
enumeration
kfe
enumeration
kff
enumeration
kfg
enumeration
kfh
enumeration
kfi
enumeration
kfj
enumeration
kfk
enumeration
kfl
enumeration
kfm
enumeration
kfn
enumeration
kfo
enumeration
kfp
enumeration
kfq
enumeration
kfr
enumeration
kfs
enumeration
kft
enumeration
kfu
enumeration
kfv
enumeration
kfw
enumeration
kfx
enumeration
kfy
enumeration
kfz
enumeration
kga
enumeration
kgb
enumeration
kgc
enumeration
kgd
enumeration
kge
enumeration
kgf
enumeration
kgg
enumeration
kgi
enumeration
kgj
enumeration
kgk
enumeration
kgl
enumeration
kgm
enumeration
kgn
enumeration
kgo
enumeration
kgp
enumeration
kgq
enumeration
kgr
enumeration
kgs
enumeration
kgt
enumeration
kgu
enumeration
kgv
enumeration
kgw
enumeration
kgx
enumeration
kgy
enumeration
kha
enumeration
khb
enumeration
khc
enumeration
khd
enumeration
khe
enumeration
khf
enumeration
khg
enumeration
khh
enumeration
khi
enumeration
khj
enumeration
khk
enumeration
khl
enumeration
khn
enumeration
kho
enumeration
khp
enumeration
khq
enumeration
khr
enumeration
khs
enumeration
kht
enumeration
khu
enumeration
khv
enumeration
khw
enumeration
khx
enumeration
khy
enumeration
khz
enumeration
kia
enumeration
kib
enumeration
kic
enumeration
kid
enumeration
kie
enumeration
kif
enumeration
kig
enumeration
kih
enumeration
kii
enumeration
kij
enumeration
kil
enumeration
kim
enumeration
kio
enumeration
kip
enumeration
kiq
enumeration
kis
enumeration
kit
enumeration
kiu
enumeration
kiv
enumeration
kiw
enumeration
kix
enumeration
kiy
enumeration
kiz
enumeration
kja
enumeration
kjb
enumeration
kjc
enumeration
kjd
enumeration
kje
enumeration
kjf
enumeration
kjg
enumeration
kjh
enumeration
kji
enumeration
kjj
enumeration
kjk
enumeration
kjl
enumeration
kjm
enumeration
kjn
enumeration
kjo
enumeration
kjp
enumeration
kjq
enumeration
kjr
enumeration
kjs
enumeration
kjt
enumeration
kju
enumeration
kjx
enumeration
kjy
enumeration
kjz
enumeration
kka
enumeration
kkb
enumeration
kkc
enumeration
kkd
enumeration
kke
enumeration
kkf
enumeration
kkg
enumeration
kkh
enumeration
kki
enumeration
kkj
enumeration
kkk
enumeration
kkl
enumeration
kkm
enumeration
kkn
enumeration
kko
enumeration
kkp
enumeration
kkq
enumeration
kkr
enumeration
kks
enumeration
kkt
enumeration
kku
enumeration
kkv
enumeration
kkw
enumeration
kkx
enumeration
kky
enumeration
kkz
enumeration
kla
enumeration
klb
enumeration
klc
enumeration
kld
enumeration
kle
enumeration
klf
enumeration
klg
enumeration
klh
enumeration
kli
enumeration
klj
enumeration
klk
enumeration
kll
enumeration
klm
enumeration
kln
enumeration
klo
enumeration
klp
enumeration
klq
enumeration
klr
enumeration
kls
enumeration
klt
enumeration
klu
enumeration
klv
enumeration
klw
enumeration
klx
enumeration
kly
enumeration
klz
enumeration
kma
enumeration
kmb
enumeration
kmc
enumeration
kmd
enumeration
kme
enumeration
kmf
enumeration
kmg
enumeration
kmh
enumeration
kmi
enumeration
kmj
enumeration
kmk
enumeration
kml
enumeration
kmm
enumeration
kmn
enumeration
kmo
enumeration
kmp
enumeration
kmq
enumeration
kmr
enumeration
kms
enumeration
kmt
enumeration
kmu
enumeration
kmv
enumeration
kmw
enumeration
kmx
enumeration
kmy
enumeration
kmz
enumeration
kna
enumeration
knb
enumeration
knc
enumeration
knd
enumeration
kne
enumeration
knf
enumeration
kng
enumeration
kni
enumeration
knj
enumeration
knk
enumeration
knl
enumeration
knm
enumeration
knn
enumeration
kno
enumeration
knp
enumeration
knq
enumeration
knr
enumeration
kns
enumeration
knt
enumeration
knu
enumeration
knv
enumeration
knw
enumeration
knx
enumeration
kny
enumeration
knz
enumeration
koa
enumeration
koc
enumeration
kod
enumeration
koe
enumeration
kof
enumeration
kog
enumeration
koh
enumeration
koi
enumeration
koj
enumeration
kok
enumeration
kol
enumeration
koo
enumeration
kop
enumeration
koq
enumeration
kos
enumeration
kot
enumeration
kou
enumeration
kov
enumeration
kow
enumeration
kox
enumeration
koy
enumeration
koz
enumeration
kpa
enumeration
kpb
enumeration
kpc
enumeration
kpd
enumeration
kpe
enumeration
kpf
enumeration
kpg
enumeration
kph
enumeration
kpi
enumeration
kpj
enumeration
kpk
enumeration
kpl
enumeration
kpm
enumeration
kpn
enumeration
kpo
enumeration
kpq
enumeration
kpr
enumeration
kps
enumeration
kpt
enumeration
kpu
enumeration
kpv
enumeration
kpw
enumeration
kpx
enumeration
kpy
enumeration
kpz
enumeration
kqa
enumeration
kqb
enumeration
kqc
enumeration
kqd
enumeration
kqe
enumeration
kqf
enumeration
kqg
enumeration
kqh
enumeration
kqi
enumeration
kqj
enumeration
kqk
enumeration
kql
enumeration
kqm
enumeration
kqn
enumeration
kqo
enumeration
kqp
enumeration
kqq
enumeration
kqr
enumeration
kqs
enumeration
kqt
enumeration
kqu
enumeration
kqv
enumeration
kqw
enumeration
kqx
enumeration
kqy
enumeration
kqz
enumeration
kra
enumeration
krb
enumeration
krc
enumeration
krd
enumeration
kre
enumeration
krf
enumeration
krh
enumeration
kri
enumeration
krj
enumeration
krk
enumeration
krl
enumeration
krm
enumeration
krn
enumeration
kro
enumeration
krp
enumeration
krr
enumeration
krs
enumeration
krt
enumeration
kru
enumeration
krv
enumeration
krw
enumeration
krx
enumeration
kry
enumeration
krz
enumeration
ksa
enumeration
ksb
enumeration
ksc
enumeration
ksd
enumeration
kse
enumeration
ksf
enumeration
ksg
enumeration
ksh
enumeration
ksi
enumeration
ksj
enumeration
ksk
enumeration
ksl
enumeration
ksm
enumeration
ksn
enumeration
kso
enumeration
ksp
enumeration
ksq
enumeration
ksr
enumeration
kss
enumeration
kst
enumeration
ksu
enumeration
ksv
enumeration
ksw
enumeration
ksx
enumeration
ksy
enumeration
ksz
enumeration
kta
enumeration
ktb
enumeration
ktc
enumeration
ktd
enumeration
kte
enumeration
ktf
enumeration
ktg
enumeration
kth
enumeration
kti
enumeration
ktj
enumeration
ktk
enumeration
ktl
enumeration
ktm
enumeration
ktn
enumeration
kto
enumeration
ktp
enumeration
ktq
enumeration
ktr
enumeration
kts
enumeration
ktt
enumeration
ktu
enumeration
ktv
enumeration
ktw
enumeration
ktx
enumeration
kty
enumeration
ktz
enumeration
kub
enumeration
kuc
enumeration
kud
enumeration
kue
enumeration
kuf
enumeration
kug
enumeration
kuh
enumeration
kui
enumeration
kuj
enumeration
kuk
enumeration
kul
enumeration
kum
enumeration
kun
enumeration
kuo
enumeration
kup
enumeration
kuq
enumeration
kus
enumeration
kut
enumeration
kuu
enumeration
kuv
enumeration
kuw
enumeration
kux
enumeration
kuy
enumeration
kuz
enumeration
kva
enumeration
kvb
enumeration
kvc
enumeration
kvd
enumeration
kve
enumeration
kvf
enumeration
kvg
enumeration
kvh
enumeration
kvi
enumeration
kvj
enumeration
kvk
enumeration
kvl
enumeration
kvm
enumeration
kvn
enumeration
kvo
enumeration
kvp
enumeration
kvq
enumeration
kvr
enumeration
kvs
enumeration
kvt
enumeration
kvu
enumeration
kvv
enumeration
kvw
enumeration
kvx
enumeration
kvy
enumeration
kvz
enumeration
kwa
enumeration
kwb
enumeration
kwc
enumeration
kwd
enumeration
kwe
enumeration
kwf
enumeration
kwg
enumeration
kwh
enumeration
kwi
enumeration
kwj
enumeration
kwk
enumeration
kwl
enumeration
kwm
enumeration
kwn
enumeration
kwo
enumeration
kwp
enumeration
kwq
enumeration
kwr
enumeration
kws
enumeration
kwt
enumeration
kwu
enumeration
kwv
enumeration
kww
enumeration
kwx
enumeration
kwy
enumeration
kwz
enumeration
kxa
enumeration
kxb
enumeration
kxc
enumeration
kxd
enumeration
kxe
enumeration
kxf
enumeration
kxh
enumeration
kxi
enumeration
kxj
enumeration
kxk
enumeration
kxl
enumeration
kxm
enumeration
kxn
enumeration
kxo
enumeration
kxp
enumeration
kxq
enumeration
kxr
enumeration
kxs
enumeration
kxt
enumeration
kxu
enumeration
kxv
enumeration
kxw
enumeration
kxx
enumeration
kxy
enumeration
kxz
enumeration
kya
enumeration
kyb
enumeration
kyc
enumeration
kyd
enumeration
kye
enumeration
kyf
enumeration
kyg
enumeration
kyh
enumeration
kyi
enumeration
kyj
enumeration
kyk
enumeration
kyl
enumeration
kym
enumeration
kyn
enumeration
kyo
enumeration
kyp
enumeration
kyq
enumeration
kyr
enumeration
kys
enumeration
kyt
enumeration
kyu
enumeration
kyv
enumeration
kyw
enumeration
kyx
enumeration
kyy
enumeration
kyz
enumeration
kza
enumeration
kzb
enumeration
kzc
enumeration
kzd
enumeration
kze
enumeration
kzf
enumeration
kzg
enumeration
kzi
enumeration
kzj
enumeration
kzk
enumeration
kzl
enumeration
kzm
enumeration
kzn
enumeration
kzo
enumeration
kzp
enumeration
kzq
enumeration
kzr
enumeration
kzs
enumeration
kzt
enumeration
kzu
enumeration
kzv
enumeration
kzw
enumeration
kzx
enumeration
kzy
enumeration
kzz
enumeration
laa
enumeration
lab
enumeration
lac
enumeration
lad
enumeration
lae
enumeration
laf
enumeration
lag
enumeration
lah
enumeration
lai
enumeration
laj
enumeration
lak
enumeration
lal
enumeration
lam
enumeration
lan
enumeration
lap
enumeration
laq
enumeration
lar
enumeration
las
enumeration
lau
enumeration
law
enumeration
lax
enumeration
lay
enumeration
laz
enumeration
lba
enumeration
lbb
enumeration
lbc
enumeration
lbe
enumeration
lbf
enumeration
lbg
enumeration
lbi
enumeration
lbj
enumeration
lbk
enumeration
lbl
enumeration
lbm
enumeration
lbn
enumeration
lbo
enumeration
lbq
enumeration
lbr
enumeration
lbs
enumeration
lbt
enumeration
lbu
enumeration
lbv
enumeration
lbw
enumeration
lbx
enumeration
lby
enumeration
lbz
enumeration
lcc
enumeration
lcd
enumeration
lce
enumeration
lcf
enumeration
lch
enumeration
lcl
enumeration
lcm
enumeration
lcp
enumeration
lcq
enumeration
lcs
enumeration
lda
enumeration
ldb
enumeration
ldd
enumeration
ldg
enumeration
ldh
enumeration
ldi
enumeration
ldj
enumeration
ldk
enumeration
ldl
enumeration
ldm
enumeration
ldn
enumeration
ldo
enumeration
ldp
enumeration
ldq
enumeration
lea
enumeration
leb
enumeration
lec
enumeration
led
enumeration
lee
enumeration
lef
enumeration
leh
enumeration
lei
enumeration
lej
enumeration
lek
enumeration
lel
enumeration
lem
enumeration
len
enumeration
leo
enumeration
lep
enumeration
leq
enumeration
ler
enumeration
les
enumeration
let
enumeration
leu
enumeration
lev
enumeration
lew
enumeration
lex
enumeration
ley
enumeration
lez
enumeration
lfa
enumeration
lfn
enumeration
lga
enumeration
lgb
enumeration
lgg
enumeration
lgh
enumeration
lgi
enumeration
lgk
enumeration
lgl
enumeration
lgm
enumeration
lgn
enumeration
lgq
enumeration
lgr
enumeration
lgt
enumeration
lgu
enumeration
lgz
enumeration
lha
enumeration
lhh
enumeration
lhi
enumeration
lhl
enumeration
lhm
enumeration
lhn
enumeration
lhp
enumeration
lhs
enumeration
lht
enumeration
lhu
enumeration
lia
enumeration
lib
enumeration
lic
enumeration
lid
enumeration
lie
enumeration
lif
enumeration
lig
enumeration
lih
enumeration
lii
enumeration
lij
enumeration
lik
enumeration
lil
enumeration
lio
enumeration
lip
enumeration
liq
enumeration
lir
enumeration
lis
enumeration
liu
enumeration
liv
enumeration
liw
enumeration
lix
enumeration
liy
enumeration
liz
enumeration
lja
enumeration
lje
enumeration
lji
enumeration
ljl
enumeration
ljp
enumeration
ljw
enumeration
ljx
enumeration
lka
enumeration
lkb
enumeration
lkc
enumeration
lkd
enumeration
lke
enumeration
lkh
enumeration
lki
enumeration
lkj
enumeration
lkl
enumeration
lkm
enumeration
lkn
enumeration
lko
enumeration
lkr
enumeration
lks
enumeration
lkt
enumeration
lku
enumeration
lky
enumeration
lla
enumeration
llb
enumeration
llc
enumeration
lld
enumeration
lle
enumeration
llf
enumeration
llg
enumeration
llh
enumeration
lli
enumeration
llj
enumeration
llk
enumeration
lll
enumeration
llm
enumeration
lln
enumeration
llo
enumeration
llp
enumeration
llq
enumeration
lls
enumeration
llu
enumeration
llx
enumeration
lma
enumeration
lmb
enumeration
lmc
enumeration
lmd
enumeration
lme
enumeration
lmf
enumeration
lmg
enumeration
lmh
enumeration
lmi
enumeration
lmj
enumeration
lmk
enumeration
lml
enumeration
lmn
enumeration
lmo
enumeration
lmp
enumeration
lmq
enumeration
lmr
enumeration
lmu
enumeration
lmv
enumeration
lmw
enumeration
lmx
enumeration
lmy
enumeration
lmz
enumeration
lna
enumeration
lnb
enumeration
lnd
enumeration
lng
enumeration
lnh
enumeration
lni
enumeration
lnj
enumeration
lnl
enumeration
lnm
enumeration
lnn
enumeration
lno
enumeration
lns
enumeration
lnu
enumeration
lnw
enumeration
lnz
enumeration
loa
enumeration
lob
enumeration
loc
enumeration
loe
enumeration
lof
enumeration
log
enumeration
loh
enumeration
loi
enumeration
loj
enumeration
lok
enumeration
lol
enumeration
lom
enumeration
lon
enumeration
loo
enumeration
lop
enumeration
loq
enumeration
lor
enumeration
los
enumeration
lot
enumeration
lou
enumeration
lov
enumeration
low
enumeration
lox
enumeration
loy
enumeration
loz
enumeration
lpa
enumeration
lpe
enumeration
lpn
enumeration
lpo
enumeration
lpx
enumeration
lra
enumeration
lrc
enumeration
lre
enumeration
lrg
enumeration
lri
enumeration
lrk
enumeration
lrl
enumeration
lrm
enumeration
lrn
enumeration
lro
enumeration
lrr
enumeration
lrt
enumeration
lrv
enumeration
lrz
enumeration
lsa
enumeration
lsd
enumeration
lse
enumeration
lsg
enumeration
lsh
enumeration
lsi
enumeration
lsl
enumeration
lsm
enumeration
lso
enumeration
lsp
enumeration
lsr
enumeration
lss
enumeration
lst
enumeration
lsy
enumeration
ltc
enumeration
ltg
enumeration
lti
enumeration
ltn
enumeration
lto
enumeration
lts
enumeration
ltu
enumeration
lua
enumeration
luc
enumeration
lud
enumeration
lue
enumeration
luf
enumeration
lui
enumeration
luj
enumeration
luk
enumeration
lul
enumeration
lum
enumeration
lun
enumeration
luo
enumeration
lup
enumeration
luq
enumeration
lur
enumeration
lus
enumeration
lut
enumeration
luu
enumeration
luv
enumeration
luw
enumeration
luy
enumeration
luz
enumeration
lva
enumeration
lvk
enumeration
lvs
enumeration
lvu
enumeration
lwa
enumeration
lwe
enumeration
lwg
enumeration
lwh
enumeration
lwl
enumeration
lwm
enumeration
lwo
enumeration
lwt
enumeration
lwu
enumeration
lww
enumeration
lya
enumeration
lyg
enumeration
lyn
enumeration
lzh
enumeration
lzl
enumeration
lzn
enumeration
lzz
enumeration
maa
enumeration
mab
enumeration
mad
enumeration
mae
enumeration
maf
enumeration
mag
enumeration
mai
enumeration
maj
enumeration
mak
enumeration
mam
enumeration
man
enumeration
map
enumeration
maq
enumeration
mas
enumeration
mat
enumeration
mau
enumeration
mav
enumeration
maw
enumeration
max
enumeration
maz
enumeration
mba
enumeration
mbb
enumeration
mbc
enumeration
mbd
enumeration
mbe
enumeration
mbf
enumeration
mbh
enumeration
mbi
enumeration
mbj
enumeration
mbk
enumeration
mbl
enumeration
mbm
enumeration
mbn
enumeration
mbo
enumeration
mbp
enumeration
mbq
enumeration
mbr
enumeration
mbs
enumeration
mbt
enumeration
mbu
enumeration
mbv
enumeration
mbw
enumeration
mbx
enumeration
mby
enumeration
mbz
enumeration
mca
enumeration
mcb
enumeration
mcc
enumeration
mcd
enumeration
mce
enumeration
mcf
enumeration
mcg
enumeration
mch
enumeration
mci
enumeration
mcj
enumeration
mck
enumeration
mcl
enumeration
mcm
enumeration
mcn
enumeration
mco
enumeration
mcp
enumeration
mcq
enumeration
mcr
enumeration
mcs
enumeration
mct
enumeration
mcu
enumeration
mcv
enumeration
mcw
enumeration
mcx
enumeration
mcy
enumeration
mcz
enumeration
mda
enumeration
mdb
enumeration
mdc
enumeration
mdd
enumeration
mde
enumeration
mdf
enumeration
mdg
enumeration
mdh
enumeration
mdi
enumeration
mdj
enumeration
mdk
enumeration
mdl
enumeration
mdm
enumeration
mdn
enumeration
mdp
enumeration
mdq
enumeration
mdr
enumeration
mds
enumeration
mdt
enumeration
mdu
enumeration
mdv
enumeration
mdw
enumeration
mdx
enumeration
mdy
enumeration
mdz
enumeration
mea
enumeration
meb
enumeration
mec
enumeration
med
enumeration
mee
enumeration
mef
enumeration
meh
enumeration
mei
enumeration
mej
enumeration
mek
enumeration
mel
enumeration
mem
enumeration
men
enumeration
meo
enumeration
mep
enumeration
meq
enumeration
mer
enumeration
mes
enumeration
met
enumeration
meu
enumeration
mev
enumeration
mew
enumeration
mey
enumeration
mez
enumeration
mfa
enumeration
mfb
enumeration
mfc
enumeration
mfd
enumeration
mfe
enumeration
mff
enumeration
mfg
enumeration
mfh
enumeration
mfi
enumeration
mfj
enumeration
mfk
enumeration
mfl
enumeration
mfm
enumeration
mfn
enumeration
mfo
enumeration
mfp
enumeration
mfq
enumeration
mfr
enumeration
mfs
enumeration
mft
enumeration
mfu
enumeration
mfv
enumeration
mfw
enumeration
mfx
enumeration
mfy
enumeration
mfz
enumeration
mga
enumeration
mgb
enumeration
mgc
enumeration
mgd
enumeration
mge
enumeration
mgf
enumeration
mgg
enumeration
mgh
enumeration
mgi
enumeration
mgj
enumeration
mgk
enumeration
mgl
enumeration
mgm
enumeration
mgn
enumeration
mgo
enumeration
mgp
enumeration
mgq
enumeration
mgr
enumeration
mgs
enumeration
mgt
enumeration
mgu
enumeration
mgv
enumeration
mgw
enumeration
mgy
enumeration
mgz
enumeration
mha
enumeration
mhb
enumeration
mhc
enumeration
mhd
enumeration
mhe
enumeration
mhf
enumeration
mhg
enumeration
mhi
enumeration
mhj
enumeration
mhk
enumeration
mhl
enumeration
mhm
enumeration
mhn
enumeration
mho
enumeration
mhp
enumeration
mhq
enumeration
mhr
enumeration
mhs
enumeration
mht
enumeration
mhu
enumeration
mhw
enumeration
mhx
enumeration
mhy
enumeration
mhz
enumeration
mia
enumeration
mib
enumeration
mic
enumeration
mid
enumeration
mie
enumeration
mif
enumeration
mig
enumeration
mih
enumeration
mii
enumeration
mij
enumeration
mik
enumeration
mil
enumeration
mim
enumeration
min
enumeration
mio
enumeration
mip
enumeration
miq
enumeration
mir
enumeration
mis
enumeration
mit
enumeration
miu
enumeration
miw
enumeration
mix
enumeration
miy
enumeration
miz
enumeration
mjc
enumeration
mjd
enumeration
mje
enumeration
mjg
enumeration
mjh
enumeration
mji
enumeration
mjj
enumeration
mjk
enumeration
mjl
enumeration
mjm
enumeration
mjn
enumeration
mjo
enumeration
mjp
enumeration
mjq
enumeration
mjr
enumeration
mjs
enumeration
mjt
enumeration
mju
enumeration
mjv
enumeration
mjw
enumeration
mjx
enumeration
mjy
enumeration
mjz
enumeration
mka
enumeration
mkb
enumeration
mkc
enumeration
mke
enumeration
mkf
enumeration
mkg
enumeration
mkh
enumeration
mki
enumeration
mkj
enumeration
mkk
enumeration
mkl
enumeration
mkm
enumeration
mkn
enumeration
mko
enumeration
mkp
enumeration
mkq
enumeration
mkr
enumeration
mks
enumeration
mkt
enumeration
mku
enumeration
mkv
enumeration
mkw
enumeration
mkx
enumeration
mky
enumeration
mkz
enumeration
mla
enumeration
mlb
enumeration
mlc
enumeration
mle
enumeration
mlf
enumeration
mlh
enumeration
mli
enumeration
mlj
enumeration
mlk
enumeration
mll
enumeration
mlm
enumeration
mln
enumeration
mlo
enumeration
mlp
enumeration
mlq
enumeration
mlr
enumeration
mls
enumeration
mlu
enumeration
mlv
enumeration
mlw
enumeration
mlx
enumeration
mlz
enumeration
mma
enumeration
mmb
enumeration
mmc
enumeration
mmd
enumeration
mme
enumeration
mmf
enumeration
mmg
enumeration
mmh
enumeration
mmi
enumeration
mmj
enumeration
mmk
enumeration
mml
enumeration
mmm
enumeration
mmn
enumeration
mmo
enumeration
mmp
enumeration
mmq
enumeration
mmr
enumeration
mmt
enumeration
mmu
enumeration
mmv
enumeration
mmw
enumeration
mmx
enumeration
mmy
enumeration
mmz
enumeration
mna
enumeration
mnb
enumeration
mnc
enumeration
mnd
enumeration
mne
enumeration
mnf
enumeration
mng
enumeration
mnh
enumeration
mni
enumeration
mnj
enumeration
mnk
enumeration
mnl
enumeration
mnm
enumeration
mnn
enumeration
mno
enumeration
mnp
enumeration
mnq
enumeration
mnr
enumeration
mns
enumeration
mnu
enumeration
mnv
enumeration
mnw
enumeration
mnx
enumeration
mny
enumeration
mnz
enumeration
moa
enumeration
moc
enumeration
mod
enumeration
moe
enumeration
mog
enumeration
moh
enumeration
moi
enumeration
moj
enumeration
mok
enumeration
mom
enumeration
moo
enumeration
mop
enumeration
moq
enumeration
mor
enumeration
mos
enumeration
mot
enumeration
mou
enumeration
mov
enumeration
mow
enumeration
mox
enumeration
moy
enumeration
moz
enumeration
mpa
enumeration
mpb
enumeration
mpc
enumeration
mpd
enumeration
mpe
enumeration
mpg
enumeration
mph
enumeration
mpi
enumeration
mpj
enumeration
mpk
enumeration
mpl
enumeration
mpm
enumeration
mpn
enumeration
mpo
enumeration
mpp
enumeration
mpq
enumeration
mpr
enumeration
mps
enumeration
mpt
enumeration
mpu
enumeration
mpv
enumeration
mpw
enumeration
mpx
enumeration
mpy
enumeration
mpz
enumeration
mqa
enumeration
mqb
enumeration
mqc
enumeration
mqe
enumeration
mqf
enumeration
mqg
enumeration
mqh
enumeration
mqi
enumeration
mqj
enumeration
mqk
enumeration
mql
enumeration
mqm
enumeration
mqn
enumeration
mqo
enumeration
mqp
enumeration
mqq
enumeration
mqr
enumeration
mqs
enumeration
mqt
enumeration
mqu
enumeration
mqv
enumeration
mqw
enumeration
mqx
enumeration
mqy
enumeration
mqz
enumeration
mra
enumeration
mrb
enumeration
mrc
enumeration
mrd
enumeration
mre
enumeration
mrf
enumeration
mrg
enumeration
mrh
enumeration
mrj
enumeration
mrk
enumeration
mrl
enumeration
mrm
enumeration
mrn
enumeration
mro
enumeration
mrp
enumeration
mrq
enumeration
mrr
enumeration
mrs
enumeration
mrt
enumeration
mru
enumeration
mrv
enumeration
mrw
enumeration
mrx
enumeration
mry
enumeration
mrz
enumeration
msb
enumeration
msc
enumeration
msd
enumeration
mse
enumeration
msf
enumeration
msg
enumeration
msh
enumeration
msi
enumeration
msj
enumeration
msk
enumeration
msl
enumeration
msm
enumeration
msn
enumeration
mso
enumeration
msp
enumeration
msq
enumeration
msr
enumeration
mss
enumeration
msu
enumeration
msv
enumeration
msw
enumeration
msx
enumeration
msy
enumeration
msz
enumeration
mta
enumeration
mtb
enumeration
mtc
enumeration
mtd
enumeration
mte
enumeration
mtf
enumeration
mtg
enumeration
mth
enumeration
mti
enumeration
mtj
enumeration
mtk
enumeration
mtl
enumeration
mtm
enumeration
mtn
enumeration
mto
enumeration
mtp
enumeration
mtq
enumeration
mtr
enumeration
mts
enumeration
mtt
enumeration
mtu
enumeration
mtv
enumeration
mtw
enumeration
mtx
enumeration
mty
enumeration
mua
enumeration
mub
enumeration
muc
enumeration
mud
enumeration
mue
enumeration
mug
enumeration
muh
enumeration
mui
enumeration
muj
enumeration
muk
enumeration
mul
enumeration
mum
enumeration
mun
enumeration
muo
enumeration
mup
enumeration
muq
enumeration
mur
enumeration
mus
enumeration
mut
enumeration
muu
enumeration
muv
enumeration
mux
enumeration
muy
enumeration
muz
enumeration
mva
enumeration
mvb
enumeration
mvd
enumeration
mve
enumeration
mvf
enumeration
mvg
enumeration
mvh
enumeration
mvi
enumeration
mvk
enumeration
mvl
enumeration
mvm
enumeration
mvn
enumeration
mvo
enumeration
mvp
enumeration
mvq
enumeration
mvr
enumeration
mvs
enumeration
mvt
enumeration
mvu
enumeration
mvv
enumeration
mvw
enumeration
mvx
enumeration
mvy
enumeration
mvz
enumeration
mwa
enumeration
mwb
enumeration
mwc
enumeration
mwe
enumeration
mwf
enumeration
mwg
enumeration
mwh
enumeration
mwi
enumeration
mwj
enumeration
mwk
enumeration
mwl
enumeration
mwm
enumeration
mwn
enumeration
mwo
enumeration
mwp
enumeration
mwq
enumeration
mwr
enumeration
mws
enumeration
mwt
enumeration
mwu
enumeration
mwv
enumeration
mww
enumeration
mwx
enumeration
mwy
enumeration
mwz
enumeration
mxa
enumeration
mxb
enumeration
mxc
enumeration
mxd
enumeration
mxe
enumeration
mxf
enumeration
mxg
enumeration
mxh
enumeration
mxi
enumeration
mxj
enumeration
mxk
enumeration
mxl
enumeration
mxm
enumeration
mxn
enumeration
mxo
enumeration
mxp
enumeration
mxq
enumeration
mxr
enumeration
mxs
enumeration
mxt
enumeration
mxu
enumeration
mxv
enumeration
mxw
enumeration
mxx
enumeration
mxy
enumeration
mxz
enumeration
myb
enumeration
myc
enumeration
myd
enumeration
mye
enumeration
myf
enumeration
myg
enumeration
myh
enumeration
myi
enumeration
myj
enumeration
myk
enumeration
myl
enumeration
mym
enumeration
myn
enumeration
myo
enumeration
myp
enumeration
myr
enumeration
mys
enumeration
myu
enumeration
myv
enumeration
myw
enumeration
myx
enumeration
myy
enumeration
myz
enumeration
mza
enumeration
mzb
enumeration
mzc
enumeration
mzd
enumeration
mze
enumeration
mzg
enumeration
mzh
enumeration
mzi
enumeration
mzj
enumeration
mzk
enumeration
mzl
enumeration
mzm
enumeration
mzn
enumeration
mzo
enumeration
mzp
enumeration
mzq
enumeration
mzr
enumeration
mzs
enumeration
mzt
enumeration
mzu
enumeration
mzv
enumeration
mzw
enumeration
mzx
enumeration
mzy
enumeration
mzz
enumeration
naa
enumeration
nab
enumeration
nac
enumeration
nad
enumeration
nae
enumeration
naf
enumeration
nag
enumeration
nah
enumeration
nai
enumeration
naj
enumeration
nak
enumeration
nal
enumeration
nam
enumeration
nan
enumeration
nao
enumeration
nap
enumeration
naq
enumeration
nar
enumeration
nas
enumeration
nat
enumeration
naw
enumeration
nax
enumeration
nay
enumeration
naz
enumeration
nba
enumeration
nbb
enumeration
nbc
enumeration
nbd
enumeration
nbe
enumeration
nbg
enumeration
nbh
enumeration
nbi
enumeration
nbj
enumeration
nbk
enumeration
nbm
enumeration
nbn
enumeration
nbo
enumeration
nbp
enumeration
nbq
enumeration
nbr
enumeration
nbs
enumeration
nbt
enumeration
nbu
enumeration
nbv
enumeration
nbw
enumeration
nby
enumeration
nca
enumeration
ncb
enumeration
ncc
enumeration
ncd
enumeration
nce
enumeration
ncf
enumeration
ncg
enumeration
nch
enumeration
nci
enumeration
ncj
enumeration
nck
enumeration
ncl
enumeration
ncm
enumeration
ncn
enumeration
nco
enumeration
ncp
enumeration
ncr
enumeration
ncs
enumeration
nct
enumeration
ncu
enumeration
ncx
enumeration
ncz
enumeration
nda
enumeration
ndb
enumeration
ndc
enumeration
ndd
enumeration
ndf
enumeration
ndg
enumeration
ndh
enumeration
ndi
enumeration
ndj
enumeration
ndk
enumeration
ndl
enumeration
ndm
enumeration
ndn
enumeration
ndp
enumeration
ndq
enumeration
ndr
enumeration
nds
enumeration
ndt
enumeration
ndu
enumeration
ndv
enumeration
ndw
enumeration
ndx
enumeration
ndy
enumeration
ndz
enumeration
nea
enumeration
neb
enumeration
nec
enumeration
ned
enumeration
nee
enumeration
nef
enumeration
neg
enumeration
neh
enumeration
nei
enumeration
nej
enumeration
nek
enumeration
nem
enumeration
nen
enumeration
neo
enumeration
neq
enumeration
ner
enumeration
nes
enumeration
net
enumeration
neu
enumeration
nev
enumeration
new
enumeration
nex
enumeration
ney
enumeration
nez
enumeration
nfa
enumeration
nfd
enumeration
nfl
enumeration
nfr
enumeration
nfu
enumeration
nga
enumeration
ngb
enumeration
ngc
enumeration
ngd
enumeration
nge
enumeration
ngf
enumeration
ngg
enumeration
ngh
enumeration
ngi
enumeration
ngj
enumeration
ngk
enumeration
ngl
enumeration
ngm
enumeration
ngn
enumeration
ngo
enumeration
ngp
enumeration
ngq
enumeration
ngr
enumeration
ngs
enumeration
ngt
enumeration
ngu
enumeration
ngv
enumeration
ngw
enumeration
ngx
enumeration
ngy
enumeration
ngz
enumeration
nha
enumeration
nhb
enumeration
nhc
enumeration
nhd
enumeration
nhe
enumeration
nhf
enumeration
nhg
enumeration
nhh
enumeration
nhi
enumeration
nhk
enumeration
nhm
enumeration
nhn
enumeration
nho
enumeration
nhp
enumeration
nhq
enumeration
nhr
enumeration
nht
enumeration
nhu
enumeration
nhv
enumeration
nhw
enumeration
nhx
enumeration
nhy
enumeration
nhz
enumeration
nia
enumeration
nib
enumeration
nic
enumeration
nid
enumeration
nie
enumeration
nif
enumeration
nig
enumeration
nih
enumeration
nii
enumeration
nij
enumeration
nik
enumeration
nil
enumeration
nim
enumeration
nin
enumeration
nio
enumeration
niq
enumeration
nir
enumeration
nis
enumeration
nit
enumeration
niu
enumeration
niv
enumeration
niw
enumeration
nix
enumeration
niy
enumeration
niz
enumeration
nja
enumeration
njb
enumeration
njd
enumeration
njh
enumeration
nji
enumeration
njj
enumeration
njl
enumeration
njm
enumeration
njn
enumeration
njo
enumeration
njr
enumeration
njs
enumeration
njt
enumeration
nju
enumeration
njx
enumeration
njy
enumeration
njz
enumeration
nka
enumeration
nkb
enumeration
nkc
enumeration
nkd
enumeration
nke
enumeration
nkf
enumeration
nkg
enumeration
nkh
enumeration
nki
enumeration
nkj
enumeration
nkk
enumeration
nkm
enumeration
nkn
enumeration
nko
enumeration
nkp
enumeration
nkq
enumeration
nkr
enumeration
nks
enumeration
nkt
enumeration
nku
enumeration
nkv
enumeration
nkw
enumeration
nkx
enumeration
nkz
enumeration
nla
enumeration
nlc
enumeration
nle
enumeration
nlg
enumeration
nli
enumeration
nlj
enumeration
nlk
enumeration
nll
enumeration
nlo
enumeration
nlq
enumeration
nlu
enumeration
nlv
enumeration
nlw
enumeration
nlx
enumeration
nly
enumeration
nlz
enumeration
nma
enumeration
nmb
enumeration
nmc
enumeration
nmd
enumeration
nme
enumeration
nmf
enumeration
nmg
enumeration
nmh
enumeration
nmi
enumeration
nmj
enumeration
nmk
enumeration
nml
enumeration
nmm
enumeration
nmn
enumeration
nmo
enumeration
nmp
enumeration
nmq
enumeration
nmr
enumeration
nms
enumeration
nmt
enumeration
nmu
enumeration
nmv
enumeration
nmw
enumeration
nmx
enumeration
nmy
enumeration
nmz
enumeration
nna
enumeration
nnb
enumeration
nnc
enumeration
nnd
enumeration
nne
enumeration
nnf
enumeration
nng
enumeration
nnh
enumeration
nni
enumeration
nnj
enumeration
nnk
enumeration
nnl
enumeration
nnm
enumeration
nnn
enumeration
nnp
enumeration
nnq
enumeration
nnr
enumeration
nns
enumeration
nnt
enumeration
nnu
enumeration
nnv
enumeration
nnw
enumeration
nnx
enumeration
nny
enumeration
nnz
enumeration
noa
enumeration
noc
enumeration
nod
enumeration
noe
enumeration
nof
enumeration
nog
enumeration
noh
enumeration
noi
enumeration
noj
enumeration
nok
enumeration
nol
enumeration
nom
enumeration
non
enumeration
nop
enumeration
noq
enumeration
nos
enumeration
not
enumeration
nou
enumeration
nov
enumeration
now
enumeration
noy
enumeration
noz
enumeration
npa
enumeration
npb
enumeration
npg
enumeration
nph
enumeration
npi
enumeration
npl
enumeration
npn
enumeration
npo
enumeration
nps
enumeration
npu
enumeration
npy
enumeration
nqg
enumeration
nqk
enumeration
nqm
enumeration
nqn
enumeration
nqo
enumeration
nqq
enumeration
nqy
enumeration
nra
enumeration
nrb
enumeration
nrc
enumeration
nre
enumeration
nrg
enumeration
nri
enumeration
nrk
enumeration
nrl
enumeration
nrm
enumeration
nrn
enumeration
nrp
enumeration
nrr
enumeration
nrt
enumeration
nru
enumeration
nrx
enumeration
nrz
enumeration
nsa
enumeration
nsc
enumeration
nsd
enumeration
nse
enumeration
nsf
enumeration
nsg
enumeration
nsh
enumeration
nsi
enumeration
nsk
enumeration
nsl
enumeration
nsm
enumeration
nsn
enumeration
nso
enumeration
nsp
enumeration
nsq
enumeration
nsr
enumeration
nss
enumeration
nst
enumeration
nsu
enumeration
nsv
enumeration
nsw
enumeration
nsx
enumeration
nsy
enumeration
nsz
enumeration
nte
enumeration
ntg
enumeration
nti
enumeration
ntj
enumeration
ntk
enumeration
ntm
enumeration
nto
enumeration
ntp
enumeration
ntr
enumeration
nts
enumeration
ntu
enumeration
ntw
enumeration
ntx
enumeration
nty
enumeration
ntz
enumeration
nua
enumeration
nub
enumeration
nuc
enumeration
nud
enumeration
nue
enumeration
nuf
enumeration
nug
enumeration
nuh
enumeration
nui
enumeration
nuj
enumeration
nuk
enumeration
nul
enumeration
num
enumeration
nun
enumeration
nuo
enumeration
nup
enumeration
nuq
enumeration
nur
enumeration
nus
enumeration
nut
enumeration
nuu
enumeration
nuv
enumeration
nuw
enumeration
nux
enumeration
nuy
enumeration
nuz
enumeration
nvh
enumeration
nvm
enumeration
nvo
enumeration
nwa
enumeration
nwb
enumeration
nwc
enumeration
nwe
enumeration
nwg
enumeration
nwi
enumeration
nwm
enumeration
nwo
enumeration
nwr
enumeration
nwx
enumeration
nwy
enumeration
nxa
enumeration
nxd
enumeration
nxe
enumeration
nxg
enumeration
nxi
enumeration
nxk
enumeration
nxl
enumeration
nxm
enumeration
nxn
enumeration
nxq
enumeration
nxr
enumeration
nxu
enumeration
nxx
enumeration
nyb
enumeration
nyc
enumeration
nyd
enumeration
nye
enumeration
nyf
enumeration
nyg
enumeration
nyh
enumeration
nyi
enumeration
nyj
enumeration
nyk
enumeration
nyl
enumeration
nym
enumeration
nyn
enumeration
nyo
enumeration
nyp
enumeration
nyq
enumeration
nyr
enumeration
nys
enumeration
nyt
enumeration
nyu
enumeration
nyv
enumeration
nyw
enumeration
nyx
enumeration
nyy
enumeration
nza
enumeration
nzb
enumeration
nzi
enumeration
nzk
enumeration
nzm
enumeration
nzs
enumeration
nzu
enumeration
nzy
enumeration
nzz
enumeration
oaa
enumeration
oac
enumeration
oar
enumeration
oav
enumeration
obi
enumeration
obk
enumeration
obl
enumeration
obm
enumeration
obo
enumeration
obr
enumeration
obt
enumeration
obu
enumeration
oca
enumeration
och
enumeration
oco
enumeration
ocu
enumeration
oda
enumeration
odk
enumeration
odt
enumeration
odu
enumeration
ofo
enumeration
ofs
enumeration
ofu
enumeration
ogb
enumeration
ogc
enumeration
oge
enumeration
ogg
enumeration
ogo
enumeration
ogu
enumeration
oht
enumeration
ohu
enumeration
oia
enumeration
oin
enumeration
ojb
enumeration
ojc
enumeration
ojg
enumeration
ojp
enumeration
ojs
enumeration
ojv
enumeration
ojw
enumeration
oka
enumeration
okb
enumeration
okd
enumeration
oke
enumeration
okg
enumeration
okh
enumeration
oki
enumeration
okj
enumeration
okk
enumeration
okl
enumeration
okm
enumeration
okn
enumeration
oko
enumeration
okr
enumeration
oks
enumeration
oku
enumeration
okv
enumeration
okx
enumeration
ola
enumeration
old
enumeration
ole
enumeration
olk
enumeration
olm
enumeration
olo
enumeration
olr
enumeration
olt
enumeration
oma
enumeration
omb
enumeration
omc
enumeration
ome
enumeration
omg
enumeration
omi
enumeration
omk
enumeration
oml
enumeration
omn
enumeration
omo
enumeration
omp
enumeration
omq
enumeration
omr
enumeration
omt
enumeration
omu
enumeration
omv
enumeration
omw
enumeration
omx
enumeration
ona
enumeration
onb
enumeration
one
enumeration
ong
enumeration
oni
enumeration
onj
enumeration
onk
enumeration
onn
enumeration
ono
enumeration
onp
enumeration
onr
enumeration
ons
enumeration
ont
enumeration
onu
enumeration
onw
enumeration
onx
enumeration
ood
enumeration
oog
enumeration
oon
enumeration
oor
enumeration
oos
enumeration
opa
enumeration
opk
enumeration
opm
enumeration
opo
enumeration
opt
enumeration
opy
enumeration
ora
enumeration
orc
enumeration
ore
enumeration
org
enumeration
orh
enumeration
orn
enumeration
oro
enumeration
orr
enumeration
ors
enumeration
ort
enumeration
oru
enumeration
orv
enumeration
orw
enumeration
orx
enumeration
ory
enumeration
orz
enumeration
osa
enumeration
osc
enumeration
osi
enumeration
oso
enumeration
osp
enumeration
ost
enumeration
osu
enumeration
osx
enumeration
ota
enumeration
otb
enumeration
otd
enumeration
ote
enumeration
oti
enumeration
otk
enumeration
otl
enumeration
otm
enumeration
otn
enumeration
oto
enumeration
otq
enumeration
otr
enumeration
ots
enumeration
ott
enumeration
otu
enumeration
otw
enumeration
otx
enumeration
oty
enumeration
otz
enumeration
oua
enumeration
oub
enumeration
oue
enumeration
oui
enumeration
oum
enumeration
oun
enumeration
owi
enumeration
owl
enumeration
oyb
enumeration
oyd
enumeration
oym
enumeration
oyy
enumeration
ozm
enumeration
paa
enumeration
pab
enumeration
pac
enumeration
pad
enumeration
pae
enumeration
paf
enumeration
pag
enumeration
pah
enumeration
pai
enumeration
pak
enumeration
pal
enumeration
pam
enumeration
pao
enumeration
pap
enumeration
paq
enumeration
par
enumeration
pas
enumeration
pat
enumeration
pau
enumeration
pav
enumeration
paw
enumeration
pax
enumeration
pay
enumeration
paz
enumeration
pbb
enumeration
pbc
enumeration
pbe
enumeration
pbf
enumeration
pbg
enumeration
pbh
enumeration
pbi
enumeration
pbl
enumeration
pbn
enumeration
pbo
enumeration
pbp
enumeration
pbr
enumeration
pbs
enumeration
pbt
enumeration
pbu
enumeration
pbv
enumeration
pby
enumeration
pca
enumeration
pcb
enumeration
pcc
enumeration
pcd
enumeration
pce
enumeration
pcf
enumeration
pcg
enumeration
pch
enumeration
pci
enumeration
pcj
enumeration
pck
enumeration
pcl
enumeration
pcm
enumeration
pcn
enumeration
pcp
enumeration
pcw
enumeration
pda
enumeration
pdc
enumeration
pdi
enumeration
pdn
enumeration
pdo
enumeration
pdt
enumeration
pdu
enumeration
pea
enumeration
peb
enumeration
ped
enumeration
pee
enumeration
pef
enumeration
peg
enumeration
peh
enumeration
pei
enumeration
pej
enumeration
pek
enumeration
pel
enumeration
pem
enumeration
peo
enumeration
pep
enumeration
peq
enumeration
pes
enumeration
pev
enumeration
pex
enumeration
pey
enumeration
pez
enumeration
pfa
enumeration
pfe
enumeration
pfl
enumeration
pga
enumeration
pgg
enumeration
pgi
enumeration
pgk
enumeration
pgl
enumeration
pgn
enumeration
pgs
enumeration
pgu
enumeration
pha
enumeration
phd
enumeration
phg
enumeration
phh
enumeration
phi
enumeration
phk
enumeration
phl
enumeration
phm
enumeration
phn
enumeration
pho
enumeration
phq
enumeration
phr
enumeration
pht
enumeration
phu
enumeration
phv
enumeration
phw
enumeration
pia
enumeration
pib
enumeration
pic
enumeration
pid
enumeration
pie
enumeration
pif
enumeration
pig
enumeration
pih
enumeration
pii
enumeration
pij
enumeration
pil
enumeration
pim
enumeration
pin
enumeration
pio
enumeration
pip
enumeration
pir
enumeration
pis
enumeration
pit
enumeration
piu
enumeration
piv
enumeration
piw
enumeration
pix
enumeration
piy
enumeration
piz
enumeration
pjt
enumeration
pka
enumeration
pkb
enumeration
pkc
enumeration
pkg
enumeration
pkh
enumeration
pkn
enumeration
pko
enumeration
pkp
enumeration
pkr
enumeration
pks
enumeration
pkt
enumeration
pku
enumeration
pla
enumeration
plb
enumeration
plc
enumeration
pld
enumeration
ple
enumeration
plf
enumeration
plg
enumeration
plh
enumeration
plj
enumeration
plk
enumeration
pll
enumeration
pln
enumeration
plo
enumeration
plp
enumeration
plq
enumeration
plr
enumeration
pls
enumeration
plt
enumeration
plu
enumeration
plv
enumeration
plw
enumeration
ply
enumeration
plz
enumeration
pma
enumeration
pmb
enumeration
pmc
enumeration
pmd
enumeration
pme
enumeration
pmf
enumeration
pmh
enumeration
pmi
enumeration
pmj
enumeration
pmk
enumeration
pml
enumeration
pmm
enumeration
pmn
enumeration
pmo
enumeration
pmq
enumeration
pmr
enumeration
pms
enumeration
pmt
enumeration
pmu
enumeration
pmw
enumeration
pmx
enumeration
pmy
enumeration
pmz
enumeration
pna
enumeration
pnb
enumeration
pnc
enumeration
pne
enumeration
png
enumeration
pnh
enumeration
pni
enumeration
pnj
enumeration
pnk
enumeration
pnl
enumeration
pnm
enumeration
pnn
enumeration
pno
enumeration
pnp
enumeration
pnq
enumeration
pnr
enumeration
pns
enumeration
pnt
enumeration
pnu
enumeration
pnv
enumeration
pnw
enumeration
pnx
enumeration
pny
enumeration
pnz
enumeration
poc
enumeration
pod
enumeration
poe
enumeration
pof
enumeration
pog
enumeration
poh
enumeration
poi
enumeration
pok
enumeration
pom
enumeration
pon
enumeration
poo
enumeration
pop
enumeration
poq
enumeration
pos
enumeration
pot
enumeration
pov
enumeration
pow
enumeration
pox
enumeration
poy
enumeration
poz
enumeration
ppa
enumeration
ppe
enumeration
ppi
enumeration
ppk
enumeration
ppl
enumeration
ppm
enumeration
ppn
enumeration
ppo
enumeration
ppp
enumeration
ppq
enumeration
pps
enumeration
ppt
enumeration
ppu
enumeration
pqa
enumeration
pqe
enumeration
pqm
enumeration
pqw
enumeration
pra
enumeration
prb
enumeration
prc
enumeration
prd
enumeration
pre
enumeration
prf
enumeration
prg
enumeration
prh
enumeration
pri
enumeration
prk
enumeration
prl
enumeration
prm
enumeration
prn
enumeration
pro
enumeration
prp
enumeration
prq
enumeration
prr
enumeration
prs
enumeration
prt
enumeration
pru
enumeration
prw
enumeration
prx
enumeration
pry
enumeration
prz
enumeration
psa
enumeration
psc
enumeration
psd
enumeration
pse
enumeration
psg
enumeration
psh
enumeration
psi
enumeration
psl
enumeration
psm
enumeration
psn
enumeration
pso
enumeration
psp
enumeration
psq
enumeration
psr
enumeration
pss
enumeration
pst
enumeration
psu
enumeration
psw
enumeration
psy
enumeration
pta
enumeration
pth
enumeration
pti
enumeration
ptn
enumeration
pto
enumeration
ptp
enumeration
ptq
enumeration
ptr
enumeration
ptt
enumeration
ptu
enumeration
ptv
enumeration
ptw
enumeration
pty
enumeration
pua
enumeration
pub
enumeration
puc
enumeration
pud
enumeration
pue
enumeration
puf
enumeration
pug
enumeration
pui
enumeration
puj
enumeration
puk
enumeration
pum
enumeration
puo
enumeration
pup
enumeration
puq
enumeration
pur
enumeration
put
enumeration
puu
enumeration
puw
enumeration
pux
enumeration
puy
enumeration
pwa
enumeration
pwb
enumeration
pwg
enumeration
pwi
enumeration
pwm
enumeration
pwn
enumeration
pwo
enumeration
pwr
enumeration
pww
enumeration
pxm
enumeration
pye
enumeration
pym
enumeration
pyn
enumeration
pys
enumeration
pyu
enumeration
pyx
enumeration
pyy
enumeration
pzn
enumeration
qaa..qtz
enumeration
qua
enumeration
qub
enumeration
quc
enumeration
qud
enumeration
quf
enumeration
qug
enumeration
quh
enumeration
qui
enumeration
quk
enumeration
qul
enumeration
qum
enumeration
qun
enumeration
qup
enumeration
quq
enumeration
qur
enumeration
qus
enumeration
quv
enumeration
quw
enumeration
qux
enumeration
quy
enumeration
quz
enumeration
qva
enumeration
qvc
enumeration
qve
enumeration
qvh
enumeration
qvi
enumeration
qvj
enumeration
qvl
enumeration
qvm
enumeration
qvn
enumeration
qvo
enumeration
qvp
enumeration
qvs
enumeration
qvw
enumeration
qvy
enumeration
qvz
enumeration
qwa
enumeration
qwc
enumeration
qwe
enumeration
qwh
enumeration
qwm
enumeration
qws
enumeration
qwt
enumeration
qxa
enumeration
qxc
enumeration
qxh
enumeration
qxl
enumeration
qxn
enumeration
qxo
enumeration
qxp
enumeration
qxq
enumeration
qxr
enumeration
qxs
enumeration
qxt
enumeration
qxu
enumeration
qxw
enumeration
qya
enumeration
qyp
enumeration
raa
enumeration
rab
enumeration
rac
enumeration
rad
enumeration
raf
enumeration
rag
enumeration
rah
enumeration
rai
enumeration
raj
enumeration
rak
enumeration
ral
enumeration
ram
enumeration
ran
enumeration
rao
enumeration
rap
enumeration
raq
enumeration
rar
enumeration
ras
enumeration
rat
enumeration
rau
enumeration
rav
enumeration
raw
enumeration
rax
enumeration
ray
enumeration
raz
enumeration
rbb
enumeration
rbk
enumeration
rbl
enumeration
rbp
enumeration
rcf
enumeration
rdb
enumeration
rea
enumeration
reb
enumeration
ree
enumeration
reg
enumeration
rei
enumeration
rej
enumeration
rel
enumeration
rem
enumeration
ren
enumeration
rer
enumeration
res
enumeration
ret
enumeration
rey
enumeration
rga
enumeration
rge
enumeration
rgk
enumeration
rgn
enumeration
rgr
enumeration
rgs
enumeration
rgu
enumeration
rhg
enumeration
rhp
enumeration
ria
enumeration
rie
enumeration
rif
enumeration
ril
enumeration
rim
enumeration
rin
enumeration
rir
enumeration
rit
enumeration
riu
enumeration
rjg
enumeration
rji
enumeration
rjs
enumeration
rka
enumeration
rkb
enumeration
rkh
enumeration
rki
enumeration
rkm
enumeration
rkt
enumeration
rkw
enumeration
rma
enumeration
rmb
enumeration
rmc
enumeration
rmd
enumeration
rme
enumeration
rmf
enumeration
rmg
enumeration
rmh
enumeration
rmi
enumeration
rmk
enumeration
rml
enumeration
rmm
enumeration
rmn
enumeration
rmo
enumeration
rmp
enumeration
rmq
enumeration
rms
enumeration
rmt
enumeration
rmu
enumeration
rmv
enumeration
rmw
enumeration
rmx
enumeration
rmy
enumeration
rmz
enumeration
rna
enumeration
rnd
enumeration
rng
enumeration
rnl
enumeration
rnn
enumeration
rnp
enumeration
rnr
enumeration
rnw
enumeration
roa
enumeration
rob
enumeration
roc
enumeration
rod
enumeration
roe
enumeration
rof
enumeration
rog
enumeration
rol
enumeration
rom
enumeration
roo
enumeration
rop
enumeration
ror
enumeration
rou
enumeration
row
enumeration
rpn
enumeration
rpt
enumeration
rri
enumeration
rro
enumeration
rrt
enumeration
rsb
enumeration
rsi
enumeration
rsl
enumeration
rtc
enumeration
rth
enumeration
rtm
enumeration
rtw
enumeration
rub
enumeration
ruc
enumeration
rue
enumeration
ruf
enumeration
rug
enumeration
ruh
enumeration
rui
enumeration
ruk
enumeration
ruo
enumeration
rup
enumeration
ruq
enumeration
rut
enumeration
ruu
enumeration
ruy
enumeration
ruz
enumeration
rwa
enumeration
rwk
enumeration
rwm
enumeration
rwo
enumeration
rwr
enumeration
rxd
enumeration
rxw
enumeration
ryn
enumeration
rys
enumeration
ryu
enumeration
saa
enumeration
sab
enumeration
sac
enumeration
sad
enumeration
sae
enumeration
saf
enumeration
sah
enumeration
sai
enumeration
saj
enumeration
sak
enumeration
sal
enumeration
sam
enumeration
sao
enumeration
saq
enumeration
sar
enumeration
sas
enumeration
sat
enumeration
sau
enumeration
sav
enumeration
saw
enumeration
sax
enumeration
say
enumeration
saz
enumeration
sba
enumeration
sbb
enumeration
sbc
enumeration
sbd
enumeration
sbe
enumeration
sbf
enumeration
sbg
enumeration
sbh
enumeration
sbi
enumeration
sbj
enumeration
sbk
enumeration
sbl
enumeration
sbm
enumeration
sbn
enumeration
sbo
enumeration
sbp
enumeration
sbq
enumeration
sbr
enumeration
sbs
enumeration
sbt
enumeration
sbu
enumeration
sbv
enumeration
sbw
enumeration
sbx
enumeration
sby
enumeration
sbz
enumeration
scb
enumeration
sce
enumeration
scf
enumeration
scg
enumeration
sch
enumeration
sci
enumeration
sck
enumeration
scl
enumeration
scn
enumeration
sco
enumeration
scp
enumeration
scq
enumeration
scs
enumeration
scu
enumeration
scv
enumeration
scw
enumeration
scx
enumeration
sda
enumeration
sdb
enumeration
sdc
enumeration
sde
enumeration
sdf
enumeration
sdg
enumeration
sdh
enumeration
sdj
enumeration
sdk
enumeration
sdl
enumeration
sdm
enumeration
sdn
enumeration
sdo
enumeration
sdp
enumeration
sdr
enumeration
sds
enumeration
sdt
enumeration
sdu
enumeration
sdv
enumeration
sdx
enumeration
sdz
enumeration
sea
enumeration
seb
enumeration
sec
enumeration
sed
enumeration
see
enumeration
sef
enumeration
seg
enumeration
seh
enumeration
sei
enumeration
sej
enumeration
sek
enumeration
sel
enumeration
sem
enumeration
sen
enumeration
seo
enumeration
sep
enumeration
seq
enumeration
ser
enumeration
ses
enumeration
set
enumeration
seu
enumeration
sev
enumeration
sew
enumeration
sey
enumeration
sez
enumeration
sfb
enumeration
sfe
enumeration
sfm
enumeration
sfs
enumeration
sfw
enumeration
sga
enumeration
sgb
enumeration
sgc
enumeration
sgd
enumeration
sge
enumeration
sgg
enumeration
sgh
enumeration
sgi
enumeration
sgj
enumeration
sgk
enumeration
sgm
enumeration
sgn
enumeration
sgo
enumeration
sgp
enumeration
sgr
enumeration
sgs
enumeration
sgt
enumeration
sgu
enumeration
sgw
enumeration
sgx
enumeration
sgy
enumeration
sgz
enumeration
sha
enumeration
shb
enumeration
shc
enumeration
shd
enumeration
she
enumeration
shg
enumeration
shh
enumeration
shi
enumeration
shj
enumeration
shk
enumeration
shl
enumeration
shm
enumeration
shn
enumeration
sho
enumeration
shp
enumeration
shq
enumeration
shr
enumeration
shs
enumeration
sht
enumeration
shu
enumeration
shv
enumeration
shw
enumeration
shx
enumeration
shy
enumeration
shz
enumeration
sia
enumeration
sib
enumeration
sid
enumeration
sie
enumeration
sif
enumeration
sig
enumeration
sih
enumeration
sii
enumeration
sij
enumeration
sik
enumeration
sil
enumeration
sim
enumeration
sio
enumeration
sip
enumeration
siq
enumeration
sir
enumeration
sis
enumeration
sit
enumeration
siu
enumeration
siv
enumeration
siw
enumeration
six
enumeration
siy
enumeration
siz
enumeration
sja
enumeration
sjb
enumeration
sjd
enumeration
sje
enumeration
sjg
enumeration
sjk
enumeration
sjl
enumeration
sjm
enumeration
sjn
enumeration
sjo
enumeration
sjp
enumeration
sjr
enumeration
sjs
enumeration
sjt
enumeration
sju
enumeration
sjw
enumeration
ska
enumeration
skb
enumeration
skc
enumeration
skd
enumeration
ske
enumeration
skf
enumeration
skg
enumeration
skh
enumeration
ski
enumeration
skj
enumeration
skk
enumeration
skm
enumeration
skn
enumeration
sko
enumeration
skp
enumeration
skq
enumeration
skr
enumeration
sks
enumeration
skt
enumeration
sku
enumeration
skv
enumeration
skw
enumeration
skx
enumeration
sky
enumeration
skz
enumeration
sla
enumeration
slc
enumeration
sld
enumeration
sle
enumeration
slf
enumeration
slg
enumeration
slh
enumeration
sli
enumeration
slj
enumeration
sll
enumeration
slm
enumeration
sln
enumeration
slp
enumeration
slq
enumeration
slr
enumeration
sls
enumeration
slt
enumeration
slu
enumeration
slw
enumeration
slx
enumeration
sly
enumeration
slz
enumeration
sma
enumeration
smb
enumeration
smc
enumeration
smd
enumeration
smf
enumeration
smg
enumeration
smh
enumeration
smi
enumeration
smj
enumeration
smk
enumeration
sml
enumeration
smm
enumeration
smn
enumeration
smp
enumeration
smq
enumeration
smr
enumeration
sms
enumeration
smt
enumeration
smu
enumeration
smv
enumeration
smw
enumeration
smx
enumeration
smy
enumeration
smz
enumeration
snb
enumeration
snc
enumeration
sne
enumeration
snf
enumeration
sng
enumeration
snh
enumeration
sni
enumeration
snj
enumeration
snk
enumeration
snl
enumeration
snm
enumeration
snn
enumeration
sno
enumeration
snp
enumeration
snq
enumeration
snr
enumeration
sns
enumeration
snu
enumeration
snv
enumeration
snw
enumeration
snx
enumeration
sny
enumeration
snz
enumeration
soa
enumeration
sob
enumeration
soc
enumeration
sod
enumeration
soe
enumeration
sog
enumeration
soh
enumeration
soi
enumeration
soj
enumeration
sok
enumeration
sol
enumeration
son
enumeration
soo
enumeration
sop
enumeration
soq
enumeration
sor
enumeration
sos
enumeration
sou
enumeration
sov
enumeration
sow
enumeration
sox
enumeration
soy
enumeration
soz
enumeration
spb
enumeration
spc
enumeration
spd
enumeration
spe
enumeration
spg
enumeration
spi
enumeration
spk
enumeration
spl
enumeration
spm
enumeration
spn
enumeration
spo
enumeration
spp
enumeration
spq
enumeration
spr
enumeration
sps
enumeration
spt
enumeration
spu
enumeration
spv
enumeration
spx
enumeration
spy
enumeration
sqa
enumeration
sqh
enumeration
sqj
enumeration
sqk
enumeration
sqm
enumeration
sqn
enumeration
sqo
enumeration
sqq
enumeration
sqr
enumeration
sqs
enumeration
sqt
enumeration
squ
enumeration
sra
enumeration
srb
enumeration
src
enumeration
sre
enumeration
srf
enumeration
srg
enumeration
srh
enumeration
sri
enumeration
srk
enumeration
srl
enumeration
srm
enumeration
srn
enumeration
sro
enumeration
srq
enumeration
srr
enumeration
srs
enumeration
srt
enumeration
sru
enumeration
srv
enumeration
srw
enumeration
srx
enumeration
sry
enumeration
srz
enumeration
ssa
enumeration
ssb
enumeration
ssc
enumeration
ssd
enumeration
sse
enumeration
ssf
enumeration
ssg
enumeration
ssh
enumeration
ssi
enumeration
ssj
enumeration
ssk
enumeration
ssl
enumeration
ssm
enumeration
ssn
enumeration
sso
enumeration
ssp
enumeration
ssq
enumeration
ssr
enumeration
sss
enumeration
sst
enumeration
ssu
enumeration
ssv
enumeration
ssx
enumeration
ssy
enumeration
ssz
enumeration
sta
enumeration
stb
enumeration
std
enumeration
ste
enumeration
stf
enumeration
stg
enumeration
sth
enumeration
sti
enumeration
stj
enumeration
stk
enumeration
stl
enumeration
stm
enumeration
stn
enumeration
sto
enumeration
stp
enumeration
stq
enumeration
str
enumeration
sts
enumeration
stt
enumeration
stu
enumeration
stv
enumeration
stw
enumeration
sty
enumeration
sua
enumeration
sub
enumeration
suc
enumeration
sue
enumeration
sug
enumeration
sui
enumeration
suj
enumeration
suk
enumeration
suq
enumeration
sur
enumeration
sus
enumeration
sut
enumeration
suv
enumeration
suw
enumeration
sux
enumeration
suy
enumeration
suz
enumeration
sva
enumeration
svb
enumeration
svc
enumeration
sve
enumeration
svk
enumeration
svm
enumeration
svr
enumeration
svs
enumeration
svx
enumeration
swb
enumeration
swc
enumeration
swf
enumeration
swg
enumeration
swh
enumeration
swi
enumeration
swj
enumeration
swk
enumeration
swl
enumeration
swm
enumeration
swn
enumeration
swo
enumeration
swp
enumeration
swq
enumeration
swr
enumeration
sws
enumeration
swt
enumeration
swu
enumeration
swv
enumeration
sww
enumeration
swx
enumeration
swy
enumeration
sxb
enumeration
sxc
enumeration
sxe
enumeration
sxg
enumeration
sxk
enumeration
sxl
enumeration
sxm
enumeration
sxn
enumeration
sxo
enumeration
sxr
enumeration
sxs
enumeration
sxu
enumeration
sxw
enumeration
sya
enumeration
syb
enumeration
syc
enumeration
syd
enumeration
syi
enumeration
syk
enumeration
syl
enumeration
sym
enumeration
syn
enumeration
syo
enumeration
syr
enumeration
sys
enumeration
syw
enumeration
syy
enumeration
sza
enumeration
szb
enumeration
szc
enumeration
szd
enumeration
sze
enumeration
szg
enumeration
szl
enumeration
szn
enumeration
szp
enumeration
szv
enumeration
szw
enumeration
taa
enumeration
tab
enumeration
tac
enumeration
tad
enumeration
tae
enumeration
taf
enumeration
tag
enumeration
tai
enumeration
taj
enumeration
tak
enumeration
tal
enumeration
tan
enumeration
tao
enumeration
tap
enumeration
taq
enumeration
tar
enumeration
tas
enumeration
tau
enumeration
tav
enumeration
taw
enumeration
tax
enumeration
tay
enumeration
taz
enumeration
tba
enumeration
tbb
enumeration
tbc
enumeration
tbd
enumeration
tbe
enumeration
tbf
enumeration
tbg
enumeration
tbh
enumeration
tbi
enumeration
tbj
enumeration
tbk
enumeration
tbl
enumeration
tbm
enumeration
tbn
enumeration
tbo
enumeration
tbp
enumeration
tbq
enumeration
tbr
enumeration
tbs
enumeration
tbt
enumeration
tbu
enumeration
tbv
enumeration
tbw
enumeration
tbx
enumeration
tby
enumeration
tbz
enumeration
tca
enumeration
tcb
enumeration
tcc
enumeration
tcd
enumeration
tce
enumeration
tcf
enumeration
tcg
enumeration
tch
enumeration
tci
enumeration
tck
enumeration
tcl
enumeration
tcm
enumeration
tcn
enumeration
tco
enumeration
tcp
enumeration
tcq
enumeration
tcs
enumeration
tct
enumeration
tcu
enumeration
tcw
enumeration
tcx
enumeration
tcy
enumeration
tcz
enumeration
tda
enumeration
tdb
enumeration
tdc
enumeration
tdd
enumeration
tde
enumeration
tdf
enumeration
tdg
enumeration
tdh
enumeration
tdi
enumeration
tdj
enumeration
tdk
enumeration
tdl
enumeration
tdn
enumeration
tdo
enumeration
tdq
enumeration
tdr
enumeration
tds
enumeration
tdt
enumeration
tdu
enumeration
tdv
enumeration
tdx
enumeration
tdy
enumeration
tea
enumeration
teb
enumeration
tec
enumeration
ted
enumeration
tee
enumeration
tef
enumeration
teg
enumeration
teh
enumeration
tei
enumeration
tek
enumeration
tem
enumeration
ten
enumeration
teo
enumeration
tep
enumeration
teq
enumeration
ter
enumeration
tes
enumeration
tet
enumeration
teu
enumeration
tev
enumeration
tew
enumeration
tex
enumeration
tey
enumeration
tfi
enumeration
tfn
enumeration
tfo
enumeration
tfr
enumeration
tft
enumeration
tga
enumeration
tgb
enumeration
tgc
enumeration
tgd
enumeration
tge
enumeration
tgf
enumeration
tgh
enumeration
tgi
enumeration
tgj
enumeration
tgn
enumeration
tgo
enumeration
tgp
enumeration
tgq
enumeration
tgr
enumeration
tgs
enumeration
tgt
enumeration
tgu
enumeration
tgv
enumeration
tgw
enumeration
tgx
enumeration
tgy
enumeration
tgz
enumeration
thc
enumeration
thd
enumeration
the
enumeration
thf
enumeration
thh
enumeration
thi
enumeration
thk
enumeration
thl
enumeration
thm
enumeration
thn
enumeration
thp
enumeration
thq
enumeration
thr
enumeration
ths
enumeration
tht
enumeration
thu
enumeration
thv
enumeration
thw
enumeration
thx
enumeration
thy
enumeration
thz
enumeration
tia
enumeration
tic
enumeration
tid
enumeration
tif
enumeration
tig
enumeration
tih
enumeration
tii
enumeration
tij
enumeration
tik
enumeration
til
enumeration
tim
enumeration
tin
enumeration
tio
enumeration
tip
enumeration
tiq
enumeration
tis
enumeration
tit
enumeration
tiu
enumeration
tiv
enumeration
tiw
enumeration
tix
enumeration
tiy
enumeration
tiz
enumeration
tja
enumeration
tjg
enumeration
tji
enumeration
tjl
enumeration
tjm
enumeration
tjn
enumeration
tjo
enumeration
tjs
enumeration
tju
enumeration
tjw
enumeration
tka
enumeration
tkb
enumeration
tkd
enumeration
tke
enumeration
tkf
enumeration
tkg
enumeration
tkl
enumeration
tkm
enumeration
tkn
enumeration
tkp
enumeration
tkq
enumeration
tkr
enumeration
tks
enumeration
tkt
enumeration
tku
enumeration
tkv
enumeration
tkw
enumeration
tkx
enumeration
tkz
enumeration
tla
enumeration
tlb
enumeration
tlc
enumeration
tld
enumeration
tlf
enumeration
tlg
enumeration
tlh
enumeration
tli
enumeration
tlj
enumeration
tlk
enumeration
tll
enumeration
tlm
enumeration
tln
enumeration
tlo
enumeration
tlp
enumeration
tlq
enumeration
tlr
enumeration
tls
enumeration
tlt
enumeration
tlu
enumeration
tlv
enumeration
tlx
enumeration
tly
enumeration
tma
enumeration
tmb
enumeration
tmc
enumeration
tmd
enumeration
tme
enumeration
tmf
enumeration
tmg
enumeration
tmh
enumeration
tmi
enumeration
tmj
enumeration
tmk
enumeration
tml
enumeration
tmm
enumeration
tmn
enumeration
tmo
enumeration
tmp
enumeration
tmq
enumeration
tmr
enumeration
tms
enumeration
tmt
enumeration
tmu
enumeration
tmv
enumeration
tmw
enumeration
tmy
enumeration
tmz
enumeration
tna
enumeration
tnb
enumeration
tnc
enumeration
tnd
enumeration
tne
enumeration
tng
enumeration
tnh
enumeration
tni
enumeration
tnk
enumeration
tnl
enumeration
tnm
enumeration
tnn
enumeration
tno
enumeration
tnp
enumeration
tnq
enumeration
tnr
enumeration
tns
enumeration
tnt
enumeration
tnu
enumeration
tnv
enumeration
tnw
enumeration
tnx
enumeration
tny
enumeration
tnz
enumeration
tob
enumeration
toc
enumeration
tod
enumeration
toe
enumeration
tof
enumeration
tog
enumeration
toh
enumeration
toi
enumeration
toj
enumeration
tol
enumeration
tom
enumeration
too
enumeration
top
enumeration
toq
enumeration
tor
enumeration
tos
enumeration
tou
enumeration
tov
enumeration
tow
enumeration
tox
enumeration
toy
enumeration
toz
enumeration
tpa
enumeration
tpc
enumeration
tpe
enumeration
tpf
enumeration
tpg
enumeration
tpi
enumeration
tpj
enumeration
tpk
enumeration
tpl
enumeration
tpm
enumeration
tpn
enumeration
tpo
enumeration
tpp
enumeration
tpq
enumeration
tpr
enumeration
tpt
enumeration
tpu
enumeration
tpv
enumeration
tpw
enumeration
tpx
enumeration
tpy
enumeration
tpz
enumeration
tqb
enumeration
tql
enumeration
tqm
enumeration
tqn
enumeration
tqo
enumeration
tqp
enumeration
tqq
enumeration
tqr
enumeration
tqt
enumeration
tqu
enumeration
tqw
enumeration
tra
enumeration
trb
enumeration
trc
enumeration
trd
enumeration
tre
enumeration
trf
enumeration
trg
enumeration
trh
enumeration
tri
enumeration
trj
enumeration
trk
enumeration
trl
enumeration
trm
enumeration
trn
enumeration
tro
enumeration
trp
enumeration
trq
enumeration
trr
enumeration
trs
enumeration
trt
enumeration
tru
enumeration
trv
enumeration
trw
enumeration
trx
enumeration
try
enumeration
trz
enumeration
tsa
enumeration
tsb
enumeration
tsc
enumeration
tsd
enumeration
tse
enumeration
tsf
enumeration
tsg
enumeration
tsh
enumeration
tsi
enumeration
tsj
enumeration
tsk
enumeration
tsl
enumeration
tsm
enumeration
tsp
enumeration
tsq
enumeration
tsr
enumeration
tss
enumeration
tst
enumeration
tsu
enumeration
tsv
enumeration
tsw
enumeration
tsx
enumeration
tsy
enumeration
tsz
enumeration
tta
enumeration
ttb
enumeration
ttc
enumeration
ttd
enumeration
tte
enumeration
ttf
enumeration
ttg
enumeration
tth
enumeration
tti
enumeration
ttj
enumeration
ttk
enumeration
ttl
enumeration
ttm
enumeration
ttn
enumeration
tto
enumeration
ttp
enumeration
ttq
enumeration
ttr
enumeration
tts
enumeration
ttt
enumeration
ttu
enumeration
ttv
enumeration
ttw
enumeration
tty
enumeration
ttz
enumeration
tua
enumeration
tub
enumeration
tuc
enumeration
tud
enumeration
tue
enumeration
tuf
enumeration
tug
enumeration
tuh
enumeration
tui
enumeration
tuj
enumeration
tul
enumeration
tum
enumeration
tun
enumeration
tuo
enumeration
tup
enumeration
tuq
enumeration
tus
enumeration
tut
enumeration
tuu
enumeration
tuv
enumeration
tuw
enumeration
tux
enumeration
tuy
enumeration
tuz
enumeration
tva
enumeration
tvd
enumeration
tve
enumeration
tvk
enumeration
tvl
enumeration
tvm
enumeration
tvn
enumeration
tvo
enumeration
tvs
enumeration
tvt
enumeration
tvu
enumeration
tvw
enumeration
tvy
enumeration
twa
enumeration
twb
enumeration
twc
enumeration
twd
enumeration
twe
enumeration
twf
enumeration
twg
enumeration
twh
enumeration
twl
enumeration
twm
enumeration
twn
enumeration
two
enumeration
twp
enumeration
twq
enumeration
twr
enumeration
twt
enumeration
twu
enumeration
tww
enumeration
twx
enumeration
twy
enumeration
txa
enumeration
txb
enumeration
txc
enumeration
txe
enumeration
txg
enumeration
txh
enumeration
txi
enumeration
txm
enumeration
txn
enumeration
txo
enumeration
txq
enumeration
txr
enumeration
txs
enumeration
txt
enumeration
txu
enumeration
txx
enumeration
txy
enumeration
tya
enumeration
tye
enumeration
tyh
enumeration
tyi
enumeration
tyj
enumeration
tyl
enumeration
tyn
enumeration
typ
enumeration
tyr
enumeration
tys
enumeration
tyt
enumeration
tyu
enumeration
tyv
enumeration
tyx
enumeration
tyz
enumeration
tza
enumeration
tzh
enumeration
tzj
enumeration
tzl
enumeration
tzm
enumeration
tzn
enumeration
tzo
enumeration
tzx
enumeration
uam
enumeration
uan
enumeration
uar
enumeration
uba
enumeration
ubi
enumeration
ubl
enumeration
ubr
enumeration
ubu
enumeration
uby
enumeration
uda
enumeration
ude
enumeration
udg
enumeration
udi
enumeration
udj
enumeration
udl
enumeration
udm
enumeration
udu
enumeration
ues
enumeration
ufi
enumeration
uga
enumeration
ugb
enumeration
uge
enumeration
ugn
enumeration
ugo
enumeration
ugy
enumeration
uha
enumeration
uhn
enumeration
uis
enumeration
uiv
enumeration
uji
enumeration
uka
enumeration
ukg
enumeration
ukh
enumeration
ukl
enumeration
ukp
enumeration
ukq
enumeration
uks
enumeration
uku
enumeration
ukw
enumeration
uky
enumeration
ula
enumeration
ulb
enumeration
ulc
enumeration
ule
enumeration
ulf
enumeration
uli
enumeration
ulk
enumeration
ull
enumeration
ulm
enumeration
uln
enumeration
ulu
enumeration
ulw
enumeration
uma
enumeration
umb
enumeration
umc
enumeration
umd
enumeration
umg
enumeration
umi
enumeration
umm
enumeration
umn
enumeration
umo
enumeration
ump
enumeration
umr
enumeration
ums
enumeration
umu
enumeration
una
enumeration
und
enumeration
une
enumeration
ung
enumeration
unk
enumeration
unm
enumeration
unn
enumeration
unr
enumeration
unu
enumeration
unx
enumeration
unz
enumeration
uok
enumeration
upi
enumeration
upv
enumeration
ura
enumeration
urb
enumeration
urc
enumeration
ure
enumeration
urf
enumeration
urg
enumeration
urh
enumeration
uri
enumeration
urj
enumeration
urk
enumeration
url
enumeration
urm
enumeration
urn
enumeration
uro
enumeration
urp
enumeration
urr
enumeration
urt
enumeration
uru
enumeration
urv
enumeration
urw
enumeration
urx
enumeration
ury
enumeration
urz
enumeration
usa
enumeration
ush
enumeration
usi
enumeration
usk
enumeration
usp
enumeration
usu
enumeration
uta
enumeration
ute
enumeration
utp
enumeration
utr
enumeration
utu
enumeration
uum
enumeration
uun
enumeration
uur
enumeration
uuu
enumeration
uve
enumeration
uvh
enumeration
uvl
enumeration
uwa
enumeration
uya
enumeration
uzn
enumeration
uzs
enumeration
vaa
enumeration
vae
enumeration
vaf
enumeration
vag
enumeration
vah
enumeration
vai
enumeration
vaj
enumeration
val
enumeration
vam
enumeration
van
enumeration
vao
enumeration
vap
enumeration
var
enumeration
vas
enumeration
vau
enumeration
vav
enumeration
vay
enumeration
vbb
enumeration
vbk
enumeration
vec
enumeration
ved
enumeration
vel
enumeration
vem
enumeration
veo
enumeration
vep
enumeration
ver
enumeration
vgr
enumeration
vgt
enumeration
vic
enumeration
vid
enumeration
vif
enumeration
vig
enumeration
vil
enumeration
vin
enumeration
vis
enumeration
vit
enumeration
viv
enumeration
vka
enumeration
vki
enumeration
vkj
enumeration
vkk
enumeration
vkl
enumeration
vkm
enumeration
vko
enumeration
vkp
enumeration
vkt
enumeration
vku
enumeration
vlp
enumeration
vls
enumeration
vma
enumeration
vmb
enumeration
vmc
enumeration
vmd
enumeration
vme
enumeration
vmf
enumeration
vmg
enumeration
vmh
enumeration
vmi
enumeration
vmj
enumeration
vmk
enumeration
vml
enumeration
vmm
enumeration
vmp
enumeration
vmq
enumeration
vmr
enumeration
vms
enumeration
vmu
enumeration
vmv
enumeration
vmw
enumeration
vmx
enumeration
vmy
enumeration
vmz
enumeration
vnk
enumeration
vnm
enumeration
vnp
enumeration
vor
enumeration
vot
enumeration
vra
enumeration
vro
enumeration
vrs
enumeration
vrt
enumeration
vsi
enumeration
vsl
enumeration
vsv
enumeration
vto
enumeration
vum
enumeration
vun
enumeration
vut
enumeration
vwa
enumeration
waa
enumeration
wab
enumeration
wac
enumeration
wad
enumeration
wae
enumeration
waf
enumeration
wag
enumeration
wah
enumeration
wai
enumeration
waj
enumeration
wak
enumeration
wal
enumeration
wam
enumeration
wan
enumeration
wao
enumeration
wap
enumeration
waq
enumeration
war
enumeration
was
enumeration
wat
enumeration
wau
enumeration
wav
enumeration
waw
enumeration
wax
enumeration
way
enumeration
waz
enumeration
wba
enumeration
wbb
enumeration
wbe
enumeration
wbf
enumeration
wbh
enumeration
wbi
enumeration
wbj
enumeration
wbk
enumeration
wbl
enumeration
wbm
enumeration
wbp
enumeration
wbq
enumeration
wbr
enumeration
wbt
enumeration
wbv
enumeration
wbw
enumeration
wca
enumeration
wci
enumeration
wdd
enumeration
wdg
enumeration
wdj
enumeration
wdk
enumeration
wdu
enumeration
wdy
enumeration
wea
enumeration
wec
enumeration
wed
enumeration
weg
enumeration
weh
enumeration
wei
enumeration
wem
enumeration
wen
enumeration
weo
enumeration
wep
enumeration
wer
enumeration
wes
enumeration
wet
enumeration
weu
enumeration
wew
enumeration
wfg
enumeration
wga
enumeration
wgb
enumeration
wgg
enumeration
wgi
enumeration
wgo
enumeration
wgu
enumeration
wgy
enumeration
wha
enumeration
whg
enumeration
whk
enumeration
whu
enumeration
wib
enumeration
wic
enumeration
wie
enumeration
wif
enumeration
wig
enumeration
wih
enumeration
wii
enumeration
wij
enumeration
wik
enumeration
wil
enumeration
wim
enumeration
win
enumeration
wir
enumeration
wiu
enumeration
wiv
enumeration
wiy
enumeration
wja
enumeration
wji
enumeration
wka
enumeration
wkb
enumeration
wkd
enumeration
wkl
enumeration
wku
enumeration
wkw
enumeration
wky
enumeration
wla
enumeration
wlc
enumeration
wle
enumeration
wlg
enumeration
wli
enumeration
wlk
enumeration
wll
enumeration
wlm
enumeration
wlo
enumeration
wlr
enumeration
wls
enumeration
wlu
enumeration
wlv
enumeration
wlw
enumeration
wlx
enumeration
wly
enumeration
wma
enumeration
wmb
enumeration
wmc
enumeration
wmd
enumeration
wme
enumeration
wmh
enumeration
wmi
enumeration
wmm
enumeration
wmn
enumeration
wmo
enumeration
wms
enumeration
wmt
enumeration
wmw
enumeration
wmx
enumeration
wnb
enumeration
wnc
enumeration
wnd
enumeration
wne
enumeration
wng
enumeration
wni
enumeration
wnk
enumeration
wnm
enumeration
wnn
enumeration
wno
enumeration
wnp
enumeration
wnu
enumeration
wnw
enumeration
wny
enumeration
woa
enumeration
wob
enumeration
woc
enumeration
wod
enumeration
woe
enumeration
wof
enumeration
wog
enumeration
woi
enumeration
wok
enumeration
wom
enumeration
won
enumeration
woo
enumeration
wor
enumeration
wos
enumeration
wow
enumeration
woy
enumeration
wpc
enumeration
wra
enumeration
wrb
enumeration
wrd
enumeration
wrg
enumeration
wrh
enumeration
wri
enumeration
wrk
enumeration
wrl
enumeration
wrm
enumeration
wrn
enumeration
wro
enumeration
wrp
enumeration
wrr
enumeration
wrs
enumeration
wru
enumeration
wrv
enumeration
wrw
enumeration
wrx
enumeration
wry
enumeration
wrz
enumeration
wsa
enumeration
wsi
enumeration
wsk
enumeration
wsr
enumeration
wss
enumeration
wsu
enumeration
wsv
enumeration
wtf
enumeration
wth
enumeration
wti
enumeration
wtk
enumeration
wtm
enumeration
wtw
enumeration
wua
enumeration
wub
enumeration
wud
enumeration
wuh
enumeration
wul
enumeration
wum
enumeration
wun
enumeration
wur
enumeration
wut
enumeration
wuu
enumeration
wuv
enumeration
wux
enumeration
wuy
enumeration
wwa
enumeration
wwb
enumeration
wwo
enumeration
wwr
enumeration
www
enumeration
wxa
enumeration
wxw
enumeration
wya
enumeration
wyb
enumeration
wyi
enumeration
wym
enumeration
wyr
enumeration
wyy
enumeration
xaa
enumeration
xab
enumeration
xac
enumeration
xad
enumeration
xae
enumeration
xag
enumeration
xai
enumeration
xaj
enumeration
xal
enumeration
xam
enumeration
xan
enumeration
xao
enumeration
xap
enumeration
xaq
enumeration
xar
enumeration
xas
enumeration
xat
enumeration
xau
enumeration
xav
enumeration
xaw
enumeration
xay
enumeration
xba
enumeration
xbb
enumeration
xbc
enumeration
xbd
enumeration
xbe
enumeration
xbg
enumeration
xbi
enumeration
xbj
enumeration
xbm
enumeration
xbn
enumeration
xbo
enumeration
xbp
enumeration
xbr
enumeration
xbw
enumeration
xbx
enumeration
xby
enumeration
xcb
enumeration
xcc
enumeration
xce
enumeration
xcg
enumeration
xch
enumeration
xcl
enumeration
xcm
enumeration
xcn
enumeration
xco
enumeration
xcr
enumeration
xct
enumeration
xcu
enumeration
xcv
enumeration
xcw
enumeration
xcy
enumeration
xda
enumeration
xdc
enumeration
xdk
enumeration
xdm
enumeration
xdy
enumeration
xeb
enumeration
xed
enumeration
xeg
enumeration
xel
enumeration
xem
enumeration
xep
enumeration
xer
enumeration
xes
enumeration
xet
enumeration
xeu
enumeration
xfa
enumeration
xga
enumeration
xgb
enumeration
xgd
enumeration
xgf
enumeration
xgg
enumeration
xgi
enumeration
xgl
enumeration
xgm
enumeration
xgn
enumeration
xgr
enumeration
xgu
enumeration
xgw
enumeration
xha
enumeration
xhc
enumeration
xhd
enumeration
xhe
enumeration
xhr
enumeration
xht
enumeration
xhu
enumeration
xhv
enumeration
xib
enumeration
xii
enumeration
xil
enumeration
xin
enumeration
xip
enumeration
xir
enumeration
xis
enumeration
xiv
enumeration
xiy
enumeration
xjb
enumeration
xjt
enumeration
xka
enumeration
xkb
enumeration
xkc
enumeration
xkd
enumeration
xke
enumeration
xkf
enumeration
xkg
enumeration
xkh
enumeration
xki
enumeration
xkj
enumeration
xkk
enumeration
xkl
enumeration
xkn
enumeration
xko
enumeration
xkp
enumeration
xkq
enumeration
xkr
enumeration
xks
enumeration
xkt
enumeration
xku
enumeration
xkv
enumeration
xkw
enumeration
xkx
enumeration
xky
enumeration
xkz
enumeration
xla
enumeration
xlb
enumeration
xlc
enumeration
xld
enumeration
xle
enumeration
xlg
enumeration
xli
enumeration
xln
enumeration
xlo
enumeration
xlp
enumeration
xls
enumeration
xlu
enumeration
xly
enumeration
xma
enumeration
xmb
enumeration
xmc
enumeration
xmd
enumeration
xme
enumeration
xmf
enumeration
xmg
enumeration
xmh
enumeration
xmj
enumeration
xmk
enumeration
xml
enumeration
xmm
enumeration
xmn
enumeration
xmo
enumeration
xmp
enumeration
xmq
enumeration
xmr
enumeration
xms
enumeration
xmt
enumeration
xmu
enumeration
xmv
enumeration
xmw
enumeration
xmx
enumeration
xmy
enumeration
xmz
enumeration
xna
enumeration
xnb
enumeration
xnd
enumeration
xng
enumeration
xnh
enumeration
xni
enumeration
xnk
enumeration
xnn
enumeration
xno
enumeration
xnr
enumeration
xns
enumeration
xnt
enumeration
xnu
enumeration
xny
enumeration
xnz
enumeration
xoc
enumeration
xod
enumeration
xog
enumeration
xoi
enumeration
xok
enumeration
xom
enumeration
xon
enumeration
xoo
enumeration
xop
enumeration
xor
enumeration
xow
enumeration
xpa
enumeration
xpc
enumeration
xpe
enumeration
xpg
enumeration
xpi
enumeration
xpj
enumeration
xpk
enumeration
xpm
enumeration
xpn
enumeration
xpo
enumeration
xpp
enumeration
xpq
enumeration
xpr
enumeration
xps
enumeration
xpt
enumeration
xpu
enumeration
xpy
enumeration
xqa
enumeration
xqt
enumeration
xra
enumeration
xrb
enumeration
xrd
enumeration
xre
enumeration
xrg
enumeration
xri
enumeration
xrm
enumeration
xrn
enumeration
xrq
enumeration
xrr
enumeration
xrt
enumeration
xru
enumeration
xrw
enumeration
xsa
enumeration
xsb
enumeration
xsc
enumeration
xsd
enumeration
xse
enumeration
xsh
enumeration
xsi
enumeration
xsj
enumeration
xsl
enumeration
xsm
enumeration
xsn
enumeration
xso
enumeration
xsp
enumeration
xsq
enumeration
xsr
enumeration
xss
enumeration
xsu
enumeration
xsv
enumeration
xsy
enumeration
xta
enumeration
xtb
enumeration
xtc
enumeration
xtd
enumeration
xte
enumeration
xtg
enumeration
xth
enumeration
xti
enumeration
xtj
enumeration
xtl
enumeration
xtm
enumeration
xtn
enumeration
xto
enumeration
xtp
enumeration
xtq
enumeration
xtr
enumeration
xts
enumeration
xtt
enumeration
xtu
enumeration
xtv
enumeration
xtw
enumeration
xty
enumeration
xtz
enumeration
xua
enumeration
xub
enumeration
xud
enumeration
xug
enumeration
xuj
enumeration
xul
enumeration
xum
enumeration
xun
enumeration
xuo
enumeration
xup
enumeration
xur
enumeration
xut
enumeration
xuu
enumeration
xve
enumeration
xvi
enumeration
xvn
enumeration
xvo
enumeration
xvs
enumeration
xwa
enumeration
xwc
enumeration
xwd
enumeration
xwe
enumeration
xwg
enumeration
xwj
enumeration
xwk
enumeration
xwl
enumeration
xwo
enumeration
xwr
enumeration
xwt
enumeration
xww
enumeration
xxb
enumeration
xxk
enumeration
xxm
enumeration
xxr
enumeration
xxt
enumeration
xya
enumeration
xyb
enumeration
xyj
enumeration
xyk
enumeration
xyl
enumeration
xyt
enumeration
xyy
enumeration
xzh
enumeration
xzm
enumeration
xzp
enumeration
yaa
enumeration
yab
enumeration
yac
enumeration
yad
enumeration
yae
enumeration
yaf
enumeration
yag
enumeration
yah
enumeration
yai
enumeration
yaj
enumeration
yak
enumeration
yal
enumeration
yam
enumeration
yan
enumeration
yao
enumeration
yap
enumeration
yaq
enumeration
yar
enumeration
yas
enumeration
yat
enumeration
yau
enumeration
yav
enumeration
yaw
enumeration
yax
enumeration
yay
enumeration
yaz
enumeration
yba
enumeration
ybb
enumeration
ybe
enumeration
ybh
enumeration
ybi
enumeration
ybj
enumeration
ybk
enumeration
ybl
enumeration
ybm
enumeration
ybn
enumeration
ybo
enumeration
ybx
enumeration
yby
enumeration
ych
enumeration
ycl
enumeration
ycn
enumeration
ycp
enumeration
yda
enumeration
ydd
enumeration
yde
enumeration
ydg
enumeration
ydk
enumeration
yds
enumeration
yea
enumeration
yec
enumeration
yee
enumeration
yei
enumeration
yej
enumeration
yel
enumeration
yer
enumeration
yes
enumeration
yet
enumeration
yeu
enumeration
yev
enumeration
yey
enumeration
yga
enumeration
ygi
enumeration
ygl
enumeration
ygm
enumeration
ygp
enumeration
ygr
enumeration
ygs
enumeration
ygu
enumeration
ygw
enumeration
yha
enumeration
yhd
enumeration
yhl
enumeration
yia
enumeration
yif
enumeration
yig
enumeration
yih
enumeration
yii
enumeration
yij
enumeration
yik
enumeration
yil
enumeration
yim
enumeration
yin
enumeration
yip
enumeration
yiq
enumeration
yir
enumeration
yis
enumeration
yit
enumeration
yiu
enumeration
yiv
enumeration
yix
enumeration
yiz
enumeration
yka
enumeration
ykg
enumeration
yki
enumeration
ykk
enumeration
ykl
enumeration
ykm
enumeration
ykn
enumeration
yko
enumeration
ykr
enumeration
ykt
enumeration
yku
enumeration
yky
enumeration
yla
enumeration
ylb
enumeration
yle
enumeration
ylg
enumeration
yli
enumeration
yll
enumeration
ylm
enumeration
yln
enumeration
ylo
enumeration
ylr
enumeration
ylu
enumeration
yly
enumeration
ymb
enumeration
ymc
enumeration
ymd
enumeration
yme
enumeration
ymg
enumeration
ymh
enumeration
ymi
enumeration
ymk
enumeration
yml
enumeration
ymm
enumeration
ymn
enumeration
ymo
enumeration
ymp
enumeration
ymq
enumeration
ymr
enumeration
yms
enumeration
ymt
enumeration
ymx
enumeration
ymz
enumeration
yna
enumeration
ynd
enumeration
yne
enumeration
yng
enumeration
ynh
enumeration
ynk
enumeration
ynl
enumeration
ynn
enumeration
yno
enumeration
ynq
enumeration
yns
enumeration
ynu
enumeration
yob
enumeration
yog
enumeration
yoi
enumeration
yok
enumeration
yol
enumeration
yom
enumeration
yon
enumeration
yot
enumeration
yox
enumeration
yoy
enumeration
ypa
enumeration
ypb
enumeration
ypg
enumeration
yph
enumeration
ypk
enumeration
ypm
enumeration
ypn
enumeration
ypo
enumeration
ypp
enumeration
ypz
enumeration
yra
enumeration
yrb
enumeration
yre
enumeration
yri
enumeration
yrk
enumeration
yrl
enumeration
yrm
enumeration
yrn
enumeration
yrs
enumeration
yrw
enumeration
yry
enumeration
ysc
enumeration
ysd
enumeration
ysg
enumeration
ysl
enumeration
ysn
enumeration
yso
enumeration
ysp
enumeration
ysr
enumeration
yss
enumeration
ysy
enumeration
yta
enumeration
ytl
enumeration
ytp
enumeration
ytw
enumeration
yty
enumeration
yua
enumeration
yub
enumeration
yuc
enumeration
yud
enumeration
yue
enumeration
yuf
enumeration
yug
enumeration
yui
enumeration
yuj
enumeration
yuk
enumeration
yul
enumeration
yum
enumeration
yun
enumeration
yup
enumeration
yuq
enumeration
yur
enumeration
yut
enumeration
yuw
enumeration
yux
enumeration
yuy
enumeration
yuz
enumeration
yva
enumeration
yvt
enumeration
ywa
enumeration
ywg
enumeration
ywl
enumeration
ywn
enumeration
ywq
enumeration
ywr
enumeration
ywt
enumeration
ywu
enumeration
yww
enumeration
yxa
enumeration
yxg
enumeration
yxl
enumeration
yxm
enumeration
yxu
enumeration
yxy
enumeration
yyr
enumeration
yyu
enumeration
yyz
enumeration
yzg
enumeration
yzk
enumeration
zaa
enumeration
zab
enumeration
zac
enumeration
zad
enumeration
zae
enumeration
zaf
enumeration
zag
enumeration
zah
enumeration
zai
enumeration
zaj
enumeration
zak
enumeration
zal
enumeration
zam
enumeration
zao
enumeration
zap
enumeration
zaq
enumeration
zar
enumeration
zas
enumeration
zat
enumeration
zau
enumeration
zav
enumeration
zaw
enumeration
zax
enumeration
zay
enumeration
zaz
enumeration
zbc
enumeration
zbe
enumeration
zbl
enumeration
zbt
enumeration
zbw
enumeration
zca
enumeration
zch
enumeration
zdj
enumeration
zea
enumeration
zeg
enumeration
zeh
enumeration
zen
enumeration
zga
enumeration
zgb
enumeration
zgh
enumeration
zgm
enumeration
zgn
enumeration
zgr
enumeration
zhb
enumeration
zhd
enumeration
zhi
enumeration
zhn
enumeration
zhw
enumeration
zhx
enumeration
zia
enumeration
zib
enumeration
zik
enumeration
zil
enumeration
zim
enumeration
zin
enumeration
zir
enumeration
ziw
enumeration
ziz
enumeration
zka
enumeration
zkb
enumeration
zkd
enumeration
zkg
enumeration
zkh
enumeration
zkk
enumeration
zkn
enumeration
zko
enumeration
zkp
enumeration
zkr
enumeration
zkt
enumeration
zku
enumeration
zkv
enumeration
zkz
enumeration
zle
enumeration
zlj
enumeration
zlm
enumeration
zln
enumeration
zlq
enumeration
zls
enumeration
zlw
enumeration
zma
enumeration
zmb
enumeration
zmc
enumeration
zmd
enumeration
zme
enumeration
zmf
enumeration
zmg
enumeration
zmh
enumeration
zmi
enumeration
zmj
enumeration
zmk
enumeration
zml
enumeration
zmm
enumeration
zmn
enumeration
zmo
enumeration
zmp
enumeration
zmq
enumeration
zmr
enumeration
zms
enumeration
zmt
enumeration
zmu
enumeration
zmv
enumeration
zmw
enumeration
zmx
enumeration
zmy
enumeration
zmz
enumeration
zna
enumeration
znd
enumeration
zne
enumeration
zng
enumeration
znk
enumeration
zns
enumeration
zoc
enumeration
zoh
enumeration
zom
enumeration
zoo
enumeration
zoq
enumeration
zor
enumeration
zos
enumeration
zpa
enumeration
zpb
enumeration
zpc
enumeration
zpd
enumeration
zpe
enumeration
zpf
enumeration
zpg
enumeration
zph
enumeration
zpi
enumeration
zpj
enumeration
zpk
enumeration
zpl
enumeration
zpm
enumeration
zpn
enumeration
zpo
enumeration
zpp
enumeration
zpq
enumeration
zpr
enumeration
zps
enumeration
zpt
enumeration
zpu
enumeration
zpv
enumeration
zpw
enumeration
zpx
enumeration
zpy
enumeration
zpz
enumeration
zqe
enumeration
zra
enumeration
zrg
enumeration
zrn
enumeration
zro
enumeration
zrp
enumeration
zrs
enumeration
zsa
enumeration
zsk
enumeration
zsl
enumeration
zsm
enumeration
zsr
enumeration
zsu
enumeration
zte
enumeration
ztg
enumeration
ztl
enumeration
ztm
enumeration
ztn
enumeration
ztp
enumeration
ztq
enumeration
zts
enumeration
ztt
enumeration
ztu
enumeration
ztx
enumeration
zty
enumeration
zua
enumeration
zuh
enumeration
zum
enumeration
zun
enumeration
zuy
enumeration
zwa
enumeration
zxx
enumeration
zyb
enumeration
zyg
enumeration
zyj
enumeration
zyn
enumeration
zyp
enumeration
zza
enumeration
zzj
Simple Type ms:scriptIdType
Annotations
Base type for scripts according to ISO 15924
Diagram
Type
restriction of xs:string
Facets
enumeration
Afak
enumeration
Aghb
enumeration
Ahom
enumeration
Arab
enumeration
Armi
enumeration
Armn
enumeration
Avst
enumeration
Bali
enumeration
Bamu
enumeration
Bass
enumeration
Batk
enumeration
Beng
enumeration
Blis
enumeration
Bopo
enumeration
Brah
enumeration
Brai
enumeration
Bugi
enumeration
Buhd
enumeration
Cakm
enumeration
Cans
enumeration
Cari
enumeration
Cham
enumeration
Cher
enumeration
Cirt
enumeration
Copt
enumeration
Cprt
enumeration
Cyrl
enumeration
Cyrs
enumeration
Deva
enumeration
Dsrt
enumeration
Dupl
enumeration
Egyd
enumeration
Egyh
enumeration
Egyp
enumeration
Elba
enumeration
Ethi
enumeration
Geok
enumeration
Geor
enumeration
Glag
enumeration
Goth
enumeration
Gran
enumeration
Grek
enumeration
Gujr
enumeration
Guru
enumeration
Hang
enumeration
Hani
enumeration
Hano
enumeration
Hans
enumeration
Hant
enumeration
Hatr
enumeration
Hebr
enumeration
Hira
enumeration
Hluw
enumeration
Hmng
enumeration
Hrkt
enumeration
Hung
enumeration
Inds
enumeration
Ital
enumeration
Java
enumeration
Jpan
enumeration
Jurc
enumeration
Kali
enumeration
Kana
enumeration
Khar
enumeration
Khmr
enumeration
Khoj
enumeration
Knda
enumeration
Kore
enumeration
Kpel
enumeration
Kthi
enumeration
Lana
enumeration
Laoo
enumeration
Latf
enumeration
Latg
enumeration
Latn
enumeration
Lepc
enumeration
Limb
enumeration
Lina
enumeration
Linb
enumeration
Lisu
enumeration
Loma
enumeration
Lyci
enumeration
Lydi
enumeration
Mahj
enumeration
Mand
enumeration
Mani
enumeration
Maya
enumeration
Mend
enumeration
Merc
enumeration
Mero
enumeration
Mlym
enumeration
Modi
enumeration
Mong
enumeration
Moon
enumeration
Mroo
enumeration
Mtei
enumeration
Mult
enumeration
Mymr
enumeration
Narb
enumeration
Nbat
enumeration
Nkgb
enumeration
Nkoo
enumeration
Nshu
enumeration
Ogam
enumeration
Olck
enumeration
Orkh
enumeration
Orya
enumeration
Osma
enumeration
Palm
enumeration
Pauc
enumeration
Perm
enumeration
Phag
enumeration
Phli
enumeration
Phlp
enumeration
Phlv
enumeration
Phnx
enumeration
Plrd
enumeration
Prti
enumeration
Qaaa..Qabx
enumeration
Rjng
enumeration
Roro
enumeration
Runr
enumeration
Samr
enumeration
Sara
enumeration
Sarb
enumeration
Saur
enumeration
Sgnw
enumeration
Shaw
enumeration
Shrd
enumeration
Sidd
enumeration
Sind
enumeration
Sinh
enumeration
Sora
enumeration
Sund
enumeration
Sylo
enumeration
Syrc
enumeration
Syre
enumeration
Syrj
enumeration
Syrn
enumeration
Tagb
enumeration
Takr
enumeration
Tale
enumeration
Talu
enumeration
Taml
enumeration
Tang
enumeration
Tavt
enumeration
Telu
enumeration
Teng
enumeration
Tfng
enumeration
Tglg
enumeration
Thaa
enumeration
Thai
enumeration
Tibt
enumeration
Tirh
enumeration
Ugar
enumeration
Vaii
enumeration
Visp
enumeration
Wara
enumeration
Wole
enumeration
Xpeo
enumeration
Xsux
enumeration
Yiii
enumeration
Zinh
enumeration
Zmth
enumeration
Zsym
enumeration
Zxxx
enumeration
Zyyy
enumeration
Zzzz
Simple Type ms:variantIdType
Annotations
Base type for language variants according to the BCP-47 guidlelines
Diagram
Type
restriction of xs:string
Facets
enumeration
1606nict
16th century French as in Jean Nicot, "Thresor de la langue francoyse", 1606, but
also including some French similar to that of Rabelais
enumeration
alalc97
Romanizations recommended by the American Library Association and the Library of Congress,
in "ALA-LC Romanization Tables: Transliteration Schemes for Non-Roman Scripts" (1997),
ISBN 978-0-8444-0940-5.
enumeration
fonipa
enumeration
fonupa
enumeration
fonxsamp
Indicates that the content is transcribed according to X-SAMPA
enumeration
1694acad
17th century French, as catalogued in the "Dictionnaire de l'acadιmie franηoise",
4eme ed. 1694; frequently includes elements of Middle French, as this is a transitional
period
enumeration
1901
enumeration
1959acad
enumeration
1994
For standardized Resian an orthography was published in 1994.
enumeration
1996
enumeration
aluku
Aluku dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
arevela
enumeration
arevmda
enumeration
baku1926
Denotes alphabet used in Turkic republics/regions of the former USSR in late 1920s,
and throughout 1930s, which aspired to represent equivalent phonemes in a unified
fashion. Also known as: New Turkic Alphabet; Birlәşdirilmiş Jeni Tyrk Әlifbasь (Birlesdirilmis
Jeni Tyrk Elifbasi); Jaŋalif (Janalif).
enumeration
balanka
Balanka is one of 19 Anii dialects.
enumeration
barla
Barlavento is one of the two main dialect groups of Kabuverdianu.
enumeration
bauddha
enumeration
biscayan
enumeration
biske
The dialect of San Giorgio/Bila is one of the four major local dialects of Resian
enumeration
bohoric
The subtag represents the alphabet codified by Adam Bohorič in 1584 and used from
the first printed Slovene book and up to the mid-19th century.
enumeration
boont
Jargon embedded in American English
enumeration
dajnko
The subtag represents the alphabet codified by Peter Dajnko and used from 1824 to
1839 mostly in Styria (in what is now Eastern Slovenia).
enumeration
ekavsk
enumeration
emodeng
enumeration
hepburn
enumeration
hognorsk
Norwegian following Ivar Aasen's orthographical principles, including modern usage.
enumeration
ijekavsk
enumeration
itihasa
enumeration
jauer
The spoken dialect of the Val Mόstair, which has no written standard.
enumeration
jyutping
Jyutping romanization of Cantonese
enumeration
kkcor
enumeration
kscor
enumeration
laukika
enumeration
lipaw
The dialect of Lipovaz/Lipovec is one of the minor local dialects of Resian
enumeration
luna1918
Russian orthography as established by the 1917/1918 orthographic reforms
enumeration
metelko
The subtag represents the alphabet codified by Franc Serafin Metelko and used from
1825 to 1833.
enumeration
monoton
enumeration
ndyuka
Ndyuka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
nedis
enumeration
njiva
enumeration
nulik
enumeration
osojs
The dialect of Oseacco/Osojane is one of the four major local dialects of Resian
enumeration
pamaka
Pamaka dialect of the "Busi Nenge Tongo" English-based Creole continuum in Eastern
Suriname and Western French Guiana
enumeration
petr1708
Russian orthography from the Petrine orthographic reforms of 1708 to the 1917 orthographic
reform
enumeration
pinyin
enumeration
polyton
enumeration
puter
Puter is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
rigik
enumeration
rozaj
enumeration
rumgr
Supraregional Romansh written standard
enumeration
scotland
enumeration
scouse
English Liverpudlian dialect known as 'Scouse'
enumeration
solba
The dialect of Stolvizza/Solbica is one of the four major local dialects of Resian
enumeration
sotav
Sotavento is one of the two main dialect groups of Kabuverdianu.
enumeration
surmiran
Surmiran is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
sursilv
Sursilvan is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
sutsilv
Sutsilvan is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
tarask
The subtag represents Branislau Taraskievic's Belarusian orthography as published
in "Bielaruski klasycny pravapis" by Juras Buslakou, Vincuk Viacorka, Zmicier Sanko,
and Zmicier Sauka (Vilnia-Miensk 2005).
enumeration
uccor
enumeration
ucrcor
enumeration
ulster
enumeration
unifon
enumeration
vaidika
The most ancient dialect of Sanskrit used in verse and prose composed until about
the 4th century B.C.E.
enumeration
valencia
Variety spoken in the "Comunidad Valenciana" region of Spain, where it is co-official
with Spanish.
enumeration
vallader
Vallader is one of the five traditional written standards or "idioms" of the Romansh
language.
enumeration
wadegile
Complex Type ms:languageVarietyInfoType
Diagram
Complex Type ms:domainInfoType
Diagram
Simple Type ms:classificationSchemeName
Annotations
Base type for listing recommended/popular classification schemes
Universal Decimal Classification system; for the Linked Data version, cf. http://udcdata.info/
enumeration
EuroVoc
EuroVoc, the EU's multilingual thesaurus; various downloadable versions at http://data.europa.eu/euodp/en/data/dataset/eurovoc
enumeration
LCSH
Library of Congress Subject Headings; cf. http://id.loc.gov/authorities/subjects.html
enumeration
DK-5
DK-5; Linked Data version at https://opensource.dbc.dk/linked-data/dk5-linked-data
enumeration
MeSH
Medical Subject Headlings; downloadable versions at https://www.nlm.nih.gov/mesh/download_mesh.html
enumeration
ANC_classification
American National Corpus controlled vocabulary for text classification; cf. http://www.anc.org/
enumeration
BNC_classification
British National Corpus controlled vocabulary for text classification; cf. http://www.natcorp.ox.ac.uk/docs/URG/
subsections on selection and descriptive features
enumeration
NLK_classification
enumeration
PAROLE_topicClassification
Parole topic classification system; used for the consistent classification of text
corpora in the LE-PAROLE project
enumeration
PAROLE_genreClassification
Parole genre classification system; used for the consistent classification of text
corpora in the LE-PAROLE project
enumeration
other
Value for classificationSchemeName, to be used when the desired value is not included
in the listed values
Complex Type ms:textClassificationInfoType
Diagram
Complex Type ms:timeCoverageInfoType
Diagram
Complex Type ms:geographicCoverageInfoType
Diagram
Complex Type ms:creationInfoType
Diagram
Complex Type ms:annotatedCorpusInfoType
Annotations
Groups together all information related to annotated corpora
Diagram
Complex Type ms:annotationInfoType
Diagram
Complex Type ms:annotationsInfoType
Diagram
Complex Type ms:baseMetadataRecord
Diagram
Complex Type ms:metadataHeaderInfoType
Annotations
Base type for metadata header
Diagram
Complex Type ms:metadataIdentifierType
Annotations
Base type for identifier schemes for metadata records